Loading...
HomeMy WebLinkAbout76 Evergreen Way - Building Plans &amp; Draw (2) PROJECT DIRECTORY INDEX MATERIAL LEGEND & CODE SUMMARY. DATE: I'013/12/II LANDLORD / COORDINATOR: JOB NO: HI - PHC - 11 I •. 1 SYMBOLS Evergreen Walk, Phase II Ventures, LLC Applicable Codes: DRAWN:STAFF c/o Poag & McEwen Lifestyle Centers Building: 2003 International Building Code CHECKED:CM SITE KEY PLAN Memphis, his,Pop T 38119, Suite 850 CDR _ _ _ - Memphis, TN 38119 GENERAL �° Plumbing: 2003 International Plumbing Code 901.761.7604 office AO.01 COVER / PROJECT INFO • EARTH BLOCKING BATT INSULATION s 901.507.5561 fax A0.02 GENERAL NOTES Mechanical: 2003 International Mechanical Code LANDLORD: Tenant Coordinator AO.03 PARTITION TYPES r- e The Meadows at Lake Saint Louis Electrical: 2005 National Electric Code (NFPA-70) 20 Meadows CircleDr. A0.04 PARTITION DETAILS • COMMON BRICK GYPSUM BOARD RIGID INSULATION C: &A A0.05 STOREFRONT ELEVATIONS LARGE SCALE LARGE SCALE Lake Saint Louis, MO 63367 Fire: Connecticut State Fire Safety Code dfreeburg@dslandco.com A0.06 STOREFRONT ELEVATIONS C 0 R A N T L 0 a Accessibility: ICC/ANSI Al 17.1-2003 M 0 R G A N • ! TENANT/OWNER: A0.07 ACCESSIBILITY DIAGRAMS g ARC H IT E C T Parmida Home Concept ARCHITECTURE FINISH WOOD CONCRETE GRAVEL FILL Energy: International Energy Conservation Code =` 102 FAIRVIEW STATION PARKWAY FAIRVIEW, TEXAS 75224 A1.00 EXISTING FLOOR PLAN . 711 N. FIELDER RD. (C) 214-412-0229 A1.01 DEMO FLOOR PLAN } ARLINGTON, TX 76012 GYPSUM BOARD (F) 972-996-4681 A1.02 FLOOR PLAN / SCHEDULES • PL""°°° SMALL SCALE COMMON BK SMALL SCALE PH: ($17) 635-5696 Finish-out Square Footage - 9,671 sf www.parmidahome.com A1.03 REFLECTED CEILING PLAN • FAX: (817) 635-5699 A2.00 INTERIOR ELEVATIONS • One Story Building - Finish Out ARCHITECT: A2.01 INTERIOR ELEVATIONS Use and Occupancy Classification C'JRTLAND MORGAN, ARCHITECT, AIA A3.00 EXTERIOR ELEVATION • SMALL SCALE ROUGHW°°` Occupancy Designations: 711 N. Fielder Road A4.00 BUILDING SECTIONS • Mercantile Group M h " Arlington, Texas 76012 North 817-635-5696 phone A5.00 WALL SECTIONS 817-635-5699 fax A6.00 DETAILS Types of Construction bil ® STEEL I METALS STUCCO I PLASTER. Type: IIB 0 MEP ENGINEER: Sprinkled: The Purdy Consultants MECHANICAL, PLUMBING, AND ELECTRICAL Fully Sprinkled [SITE LOCATION MAP 14850 Montfort Dr. Suite # 250 M1.1 MECHANICAL PLAN Dallas, TX 75254 M2.1 MECHANICAL SCHEDULES REFERENCE SYMBOLS Means of Egress - IBC TABLE 1004.1.1 P l Occupant Load : U 0 W 0 ' '� �t �, ''t'' �� s �'� ,�,�i` �•, ,;'�, � T (972) 386-6838 M3.1 MECHANICAL DETAILS Mercantile: � � �— = ' T- -9uuL6 in or 1 Design Firm Registration No:184.005716 Grade Floor Area: 30 gross sq. ft. per occupant (8,811 sf/ 30 = 294) P1 r / 9 9 .1 PLUMBING PLAN s. 4- 0-2011 ROOM x Expire 3 P2.1 PLUMBING DETAILS & ROOM MARK ADDENDUM