Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Application Files_82693_pg0827
Appendix A Sewer Calculations Prepared by SK Checked by CNB (STUDIO ONLY) Date: March 4,2010 Length Slope Q V Q V (ft) (cfs) (ft/s) (cfs) NO (full capacity) (full capacity) 197.1 0.005074 0.18 0.13 1.12 3.21 153.8 0.005202 0.22 0.26 1.14 3.25 197.6 0.005061 0.26 0.32 1.12 3.21 157.6 0.005076 0.36 0.61 1.12 3.21 314.4 0.005089 0.62 1.86 1.12 3.22 I 196.7 0.005084 0.62 1.86 1.12 3.22 242.1 0.005 0.72 2.32 1.11 / 3.18 (STUDIO ONLY) Length Slope Q V Q V (ft) (cfs) (ft/s) (cfs) NO (full capacity) (full capacity) 197.1 0.005074 0.18 0.07 2.03 3.72 ' 153.8 0.005202 0.22 0.08 2.05 3.77 197.6 0.005061 0.26 0.11 2.03 3.73 157.6 0.005076 0.36 0.15 2.03 3.72 j 314.4 0.005089 0.62 0.67 2.03 3.74 196.7 0.005084 0.62 0.67 2.03 3.73 6 242.1 0.005 0.72 0.85 2.01 3.68 (STUDIO ONLY) Length Slope Q V Q V { (ft) (cfs) (ft/s) (cfs) (ft/s) (full capacity) (full capacity) 197.1 0.005074 0.18 0.04 3.3 4.21 j 153.8 0.005202 0.22 0.04 3.35 4.26 197.6 0.005061 0.26 0.04 3.3 4.2 157.6 0.005076 0.36 0.08 3.31 4.21 314.4 0.005089 0.62 0.21 3.31 4.22 196.7 0.005084 0.62 0.21 3.31 4.21 242.1 0.005 0.72 0.33 3.27 4.17 T (MAX FLOW RATE) l 1 I 1