HomeMy WebLinkAboutApplication Files_82693_pg0069 '0W N.Sf4
�'
a � -
�� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
l�OSOR-CO TELEPHONE(860) 644-2511
Certified#70081300000145782972
March 22,2010
Attorney Ralph J.Alexander
Willard&Alexander,LLC
225 Oakland Road,Suite 306
South Windsor,CT 06074
RE: Appl.#10-1513=CT Studios
Dear Attorney Alexander:
At the March 17,2010 regular meeting,the Inland Wetlands Agency/Conservation Commission approved application#10=15P
— CT Studios — John Fitch Blvd — IWA/Conservation Commission application for the construction of a film studio complex
including associated improvements to the drainage and storm water structures. On property located easterly of Rt. .5,
southerly of Chapel Road,and westerly of Ellington Road, 1-291 Corridor Development Zone,with the following conditions:
1. The final approved copy of the entire set of plans and this letter reproduced thereon must be submitted to the
Planning Department. This must be completed within 65 days of approval prior to any construction activity on the
site. Plans submitted to Planning&Zoning Commission shall be considered having met this requirement.
2. The application shall indemnify and hold harmless the Town of South Windsor against any liability,which might result
from the proposed operation or use.
3. The permit is valid for five years and shall expire on March 18,2015. It is the landowner(s)/applicant(s)responsibility
to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration.
4. A bond shall be collected in the amount of$25,000 to ensure proper placement and maintenance of erosion and
sediment controls,and$50,000 for installation of storm water systems.
5. All approvals required must be obtained and submitted prior to any activity on the site.
6. A contact person shall be identified on the plans.
7. Relocation of existing Red Cedar trees on the property shall be included in the areas to be landscaped.
8. Mitigation planting supplements on the west end of the wetland area to be approved by town staff.
9. The location of soil stockpile areas with appropriate erosion controls must be shown on final plans.
10. The invasive plant control plan submitted must be implemented.
11. Installation of isolation valve at DMH 9.
12. The outlet of the culvert under RT 5 is to be inspected by town staff with recommendations to State of CT if
necessary.
Very truly yours,
INLAND WETLANDS AGENCY/
CONSERVATION COMMISSION
Elizabeth A.Warren, Chairperson
EAW:dt
cc: Director of Planning
Chief Building Official
Assessor