HomeMy WebLinkAbout43 Evergreen Way - Life Safety System Te 13—I 90 INSTALLATION OF SPRINKLER SygTEMS
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE b tnessad owner s
Upon completion of work,inspection and tests shall be made by the contractor's representativeand f rrifti Y an
representative.All defects shalt be corrected and system left in service before contractor's personnel
A certificate shall be filled out and signed by both representatives. Copies shag be prepared for approving authorities,°wne''s'and
contractor. It is understood the owner's representative's signature in no way prejudices any for
claim against contractor material,poor
workmanship,or failure to comply with approving authority's requirements Of local ordinances.
Property name___--__-- Data Fj� V-
I 1
Property address
Accepted by appr authorities(na 4fi S JC
Address ^��
Plans Yes ~_ NO
Installation conforms to accepted plans Yes No
Equipment used is approved
If no,explain deviations
Has person in charge of fire equipment been instructed as Yes _ NO
to location of control valves and care and maintenance
of this new equipment?
It no,explain
Instructions — J Yes _ No
Have copies of the following been left on the premises? _
1. System components instructions — Yes No
NO
2. Care and maintenance instructions Yes _
3. NFPA 25 Yes No
Location of Supplies buildings
system
Year of i Orifice Temperature
_ Make Model manufacture size Chrantity rating
Sprinklers
Pipe and Type of pipe
fittings Type of fittings - w
Maximum time to operate
Alarm Alarm device through test connec Ilion
valve or Type Make Model Minutes Serwnds
flow i
indicator -- i
Dry valve 0.0.[3
Make Model Serial no. M Modal Serial tp
Dry pipe Time to trip I i i Time water Alarm
operating t through test Watsr Air air pressure
re reached 1�
test i connection Pressure Pressure
Minutes Seconds' R psi F�exrtes Seconds ; Yes No
wfhouti i
O,O.D
With
If no,explain
t Measured from time inspectoPs test connection Is opened
2 NFPA 13 only requires the 60-second limitation in s3peCi is sections
FIGURE 16.1 Contractor's Material and Test Cft-dfie fOrAbovegmund P Ping.
2002 Edition
SYSTEMS ACCEPTANCE 13-191
Operation
Pneumatic Electric Hydraulics
Piping supervised ❑ Yes - No I Detecting media supervised Yes No
Does valve operate from the manual trip,remote,or both J Yes No j
control stations?
Deluge and — — —`
preaction Is there an accessible facility in each circuit if no,explain
valves fortesting?
Yes ❑ No
i Does each circuit operate I noes each circuii opa,ate T- "" ^c^ `•i^e'•^
Make , Model supervision loss alarm? ' _valve release? i _operate release
Yes No -- Yes No i Minutes ! Seconds
— —7---— I
Location i Make and Setting + Static pressure Residual pressure j Flow rate
Pressure j and floor model ( j (flowing)
reducing - —
valve test i j Inlet(psi) i Outlet(psi) inlet(psi) t Outlet(psi) Flow(gpm)
Hydrostatic: Hydrostatic tests shall be made at not less than 200 psi(13.6 bar)for 2 hours or 50 psi(3.4 bar)
above static pressure in excess of 150 psi(10.2 bar)for 2 hours. Differential dry-pipe valve clappers shall be left
open during the test to prevent damage.All aboveground piping leakage shall be stopped.
Test
description Pn� 1Lc Establish 40 psi(23 bar)air pressure and measure drop,which shall not exceed 11/2 psi(0.1 bar)
i in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop,which shall
not exceed 11r12 psi(0.1 bar)in 24 hours.
All piping hydrostatically tested at psi{—bar)for—hours If no,state reason
Dry piping pneumatically tested ❑ Yes No
Equipment operates properly Yes ❑ No
Do you certify as the sprinkler contractor that additives and corrosive chemicals,sodium silicate or derivatives
of sodium silicate,brine,or other corrosive chemicals were not used for testing systems or stopping leaks?
i
Yes ❑ No
Drain Reading of gauge located near water Residual pressure with valve in test
Tests test supply test connection: _ iconnecion open wide: psi(v bar)
Underground mains and lead-in connections to system risers flushed before connection made to
sprinkler piping i
Verified by copy of the Contractor's Material and Test ❑ Yes ❑ No j Other Explain
Certificate for Underground Piping.
Flushed by installer of underground sprinkler piping ❑ yes ❑ No
! If powder-driven fasteners are used in concrete, Yes ❑ No If no,explain
has representative sample testing been
i satisfactorily completed?
Blank testing Number used Locations l Number removed
gaskets
Welding piping ❑ Yes ❑ No
If yes...
Do you certify as the sprinkler contractor that welding procedures comply ❑ Yes ❑ No
with the requirements of at least AWS B2.1?
I
Welding ! Do you certify that the welding was performed by welders qualified in ❑ Yes ❑ No
compliance with the requirements of at least AWS B2.1?
I
i I
Do you certify that the welding was carried out in compliance with a ❑ Yes ❑ No
documented quality control procedure to ensure that all discs are retrieved,that
openings in piping are smooth,that stag and other welding residue are
i removed,and that the internal diameters of piping are not penetrated?
Cutouts Do you certify that you have a control feature to ensure that ❑ Yes ❑ No
(discs) all cutouts(discs)are retrieved?
FIGURE 16.1 Cen0n red
2002 Edition
1t11t INSTAUA770N4FJS3'>til KUIIBV87ZW
Wydrtulkt NArnAplate p►evlded tt fr®,AxFNatn
data
"Imoplats �a yam, ED No
Date Iatt in aeMOe tk}tff Allntfa vsiVee a
P4Afltifkb •.�. .._. _...
ttflttiYf�nVaater s
�' � TAyTe W►tffeAAlp Dy � �..
signatures -
f -- EEnor
O=
rTWO
Addhiand cl -gA C
explafurHaru nags
f,