Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
295 Rye Street - Building Plans & Drawin (4)
1 Hydraulic Calculations for Project Name:ALDI DISTRIBUTION FACILITY Location: RACK STORAGE-PHASE III,295 RYE STREET,SOUTH WINDSOR,CT 06074 Drawing Name:2017-1839-N Calculation Date:2/20/2018 Design Remote Area Number: ZONE 11-RACKS Remote Area Location: ZONE 11 Occupancy Classification: In Rack Sprinklers Commodity Classification: CLASS III Density: 0.200gpm/ft2 Area of Application: 100.00ft2(Actual 187.31ft2) Coverage per Sprinkler: 52.08ft2 Type of sprinklers calculated: Upright No.of sprinklers calculated: 10 Type of System: DI PREACTION Volume of Dry or PreAction System: N/A In-rack Demand: N/A gpm at Node: N/A Hose Streams: 0.0 gpm at Node: 804 Type: Allowance at Source Total Water Required (including Hose Streams where applicable): From Water Supply at Node 804: 962.12 @ 87.929 Water Supply Information: Name of Contractor: WOLVERINE FIRE PROTECTION Address: 101 BIDWELL ROAD,SOUTH WINDSOR,CT 06074 Phone Number: 860-282-2488 Name of designer: JEFF CORCORAN Authority Having Jurisdiction: Notes: GORCO Flo.20361 �zz�g L�©M.E.P.CAD, Inc. � �AutoSPRINK@ 12 v12.1.1.0 ZONE 11-RACK: 2/20/2018 3:22:33PM Page 1 Hydraulic Calculations for Project Name:ALDI DISTRIBUTION FACILITY Location: RACK STORAGE-PHASE III,295 RYE STREET, SOUTH WINDSOR,CT 06074 Drawing Name:2017-1839-N Calculation Date:2/20/2018 Design Remote Area Number: ZONE 11-ROOF Remote Area Location: Zone 11 Occupancy Classification: Spec.Warehouse Commodity Classification: Class III Density: 0.228gpm/ft2 Area of Application: 2600.00ft2(Actual 2620.10ft2) Coverage per Sprinkler: 104.17ft2 Type of sprinklers calculated: Upright No.of sprinklers calculated: 26 Type of System: DI Preaction Volume of Dry or PreAction System: N/A In-rack Demand: N/A gpm at Node: N/A Hose Streams: 0.0 gpm at Node: 804 Type: Allowance at Source Total Water Required (including Hose Streams where applicable): Water Supply Information: Name of Contractor: WOLVERINE FIRE PROTECTION Address: 101 BIDWELL ROAD,SOUTH WINDSOR, CT 06074 Phone Number: 860-282-2488 Name of designer: JEFF CORCORAN Authority Having Jurisdiction: Notes: bR o M.E.P.CAD, Inc. � �AutoSPRINK®12 v12.1.1.0 ZONE 11-ROOF 2/20/2018 3:22:33PM Page 2 Hydraulic Graph Job Name:ALDI DISTRIBUTION FACILITY N 1.85 Remote Area Number:ZONE 11-RACKS,ZONE 11-ROOF Date:2/20/2018 150 Water Supply Summary Sheet 135 Node: 804 120 Static Pressure 113.000 17 1500.00 @ 110.000 105 - 7 90 62.12 @ 87.92 .N a 75 d a` 60 System demand curve 45 30 15 0 0300 600 900 1200 1500 1800 2100 2700 2400 3000 Flow-gpm ©M.E.P.CAD,Inc. ,IN AutoSPRINK®12 v12.1.1.0 2/20/2018 3:22:35PM Paqe 3 Summary Of Outflowing Devices Job Number:2017-1839 Report Description:In Rack Sprinklers(ZONE 11-RACKS),Spec. Actual Flow Minimum Flow K-Factor Pressure Density cov ll ou Device m mIns!) m ft2 Foot Sprinkler 1101 23.76 23.76 8 8.819 0.228gpm/ft' 104.20ft2 Sprinkler 1102 23.85 23.76 8 8.888 0.229gpmfft2 104.20ft2 Sprinkler 1103 24.18 23.76 8 9.136 0.232gpm/ft2 104.20ft2 SprinklerM0824 24.87 23.76 8 9.666 0.239gpm/ft2 104.20ft2 Sprinkler26.03 23.76 8 N24 0.250gpmfft2 104.20ft2 Sprinkler27.73 23.76 8 0.266gpmfft2 104.20ft' Sprinkler24.23 23.76 8 0.233gpm/ft2 104.20ft2 Sprinkler24.32 23.76 8 0.233gpmt t2 104.20ft2 Sprinkler24.66 23.76 8 0.237gpm/t2 104.20ft2 Sprinkler5.36 23.76 8 10.049 0.243gpm/ft2 104.20ft2 Sprinkler6.54 23.76 8 11.002 0.255gpm/Ft2 104.20ft2 Sprinkler8.27 23.76 8 12.484 0.271gpm/ft2 104.20ft2 Sprinkler4.45 23.76 8 9.341 0.235gpm/ft2 104.20ft2 Sprinkler 1114 24.55 23.76 8 9.414 0.236gpm/ft2 104.20ft2 Sprinkler 1115 24.88 23.76 8 9.675 0.239gpm/ft2 104.20ft2 Sprinkler 1116 25.59 23.76 8 10.234 0.246gpm/ft2 104.20ft2 Sprinkler 1117 26.78 23.76 8 11.203 0.257gpm/ft2 104.20ft2 Sprinkler 1118 28.52 23.76 8 12.710 0.274gpm/ft2 104.20ft2 Sprinkler 1119 24.76 23.76 8 9.577 0.238gpm/ft2 104.20ft2 Sprinkler 1120 24.85 23.76 8 9.651 0.239gpm/ft2 104.20ft2 Sprinkler 1121 25.20 23.76 8 9.919 0.242gpm/t2 104.20ft2 Sprinkler 1122 25.91 23.76 8 10.491 0.249gpm/ft2 104.20ft2 Sprinkler 1123 27.11 23.76 8 11.483 0.260gpmfft2 104.2011:2 Sprinkler 1124 28.87 23.76 8 13.024 0.277gpm/ft' 104.20ft2 Sprinkler 1125 33.78 26.22 8 17.831 0.294gpm/ft2 115.00ft2 Sprinkler 1126 33.91 26.22 8 17.963 0.295gpm/ft2 115.00ft2 Sprinkler 1151 25.75 21.69 5.6 21.145 0.322gpm/ft2 80.00ft2 Sprinkler 1152 25.94 21.69 5.6 21.462 0.324gpm/ft2 80.00ft2 Sprinkler 1153 26.60 21.69 5.6 22.570 0.333gpmfft2 80.00ft' Sprinkler 1154 27.97 21.69 5.6 24.941 0.350gpm/ft2 80.00ft Sprinkler 1155 26.86 21.69 5.6 23.001 0.336gpmfft2 80.00ft2 Sprinkler 1156 27.06 21.69 5.6 23.342 0.338gpm/ft2 80.00ft2 Sprinkler 1157 27.74 21.69 5.6 24.538 0.347gpm/t2 80.00ft2 Sprinkler 1158 29.15 21.69 5.6 27.099 0.364gpm/ft2 80.00ft2 Sprinkler 1159 30.42 21.69 5.6 29.503 0.380gpmfft2 80.00ft2 Sprinkler 1160 31.69 1 21.69 5.6 32.029 0.396gpm/t2 80.00ft2 b Most Demanding Sprinkler Data �,©M.E.P.CAD,Inc. §1 1 AutoSPRINKO 12 v12.1.1.0 2/20/2018 3:22:36PM Page 4 Job Name: ALDI DISTRIBUTION FACILITY Remote Area Number: ZONE 11-RACKS, ZONE 11-ROOF Date: 2/20/2018 Supply Analysis Static Residual Flow Available Total Demand Required Pressure Node Name (Psi) (psi) @ (gpm) (psi) (gpm) (psi) 804 Water Supply 113.000 110.000 1 1500.00 111.681 962.12 87.929 Node Analysis Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node (psi) (gpm) 804 -2'-6 Supply 87.929 962.12 I 1101 26'-43/. Sprinkler 8.819 23.76 Density:0.228gpm/ft2 Coverage:104.20ft2 1102 26'-43/< Sprinkler 8.888 23.85 Density:0.229gpm/ft2 Coverage:104.20ft2 1103 26'-43/, Sprinkler 9.136 24.18 Density:0.232gpm/ft2 Coverage:104.20112 1104 26'-4% Sprinkler 9.666 24.87 Density:0.239gpm/ft2 Coverage: 104.20112 1105 26'-4% Sprinkler 10.585 26.03 Density:0.250gpm/ft2 Coverage: 104.20ft2 1106 26'-4% Sprinkler 12.014 27.73 Density:0.266gpm/ft2 Coverage: 104.20112 1107 25'-5 Sprinkler 9.172 24.23 Density:0.233gpm/t2 Coverage: 104.20112 1108 25'-5 Sprinkler 9.243 24.32 Density:0.233gpm/ft2 Coverage:104.20112 1109 25'-5 Sprinkler 9.500 24.66 Density:0.237gpm/ft2 Coverage:104.20ft2 1110 25-5 Sprinkler 10.049 25.36 Density:0.243gpm/ft2 Coverage:104.20ft2 1111 25'-5 Sprinkler 11.002 26.54 Density:0.255gpm/ft2 Coverage: 104.20ft2 1112 25'-5 Sprinkler 12.484 28.27 Density:0.271gpm/ft2 Coverage:104.20ft2 1113 25'-2% Sprinkler 9.341 24.45 Density:0.235gpm/ft2 Coverage:104.20ft2 1114 25'-2% Sprinkler 9.414 24.55 Density:0.236gpm/ft2 Coverage:104.20112 1115 25'-2% Sprinkler 9.675 24.88 Density:0.239gpm/ft2 Coverage: 104.20112 1116 25'-2% Sprinkler 10.234 25.59 Density:0.246gpm/ft2 Coverage:104.20112 1117 25'-2% Sprinkler 11.203 26.78 Density:0.257gpm/ft2 Coverage:104.20112 1118 25'-2% Sprinkler 12.710 28.52 Density:0.274gpm/ft2 Coverage: 104.20ft2 &@ M.E.P.CAD,Inc. F-11 AutoSPRINK®12 v12.1.1.0 2/20/2018 3:22:38PM Page 5 Job Name: ALDI DISTRIBUTION FACILITY Remote Area Number: ZONE 11-RACKS, ZONE 11-ROOF Date: 2/20/2018 Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node (psi) (gp►n) 1119 25'-2% Sprinkler 9.577 24.76 Density:0.238gpm/ft2 Coverage:104.20ft2 1120 25'-2% Sprinkler 9.651 24.85 Density:0.239gpmfft2 Coverage:104.20ft2 1121 25'-2% Sprinkler 9.919 25.20 Density:0.242gpm/ft2 Coverage:104.20ft2 1122 25'-2% Sprinkler 10.491 25.91 Density:0.249gpm/ft2 Coverage:104.20ft2 1123 25'-2% Sprinkler 11.483 27.11 