HomeMy WebLinkAboutApplication Files_85048_pg0134 Page 440 2009 Edition
Figure 4C-1. Warrant 2, Four-Hour Vehicular Volume
' 500
2 OR MORE LANES&'2 OR MORE LANES
400 2 OR MORE LANES&1 LANE
' MINOR I I I I
STREET 300 1 LANE&1 LANE
HIGHER-
VOLUME
' APPROACH - 200
VPH
115"
100 80*
300 400 500 600 700 800 900 1000 1100 1200 1300 1400
' MAJOR STREET-TOTAL OF BOTH APPROACHES—
VEHICLES PER HOUR (VPH)
*Note: 115 vph applies as the lower threshold volume for a minor-street
approach with two or more lanes and 80 vph applies as the lower
}_ threshold volume for a minor-street approach with one lane.
4
Figure 4C-2o Warrant 2, Four-Hour Vehicular Volume (70% Factor)
' (COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET)
400
OR MORE LANES&2 OR MORE LANES
300
MINOR 2 OR MORE LANES&1 LANE
STREET
' HIGHER- 200 1 LANE&1 LANE
VOLUME
APPROACH -
VPH
' 100
80'
60*
' 200 300 400 500 600 700 800 900 1000
' MAJOR STREET—TOTAL OF BOTH APPROACHES—
VEHICLES PER HOUR (VPH)
"Note:80 vph applies as the lower threshold volume for a minor-street
' approach with two or more lanes and 60 vph applies as the lower
threshold volume for a minor-street approach with one lane.
' Sect.4C.04 December 2009