REVISIONMARK Storage Floor Area: 300 gross sq. ft, per occupant (860sf/ 300 = 3) ® 0 L.L.) y SCHEDULES & RISER DIAGRAMS DATUMN ELEVATION 0*- Occupancy classification groups M I U a 1 fir, s � ' //f `r4 ; TENANT CONTRACTOR: E1.1 ELECTRICAL POWER PLAN • DOOR MARK O Max. travel distance of 250' in sprinklered buildings = Q t �' EVERGRENNAI.IC kf Ire "' ��+' H1 Project Mana ment Inc. COLUMN GRID t f; l 7y 1 g E2.1 ELECTRICAL LIGHTING PLAN • --0 Corridors LILT ° j lF u ) f ' 12820 Hillcrest Rd, Ste. C-203 I E3.1 ELECTRICAL ONE LINE & PANEL • O Max. dead end corridor length = 20 WINDOW MARK X Dallas TX 75230 to •". S r k : '' e t .�^"',"� } -, , SECTION MARK z r, / )'I r Office 972-516-1007 SCHEDULES x;,x — Q ..,� JFoas SA` j euRifRft t '3 ` +'- , WALLS PARTITION TYPE X o �W, § p ` 1 " I Email: h1construction@yahoo.com MEP1 MEP SPECIFICATIONS °� ® Q � y !4 WWW.hlconLd struction.com MEP2 MEP SPECIFICATIONS X S 0 i fMr Mr ls._ T;` �,Ta*i DETAIL MARK x- L,J Y, MEP3 MEP SPECIFICATIONS cT3J EXISTING SPOT GRADE /1/ y - , F � — MEP4 MEP SPECIFICATIONS �yx tl I Y i. i ,,✓[ unu '�.a; ' t4+.ULtyV44 p t ,i --i {'TPA^ I>r !� MEP5 COM CHECK VJ 35�, 'r, �f ' � y� "ter �'t'`�`l' ;� f1AYLfcy{f ( �. •� { �-' e � �7-s7t3, PROPOSED SPOT GRADE �ay , c C'•_Sy. � ;,',£v-..� , 7 i�tta!AG- ' t�"+�•"� i f � � 'I r d f > ` — J ' 1� s"l�lY�f3-'=° � #: f , .ai. fh I 1 �i +t ! �� S�'� UJ PAINT COLOR —' � w icy n - I4 , V�Cs ,^�"• 7v�!( x -") CLEVATION MARK ��; r-. r 7�r� �� :. �'tl �' i �i��� I I ...avJ>=�'R�'�t�{z}'.`�•C, � �r J V �' $. W(��'n ` ,JTLI•; 1 H L,�(Oy. - !J'1 �� 1� 13' °t�``� + '': 1� ' �� `r _ ,� �` W � y i• Ye- 6 7, �T'� ' I {L ) ��g {, kv A L L bb . ,1 I� 1���`,�.. # �':.\AN &,f �' : I-{'vK;Y,�'< F{r�•3'n� .! . . .� I i M1 y r5n•,�'r ' � k' i ,. .y �� _�.' ICY— ,_ (� O 0 EXISTING BUILDING DRAWING DISREGARD REFERENCES (NOT PART OF SET) ARCHITECTURAL ABBREVIATION LEGEND L_ ABV ABOVE DBL DOUBLE HP HIGH POINT PT PRESSURE TREATED SUSP SUSPENDED W AFF ABOVE FINISHED DH DOUBLE HUNG HC HOLLOW CORE PR PAIR SYM SYMMETRICAL r FLOOR ON DOWN HM HOLLOW METAL PNL PANEL SYNTH SYNTHETIC y AWC ACCENT WALLCOVERING DS DOWNSPOUT HB HOSE BIB PRKG PARKING SYS SYSTEM ACC ACCESS/ACCESSIBLE DW DISHWASHER HORIZ HORIZONTAL PTN PARTITION STC SOUND TRANS- ACFL ACCESS FLOOR DWR DRAWER INCL INCLUDE(D) PVMT PAVEMENT MISSION CLASS 116;- "';ROEMI$iN(3 WALL Td INSIDE.FACE OF 11T1LITY ROOM ItYALI F AP ACCESS PANEL DWG DRAWING ID INSIDE DIAMETER FED PEDESTAL TEL TELEPHONE ) 12'-9" ACST ACOUSTICAL DF DRINKING FOUNTAIN INSUL INSULATE/INSULATION PERF PERFORATE TV TELEVISION mm ACT ACOUSTICAL(CLG)TILE EA EACH INTERIOR LAS IC TEMP TEMPORARY/ WALLCOVERING FOUNTAIN JT JOINT PLAS PLASTER TMPD TEMPEREDp . - ACWC ACOUSTIC EDF EECTRICD INKING INV INVERT P PLATE TEMPERATURE RE - - - -- --- - - ADJ ADJACENT EWC ELECTRIC WATER JST JOIST PLAM PLASTIC LAMINATE TFCI TENANT FURNISHED ADJ ADJUSTABLE COOLER J-BOX JUNCTION BOX PL GL PLATE GLASS CONTRACTOR .:LHs' fz• ' .., 'n -, , AGGR AGGREGATE ELEC ELECTRIC KPL KICKPLATE PLYWD PLYWOOD INSTALLED :yy Ir4l Iia ALT ALTERNATE EPB ELECTRIC KIT KITCHEN PVC POLYVINYL TFTI TENANT FURNISHED -0, ' ALUM ALUMINUM PANELBOARD KO KNOCT CHLORIDE TENANT INSTALLED I q �•,�. • �S.'