Density:0.260gpm/ft2 Coverage:104.20ft2 I 1124 25'-2% Sprinkler 13.024 28.87 Density:0.277gpmfft2 Coverage: 104.20ft2 1125 25'-0Y. Sprinkler 17.831 33.78 Density:0.294gpm/ft2 Coverage: 115.00ft2 1126 25'-0Y, Sprinkler 17.963 33.91 Density:0.295gpm/ft2 Coverage: 115.00ft2 1151 18'-0% Sprinkler 21.145 25.75 Density:0.322gpm/ft2 Coverage:80.00ft2 1152 18'-0'/< Sprinkler 21.462 25.94 Density:0.324gpm/ft2 Coverage:MOOft2 1153 17'-113/, Sprinkler 22.570 26.60 Density:0.333gpm/ft2 Coverage:80.00ft2 1154 'IT-11% Sprinkler 24.941 27.97 Density:0.350gpm/ft2 Coverage:80.00ft2 1155 11'-3% Sprinkler 23.001 26.86 Density:0.336gpm/ft2 Coverage:80.00ft2 1156 11'-3'/< Sprinkler 23.342 27.06 Density:0.338gpm/ft2 Coverage:MOOft2 1157 11'-2% Sprinkler 24.538 27.74 Density:0.347gpm/ft2 Coverage:MOOft2 1158 11'-2'/. Sprinkler 27.099 29.15 Density:0.364gpm/t2 Coverage:80.00ft2 1159 17'-11'% Sprinkler 29.503 30.42 Density:0.380gpm/ft2 Coverage:MOOft2 1160 11'-2% Sprinkler 32.029 31.69 Density:0.396gpm/ft2 Coverage:MOOft2 101 24'-7'/a 17.740 102 24'-5% 17.864 103 24'-3'/ 18.148 104 24'-1% 18.670 105 23'-11% 19.503 L,©M.E.P.CAD,Inc. AutoSPRINK®12 v12.1.1.0 2/20/2018 3:22:38PM Page 6 Job Name: ALDI DISTRIBUTION FACILITY Remote Area Number: ZONE 11-RACKS, ZONE 11-ROOF Date: 2/20/2018 Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node (Psi) (gpm) 106 2'-10114 82.795 200 17'-11 29.972 201 17'-10'/ 30.479 202 20'-7% 68.162 203 2'-10'/ 82.747 i 204 11'-2 32.534 801 1'-0 83.652 802 4-3 87.932 803 -2'-6 87.929 A4©M.E.P.CAD,Inc. F11 AutoSPRINK®12 v12.1.1.0 2/20/2018 3:22:38PM Page 7 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 11-RACKS,ZONE 11-ROOF Date:2/20/2018 Pipe Information Flow added Length C Factor ) Notes Elev 1 Fittings 8 g Total(Pt Node 1 (Foot)K-Factor this step Nominal ID Ft (Foot) (q) Devices ( ) Fitting/Device(Equivalent g Length) (q) Fitting Pf Friction Elev(Pe) Fixed Pressure Losses,osses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit Node 2 Length applicable,are added directly (Foot) (Q) Actual ID 9 Total (psi) ( and shown as a (Foot) (Foot) Friction(Pf) to alive value. 1101 26'-4/, 8 23.76 2 (See 3 10'-5 120 8.819 .....Route I..... Notes) Sprinkler 1102 26-4% t 23.76 2.067 10'-5 0.006579 0.069 1102 26'-4Y44 8 23.85 2 (See 10'-5 120 8.888 Notes) Sprinkler 1103 26'-43/, 47.61 2.067 0.023804 10'-5 0.248 1103 26-43/4 8 24.18 2 (See 10'-5 120 9.136 Notes) Sprinkler 1104 26'-43/4 71.79 2.067 0.050890 10'-5 0.530 1104 26'-4% 8 24.87 2 (See 10'-5 120 9.666 Notes) Sprinkler 1105 26'-43/, 96.66 2.067 0.088236 10'-5 0.919 1105 26'-4% 8 26.03 2 (See 10'-5 120 10.585 Notes) Sprinkler 1106 26'-4Y44 122.69 2.067 0.137158 10'-5 1.429 1106 26-43/4 8 27.73 2 (See 4'-8% 120 12.014 Notes) Sprinkler, 20'-0 0.782 101 24'-7'/. 150.42 2.067 0.199956 T(10'-0),130(10'-0) 24'-83/4 4.944 101 24'-7'% 4 9'-9% 120 17.740 0.066 102 24'-5'/4 150.42 4.260 0.005908 9'-9% 0.058 102 24'-5'/4 153.37 4 10'-0 120 17.864 Flow(q)from Route 2 0.067 103 24'-3% 303.78 4.260 0.021686 10'-0 0.217 103 24'-3% 154.77 4 91-9% 120 18.148 Flow(q)from Route 3 0.066 104 24'-1'/z 458.55 4.260 0.046451 91-9% 0.456 104 24'-1'/ 156.70 4 9'-7'% 120 18.670 0.065 Flow(q)from Route 4 105 23'-11% 615.25 4.260 0.080016 9'-7'/ 0.768 105 23'-11% 67.69 4 (See 427'-4'/4 120 19.503 Notes) 130'-4'/4 Flow(q)from Route 6 9.161 106 2'-10% 682.94 4.260 0.097059 3E(13'-2),EE(5'-3'/4), 557'-8% 54.131 2BV(15'-9%),DeIV(27'-7%), PO 26'-4 1 ©M.E.P.CAD,Inc. U,9 1 AutoSPRINKO 12 02.1.1.0 E 11-RACKS,ZONE 11-R 2/20/2018 3:22:40PM Page 8 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 11-RACKS,ZONE 11-ROOF Date:2/20/2018 Pipe Information El(Fo v 1 Flow added Fittings S Length C Factor Total(Pt) Notes eot) Devices Node 1 K-Factor this step Nominal ID (Foot) Fitting/Device(Equivalent (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Node 2 Actual ID Length Total Loss Per Unit applicable,are added directly (Foot) tQ) (Foot) (PSG) Friction(Pf) to(Pf)and shown as a (Foot) negative value. 106 2'-10'/4 279.18 10 (See 2'-11 120 82.795 Notes) 19'-4'/a 0.804 Flow(q)from Route 5 801 1'-0 962.12 10.420 0.002348 LtE(19'-4'/,) 22'-3'/ 0.052 801 1'-0 10 (See 1003'-03/, 140 83.652 Notes) 365'-1'/. 1.842 802 -3'-3 962.12 10.400 0.001782 2LtE(25'-6),6EE(1 T-6'/z), 1368'-2 2.438 3PIV(7'-11%),3E(35'-1), T 79'-8'/ 802 -T-3 10 (See 15'-0 120 87.932 Notes) 122,-2,/ -0.325 803 -2'-6 962.12 10.420 0.002348 LtE(19'-4'/.),EE(13'-3%), 137'-2'/2 0.322 BV 23'-0 ,CV 66'-6% 803 -2'-6 6 (See 0'-0 120 87.929 Notes) 804 -2'-6 962.12 6.065 0-0 0.032752 0.000 Water Supply 0.00 87.929 Hose Allowance At Source 804 962.12 Total(Pt) Route 1 1107 25'-5 8 24.23 2 (See 10'-5 120 9.172 .....Route 2 Notes) Sprinkler 1108 25-5 24.23 2.067 0.006822 10'-5 0.071 1108 25'-5 8 24.32 2 (See 10'-5 120 9.243 Notes) Sprinkler 1109 25'-5 48.55 2.067 0.024682 10'-5 0.257 1109 25'-5 8 24.66 2 (See 10'-5 120 9.500 Notes) Sprinkler 1110 25'-5 73.21 2.067 0.052767 10'-5 0.550 1110 25'-5 8 25.36 2 (See 10'-5 120 10.049 Notes) Sprinkler 1111 25-5 98.57 2.067 0.091485 10'-5 0.953 1111 25'-5 8 26.54 2 (See 10'-5 120 11.002 Notes) Sprinkler 1112 25'-5 125.10 2.067 0.142196 10'-5 1.481 1112 25'-5 8 28.27 2 (See 3'-103/ 120 12.484 Notes) Sprinkler, 20'-0 0.426 102 24'-5'/, 153.37 2.067 0.207279 T(10'-0),PO(10'-0) 23-103/ 4.955 �i ©M.E.RCAD,Inc. F-11 AutoSPRINKO 12 02.1.1.0 E 11-RACKS,ZONE 11-R 2/20/2018 3:22:40PM Page 9 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 11-RACKS,ZONE 11-ROOF Date:2/20/2018 Pipe Information Elev 1 Flow added Fittings& Length C Factor Total(Pt) Notes Node 1 K-Factor this step Nominal ID (Foot) Fitting/Device(Equivalent (Foot) Devices (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (Foot) (psi) Friction(Pf) to(Pf)and shown as a (Foot) negative value. 17.864 Total(Pt) Route 2 1113 25'-23/4 8 24.45 2 (See 10'-5 120 9.341 .....Sprinkler Route 3 Notes) i j 1114 25'-2Y4 24.45 2.067 0.006939 10'-5 0.072 1114 25-23/4 8 24.55 2 (See 10'-5 120 9.414 Sprinkler le Notes) P 1115 25'-2'/4 49.00 2.067 0.025104 10'-5 0.261 1115 25'-2% 8 24.88 2 (See 10'-5 120 9.675 Notes) Sprinkler "1116 25'-2'/. 73.88 0.053668 2.067 10'-5 0.559 1116 25'-2% 8 25.59 2 (See 10'-5 120 10.234 Notes) Sprinkler 1117 25'-2Y, 99.47 2.067 10'-5 0.093045 0.969 1117 25'-23/4 8 26.78 2 (See 10'-5 120 11.203 Notes) Sprinkler 1118 25'-2% 126.25 2.067 10'-5 0.144617 1.506 120 12.710 1118 25'-2'/. 8 28.52 2 (See 3- "0 Sprinkler, Notes) 20'-0 0.408 P 103 24'-3'Y2 �'r r 154.77 2.067 23'-10'/ 0.210797 5.030 T(10'-0),PO(lO'-0) 18.148 Total(Pt) Route 3 10'-5 120 9.577 1119 25'-2/ 8 24.76 2 (See •••••Route 4•••••S Sprinkler Notes) p 1120 25'-2% 24.76 2.067 0.007101 10'-5 0.074 1120 25'-2% 8 24.85 2 (See 10'-5 120 9.651 Notes) Sprinkler MI1121 25'-2'/2 49.61 2.067 10'-5 0.025690 0.268 1121 25'-2'/ 8 25.20 2 (See 10-5 120 9.919 Notes) Sprinkler 1122 25'-2% 74.81 2.067 10'-5 0.054920 0.572 1122 25'-2%2 8 25.91 2 (See 10'-5 120 10.491 Notes) Sprinkler 1123 25'-2'/2 100.72 2,067 10'-5 0.095212 0.992 :-t©M.E.P.CAD,Inc. -o AutoSPRINK®12 02.1.1.0 E 11-RACKS,ZONE 11-R 2/20/2018 3:22:40PM Page 10 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 11-RACKS,ZONE 11-ROOF Date:2/20/2018 Pipe Information Flow added Length C Factor Notes Elev 1 Fittings& Total(Pt) Node t K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (Foot) (q) Length) Fitting Pf Friction Elev Pe ! Equiv. (Foot) Elev(Pe) Fixed Pressure Losses,when . Elev 2 Total Flow Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (Foot) Foot) (psi) Friction(Pf) to(Pf)and shown as a ( negative value. 