Loading...
HomeMy WebLinkAboutApplication Files_82693_pg0442 ® Vanacce Hangen R�ctlin, Inc 3 Proposed Conditions Summary The project will include four 53,290 square-foot studio production buildings,a 29,375 square-foot mill building,paved parking for 576±vehicles(including two porous pavement parking areas),site access drives,secured entrance gates,landscape areas, and a paved backlot staging area. The stormwater management system design was guided by the 2004 Connecticut Stormwater Quality Manual.Existing grading and drainage patterns were maintained to the maximum extent possible.Low impact development(LID)stormwater management techniques were incorporated into the design.These practices are focused at decentralizing stormwater management at the Site and incorporating many smaller stormwater management techniques into the design that will reduce peak runoff rates,maximizing groundwater recharge and treating for water quality. Under proposed conditions,the majority of stormwater runoff from the studio and mill buildings,backlot staging area,and perimeter parking fields will flow overland to deep sump catch basins and into a closed pipe network.This network will discharge into Stormtech®infiltration chambers,where all storms up to and ' including the 100-year event will infiltrate. Runoff from abutting properties will be conveyed to biofiltration basins or an infiltration basin with a sediment forebay. An emergency overflow connection to the existing 48-inch culvert under John Fitch 1 Boulevard will be provided from the Stormtech®system if allowed by CTDOT. The 48-inch culvert will safely convey stormwater from storms exceeding the 100-year event to the Podunk River. In addition to the Stormtech®infiltration system,several LID components were incorporated into the design. These include two porous pavement parking lots,numerous biofiltration basins,infiltration basins,and water quality and vegetated swales to treat runoff from a portion of the major access drive. Other water quality and quantity control measures include pavement sweeping/vacuuming,and sediment traps/forebays.The stormwater management system was designed to protect the surrounding natural resources from potential ' stormwater runoff impacts. (See Figure 3 in Appendix A). Details of the stormwater water management system features are provided on the following pages. ' 1189DrarojeeRep rtAugust201I.docage172 8 Proposed Conditions 189 Drainage RepoAAugus12911.doc