. KOLIT ANC ANCHOR/ EMER EMERGENCY LAM LAMINATE PCF POUNDS PER THK THICKNESS) ' ANCHORAGE EL ELEVATION LAV LAVATORY CUBIC FOOT THRES THRESHOLD ° �C'•JS:� ' I AB ANCHOR BOLT ELEV ELEVATOR LB LAG BOLT PLF POUNDS PER TINT TINTED ANOD ANODIZED ENCL ENCLOSURE LH LEFT HAND LINEAR FOOT TYP TYPICAL 61 < APPROX APPROXIMATE EQ EQUAL L LENGTH PSF POUNDS PER TPH TOILET PAPER ARCH ARCHITECT(URAL) EQUIP EQUIPMENT LT LIGHT SQUARE FOOT HOLDER ftCn AD AREA DRAIN ESCAL ESCALATOR LT WT LIGHTWEIGHT PSI POUNDS PER TOL TOLERANCE AUTO AUTOMATIC EXIST EXISTING LTL LINTEL SQUARE INCH T&G TONGUE AND GROOVE BSMT BASEMENT EJ EXPANSION JOINT LL LIVE LOAD PL PROPERTY LINE TOS TOP OF SLAB BRG BEARING EXP EXPOSED LVR LOUVER QT QUARRYTILE TOST TOP OF STEEL , ' F-. - '"• ELECTRICAL L. BRG PL BEARING PLATE EXT EXTERIOR MH MANHOLE R RADIUS TOW TOP OF WALL '' I I' RDDA7 n °v BM BENCH MARK FWC FABRIC WALL COVERING MFR MANUFACTURE(ER)(ING) REF REFERENCE TOC TOP OF CURB! BITUM BITUMINOUS FOC FACE OF CONCRETE MAS MASONRY REFR REFRIGERATOR CONCRETE BLK BLOCKING) FOF FACE OF FINISH MO MASONRY OPENING REINF REINFORCED TB TOWEL BAR 1-4 BD BOARD FOM FACE OF MASONRY MATL MATERIAL READ REQUIRED T TREAD 'A' - FOR PERMIT CE P MAXMAXIMUM BOC BOTTOM OF CURB FOS FACE OF STUDS RC REINFORCED � RIITIDE& �. TR TOWEL RING Og-12-II z I a d ROOM I BLDG BUILDING FF FINISH FLOOR MECH MECHANICAL CONCRETE PIPE UNFIN UNFINISH(ED) ' .I. _ BUR BUILT UP ROOF FIN FINISH MED MEDIUM RESIL RESILIENT UNO UNLESS NOTED c - _ CAB CABINET FE FIRE EXTINGUISHER MEMB MEMBRANE RET RETURN OTHERWISE p CPT CARPET FEC FIRE EXTINGUISHER MTL METAL RA RETURN AIR UR URINAL CPB CARPET BASE CABINET MTFR METAL FURRING RVS REVERSE VJ V(EE)JOINT CPD CARPETPAD FHS FIRE HOSE STATION M METER REV REVISION VAR VARNISH p_ -- :-_ ------ -- ,----{W - a- . I _ CB CATCH BASIN FGL FIXED GLASS MW MICROWAVE ROW RIGHT OF WAY Fy CASEMENT FIREPLACE MM MILLIMETER RH RIGHT HAND VNR VENEER pO VER. VERI CTR CENTER FWC FABRIC WALL MIN MINIMUM R RISER VEST VESTIBULE CLG CEILING COVERING MIR MIRROR RVT RIVET VERT VERTICAL :a CLG HT CEILING HEIGHT FLEX FLEXIBLE MISC MISCELLANEOUS RD ROOF DRAIN VCT VINYL COMPOSITION F CM CENTIMETER FLR FLOOR MOD MODULAR(MODULE) RFG ROOFING TILE CER CERAMIC FD FLOOR DRAIN MTD MOUNTED RM ROOM VF VINYL FLOORING f f :O CT CERAMICTILE FCO FLOOR CLEANOUT MOV MOVABLE RO ROUGH OPENING VWC VINYL WALL CWT CERAMICWALLTILE FTG FOOTING MULL MULLION RB RUBBER BASE COVERING W CLO CLOSET FDTN FOUNDATION