1123 25'-2'/ 8 27.11 2 (See 10'-5 120 11.483 Sprinkler Notes) P 127.83 2.067 0.147978 1124 25'-2'/ 10'-5 1.541 1124 25'-2Yz 8 28.87 2 (See 4'-0 120 13.024 Notes Sprinkler, rinkler 20-0 0.469 104 24'-1Yz 156.70 2.067 24'0 0.215681 5.177 T(10'-0),PO(10'-0) 18.670 Total(Pt) Route 4 ( 8'-4 100 21.145 .....Route 1151 18'-0% 5.6 25.75 1 Ys See Sprinkler Notes) 0.015 1152 18'-0'/4 25.75 1.610 8'-4 0.036130 0.301 1152 18'-0'/. 5.6 25.94 1'/: (See 8'-4 100 21.462 Notes) Sprinkler 0.015 1153 17'-11% 51.69 1.610 8 0.131148 1.093 1153 17'-11% 5.6 26.60 1'/2 (See 8'-4 100 22.570 Notes) 0.015 Sprinkler 1154 17'-11% 78.30 1.610 8'-4 0.282708 2.356 1154 17'-11 Y. 5.6 27.97 1% (See 4'-4% 100 24.941 Notes) Sprinkler, 5'-8% 0.008 200 1 T-11 106.26 1.610 10'-1 Y. 0.497414 5.023 mecT(5'-8Yz) 200 17'-11 30.42 3 (See V-11 100 29.972 Notes) 12'-5'/ 0.013 Flow(q)from Route 8 201 17'-10% 136.68 3.260 19'-4'/ 0.025517 0.495 T(12'-5Y2) 201 17'-103/, 142.50 3 (See 355'-6'/ 100 30.479 Notes) Flow(q)from Route 7 50'-10Yz -1.185 202 20'-7% 279.18 3.260 3 0.095643 4E(4'-9%),5Tr(5'-0),E(6'-8Yz) 406'-4/. 38.869 202 20'-7'/ 4 (See 156'-9 100 68.162 Notes) 107'-11% 7.705 203 2'-10Y. 279.18 4.260 0.025990 5E(9'-4'/.),2BV(11'-3%), 264'-8/z 6.880 DeIV 19'-8'/,PO 18'-9'/< 203 2'-10Y, 10 (See 8'-43/. 120 82.747 Notes) 194'-9% 106 2'-10% 279.18 10.420 0.000238 3T(60'-6),EE(13'-3%) 203'-2Y2 0.048 82.795 Total(Pt) Route 5 1�{ ©M.E.P.CAD,Inc. AutoSPRINK®12 02.1.1.0 E 11-RACKS,ZONE 11-R 2/20/2018 3:22:40PM Page 11 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 11-RACKS,ZONE 11-ROOF Date:2/20/2018 Pipe Information Flow added Length C Factor Notes Elev 1 this stop Fittings& Total(Pt) Node 1 (Foot) K-Factor p Nominal ID Devices (Foot) Fitting/Device(Equivalent (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (psi) Friction(Pf) to(Pf)and shown as a (Foot) (Foot) negative value. 1125 25'-0'/4 8 33.78 2 (See 10'-5 120 17.831 .....Route 6 Notes) Sprinkler 1126 25'-0'/. 33.78 2.067 0.012618 10'-5 0.131 1126 25'-0'/4 8 33.91 2 (See 3'-11% 120 17.963 Notes) Sprinkler, 20'-0 0.447 105 23'-11'/ 67.69 2.067 0.045644 T(10'-0),PO(10'-0) 23'-11'/ 1.093 19.503 Total(Pt) Route 6 1155 11'-3'/ 5.6 26.86 1'/z (See 8'-4 100 23.001 ..... ••••Route 7 0.015 Notes) Sprinkler 1156 11'-3'/4 � 26.86 1.610 0.039054 8'-4 0.325 1156 11'-3'/4 5.6 27.06 1'% (See 8'-4 100 23.342 Sprinkler Notes) _ 0.015 1157 11'-2% 53.91 1.610 0.141751 8'-4 1.181 1157 11'-2% 5.6 27.74 1'% (See 8'-4 100 24.538 Notes) Sprinkler 0.015 1158 11'-2'/4 81.65 1.610 0.305524 8'-4 2.546 1158 11'-2'/4 5.6 29.15 1% (See 4'-4% 100 27.099 Notes) Sprinkler, 5'-8'% 0.008 204 11'-2 x 110.80 1.610 0.537440 mecT(5'-8%) 10'-1/4 5.427 204 11'-2 31.69 3 (See 13'-8 100 32.534 Notes) Flow(q)from Route 9 17'-5% -2.914 201 17'-10% 142.50 3.260 0.027562 T(12'-5'/),Tr(5'-0) 31'-1'/ 0.858 30.479 Total(Pt) Route 7 1159 7-11/ 5.6 30.42 1/2 (See T-8'/4 100 29.503 •••••Route 8••••• Sprinkler, Notes) 5'-8'/ 0.007 200 17'-11 30.42 1.610 9-4'/ 0.049167 0.462 mecT(5'-8'/s) 29.972 Total(Pt) Route 8 1160 11'-2'/4 5.6 31.69 1'/z (See 3'-8'/ 100 32.029 •••••Route 9••••• Notes) Sprinkler, 5'-8'/ 0.007 204 11'-2 31.69 1.610 9-4'/ 0.053049 0 498 mecT(5'-8'/.) 32.534 Total(Pt) Route 9 ©M.E.P.CAD,Inc. AutoSPRINK®12 02.1.1.0 E 11-RACKS,ZONE 11-R 2/20/2018 3:22:40PM Page 12 �Y Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 11-RACKS,ZONE 11-ROOF Date:2/20/2018 Equivalent Pipe Lengths of Valves and Fittings(C=120 only) C Value Multiplier Actual Inside Diameter 4.87 Value Of C 100 130 140 150 =Factor Schedule 40 Steel Pipe Inside Diameter ) Multiplying Factor 0.713 1.16 1.33 1.51 "Fittings Lagend ALV Alarm Valve An V Angle Valve b Bushing BaIV Ball Valve BFP Backflow Preventer BV Butterfly Valve C Cross Flow Turn 90° cpIq Coupling Cr Cross Run CV Check Valve DeIV Deluge Valve DPV Dry Pipe Valve E 90°Elbow EE 45'Elbow Eel 11'/.°Elbow Ee2 22% Elbow f Flow Device fd Flex Drop FDC Fire Department Connection fE 90°FireLock TM Elbow fEE 45°FireLock TM Elbow fig Flange FN Floating Node fT FireLock M Tee Gau a GloV Globe Valve GV Gate Valve Ho Hose Hose Hose HV Hose Valve H d Hydrant LtE Long Turn Elbow mecT Mechanical Tee Noz Nozzle P1 Pump In P2 Pump Out PIV Post Indicating Valve PO Pipe Outlet PRV Pressure Reducing Valve PrV Pressure Relief Valve red Reducer/Adapter S Supply sCV Swing Check Valve S r Sprinkler St Strainer T Tee Flow Turn 90° Tr Tee Run U Union WirF Wirsbo WMV Water Meter Valve Z Ca 1,©M.E.P.CAD,Inc. H1 AutoSPRINK®12 02.1.1.0 E 11-RACKS,ZONE 11-R 2/20/2018 3:22:40PM Page 13 Hydraulic Calculations for Project Name:ALDI DISTRIBUTION FACILITY Location: RACK STORAGE-PHASE III,295 RYE STREET,SOUTH WINDSOR,CT 06074 Drawing Name:2017-1839-N Calculation Date:2/20/2018 Design Remote Area Number: ZONE 12-RACK Remote Area Location: ZONE 12 Occupancy Classification: In Rack Sprinklers Commodity Classification: CLASS III Density: 0.200gpm/ft2 Area of Application: 100.00ft2(Actual 429.09ft2) Coverage per Sprinkler: 70.83ft2 Type of sprinklers calculated: Upright No.of sprinklers calculated: 6 Type of System: DI PREACTION Volume of Dry or PreAction System: N/A In-rack Demand: N/A gpm at Node: N/A Hose Streams: 0.0 gpm at Node: 804 Type: Allowance at Source Total Water Required (including Hose Streams where applicable): From Water Supply at Node 804: 915.98 @ 91.240 Water Supply Information: Name of Contractor: WOLVERINE FIRE PROTECTION Address: 101 BIDWELL ROAD, SOUTH WINDSOR,CT 06074 Phone Number: 860-282-2488 Name of designer: JEFF CORCORAN Authority Having Jurisdiction: Notes: ���oflaaeae�es©n©o®>©� o ° 0 No. o 0 M.E.P.CAD, Inc. J,1JJAutoSPRINK@ 12 02.1.1.0 ZONE 12-RACK 2/20/2018 3:38:13PM Pagel Hydraulic Calculations for Project Name:ALDI DISTRIBUTION FACILITY Location: RACK STORAGE-PHASE III,295 RYE STREET,SOUTH WINDSOR,CT 06074 Drawing Name:2017-1839-N Calculation Date:2/20/2018 Design Remote Area Number: ZONE 12-ROOF Remote Area Location: ZONE 12 Occupancy Classification: Spec.Warehouse Commodity Classification: CLASS III Density: 0.245gpm/ft2 Area of Application: 2600.00ft2(Actual 2606.26ft2) Coverage per Sprinkler: 106.70ft2 Type of sprinklers calculated: Upright No.of sprinklers calculated: 27 Type of System: DI PREACTION Volume of Dry or PreAction System: N/A In-rack Demand: N/A gpm at Node: N/A Hose Streams: 0.0 gpm at Node: 804 Type: Allowance at Source Total Water Required (including Hose Streams where applicable): Water Supply Information: Name of Contractor: WOLVERINE FIRE PROTECTION Address: 101 BIDWELL ROAD, SOUTH WINDSOR, CT 06074 Phone Number: 860-282-2488 Name of designer: JEFF CORCORAN Authority Having Jurisdiction: Notes: ©M.E.P.CAD, Inc. �;��AutoSPRINK@ 12 v12.1.1.0 ZONE 12-ROOF 2/20/2018 3:38:13PM Page 2 Hydraulic Graph Job Name:ALDI DISTRIBUTION FACILITY N 1.85 Remote Area Number:ZONE 12-RACK,ZONE 12-ROOF Date:2/20/2018 150 Water Supply Summary Sheet 135 Node: 804 120 Static Pressure 113.000 7�15.98@111.795- 1500.00 @ 110.000 105 7 90 15.98 @ 91.240 .N a 3 75 a� 60 System demand curve 45 30 15 0 0300 600 900 1200 1500 1800 2100 2700 2400 3000 Flow-gpm ©M.E.P.CAD, Inc. APB AutoSPRINK@ 12 02.1.1.0 2/20/2018 3:38:14PM Pa4e 3 summary Of Outf