Loading...
HomeMy WebLinkAboutApplication Files_82693_pg0129 vile Vanasse Hangen Brustlin,Inc. Table 4 Trip Distribution Summary Percent of Site Traffic To/From the Travel Route Assigned to Each Route ' North Route 5 30 Route 30 15 ' South Route 5 15 East 1-291 10 ' Chapel Road 5 West 1-291 25 ' Total All Routes 100 Source: Vanasse Hangen Brustlin,Inc. The new traffic generated by the proposed development was assigned to the area roadways based on the above trip distribution pattern. The site-generated trips are shown ' in Figures 7, and the 2015 Build peak hour traffic volume networks are illustrated in Figures 8. ' 1:172189.1111re111s11G Report-South Windsor Final.doc 22 future Conditions