Loading...
HomeMy WebLinkAboutApplication Files_85048_pg0135 2009 Edition Page 441 Figure 4C-3. Warrant 3, Peak Hour 600 ' 500 2 OR MORE LANES&2 OR MORE LANES MINOR ' STREET 400 2 OR MORE LANES&1 LANE HIGHER- VOLUME 300 APPROACH - 1 LANE&1 LANE ' VPH 200 150* 100 100* ' 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 ' MAJOR STREET—TOTAL OF BOTH APPROACHES— VEHICLES PER HOUR (VPH) *Note:150 vph applies as the lower threshold volume for a minor-street ' approach with two or more lanes and 100 vph applies as the lower threshold volume for a minor-street approach with one lane. ' Figure 4C-4. Warrant 3, Peak Hour(70% Factor) (COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400 f 2 OR MORE LANE I S&2 OR MORE LANES ' MINOR 2 OR MORE LANES&1 LANE STREET 300 HIGHER- 1 LANE&1 LANE ' VOLUME APPROACH - 200 VPH ' 100 100* 75* 75 ' 300 400 500 600 700 800 900 1000 1100 1200 1300 MAJOR STREET—TOTAL OF BOTH APPROACHES— VEHICLES PER HOUR (VPH) *Note:100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower ' threshold volume for a minor-street approach with one lane. ' December 2009 Sect.4C.04