owing Devices Job Number:2017-1839 Report Description:In Rack Sprinklers(ZONE 12-RACK),Spec. Actual Flow Minimum Flow K-Factor Pressure Density Co Af@ ous Device m m si m ft2 Foot Sprinkler 1201 26.87 26.14 8 11.282 0.252gpm/ft2 106.70ft2 Sprinkler 1202 26.98 26.14 8 11.370 0.253gpm/ft2 106.70ft2 Sprinkler 1203 27.35 26.14 8 11.689 0.256gpm/ft2 106.70ft2 Sprinklera1208 28.14 26.14 8 12.371 0.264gpm/ft2 106.70ft2 Sprinkler 26.92 26.14 8 11.322 0.252gpm/ft2 106.70ft2 Sprinkler 27.02 26.14 8 11.410 0.253gpm/ft2 106.70ft2 Sprinkler 27.40 26.14 8 11.730 0.257gpmfft2 106.70ft2 Sprinkler 28.19 26.14 8 12.414 0.264gpm/ft2 106.70ft2 Sprinkler 1209 27.16 26.14 8 11.527 0.255gpm/ft2 106.70ft2 Sprinkler 1210 27.27 26.14 8 11.616 0.256gpm/ft2 106.70ft2 Sprinkler 1211 27.65 26.14 8 11.942 0.259gpm/ft2 106.70ft2 Sprinkler 1212 28.44 26.14 8 12.637 0.267gpmfft2 106.70ft2 Sprinkler 1213 28.41 26.14 8 12.609 0.266gpm/ft2 106.70ft2 Sprinkler 1214 28.52 26.14 8 12.707 0.267gpm/ft2 106.70ft2 Sprinkler 121 P 5 28.91 26.14 8 13.060 0.271gpm/ft2 106.70ft2 Sprinkler 1216 29.74 26.14 8 13.816 0.279gpm/ft2 106.70ft2 Sprinkler 1217 29.42 26.14 8 13.521 0.276gpm/ft2 106.70ft2 Sprinkler 1218 29.47 26.14 8 13.568 0.276gpm/ft2 106.70ft2 Sprinkler 1219 29.73 26.14 8 13.811 0.279gpm/ft2 106.70ft2 Sprinkler 1220 29.07 23.89 8 13.204 0.298gpm/ft2 97.502 Sprinkler 1221 29.17 23.89 8 13.297 0.299gpm/ft2 97.50ft2 Sprinkler 1222 29.12 23.89 8 13.250 0.299gpm/ft2 97.50ft2 Sprinkler 1223 29.22 23.89 8 13.343 0.300gpm/ft2 97.50ft2 Sprinkler 1224 29.38 23.89 8 13.487 0.301gpm/ft2 97.50ft2 Sprinkler 1225 29.48 23.89 8 13.582 0.302gpm/ft2 97.50ft2 Sprinkler 1226 31.59 26.14 8 15.596 0.296gpm/ft2 106.70ft2 Sprinkler 1227 31.52 23.89 8 15.524 0.323gpm/ft2 97.50ft2 C> Sprinkler 1251 21.69 21.69 5.6 16.000 0.306gpmIR2 70.80ft2 Sprinkler 1252 21.86 21.69 5.6 15.234 0.309gpm/ft2 70.80ft2 Sprinkler 1253 22.43 21.69 6.6 16.045 0.317gpm/ft2 70.80ft2 Sprinkler 1254 23.61 21.69 5.6 17.777 0.333gpm/ft2 70.80ft2 Sprinkler 1255 25.55 21.69 5.6 20.815 0.361 gpm/ft2 70.80ft2 Sprinkler 1256 28.73 21.69 5.6 26.315 0.406gpm/ft2 70.80ft2 b Most Demanding Sprinkler Data dLy©M.E.P.CAD,Inc. j-j AutoSPRINK®12 02.1.1.0 2/20/2018 3:38:16PM Page 4 Job Name: ALDI DISTRIBUTION FACILITY Remote Area Number: ZONE 12-RACK, ZONE 12-ROOF Date: 2/20/2018 Supply Analysis Node Name Static Residual Flow Available Total Demand Required Pressure (Psi) (Psi) (gP►n) (Psi) @ (gp-) (Psi) 804 Water Supply 113.000 110.000 1500.00 111.795 915.98 91.240 Node Analysis Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node j (Psi) (gP►n) 804 -2'-6 Supply 91.240 915.98 1201 26'-0 Sprinkler 11.282 26.87 Density:0.252gpm/ft2 Coverage:106.70ft2 1202 26'-0 Sprinkler 11.370 26.98 Density:0.253gpm/ft2 Coverage: 106.70ft2 1203 26'-0 Sprinkler 11.689 27.35 Density:0.256gpm/ft2 Coverage:106.70ft2 1204 26'-0 Sprinkler 12.371 28.14 Density:0.264gpm/ft2 Coverage:106.70ft2 1205 26'-0 Sprinkler 11.322 26.92 Density:0.252gpm/ft2 Coverage: 106.70ft2 1206 26'-0 Sprinkler 11.410 27.02 Density:0.253gpm/ft2 Coverage:106.70ft2 1207 26'-0 Sprinkler 11.730 27.40 Density:0.257gpm/ft2 Coverage:106.70ft2 1208 26'-0 Sprinkler 12.414 28.19 Density:0.264gpm/ft2 Coverage: 106.70ft2 1209 26'-0 Sprinkler 11.527 27.16 Density:0.255gpm/ft2 Coverage:106.70ft2 1210 26'-0 Sprinkler 11.616 27.27 Density:0.256gpm/ft2 Coverage:106.70ft2 1211 26'-0 Sprinkler 11.942 27.65 Density:0.259gpm/ft2 Coverage:106.70ft2 1212 26'-0 Sprinkler 12.637 28.44 Density:0.267gpm/ft2 Coverage:106.70ft2 1213 26'-0 Sprinkler 12.609 28.41 Density:0.266gpm/ft2 Coverage:106.70ft2 1214 26'-0 Sprinkler 12.707 28.52 Density:0.267gpm/ft2 Coverage: 106.70ft2 1215 26'-0 Sprinkler 13.060 28.91 Density:0.271 gpm/ft2 Coverage: 106.70ft2 1216 26'-0 Sprinkler 13.816 29.74 Density:0.279gpm/ft2 Coverage: 106.70ft2 1217 26'-0 Sprinkler 13.521 29.42 Density:0.276gpm/ft2 Coverage: 106.70ft2 1218 26'-0 Sprinkler 13.568 29.47 Density:0.276gpm/ft2 Coverage: 106.70ft2 ,©M.E.P.CAD,Inc. 0111 AutoSPRINK®12 v12.1.1.0 2/20/2018 3:38:17PM Page 5 Job Name: ALDI DISTRIBUTION FACILITY Remote Area Number: ZONE 12-RACK, ZONE 12-ROOF Date: 2/20/2018 Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node (psi) (gpm) 1219 26'-0 Sprinkler 13.811 29.78 Density:0.279gpm/ft2 Coverage: 106.70ft2 1220 26'-0 Sprinkler 13.204 29.07 Density:0.298gpm/ft2 Coverage:97.50ft2 1221 26'-0 Sprinkler 13.297 29.17 Density:0.299gpm/ft2 Coverage:97.50ft2 1222 26'-0 Sprinkler 13.250 29.12 Density:0.299gpm/ft2 Coverage:97.50ft2 1223 26'-0 Sprinkler 13.343 29.22 Density:0.300gpm/ft2 Coverage:97.50ft2 1224 26'-0 Sprinkler 13.487 29.38 Density:0.301gpm/ft2 Coverage:97.50ft2 1225 26-0 Sprinkler 13.582 29.48 Density:0.302gpm/ft2 Coverage:97.50ft2 1226 26'-0 Sprinkler 15.596 31.59 Density:0.296gpm/ft2 Coverage:106.70ft2 1227 26'-0 Sprinkler 15.524 31.52 Density:0.323gpm/ft2 Coverage:97.50ft2 1251 12'-6'/ Sprinkler 15.000 21.69 Density:0.306gpm/ft2 Coverage:70.80ft2 1252 12'-6 Sprinkler 15.234 21.86 Density:0.309gpm/ft2 Coverage:70.80ft2 1253 12'-5% Sprinkler 16.045 22.43 Density:0.317gpm/ft2 Coverage:70.80ft2 1254 12'-5 Sprinkler 17.777 23.61 Density:0.333gpm/ft2 Coverage:70.80ft2 1255 12'-4'/ Sprinkler 20.815 25.55 Density:0.361 gpmfft2 Coverage:70.80ft2 1256 12'-4% Sprinkler 26.315 28_73 Density:0.406gpm/ft2 Coverage:70.80ft2 300 26'-0 14.419 301 25'-6 18.102 302 25'-4% 18.242 303 25'-3'/, 18.639 304 25'-2 19.418 305 22'-8 70.043 306 2'-10'/. 86.052 308 26'-0 14.469 ( ©M.E.P.CAD,Inc. LI)jAutoSPRINK®12 v12.1.1.0 2/20/2018 3:38:17PM Page 6 Job Name: ALDI DISTRIBUTION FACILITY Remote Area Number: ZONE 12-RACK, ZONE 12-ROOF Date: 2/20/2018 Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node (PSI) (9pm) 309 26'-0 14.726 310 26'-0 16.085 400 12'-4% 26.741 401 24'-3% 64.121 I 402 21'-7 75.026 403 2'-10114 86.048 801 1'-0 87.203 802 4-3 91.271 803 -2'-6 91.240 LM,©M.E.P.CAD,Inc. NO AutoSPRINK®12 v12.1.1.0 2/20/2018 3:38:17PM Page 7 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 12-RACK,ZONE 12-ROOF Date:2/20/2018 Pipe Information Flow added Fittings Length C Factor (gs& Len Total Pt) Notes Node 1 Elev 1 9(Foot) K•Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent -777777 (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit Node 2 Actual ID Length Total applicable,are added directly (Foot) (0) (Foot) Foot (psi) Friction(Pf) to(Pf)and shown as a „- Foot ( ) negiative value. 1251 12'-6Y, 5.6 21.69 1'/z (See 8'-4 100 15.000 .....Route 1 Notes) Sprinkler 0.015 1252 12'-6 21.69 1.610 0.026298 8'-4 0.219 1252 12'-6 5.6 21.86 1 Yz (See V-4 100 15.234 Notes) Sprinkler 0.015 1253 12'-5Yz 43.55 1.610 0.095489 8'4 0.796 1253 12'-5Yz 5.6 22.43 1 Yz (See 8'-4 100 16.045 Notes) 0.015 Sprinkler 1254 12'-5 65.98 1.610 0.205960 1.716 1254 12'-5 5.6 23.61 1 Yz (See 8'-4 100 17.777 Notes) 0.015 Sprinkler 1255 12'-4'/ 89.59 1.610 0.362715 8'-4 3.023 1255 12'-4Y 5.6 25.55 1'% (See 4'-6314 100 20.815 Notes) 0.008 Sprinkler, 400 12'-4% 115.14 1.610 0.576964 5.918 T(5'-8%) 10'-3 400 12'-4'% 28.73 1 Yz (See 37'-5% 100 26.741 Notes) Flow(q)from Route 14 11-5 -5.165 401 24'-3Y, 143.86 1.610 0.871187 2E(2'-10'/<),mecT(5'-8%) v war 48'-10 42.545 401 24'-3'/, 3 (See 302'-9 100 64.121 Notes) 44'-3'/ 1.169 402 21'-7 143.86 3.260 0.028053 347'-0% 9.736 Tr(5'-0),3E(4'-9'/),2T(12'-5%) 402 21'-7 4 (See 241'-2% 100 75.026 Notes) 403 2'-10'/. 