Loading...
HomeMy WebLinkAboutApplication Files_82693_pg0066 VM Vanasse Hangen Brustlin,Inc. . intersections. With the proposed optimization of traffic signal timings, vehicle queues are expected to be reduced or comparable to the projected 2015 No-Build conditions. The proposed unsignalized site driveways on Chapel Road and Route 30 (Ellington Road) are projected to operate at an acceptable level of service during the peak periods analyzed.It is recommended that a left turn lane be installed on the Route 30 (Ellington Road)eastbound approach to the proposed site driveway. In summary, the surrounding roadway network is anticipated to adequately accommodate the forecasted traffic increases generated by the proposed Connecticut Studios development, and the site driveways can safely and adequately serve the proposed development traffic with the recommended optimized signal timings and proposed roadway improvements. JA7218s.10keportsMS Report-South winasurFinal.aoc3 Executive Summary