Loading...
HomeMy WebLinkAboutApplication Files_82693_pg0438 Ucce Hang )?rust iy* rna 1 to Chapel Road. Two driveways off of the access road will have a manned security house and gate to the studio project site. Under proposed conditions,the majority of 1 Site stormwater runoff and runoff from abutting properties will be collected and treated by sediment forebays,catch basins with deep-sumps and hoods,and biofiltration basins,then conveyed via closed pipe to Stormtech®infiltration 1 chambers,which will infiltrate all storms up to and including the 100-year event.If permitted by CTDOT an emergency overflow connection will be provided to the on- site drainage manhole with 48-inch pipe outlet,described above. The remainder of 1 the Site stormwater will discharge to various Low Impact Development(LID) components,including biofiltration basins,water quality swales,infiltration basins, existing infiltration areas,and/or porous pavement. Further descriptions of these 1 LID techniques are provided in Section 3 of this report.Where possible,the proposed design maintains existing grading and drainage patterns.The stormwater management system has been designed to protect the surrounding natural resources from potential stormwater runoff impacts. 1 A HydroCAD model,using TR-20 methodology,was developed to evaluate the ' existing and proposed drainage conditions on the Site.A total of 54+acres of land, including off-site contributing areas,were analyzed.The results of the analyses 1 indicate that there is no increase in peak discharge rates between the pre-and post- development conditions for the 2-,10-,25-,and 100-year storm events. The pre-and post-development peak discharge values are presented in Table 3 at the end of this report. 1 The Stormwater Management Plan(the flan),including Best Management Practices ' (BMPs)for maintaining stormwater runoff quality both during and after construction,was prepared in accordance with the applicable local,state,and federal regulations. Details of the Plan are provided herein. 1 1 i . _ 1 1 1 72189 mkwgoisl72t6j*201atsffireinegel 2 Project Summary 72189Oranega Rcpott,lE[y 2077,doc