7 143.86 4.260 0.007623 2E(6'-4%),7E(9'-4%), 380'-8Y. 2.902 213V(11'-3'Y),DeIV(19'-8'/), PO 18'-9Y. 403 2'-10% 10 (See 5'-9% 120 86.048 Notes) 60'-6 306 2'-10'/+ 143.86 10.420 0.000070 T(60'-6) 0.005 306 2'-10% 772.12 10 (See 8'-1% 120 86.052 Notes) Flow(q)from Route 2 153'-8 0.804 801 1'-0 915.98 10.420 0.002144 2T(60'-6),EE(13'-3%), 161'-9% 0.347 LtE 19'-4Y, 801 V-0 10 (See 1003'-0% 140 87.203 Notes) 365'-1% 1.842 802 -3'-3 915.98 10.400 0.001627 2LtE(25'-6),6EE(17'-6'/), 1368'-2 2.226 3PIV(7'-11%),3E(35'-1), T 79'-8Yz ©M.E.RCAD,Inc. till AutoSPRINKO 12 02.1.1.0 IE 12-RACK,ZONE 12-R( 2/20/2018 3:38:19PM Page 8 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 12-RACK,ZONE 12-ROOF Date:2/20/2018 Pipe Information Flow added Length C Factor Notes F Elev i Fittings 8 g Total Pt Node i K-Factor this step Nominal ID (Foot) ( ) (Foot) Devices ( ) Fitting/Device(Equivalent (q) Fitting Length) pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit Node 2 (Foot) " (Q) Actual ID Length Total (psi) applicable,are added directly (Foot) Friction(Pf) to(Pf)and shown as a (Foot) negative value. 802 -T-3 10 (See 15'-0 120 91.271 Notes) 777 122'-2'% -0.325 j 803 -2'-6 915.98 10.420 137'-2Y2 0.002144 0.294 LtE(19'-4Y4),EE(13'-3%), BV 23'-0,CV 66'-6Yz 803 -2'-6 6 (See 0'-0 120 91.240 Notes) 804 -2'-6 915.98 6.065 0.029906 Water Supply 0.000 0.00 91.240 Hose Allowance At Source 804 " 915.98 Total(Pt) Route 1 1201 26'-0 8 26.87 2 (See 10'-8 120 11.282 .....Route 2 Notes) Sprinkler 1202 26'-0 26.87 2.067 0.008263 r 10'-8 0.088 1202 26'-0 8 26.98 2 (See 10'-8 120 11.370 Notes) Sprinkler 1203 26'-077 53.85 2.067 0.029894 10'-8 0.319 1203 26'-0 8 27.35 2 (See 10'-8 120 11.689 Notes) Sprinkler 1204 26'-0 81.20 2.067 0.063915 . 10'-8 0.682 1204 26'-0 8 28.14 2 (See 8'-5% 120 12.371 Notes) Sprinkler, 10'-0 F 00 26'-0 109.34 2.067 3 0.110829 T(10'-0) j-, 18'-5/ 2.048 300 26'-0 87_66 2 (See 0'-6Y4 120 14.419 Notes) Flow(q)from Route 6 10'-0 0.221 301 25'-6 196.99 2.067 0.329368 PO(10'-0) 10'-6/. 3.462 301 25'-6 4 9'-9Y 120 18.102 s 0.045 302 25'-4Y4 i ;` 196.99 4.260 0.009731 9'-9% 0.095 302 25'-4% 197.34 4 10'-0 120 18.242 Flow(q)from Route 3 0.046 303 25'-3Y44 394.33 4.260 0.035138 10'-0 0.351 303 25'-3% 199.10 4 91-9% 120 18.639 Flow(q)from Route 4 0.045 304 25'-2 593.44 4.260 0.074846 91-9% 0.734 1i ©M.E.P.CAD,Inc. ill AutoSPRINKO 12 02.1.1.0 IE 12-RACK,ZONE 12-RI 2/20/2018 3:38:19PM Page 9 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 12-RACK,ZONE 12-ROOF Date:2/20/2018 Pipe Information Ele (Foot)v 1 Flow added Fittings& Length C Factor Total(Pt) Notes Node 1 K-Factor this step Nominal ID Ft (Foot) Devices ( ) Fitting/Device(Equivalent (q) Length) Fitting Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (Foot) (Foot) (psi) Friction(Pf) to(Pf)and shown as a ne ative value, 304 25'-2 178.69 4 (See 298'-8% 120 19.418 Notes) 107'-11'/a 1.088 Flow(q)from Route 5 305 22'-8 r 772.12 4.260 0.121800 8EE(5'-3Y.),5E(13'-2) 406'-8'Y 49.537 i 305 22'-8 6 (See 240'-6'/ 120 70.043 Notes) 187'-4 8.589 306 2'-10% 772.12 6.357 0.017339 5E(17'-7Y.),EE(8'-9'Y), 427'-10'/. 7.420 2BV(12'-7),DeIV(27'-8), PO 37'-8% 86.052 Total(Pt) Route 2 1205 26-0 8 26.92 2 (See 10'-8 120 11.322 •••••Route 3••••• Notes) Sprinkler 1206 26'-0 26.92 2.067 0.008289 10'-8 0.088 1206 26'-0 8 27.02 2 (See 10'-8 120 11.410 Notes) Sprinkler 1207 26-0 53.94 2.067 0.029991 10'-8 0.320 1207 26'-0 8 27.40 2 (See 10'-8 120 11.730 Notes) Sprinkler 1208 26-0 81.34 2.067 0.064122 10'-8 0.684 1208 26'-0 8 28.19 2 (See 8'-5% 120 12.414 Notes) Sprinkler, s r a 10'-0 308 26-0 109.53 2.067 0.111188 T(10'-0) 18'-5% 2.055 308 26-0 87.81 2 (See 0'-7Y. 120 14.469 v� Notes) 10'-0 0.266 Flow(q)from Route 7 302 25'-4'/s 197.34 2.067 10'-7Y 0.330432 3.507 PO(10'-0) )r1,P 4"v�lyi 18.242 Total(Pt) Route 3 1209 26-0 8 27.16 2 (See 10'-8 120 11.527 .....Route 4 Notes) Sprinkler 1210 26-0 27.16 2.067 0.008428 ���� � 10'-8 0.090 1210 26'-0 8 27.27 2 (See 10'-8 120 11.616 Notes) Sprinkler 1211 26-0 j 54.43 2.067 0.030493 10'-8 0.325 1211 26-0 8 27.65 2 (See 10'-8 120 11.942 Notes) Sprinkler 1212 26'-0 82.07 2.067 0.065194 10'-8 0.695 ii ©M.E.P.CAD,Inc. AutoSPRINK®12 02.1.1.0 IE 12-RACK,ZONE 12-Ri 2/20/2018 3:38:19PM Page 10 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 12-RACK,ZONE 12-ROOF Date:2/20/2018 Pipe Information Elev 1 Flow added Fittings& Length C Factor Total(Pt) Notes Node 1 (Foot) Devices K-Factor this step Nominal ID (Foot) Fitting/Device(Equivalent (q) Fitting Length) Pf Friction Elev Pe ( ) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (Foot) (Psi) Friction(Pf) to(Pf)and shown as a (Foot) negative value. 1212 26-0 8 28.44 2 (See 8'-53/< 120 12.637 Notes) Sprinkler, 10'-0 309 26-0 110.51 2.067 0.113044 T ' (10'-0) 18-5% 2.089 309 26'-0 gg.5g 2 (See 0'-8'/. 120 14.726 Notes) Flow(q)from Route 8 10'-0 0.312 303 25'-3Y. 199.10 2.067 0.335926 PO(10'-0) 10'-83/ 3.601 18.639 Total(Pt) Route 4 10'-8 120 12.609 •••••Route 5••••• Notes) P 1213 26'-0 8 28.41 2 (See Sprinkler 1214 26'-0 28.41 2.067 0.009158 10'-8 0.098 1214 26-0 8 28.52 2 (See 10'-8 120 12.707 Notes) Sprinkler 1215 26-0 56.92 2.067 0.033132 10'-8 0.353 1215 26-0 8 28.91 2 (See 10'-8 120 13.060 Notes) Sprinkler 1216 26-0 r 85.84 2.067 0.070832 ; 10'-8 0.756 1216 26-0 8 29.74 2 (See 8'-5% 120 13.816 Notes) 10'-0 Sprinkler, 310 26'-0 115.57 2.067 18'-5�/ 2.269 0.122805 T(10'-0) 310 26-0 63.11 2 (See 0'-10 120 16.085 Notes) 10'-0 0.357 Flow(q)from Route 12 304 25'-2 178.69 2.067 10'-10 0,274984 2.976 PO(10'-0) 19.418 Total(Pt) Route 5 1217 26'-0 8 58.24 2 (See 2'-2'/. 120 13.521 .....Route 6 Notes) Sprinkler„Flow(q)from Route 10'-0 g 300 26'-0 87.66 2.067 12'-2'/a 0.073640 0.897 T(10'-0) 14.419 Total(Pt) Route 6 1218 26-0 8 58.34 2 (See 2'-2'/. 120 13.568 •••••Route 7••••• Notes) Sprinkler„Flow(q)from Route 10'-0 10 308 26-0 87.81 2.067 0.073876 T(10'-0) 12'-2'% 0.900 14.469 Total(Pt) Route 7 ©M.E.P.CAD,Inc. Flo AutoSPRINK®12 v12.1.1.0 IE 12-RACK,ZONE 12-R( 2/20/2018 3:38:19PM Page 11 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 12-RACK,ZONE 12-ROOF Date:2/20/2018 Pipe Information Flow added Length C Factor Notes Elev 1 Fittings& Total(Pt) Node 1 (Foot) K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) " (Q) (Foot) t (psi) Friction(Pf) to(Pf)and shown as a (Foo) negative value. 1219 26-0 8 58.86 2 (See 2'-2'/4 120 13.811 .....Route 8..... Notes) Sprinkler„Flow(q)from Route 10'-0 11 309 26'-0 88.59 2.067 0.075099 T(10'-0) 14.726 Total(Pt) Route 8 1220 26-0 8 29.07 2 (See 91-9 120 13.204 .....Route 9 Notes) Sprinkler 1221 26'-0 29.07 2.067 0.009557 9'-9 0.093 1221 26-0 8 29.17 2 (See 6'-6 120 13.297 Notes) Sprinkler 1217 26'-0 58.24 2.067 0.034564 6'-6 0.224 13.521 Total(Pt) Route 9 1222 26'-0 8 29.12 2 (See 9'-9 120 13.250 .....Route 10 Notes) Sprinkler 1223 26-0 L- 29.12 2.067 0.009587 9'-9 0.093 1223 26-0 8 29.22 2 (See 6'-6 120 13.343 Notes) Sprinkler 1218 26'-0 ' 58.34 2.067 0.034675 6'-6 0.225 13.568 Total(Pt) Route 10 •••••Routell 9'-9 120 13.487 ••••• 1224 26'-0 8 29.38 2 (See Sprinkler Notes) p 1225 26'-0 29.38 2.067 0.009746 9'-9 0.095 1225 26'-0 8 29.48 2 (See 6'-6 120 13.582 Notes) Sprinkler 1219 26'-0 58.86 2.067 0.035249 6'-6 0.229 13.811 Total(Pt) Route 11 ••••Route12••••• 2'-2'Y 120 15.596 • 1226 26'-0 8 31.52 2 (See Sprinkler,,Flow from Route Notes) 10'-0 p (q) 13 310 26'-0 63.11 2.067 0.040103 T(10'-0) 12'-2% 0.489 16.085 Total(Pt) Route 12 1227 26'-0 8 31.52 2 (See 6'-6 120 15.524 .....Route 13 Notes) Sprinkler 1226 26'-0 31.52 2.067 0.011100 6'-6 0.072 15.596 Total(Pt) Route 13 ©M.E.RCAD,Inc. 