Loading...
HomeMy WebLinkAboutApplication Files_82693_pg0096 F � , Traffic Investigation Report No. 132-1005-01 Town of South Windsor Connecticut Studios 300 Ellington Road Page 2 S. That approach grades of the driveways along Route 30 affected by the roadway widenings noted in this report meet Department of Transportation's standards for intersecting streets or not be increased. 6. That the intersectional sight distances of the driveways along Route 30 affected by the roadway widening noted in this report, meet Department standards for intersecting streets or not be diminished. 7. That Route 30 be overlaid within the limits of the widening. The extent of the overlay is to be determined by the Department of Transportation's District 1 Office. 8. That any cutting, removal or pruning of trees, shrubbery or vegetation situated partially or wholly within the limits of the State highway right-of-way be in accordance with Department of Transportation Regulations. 9. That all work on roadways that are owned and maintained by the Town of South Windsor be performed in conformance with the standards and specifications of the town. 10. That the traffic signal be revised on Route 5 at Route 30 and the I-291 eastbound ramps. 11. That signs and pavement markings on Route 30 be installed in substantial conformance with the referenced plans, and in accordance with the"Manual on Uniform Traffic Control Devices,"latest edition. 12. That all conflicting pavement markings in the area of roadway work be eradicated to the satisfaction of the Department of Transportation. 13. That all pavement markings installed on State roads be of epoxy material, or of a material as directed by the Department of Transportation. 14. That prior to the issuance of certificate, a sightline easement be obtained from the property owner to the east on Route 30 (No. 260 Ellington Road, South Windsor, Connecticut) as indicated on the referenced plans. 15. That prior to the issuance of certificate, a sightline easement be obtained from the property owner to the west on Chapel Road (No. 273 Chapel Road, South Windsor, Connecticut) as indicated on the referenced plans. 16. That all roadway and drainage improvements within the State highway right-of way be subject to review by the Department of Transportation and all their requirements including those pertaining to maintenance and protection of traffic be satisfied prior to the issuance of a permit for work within the highway right-of-way. 17. That all utility relocations in the State highway right-of-way be at no cost to the.State and in accordance with`'Utility Accommodation Manual."