HomeMy WebLinkAboutApplication Files_83610_pg0009 17. See comment 1 above.
18. See comment 1 above.
19. A sediment and erosion control narrative along with soil erosion and sedimentation notes, and
seeding, mulching and stabilization measures have been included on the detail sheet.
20. See comment 1 above.
21. Existing utility data is still in the process of being verified and will be shown on the plans.
22. Directional signs and arrows have been added to the plans.
We tape this opportunity to thank the engineering staff for their excellent comments as they do ensure
the integrity of the project will be a positive one.
Sincerely,
Anthony Ferraro, PE