'p��AutoSPRiNKO 12 v12.1.1.0 IE 12-RACK,ZONE 12-R( 2/20/2018 3:38:19PM Page 12 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 12-RACK,ZONE 12-ROOF Date:2/20/2018 Pipe Information Flow added Length C Factor Notes Elev 1 Fittings& Total(Pt) Node t K-Factor this step Nominal ID (Foot) Fitting/Device(Equivalent (Foot) Devices (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev,2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (Foot) (psi) Friction(Pf) to(Pf)and shown as a (Foot) negative value. See ( T-9'/a 100 26.315 •••••Route 14••••• 1256 12'-4'/z 5.6 28.73 1'/z Sprinkler, Notes) 5'-8Y 0.007 400 12'-4% 28.73 1.610 0.044232 T(5'-8Yz) 9'-53/a 0.419 26.741 Total(Pt) Route 14 i i i / ©M.E.P.CAD,Inc. AutoSPRINK®12 02.1.1.0 IE 12-RACK,ZONE 12-R( 2/20/2018 3:38:19PM Page 13 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number:ZONE 12-RACK,ZONE 12-ROOF Date:2/20/2018 Equivalent Pipe Lengths of Valves and Fittings(C=120 only) C Value Multiplier Actual Inside Diameter 4.87 Value Of C 100 130 140 150 Pipe Inside Diameter Factor Schedule Schedule 40 Steel Pi p ) _ Multiplying Factor 0.713 1.16 1.33 1.51 Fittings Legend- ALV Alarm Valve An V Angle Valve b Bushing BaIV Ball Valve BFP Backflow Preventer BV Butterfly Valve C Cross Flow Turn 90° cPIq Coupiing Cr Cross Run CV Check Valve DeIV Deluge Valve DPV Dry Pi a Valve E 90'Elbow EE 45°Elbow Eel 11%*Elbow Ee2 22%Elbow f Flow Device fd Flex Drop FDC Fire Department Connection fE 90°FireLock TM Elbow fEE 45°FireLock M Elbow fig Flange FN Floating Node fT FireLock M Tee Gauge GloV Globe Valve GV Gate Valve Ho Hose Hose Hose HV Hose Valve H d Hydrant LtE Long Turn Elbow mecT Mechanical Tee Noz Nozzle P1 Pump In P2 PumD Out PIV Post Indicating Valve PO Pipe Outlet PRV Pressure Reducing Valve PrV Pressure Relief Valve red Reducer/Adapter S Supply sCV Swing Check Valve S r S rinkler St Strainer T Tee Flow Turn 90° Tr Tee Run U Union WirF Wirsbo WMV Water Meter Valve Z Ca ©M.E.P.CAD,Inc. AutoSPRINK®12 02.1.1.0 IE 12-RACK,ZONE 12-RI 2/20/2018 3:38:19PM Page 14 Hydraulic Calculations for Project Name:ALDI DISTRIBUTION FACILITY Location: RACK STORAGE-PHASE III,295 RYE STREET,SOUTH WINDSOR,CT 06074 Drawing Name:2017-1839-N Calculation Date:2/20/2018 Design Remote Area Number: 13-Rack Remote Area Location: Zone 13 Occupancy Classification: In Rack Sprinklers Commodity Classification: Class III Density: 0.200gpm/ft2 Area of Application: 100.00ft2(Actual 199.61ft2) Coverage per Sprinkler: 33.33ft2 Type of sprinklers calculated: Upright No.of sprinklers calculated: 6 Type of System: DI Preaction Volume of Dry or PreAction System: N/A In-rack Demand: N/A gpm at Node: N/A Hose Streams: 0.0 gpm at Node: 804 Type: Allowance at Source Total Water Required (including Hose Streams where applicable): From Water Supply at Node 804: 902.79 @ 95.506 Water Supply Information: Name of Contractor: WOLVERINE FIRE PROTECTION Address: 101 BIDWELL ROAD,SOUTH WINDSOR,CT 06074 Phone Number: 860-282-2488 Name of designer: JEFF CORCORAN Authority Having Jurisdiction: Notes: oaoo��ati en as aaanon°®© CON At r 6 °v Ho.20331 M M.E.P.CAD, Inc. � �AutoSPRINK012 v12.1.1.0 13-Rack 2/20/2018 3:34:47PM Pagel i Hydraulic Calculations for Project Name:ALDI DISTRIBUTION FACILITY Location: RACK STORAGE-PHASE III,295 RYE STREET, SOUTH WINDSOR,CT 06074 Drawing Name:2017-1839-N Calculation Date:2/20/2018 Design Remote Area Number: ZONE 13-ROOF Remote Area Location: Zone 13 Occupancy Classification: Spec.Warehouse Commodity Classification: CLASS III Density: 0.245gpm/ft2 Area of Application: 2600.00ft2(Actual 2693.12ft2) Coverage per Sprinkler: 106.67ft2 Type of sprinklers calculated: Upright No.of sprinklers calculated: 26 Type of System: DI PREACTION Volume of Dry or PreAction System: N/A In-rack Demand: N/A gpm at Node: N/A Hose Streams: 0.0 gpm at Node: 804 Type: Allowance at Source Total Water Required (including Hose Streams where applicable): Water Supply Information: Name of Contractor: WOLVERINE FIRE PROTECTION Address: 101 BIDWELL ROAD, SOUTH WINDSOR, CT 06074 Phone Number: 860-282-2488 Name of designer: JEFF CORCORAN Authority Having Jurisdiction: Notes: M M.E.RCAD, Inc. � �AutoSPRINK@ 12 v12.1.1.0 ZONE 13-ROOF 2/20/2018 3:34:47PM Page 2 Hydraulic Graph Job Name:ALDI DISTRIBUTION FACILITY N 1.85 Remote Area Number: 13-Rack,ZONE 13-ROOF Date:2/20/2018 150 Water Supply Summary Sheet 135 Node: 804 120 Static Pressure 113.000 02.79 @ 111.82 1 500.00 @ 110.000 105 902.79 @ 95.506 90 .N n 75 w W N d 60 System demand curve 45 30 15 4 0300 600 900 1200 1500 1800 2100 2400 2700 3000 Flow-gpm ©M.E.P.CAD,Inc. A AutoSPRINK®12 02.1.1.0 2/20/2018 3:34:48PM Paqe 3 1 Summary Of'Outflowing,Devices Job Number:2017-1839 Report Description:In Rack Sprinklers(13-Rack),Spec.Warehouse Actual Flow Minimum Flow K-Factor Pressure Density Coverag Device m m si m ft2 Foot Sprinkler 1301 26.53 25.72 8 11.001 0.253gpmt t2 105.00ft2 Sprinkler 1302 26.64 26.14 8 11.085 0.250gpm/ft2 106.70ft' Sprinkler 1303 27.01 26.14 8 11.397 0.253gpmtft2 106.70ft2 Sprinkler 1304 27.79 25.60 8 12.063 0.266gpmt t2 104.50ft2 Sprinkler 1305 29.08 25.60 8 13.218 0.278gpm/ft2 104.50ft2 Sprinkler 1306 31.40 25.60 8 15.410 0.301gpmfft2 104.50ft2 Sprinkler 1307 26.04 25.72 8 10.596 0.248gpm/ft2 105.00ft2 Sprinkler 1308 26.14 26.14 8 10.678 0.245gpmKt2 106.70ft2 j Sprinkler 1309 26.51 26.14 8 10.979 0.248gpmtt2 106.70ft2 j Sprinkler 1310 27.27 26.14 8 11.622 0.256gpm/ft2 106.70ft2 Sprinkler 1311 28.55 26.14 8 12.738 0.268gpm/ft2 106.70ft2 Sprinkler 1312 31.48 26.14 8 15.488 0.295gpm/ft2 106.70ft2 Sprinkler 1313 26.74 25.72 8 11.172 0.255gpm/ft2 105.00ft2 Sprinkler 1314 26.84 26.14 8 11.258 0.252gpmfft2 106.70ft2 Sprinkler 1315 27.22 26.14 8 11.574 0.255gpm/ft2 106.70ft2 Sprinkler 1316 28.00 26.14 8 12.250 0.262gpmfft2 106.70ft2 Sprinkler 1317 29.31 26.14 8 13.421 0.275gpm/ft2 106.70ft' Sprinkler 1318 31.64 26.14 8 15.645 0.297gpm/ft2 106.70ft2 Sprinkler 1319 27.12 25.72 8 11.490 0.258gpm/ft2 105.00ft2 Sprinkler 1320 27.22 26.14 8 11.578 0.255gpmfft2 106.70ft2 Sprinkler 1321 27.60 26.14 8 11.902 0.259gpm/ft2 106.70ft' Sprinkler 1322 28.39 25.65 8 12.595 0.271gpm/ft2 104.70ft2 Sprinkler 1323 29.72 25.65 8 13.798 0.284gpm/ft2 104.70ft2 Sprinkler 1324 32.08 25.65 8 16.079 0.306gpm/t' 104.702 Sprinkler 1325 34.56 26.14 8 18.660 0.324gpm/ft2 106.70ft2 Sprinkler 1326 34.69 26.14 8 18.800 0.325gpm/ft2 106.70ft' Sprinkler 1351 24.41 21.69 5.6 18.995 0.305gpmt t2 80.00ft2 Sprinkler 1352 24.59 21.69 5.6 19.283 0.307gpm/ft2 80.00ft2 Sprinkler 1353 25.22 21.69 5.6 20.287 0.315gpm/ft2 80.00ft2 Sprinkler 1354 26.53 21.69 5.6 22.436 0.332gpmt t2 80.00ft2 Sprinkler 1355 28.14 21.69 5.6 25.242 0.352gpm/ft2 80.00ft2 Sprinkler 1356 28.34 21.69 5.6 25.611 0.354gpmt t2 80.00ft2 b Most Demanding Sprinkler Data ©M.E.P.CAD,Inc. a:s AutoSPRINK®12 v12.1.1.0 2/20/2018 3:34:50PM Page 4 Job Name: ALDI DISTRIBUTION FACILITY Remote Area Number: 13-Rack, ZONE 13-ROOF Date: 2/20/2018 Supply Analysis Static Residual Flow Available Total Demand Required Pressure Node Name (psi) (psi) @ (gpm) (psi) (gpm) (psi) 804 Water Supply 113.000 110.000 1 1500.00 111.827 902.79 95.506 Node