Loading...
HomeMy WebLinkAboutApplication Files_85048_pg0169 ZOW N Sf4 Sou� V&U&ot cp 9 r. • �C, 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 sox•co TELEPHONE (860) 644-2511 CERTIFIED MAIL 7008 1300 0001 4578 3672 February 10, 2011 James Ussery JR Russo &Associates, LLC 1 Shoham Road East Windsor Ct 06088 Dear Mr. Ussery: Re: Appl. 11-05P FedEx Ground Distribution Center We are pleased to advise you that the Planning & Zoning Commission voted on February 8, 2010 to approve with modifications the above referenced application for a Site Plan of Development. This approval is for the construction of a 301,000+ sq ft distribution center in two phases on 60+ acres of property at 40 Kennedy Road, northern side of Sullivan Avenue, I zone as shown on plans prepared by JR Russo Associates dated 12-13-2010, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission,including bonds in the amount of$25,000 for wetland mitigation, and$20,000 to ensure proper placement and maintenance of erosion and sediment controls, and$25,000 for installation of storm water systems. 4. A landscape bond in the amount of$20,000 is required and must be submitted prior to filing of mylars. _.. 5. All bonds must be in one of the forms described in the enclosed Bond Policy. 6. An as-built plan is required prior to issuance of a Certificate of Occupancy per Article 9.1.213 of the Zoning Regulations. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water Pollution Control Authority. 9. The building street number must be included on the final plan.