Sanitary Sewer
r Design
1
' Introduction
Sanitary sewer design flow estimates,as calculated herein,are based on information
' provided by Gaskell Associates Consulting Engineers,Connecticut Public Health
Code,and the Connecticut Department of Public Health Technical Standards for
sewer design. For the purposes of the analysis,the development includes the
Connecticut Studios Project,as previously described,and provides additional
' capacity for development potential of the remaining developable area,as allowed in
the CD zone.
' VHB designed a 12-inch gravity sewer main from an existing 30-inch main in Chapel
Road,southerly into the subject property,connecting to sewer laterals from all studio
buildings,thence southerly to a terminus manhole(SMH 5). VHB designed a dry,4-
inch force main from SMH 5. The force main would exit SMH 5 in a southerly
direction with a terminus in the landscape area to the south of the Connecticut
Studios Site. VHB anticipates that any development of the undeveloped area would
r require a pump station to bring sewer to SMH 5. The following sections provide
supporting calculations for this design.
rConnecticut Studios Sewer Design
■
rStudio Building Design Flow
• Office=(22,000 SF)(I person/100 SF)(25 GPD per person)=5,500 GPD
r • Production=(estimated 100 persons)(25 GPD per person)=2,500 GPD
• Total =(5,500 GPD+2,500 GPD)=8,000 GPD
• Average Flow Rate(AFR)at 9 hours of operation=
' (8,000 GPD/9)(1 HR/60 MIN)=14.8 GPM
• Peak Flow Rate(PFR)=4 x AFR=59.2 GPM