Analysis Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node (psi) (gpm) 1355 12'-7% Sprinkler 25.242 28.14 Density:0.352gpm/ft2 1 Coverage:MOOftZ 1356 12'-7 Sprinkler 25.611 28.34 Density:0.354gpm/ft2 Coverage:MOOftz 501 27'-5 15.506 502 25'-6 19.282 503 27'-5 15.631 504 25'-43/< 19.398 505 25'-3'/4 19.703 506 27'-5 15.742 507 25'-2 20.291 508 27'-5 16.179 509 25'-1 21.250 510 21'-10 75.939 511 2'-10% 90.398 600 12'-7 27.079 601 25'-3'/4 63.514 602 25'-0 66.529 603 22-8 77.710 604 2'-10% 90.392 801 1'-0 91.535 ,©M.E.P.CAD,Inc. F-ISAutoSPRINK®12 v12.1.1.0 2/20/2018 3:34:51PM Page 5 Job Name: ALDI DISTRIBUTION FACILITY Remote Area Number: 13-Rack, ZONE 13-ROOF Date: 2/20/2018 Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node (psi) (gpm) 802 4-3 95.545 803 4-6 95.506 804 -2'-6 Supply 95.506 902.79 1301 27'-5 Sprinkler 11.001 26.53 Density:0.253gpmht2 Coverage: 105.00ft2 1302 27'-5 Sprinkler 11.085 26.64 Density:0.250gpm/ft2 Coverage:106.70ft2 1303 27'-5 Sprinkler 11.397 27.01 Density:0.253gpmfft2 Coverage:106.70ft2 1304 27'-5 Sprinkler 12.063 27.79 Density:0.266gpm/ft2 Coverage:104.50ft2 1305 27'-5 Sprinkler 13.218 29.08 Density:0.278gpm/ft2 Coverage:104.50ft2 1306 27'-5 Sprinkler 15.410 31.40 Density:0.301gpm/ft2 Coverage:104.50ft2 1307 27-5 Sprinkler 10.596 26.04 Density:0.248gpm/ft2 Coverage:105.00ft2 1308 27'-5 Sprinkler 10.678 26.14 Density:0.245gpm/ft2 Coverage:106.70ft2 1309 27'-5 Sprinkler 10.979 26.51 Density:0.248gpm/ft2 Coverage:106.70ft2 1310 27-5 Sprinkler 11.622 27.27 Density:0.256gpm/ft2 Coverage:106.70ft2 1311 27-5 Sprinkler 12.738 28.55 Density:0.268gpm/ft2 Coverage:106.70ft2 1312 27'-5 Sprinkler 15.488 31.48 Density:0.295gpm/ft2 Coverage:106.70ft2 1313 27'-5 Sprinkler 11.172 26.74 Density:0.255gpm/ft2 Coverage:105.00ft2 1314 27-5 Sprinkler 11.258 26.84 Density:0.252gpm/ft2 Coverage:106.70ft2 1315 27'-5 Sprinkler 11.574 27.22 Density:0.255gpm/ft2 Coverage:106.70ft2 1316 27'-5 Sprinkler 12.250 28.00 Density:0.262gpm/ft2 Coverage:106.70ft2 1317 27'-5 Sprinkler 13.421 29.31 Density:0.275gpm/ft2 Coverage:106.70ft2 1318 27'-5 Sprinkler 15.645 31.64 Density:0.297gpm/ft2 Coverage: 106.70ft2 1319 27'-5 Sprinkler 11.490 27.12 Density:0.258gpm/ft2 Coverage: 105.00ft2 1320 27'-5 Sprinkler 11.578 27.22 Density:0.255gpm/ft2 -1 - L Coverage: 106.70ft2 ©M.E.P.CAD,Inc. F-Il AutoSPRINK®12 02.1.1.0 2/20/2018 3:34:51 PM Page 6 Job Name: ALDI DISTRIBUTION FACILITY Remote Area Number: 13-Rack, ZONE 13-ROOF Date: 2/20/2018 Node Number Elevation(Foot) Node Type Pressure at Discharge at Notes Node Node (psi) (gpm) 1321 27'-5 Sprinkler 11.902 27.60 Density:0.259gpm/ft2 Coverage:106.70ft2 1322 27'-5 Sprinkler 12.595 28.39 Density:0.271 gpm/ft2 Coverage: 104.70ft2 1323 27-5 Sprinkler 13.798 F32.08 9.72 Density:0.284gpm/ft2 Coverage:104.70ft2 1324 27'-5 Sprinkler 16.079 Density:0.306gpm/ft2 Coverage: 104.70ft2 1325 27'-5 Sprinkler 18.660 34.56 Density:0.324gpm/ft2 Coverage:106.70ft2 1326 27'-5 Sprinkler 18.800 34.69 Density:0.325gpm/ft2 Coverage:106.70ft2 1351 12'-8% Sprinkler 18.995 24.41 Density:0.305gpm/ft2 Coverage:80.00ft2 1352 12'-8 Sprinkler 19.283 24.59 Density:0.307gpm/ft2 Coverage:80.00ft2 1353 12'-7% Sprinkler 20.287 25.22 Density:0.315gpm/ft2 Coverage:WOOft2 1354 12'-7% Sprinkler 22.436 26.53 Density:0.332gpm/ft2 Coverage:80.00ft2 L,©M.E.P.CAD,Inc. L-11 AutoSPRINK®12 v12.1.1.0 2/20/2018 3:34:51 PM Page 7 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number: 13-Rack,ZONE 13-ROOF Date:2/20/2018 Pipe Information Flow added Length C Factor ) Notes Elev 1 Fittings 8 g Total(Pt Node 1 (Foot) Devices K-Factor this step Nominal ID (Foot) Fitting/Device(Equivalent (q) Length) Fitting Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit Node 2 Length applicable,are added directly (Foot) tf1) Actual ID 9 Total (psi) to and shown as a (Foot) (Foot) Friction(Pf) (� negative value. 1308 27'-5 8 26.14 2 (See 10'-8 120 10.678 •••••Route 1••••• Notes) Sprinkler 1309 27'-5 52.18 2.067 0.028208 10'-8 0.301 1309 27'-5 8 26.51 2 (See 10'-8 120 10.979 Notes) Sprinkler 1310 27'-5 78.69 2.067 0.060311 10'-8 0.643 1310 27-5 8 27.27 2 (See 10'-8 120 11.622 Notes) Sprinkler 1311 27'-5 105.96 2.067 0.104587 10'-8 1.116 1311 27'-5 8 28.55 2 (See 7'-9% 120 12.738 Notes) 10'-0 Sprinkler, 503 27-5 m 134.51 2.067 IT-9Yz 0.162618 2.893 T(10'-0) 503 27'-5 31.48 2 (See 2'-0'/. 120 15.631 Notes) Flow(q)from Route 10 10'-0 0.880 504 25'-4% 166.00 2.067 12'-0/ 0.239959 2.887 PO(i0'-0) 504 25'-43/4 168.45 4 10'-0 120 19.398 Flow(q)from Route 3 0.046 505 25'-3'/. 334.45 4.260 0.025908 0.259 505 25'-3Y4 169.75 4 91-9% 120 19.703 Flow(q)from Route 4 0.045 507 25'-2 504.20 4.260 0.055366 Kx� 9'-9% 0.543 507 25'-2 172.13 4 9'-7'% 120 20.291 Flow(q)from Route 7 0.044 509 25'-1 676.32 4.260 0.095327 9'-7'/a 0.915 509 25'-1 69.25 4 (See 427-2% 120 21.250 Notes) Flow(q)from Route 14 39'-6 1.405 510 2V-10 x 745.57 4.260 0.114164 ( 466'-8'/. 53.283 3E 13'-2) 510 21'-10 6 (See 196'-0'% 120 75.939 Notes) 187'-4 8.228 511 2'-10'% 745.57 6.357 0.016252 5E(17'-7'/),EE(8'-9Y2), 383'-4% 6.231 2BV(12'-7),DeIV(27'-8), PO 37'-8% 511 2'-10% 157.22 10 (See 6'-3 120 90.398 Notes) 153'-8 0.804 Flow(q)from Route 9 801 1'-0 902.79 10.420 0.002087 2T(60'-6),EE(13'-3%), 159'-11 0•334 LtE 19'-4'/< ©M.E.RCAD,Inc. f-11 AutoSPRINK®12 02.1.1.0 13-Rack,ZONE 13-ROOF 2/20/2018 3:34:53PM Page 8 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number: 13-Rack,ZONE 13-ROOF Date:2/20/2018 Pipe Information Flow added Elev 1 Fittings& Length C Factor Notes Node 1 (Foot) K-Factor this step Nominal ID Devices (Foot) Total(Pt) Fitting/Device(Equivalent (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit Node 2 (Foot) (Q) Actual ID Length Total (psi) applicable,are added directly (Foot) (Foot) Friction(Pf) to(negative value. 801 1'-0 10 (See 1003'-0% 140 91.535 Notes) 365'-1'/. 1.842 802 902.79 10.400 0.001584 2LtE(25'-6),6EE(1T-6%), 1368'-2 2.167 3PIV(7'-11%),3E(35'-1), T 79'-8% 802 -3'-3 90 (See 15'-0 120 95.545 --T- Notes) 122'-2Y2 -0.325 803 -2'-6 902.79 10.420 0.002087 LtE(19'-4Y,),EE(13'-33/,), 137'-2'/ 0.286 BV 23'-0,CV 66'-6'/ 803 -2'-6 6 (See 0'-0 120 95.506 Notes) 804 -2'-6 902.79 6.065 0.029114 x? r-0-1-0 Water Supply 0.000 0.00 95.506 Hose Allowance At Source t � 804 902.79 Total(Pt) Route 1 1307 27-5 8 26.04 2 (See 10'-6 120 10.596 .....Route 2 Notes) Sprinkler ::130:8 27'-5 26.04 2.067 0.007797 10'-6 0.082 10.678 Total(Pt) Route 2 1302 2T-5 8 26.64 2 (See 10'-8 120 11.085 .....Route 3 Notes) Sprinkler 1303 27'-5 f 53.17 2.067 0.029203 10'-8 0.311 1303 27'-5 8 27.01 2 (See 10'-8 120 11.397 Notes) Sprinkler 1304 27'-5 80.18 2.067 0.062436 1304 27'-5 8 27.79 2 (See 10'-8 120 12.063 Notes) Sprinkler 1305 27-5 107.96 2.067 0.108268 10'-8 1.155 1305 27'-5 8 29.08 2 (See 7'-9% 120 13.218 Notes) Sprinkler, 501 27-5 137.05 2.067 0.168328 , 13'-7 2.288 T(5'-9/�) 501 27'-5 31.40 2 (See V-11 120 15.506 Notes) Flow(q)from Route 12 10'-0 0.835 502 25'-6 168.45 2.067 11'-11 0.246561 PO(10'-0) } 2.941 1,©M.E.RCAD,Inc. F-19 AutoSPRINKO 12 v12.1.1.0 13-Rack,ZONE 13-ROOF 2/20/2018 3:34:53PM Page 9 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number: 13-Rack,ZONE 13-ROOF Date:2/20/2018 Pipe Information Elev 1 Flow added Fittings 8 Total(Pt)Length C Factor Notes Node 1 K-Factor this step Nominal ID (Foot) Fitting/Device/Device(Equivalent (Foot) (q) Devices 9 ( q g Len th Fitting pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) = (Q) (psi) to(PQ and shown as a (Foot) (Foot) Friction(Pf) negative value. 