Loading...
HomeMy WebLinkAboutApplication Files_82693_pg0064 -- Vanasse Hangen Brustlin,Inc. T Executive Summary Vanasse Hangen Brustlin, Inc. has been retained by Connecticut Studios, LLC to ^ prepare a traffic impact and access study in support of a proposed 317,000±square foot full service,state of the art motion picture and television studio,production and post production facility. The approximate 40-acre Site is located in the northeast quadrant of the intersection of I-291 and Route 5 in the Town of South Windsor, Connecticut. ' ^ The traffic impact study quantifies both the existing traffic conditions along area roadways surrounding the site and the projected future traffic conditions expected with and without the development of the proposed site.The following is a list of the study intersections included in the analysis: Route 5(John Fitch Blvd.)at I-291 EB Ramps/Route 30(Ellington Road) Route 5(John Fitch Blvd.)at I-291 WB Ramps ➢ Route 5 Qohn Fitch Blvd.)at Chapel Road Route 30(Ellington Road)at Chapel Road A total of 520+parking spaces,24+star wagons,and accommodations for 35+trucks to load/unload are proposed to accommodate the development. Access to the development will be provided via one new unsignalized driveway on the north side of Route 30 (Ellington Road) and one new unsignalized driveway on the south side of Chapel Road. Based on a design speed of 50 mph (posted speed of 40 mph) on Route 30 (Ellington Road),the sight distance requirement at the site driveway is 555 feet in both directions for vehicles exiting the site.Based on a design speed of 45 mph _ (posted speed of 35 mph) on Chapel Road,the sight distance requirement at the site driveway is 500 feet in both directions for vehicles exiting the site. As measured in the field, the sight distance at the proposed site driveways meet or exceed the minimum requirement. Based on the automatic traffic recorder (ATR) counts conducted between December _ 17,2009 to December 19,2009,Route 5 (John Fitch Boulevard)carries a total of 25,460 vehicles per day (both directions); Route 30 (Ellington Road) carries a total of 7,840 vehicles per day (both directions); and Chapel Road carries a total of 4,230 vehicles per day(both directions). Based on a review of accident data for the most recent available 3 full year span,the . T. years 2006 through 2008, rear-end collisions are the leading type of accidents that J:vzass.Mmponsrcrs Report-southwndwrFinei.a.1 Executive Summary