HomeMy WebLinkAbout466 Evergreen Way - Life Safety System T CONTRACTOR'S MATERIAL TEST CERTIFICATE FOR ABOVEGROUND PIPING PROCEDURE Upon completion of work,inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative.All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities,owners and contractor. It is understood the property owner's authorized representative is a legal signatory and fully representitive of the Property owner's or propedy that it is in compliance with the applicable approving authoritiy's requirements and local oordinances. cepts full responsibility for the system as installed and agrees PROPERTY NAME Red Hawk# DATE Bone Fish Grill @ Evergreen Walk 3004889 PROPERTY ADDRESS 3/1/2013 400 Evergreen Walk Suite#466 South Windsor, CT ACCEPTED BY APPROVING AUTHORITY('S)NAMES AHJ ADDRESS PLANS INSTALLATION CONFORMS TO ACCEPTED PLANS EQUIPMENT USED IS APPROVED x YES NO IF NO,EXPLAIN DEVIATIONS x YES NO HAS ST RORP BEEN INRUCTED AS TOLOCATIOON O CONTROLL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT x YES NO IF NO,EXPLAIN INSTRUCTIONS HAVE COPIES OF THE FOLLOWING BEEN GIVEN TO THE PROPERTY OWNER OR PROPERTY OWNER'S AUTHORIZED REPRESENTITIVE: 1.SYSTEM COMPONENTS INTRUCTIONS 2.CARE AND MAINTENANCE INSTRUCTIONS: X YES _NO 3. NFPA 25: X YES _NO LOCATION OF SUPPLIES BLDGS. X YES NO SYSTEM Entire Tenant Space MAKE MODEL YEAR OF QUANTITY TEMPERATURE RATING in ORIFICE SIZE MANUFACTURE degrees SPRINKLERS Reliabe F1FR/Pend 2012 1/2" 55 165 Reliabe F1FR/UPR 2012 1/2" 2 165 Reliabe F3QR/Pend 2012 1/2" 3 165 Reliabe F3QR/SW 2013 1/2" 5 200 E PIPE CONFORMS TO NFPA#13 STANDARD [] PIPE AND FITTINGS CONFORM TO NFPA#13 X YES NO STANDARD X YES NO FITTINGS IF NO,EXPLAIN ALARM DEVISE MAXIMUM TIME TO OPERATE THROUGH TEST PIPE ALARM VALVE OR TYPE MAKE MODEL MIN. FLOW INDICATOR Exist Flow sec. DRY VALVE Q.O.D. MAKE NA MODEL SERIAL NO. MAKE MODEL SERIAL NO. DRY PIPE TIME TO TRIP WATER TRIP POINTAIR TIME WATER ALARM OPERATED OPERATING TEST THRUTEST PIPE PRESSURE AIR PRESSURE REACHED TEST PRESSURE PROPERLY OUTLET MIN. SEC. PSI. PSI. PSI. MIN. SEC. YES Without NO Q.O.D. With Q.O.D IF NO,EXPLAIN PAGE#1 OF 2 OPERATION T—JPNEUMATIC ELECTR DELUGE& IC I HYDRAULIC PREACTION PIPING SUPERVISED YES NO DETECTING MEDIA SUPERVISED YES NO OPERATE FROM THE MANUAL TRIP ANDIOR REMOTE CONTROL STATION YES I NO IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING IF NO,EXPLAIN YES r NO DOES EACH CIRCUIT DOES EACH CIRCUIT MAXIMUM TIME TO MAKE MODEL OPERATE SUPERVISION OPERATE VALVE RELEASE OPERATE RELEASE NA LOSS ALARM YES NO YES NO YES NO HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi(13.6 bars)for two hours or 50 psi(3A bars)above static pressure in excess of 150 psi(10.2 bars)for two hours. Differential dry-pipe valve clappers shall be left open during test to prevent damage.All aboveground piping leakage shall be stopped. TEST FLUSHING: Flow the required rate until water is clear as indicated by no collection of foreign material in burlap bags at outlets such as DESCRIPTION hydrants and blow-offs. Flush at flows not less than 400 GPM If 514 Umin)for 4-inch pipe,600 GPM(2271 Umin)for 5-inch pipe,750 GPM(2839 Umin)for 124nch pipe.When supply cannot produce stipulated flow rates,obtain maximum available. PNEUMATIC: Establish 40 psi(2.7 bars)air pressure and measure drop which shall not exceed 1-1/2 psi(0.1 bars)in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 1-1/2 psi 0.1 bars in 24 hours. ALL PIPING HYDROSTATICALLY TESTED AT 200 PSI FOR 2 HRS. 1F NO,STATE REASON DRY PIPING PNEUMATICALLY TESTED YES X NO NA EQUIPMENT OPERATES PROPERLY X YES I IND READING OF GAGE LOCATED NEAR WATER SUPPLY TEST PIPE. RESIDUAL PRESSURE WITH VALVE IN TEST TESTS DRAIN TEST STATIC PRESSURE: PSI PIPE OPEN WIDE PSI Underground mains and lead in connections to system risers flushed before connection made to sprinkler piping. VERIFIED BY COPY OF THE U FORM NO.85B =YES XQNO OTHER EXPLAIN FLUSHED BY INSTALLER OF UNDER GROUND Exist Underground SPRINKLER PIPING YES X NO TANK TESTING NUMBER USED LOCATIONS NUMBER REMOVED AND GASKETS 0 WELDING PIPING YES I X I NO IF YES........ DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3 =YES=NO DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED WELDING IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3 =YES=NO DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE RETRIEVED,THAT OPENINGS IN PIPING ARE SMOOTH,THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED,AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED YES NO HYDRAULIC DATA NAMEPLATE PROVIDED IF NO,EXPLAIN NAMEPLATE YEs No DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: REMARKS 3/112013 NAME OF SPRINKLER CONTRACTOR Red Hawk Fire&Security,LLC 55 Robinson Ave.Orange,CT 06460 TESTS WITNESSED BY SIGNATURES F PE D R(SIG ) TITLE DATE F ER CONTRA (SINGED) TITLE DATE St-r-vai. ADDITIONAL EXPLANATION AND NOTES PAGE#2 OF 2