502 25'-6 4 9'-9'Y 120 19.282 0.045 504 25'-43/+ 168.45 4.260 9-g+/ 0.007285 0.071 19.398 Total(Pt) Route 3 1314 2T-5 8 26.84 2 (See 10'-8 120 11.258 .....Route 4 Notes) Sprinkler 1315 27'-5 53.58 2.067 0.029623 10'-8 0.316 1315 27'-5 8 27.22 2 (See 10'-8 120 11.574 Notes) Sprinkler 1316 27'-5tv 80.80 2.067 0.063335 10'-8 0.676 1316 27'-5 8 28.00 2 (See 10'-8 120 12.250 Sprinkler Notes) 1317 27'-5 108.80 2.067 0.109823 10'-8 1.171 1317 27'-5 8 29.31 2 (See T-9'% 120 13.421 Notes) Sprinkler, 506 27'-5 138.11 2.067 13'-7 0.170740 2.321 T(5'-9'Y) 506 27-5 31.64 2 (See 2'-1% 120 15.742 Notes) 10'-0 0.926 Flow(q)from Route 11 505 25'-3'/, c, 169.75 2.067 0.250083 P0(10'-0) 12'-17Y4 3.035 19.703 Total(Pt) Route 4 1301 27'-5 8 26.53 2 (See 10'-6 120 11.001 .....Route 5 Notes) Sprinkler 1302 27'-5 26.53 2.067 10'-6 0.008072 0.085 11.085 Total(Pt) Route 5 1313 27'-5 8 26.74 2 (See 10'-6 120 11.172 .....Route 6 Notes) Sprinkler 1314 27'-5 77 26.74 2.067 0.008188 10'-6 0.086 11.258 Total(Pt) Route 6 1320 27'-5 8 27.22 2 (See 10'-8 120 11.578 •••••Route 7••••• Notes) Sprinkler 1321 27-5 54.34 2.067 0.030401 10'-8 0.324 ©M.E.P.CAD,Inc. his AutoSPRINK®12 02.1.1.0 13-Rack,ZONE 13-ROOF 2/20/2018 3:34:53PM Page 10 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number: 13-Rack,ZONE 13-ROOF Date:2/20/2018 Pipe Information Elev 1 Flow added Fittings 8 Total(Pt)Length C Factor Notes Node 7 K-Factor this step Nominal ID (Foot) Fitting/Device/Device thE uivalent (Foot) (q) Devices 9 Length) Fitting Pf Friction Elev(Pe) g ) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added direct) Node 2 Actual ID Length Total Y (Foot) (0) (Foot) (Foot) (psi) Friction(Pf) to(Pt)and shown as a ne ative value. 1321 27'-5 8 27.60 2 (See 10'-8 120 11.902 Notes) Sprinkler 1322 2T-5 = 81.94 2.067 0.064997 10'-8 0.693 1322 2T-5 8 28.39 2 (See 10'-8 120 12.595 Notes) Sprinkler 1323 27'-5 110.33 2.067 0.112701 10'-8 1.202 1323 2T-5 8 29.72 2 (See T-9'/ 120 13.798 Notes) Sprinkler, 5'-9'/: 508 27'-5 140.05 2.067 13'-7 0.175205 2 381 T(5'-9'/) 508 27-5 32.08 2 (See 2'-3 120 16.179 Notes) 10'-0 0.971 Flow(q)from Route 13 507 25'-2 172.13 2.067 12'-3 0.256601 3.141 PO(i0'-0) 20.291 Total(Pt) Route 7 1319 27'-5 8 27.12 2 (See 10'-6 120 11.490 •••••Route 8••••• Notes) Sprinkler 1320 2T-5 27.12 2.067 0.008403 10'-6 0.088 11.578 Total(Pt) Route 8 1351 12'-8/2 5.6 24.41 1/z (See 8'-4 100 18.995 •••••Route 9••••• Notes) 0.015 Sprinkler 1352 12'-8 0.032718 24.41 1.610 8'-4 0.273 1352 12'-8 5.6 24.59 1'/ (See 8'-4 100 19.283 Notes) Sprinkler 0.015 1353 12'-7Y 49.00 1.610 0.118772 8'-4 0.990 1353 12'-7'/ 5.6 25.22 1'/2 (See 8'-4 100 20.287 Notes) 0.015 Sprinkler Ft�..r 1354 12'-7'/. 74.22 1.610 8-4 0.256074 2.134 1354 12'-7% 5.6 26.53 1% (See 4'-7 100 22.436 Notes) 0.008 Sprinkler, 600 12'-7 100.75 1.610 0.450680 T(5'-8'%) 4.634 600 12'-7 56.48 1'/ (See 26'-7 100 27,079 Notes) Flow(q)from Route 15 14'-3 -5.501 601 25'-3Y. 157.22 1.610 1.026695 T(5'-8'/),E(2'-10%), Y. 41.937 mecT 5'-8% 40'-10 ©M.E.RCAD,Inc. F-11 AutoSPRINKO 12 v12.1.1.0 13-Rack,ZONE 13-ROOF 2/20/2018 3:34:53PM Page 11 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number: 13-Rack,ZONE 13-ROOF Date:2/20/2018 Pipe Information Ele (Foot)v 1 Flow added Fittings& Length C Factor Total(Pt) Notes Node 7 K-Factor this step Nominal ID Ft (Foot) tq) Devices ( ) Fitting/Device(Equivalent Length) Fitting Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) (Q) (Foot) (Psi) Friction(Pf) to(Pf)and shown as a (Foot) negative value. 601 25'-3Y. 3 (See 77'-11 100 63.514 Notes) 9'-9'/ 0.115 602 25'-0 157.22 3.260 87'-8'/ 2.900 0.033061 E(4'-9'/),Tr(5'-0) 602 25'-0 3 (See 223'-10% 100 66.529 Notes) 5'-0 1.012 603 22'-8 157.22 3.068 0.044432 E(5'-0) Y 228'-10'% 10.170 i 603 22'-8 4 (See 421'-1'/ 120 77.710 Notes) 217'-3 8.589 604 2'-10Y, 157.22 4.260 0.006412 10E(13'-2),2BV(15'-9'/), 638'-4'/2 4.093 DeIV 27'-7'/.,PO 26'-4 4 604 2'-10Y, '-9/2 10 (See ' 120 90.392 Notes) 60'-6 511 2'-10% 157.22 10.420 0.000082 T(60'-6) 65'-3'/ 0.005 90.398 Total(Pt) Route 9 1312 27'-5 8 31.48 2 (See 2'-10% 120 15.488 •••••Route 10••••• Notes) Sprinkler, 10'-0 503 27'-5 '2'1 8 2.067 0.011077 T(10'-0) 12'-10Y2 0.143 15.631 Total(Pt) Route 10 1318 27'-5 8 31.64 2 (See 2'-10% 120 15.645 .....Route 11 Notes) Sprinkler, 5'-9'/2 506 27'-5 - 31.64 2.067 8-8 0.011180 0.097 T(5'-9Y2) r; 15.742 Total(Pt) Route 11 1306 27'-5 8 31.40 2 (See 2'-10% 120 15.410 •••••Route 12••••• Notes) 5'-9'/z Sprinkler, 501 27'-5 31.40 2.067 8-8 0.011025 0.096 T(5'-9Y2) 15.506 Total(Pt) Route 12 1324 27'-5 8 32.08 2 (See 2'-10'/ 120 16.079 •••••Route 13••••• Notes) 5,-91/2 Sprinkler, 508 27'-5 32.08 2.067 8-8 0.011467 0.099 T(5'-9'/) 16.179 Total(Pt) Route 13 1325 27'-5 8 34.56 2 (See 10'-8 120 18.660 •••••Route 14••••• Notes) Sprinkler 1326 27'-5 34.56 2.067 0.013160 10'-8 0.140 �M ©M.E.RCAD,Inc. d�►�AutoSPRINKO 12 v12.1.1.0 13-Rack,ZONE 13-ROOF 2/20/2018 3:34:53PM Page 12 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number: 13-Rack,ZONE 13-ROOF Date:2/20/2018 Pipe Information (Foot) Flow added Devices g (Equivalent Length C Factor Notes Elev 1 Fittings 8 Total(Pt) Node 1 K-Factor this step Nominal ID (Foot) Fittin /Device E uivalent (q) Fitting Length) Pf Friction Elev(Pe) Fixed Pressure Losses,when Elev 2 Total Flow Equiv. (Foot) Loss Per Unit applicable,are added directly Node 2 Actual ID Length Total (Foot) tQ) (Foot) (P51) Friction(Pf) to(Pf)and shown as a (Foot)) negative value. 1326 2T-5 8 34.69 2 (See 10'-1'/: 120 18.800 Sprinkler, Notes) 20'-0 1.015 509 25'-1 69.25 2.067 0.047606 T(10'-0),PO(10'-0) 30'-1/ 1.435 21.250 Total(Pt) Route 14 8'-4 100 25.242 •••••Route15••••• 1355 12'-7/2 5.6 28.14 1'/z (See Sprinkler S Notes) P 0.015 1356 12'-7 28.14 1.610 0.042560 8'-4 0.355 1356 12'-7 5.6 28.34 1% (See I 3'-9 100 25.611 Notes) Sprinkler, 1.. 5'-8'/ 0.007 600 12'-7 56.45 1.610 0.154465 T(5'-8'Y 9'-5'/ 1.461 j 27.079 Total(Pt) Route 15 1V ©M.E.P.CAD,Inc. AutoSPRINK®12 v12.1.1.0 13-Rack,ZONE 13-ROOF 2/20/2018 3:34:53PM Page 13 Job Name:ALDI DISTRIBUTION FACILITY Remote Area Number: 13-Rack,ZONE 13-ROOF Date:2/20/2018 Equivalent Pipe Lengths of Valves and Fittings(C=120 only) =Factor C Value Multiplier Actual Inside Diameter 4.87 Value Of C 100 130 140 150 ( Schedule 40 Steel Pipe Inside Diameter ) Multiplying Factor 0.713 1.16 1.33 1.51 Fittings Legend I ALV Alarm Valve An V An le Valve b Bushing BaIV Ball Valve BFP Backflow Preventer BV Butterfly Valve C Cross Flow Turn 90° cpIq Coupling Cr Cross Run CV Check Valve DeIV Deluge Valve DPV D Pipe Valve E 90°Elbow EE 45°Elbow Eel 11'/.°Elbow Ee2 22'/°Elbow f Flow Device fd Flex Drop FDC Fire Department Connection fE 90°FireLock M Elbow fEE 45°FireLock TM Elbow fig Flan a FN Floating Node fT FireLock M Tee Gauge GloV Globe Valve GV Gate Valve Ho Hose Hose Hose H d Hydrant LtE Lon HV Hose Valve Turn Elbow HV Mechanical Tee Noz Nozzle P1 PumpIn mecT Pump Out PIV Post IndicatingValve PO Pipe Outlet PRV Pressure Reducing Valve PrV Pressure Relief Valve red Reducer/Adapter S Supply sCV Swing Check Valve S r S rinkler St Strainer T Tee Flow Turn 90° Tr Tee Run U Union WirF Wirsbo WMV Water Meter Valve Z Ca �1 ©M.E.P.CAD,Inc. .I AutoSPRINK®12 02.1.1.0 13-Rack,ZONE 13-ROOF 2/20/2018 3:34:53PM Page 14