Loading...
HomeMy WebLinkAboutApplication Files_85048_pg0184 provide pre-treatment of runoff from the respective parking lots prior to discharge into Baskin. :#6. or sizing sheet"rovid$&in Appendix f2 inate thAt unifq will provide 65% and 71% removal of sediment prior to discharge into Basin #6. The large permanent pool of Basin #6 exceeds the required water quality volume for the contributing watershed. Together, the basins and sediment chambers will facilitate the removal of suspended solids via settling prior to discharge. Additional treatment ' measures include vegetation within the basins, two-foot sumps in all catch basins for the initial removal of suspended solids from the stormwater and an oil/trap hood installed in the last catch basin in line prior to discharge into the basins. F. Pipe Outfall Protection Outfall protection for the pipe discharges into the basins consists of riprap aprons extending from the pipe ends down into the permanent pool of the basin. The widths of the aprons in all cases are in excess of 3 times the pipe diameter. ' The outfall from CB#35 into Basin #6 was designed a little differently because the permanent pool does not extend up near the pipe outlet. However, in reviewing the IHydroCAD data sheets, the water surface in Basin #6 does back up to above the outlet flowline of this pipe in each of the design storms. Thus, the energy resulting from discharges during the design storms will be dissipated by the elevated water in the basin. ' As a result, the outfall need only be sized for much smaller storms where the water surface does not back up to the pipe outlet. To be conservative,the apron was sized with a minimum 12' apron length and 8' width which, according to the DOT Drainage Manual Table 8.7.1 provided in Appendix 7, is more than sufficient for the 2-year design storm (4.21 cfs discharge from the 24-inch diameter pipe). ' G. Summary of Results The proposed design and analysis indicates that there will be no increase in peak runoff from the site for the indicated design storms. In addition, the treatment measures discussed will provide pollutant removal prior to discharge of the stormwater. 1 ' Page 6 of 6