Loading...
HomeMy WebLinkAboutApplication Files_85048_pg0036 Table 2 Estimated Site-Generated Traffic Volumes and Distributions Proposed Fed-Ex Distribution Center 2013 Scenario-Partial Build Sullivan Avenue at Kennedy Road South Windsor,Connecticut Traffic Volumes Automobiles P&D Vans Lmehauls Totals Hour Arrive Depart Arrive Depart Arrive Depart Arrive Depart Hour 12 mid-lam 2 1 2 2 4 3 12 mid-lam 1-2am 2 2 1 1 3 3 1-2am 2-3am 29 1 1 30 1 2-3am 3-4am 2 1 1 1 3 3-4am 4-5am 2 1 2 1 4-5am 5-6am 2 1 1 2 2 5-6am 6-7am 30 4 36 1 1 31 41 6-7am AM PEAK> 7-gam 34 27 20 36 1 > 55 63 < 7-8 am <AM PEAK 8-9am 11 4 20 20 31 24 8-9am 9-loam 20 0 20 9-loam 10-11am 0 0 10-11am 11-12 noon 4 0 4 11-12 noon 12-lpm 6 0 6 12-1 pm 1-2 pm 6 0 6 1-2 pm 2.3 pm 3 0 3 2-3 pm 3-4 pm 4 4 0 3-4 pm 4-5 pm 6 30 35 42 30 4-5 pm PM PEAK> 5-6 pm 30 40 36 > 66 40 < 5-6 pm <PM PEAK 6-7 pm 6 1 6 1 6-7 pm 7-8 pm 2 1 0 3 7-8pm 8-9 Pm 0 0 8-9pm 9-10 pm 4 3 3 7 3 9-10 pm 10-llpm 27 1 1 1 28 10-llpm 11-12 mid 2 2 2 2 4 4 11-12 mid Total 162 162 112 112 15 15 289 289 Total Percent 56% 39% 5% 100% Percent Traffic Distributions Percent To/From south via Route 5: 110 110 75 75 11 11 196 196 68% To/From north via Route 5: 33 33 23 23 0 0 56 56 19% To/From east via Sullivan Ave: 19 19 14 14 4 4 37 37 13% Total 162 162 112 112 15 15 289 289 100% SOURCE:FROM FED-EX PROJECTION Bubaris Traffic Associates January2011