HomeMy WebLinkAboutApplication Files_82693_pg0801 13. Job meetings will be held as needed, and can be called by the developer or Town.
14. Seventy-two (72) hours' notice needed for certificate of occupancy inspection and a $35 C.O.
inspection fee is due at that time.
15. Any proposed changes are to be presented to the Engineering or Planning Department prior to
implementation on change order form in quadruplicate with 4 copies of the drawing. Town will
attempt to turn around within 24 hours.
16. Normal hours of operation 7:00 a.m.—5:00 p.m.,no work on Sunday.
17. DOT permit needed for all work within state road. Copy must be given to the Engineering
Department.
18. A Street Cut Permit is needed for the driveway off Chapel Road.
19.No paving after October 15 or before April 15 without written approval from Director of Public
Works.
20. Sanitary lateral locations should be tied down to existing structures and shown on the progress as
built.
21. For concrete sidewalks, 8" depth with reinforcements is required at driveway crossing. If the
sidewalk is constructed before lot development, the locations must be indicated on the as-built
plans. If a proposed driveway location is moved, the sidewalk must be removed to the nearest
expansion joint and rebuilt to the proper depth with reinforcement.
Planning Department
1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are
changes required, contact the Planning Dept.
2. All erosion bonds and wetlands are required; mylar must go on file prior to issuance of building
permit.
3. All easements must be submitted for review prior to filing of mylars.
4. Sign permits are required for all temporary and permanent signs.
5. Phasing plan of the building should be submitted to staff with a change order request.
SNET/NU
1. Contact utilities for coordination of utilities connection.