HomeMy WebLinkAboutApplication Files_82693_pg0129 vile Vanasse Hangen Brustlin,Inc.
Table 4
Trip Distribution Summary
Percent of Site Traffic
To/From the Travel Route Assigned to Each Route
' North Route 5 30
Route 30 15
' South Route 5 15
East 1-291 10
' Chapel Road 5
West 1-291 25
' Total All Routes 100
Source: Vanasse Hangen Brustlin,Inc.
The new traffic generated by the proposed development was assigned to the area
roadways based on the above trip distribution pattern. The site-generated trips are shown
' in Figures 7, and the 2015 Build peak hour traffic volume networks are illustrated in
Figures 8.
' 1:172189.1111re111s11G Report-South Windsor Final.doc 22 future Conditions