Loading...
HomeMy WebLinkAboutApplication Files_82693_pg0447 > Drainage Area PR1C-This 3.2±-acre area will contain runoff from Studio Building 1's roof and parking areas,and a remote parking lot.Runoff will be treated in Biofiltration Basin 2 with overflow the Stormtech Infiltration Chamber system. Emergency overflow is to Design Point 1. > Drainage Area PR1D-This 5.9±-acre area will remain wooded and continue to discharge to Design Point 1. > Drainage Area PR1E-This 2.2±-acre area will contain runoff from Studio Building 2's roof and parking areas.. Runoff will be treated in Biofiltration Basin 1 with overflow the Stormtech Infiltration Chamber system. Emergency overflow is to Design Point 1. > Drainage Area PR1F-This 4.7±-acre area is from abutting properties along Chapel Road that enters the studio property,and portions of the perimeter roadway around the Studio site. Runoff is comprised of building rooftop and parking areas.Runoff from this area will be directed to a grassed swale,then into a sediment forebay for treatment,and finally into Infiltration Basin 1. An emergency overflow allows for drainage to the Stormtech Infiltration Chamber system,which has a second emergency overflow to Design Point 1. > Drainage Area PRIG-This 3.3±-acre area is from abutting properties along Chapel Road that enters the studio property,landscaped area,and Infiltration Basin 1. Runoff from this area will be directed to Infiltration Basin 1. An emergency overflow allows for drainage to the Stormtech Infiltration Chamber system,which has a second emergency overflow to Design Point 1. ' > Drainage Area PRIH-This 1.4±acre area will contain runoff from Studio Building 3's roof and parking areas.Runoff will be treated in Biofiltration Basin 3 with overflow the Stormtech Infiltration Chamber system. Emergency overflow is to Design Point 1. > Drainage Area PRII-This 3.4±-acre area is unchanged from existing conditions and infiltrates before overflowing to Design Point 1. > Drainage Area PR11-This 2.0±acre area consists of parking and a portion of the perimeter roadway. All runoff from this drainage area drains onto porous pavement where it is infiltrated into the ground water. Should the porous pavement back up (much greater than the 100-year storm),the system will overflow into Infiltration Basin 2 prior to reaching Design Point 1. > Drainage Area PR1K-This 0.8±acre area consists of landscaped area and Infiltration Basin 2. All runoff from this drainage area drains to Infiltration Basin 2,which connects directly with the Stormtech Infiltration Chamber system. Emergency overflow is to Design Point 1. 72MDrimp Repo4 gJ*2011.d m �+_ 13 Proposed Conditions