NAT NATURAL SCHED VS VINYL BASE SCHEDULE I 28 _= COL COLUMN FUR FURRING/FURRED NRC NOISE REDUCTION SECT SECTION W CLOTHES WASHER .er.lrxK♦'rt' 1TP. I ti s,. ,�, CIR CIRCLE FIR FRAME COEFFICIENT SHT SHEET WSCT WAINSCOT :Z, CONC CONCRETE FS FULL SIZE NR NOISE REDUCTION SHTGL SHEETGLASS WT WALL TILE _ itp CMU CONCRETE GA GAUGE NOM NOMINAL SHWR SHOWER F WC WATER CLOSET .y. a � MASONRY UNIT GALV GALVANIZED NFHB NON FREEZE SIM SIMILAR WWF WELDED WIRE PROJECT I. -s m.. I '' ' '� `� CONT CONTINUOUS/CONTINUE GC GENERAL HOSE BIB SS SOLID SURFACE FABRIC r� M �.,. , CORR CORRIDOR CONTRACTOR NIC NOT IN CONTRACT SPKR SPEAKER WDW WINDOW _ - "•` _-e CFCI CONTRACTOR FURNISHED GL GLASS/GLAZING NTS NOT TO SCALE SPEC SPECIFICATION W/O WITHOUT INFORMATION -- —,�, .i—__ _—}- - -__-- _ gp CONTRACTOR GD GRADEIGRADING OC ON CENTER SQ SQUARE WH WATER HEATER INSTALLED GYP GYPSUM OPQ OPAQUE SF SQUARE FEET .. U WGL WIRED GLASS CJ CONTROL JOINT GYP BD GYPSUM BOARD OPNG OPENING SST STAINLESS STEEL WM WIRE MESH i -;,; - ,Y,;v. `; ; gw� •,; , , CU FT CUBIC FOOT HH HANDHOLE OPP OPPOSITE Ss SANITARY SEWER WD WOOD - - - - - - --- - - - - - - - - - - - - CU YD CUBIC YARD HDBD HARD BOARD OD OUTSIDE DIAMETER STD STANDARD WB WOOD BASE JWd 10" DEMISINGWALLTO BUILDING LINE Pa Ei CLOTHES DRYER HDW HARDWARE OPP OPPOSITE HAND STA STATION WT WEIGHT SHEET NUMBER DL DEAD LOAD HDR HEADER OA OVERALL ST STEEL WPT WORKING POINT DTL DETAIL HTG HEATING OH OVERHEAD(OVERHANG) SD STORM DRAIN ❑ CENTER LINE Lam,- DIAG DIAGONAL HVAC HEATING! OFCI OWNER FURNISHED STOR STORAGE C CHANNEL . . . . . . .. _. . . . . :: DIA DIAMETER VENTILATION! CONTRACTOR STRUCT STRUCTURAL PL PLATE DIM DIMENSION AIR CONDITIONING INSTALLED ± PLUS OR MINUS � o � I North DEPT DEPARTMENT HT HEIGHT OFOI OWNER FURNISHED DISP DISPENSER ' HEX HEXAGON(AL) OWNER INSTALLED DATE: 05/12/11 JOB NO: HI - PHC - II DRAWN:5TAFF CHECKED:CM GENERAL NOTES LANDLORD GENERAL NOTES 1. PROJECT CONSISTS OF COMPLETE EXTERIOR/INTERIOR FINISH-OUT CONSTRUCTION. 17. GENERAL CONTRACTOR SHALL MAINTAIN THE CONSTRUCTION SCHEDULE AS 3. THE FIRE PROTECTION SYSTEM SHALL MEET ALL REQUIREMENTS FOR AN NFPA 13 1. REFERENCE THE LANDLORD PROVIDED CONSTRUCTION GUIDELINES C 0 R T L A N 0 AGREED TO BY ALL PARTIES. ALL DEVIATIONS TO SCHEDULE SHALL BE AS AGREED TO SPRINKLER SYSTEM. IN WRITING BY ALL PARTIES. CONTRACTOR SHALL SUBMIT TO TENANT A DETAILED 2. REFERENCE THE TENANT STORE DESIGN AND CONSTRUCTION MANUAL M 0 R G AN ARCH I T E C T 2. DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE. DIMENSIONAL LAYOUT SHALL SITE & SHELL BAR CHART SCHEDULE WITH ACCOMPANYING TENANT IMPROVEMENT 4. ALL FIRE PROTECTION WORK SHALL COMPLY WITH ALL APPLICABLE SECTIONS OF BE VERIFIED IN THE FIELD PRIOR TO PROCEEDING WITH THE WORK. THE ARCHITECT CANT CHART. SHALL BE NOTIFIED OF ANY DIMENSIONS REQUIRING CORRECTION. DIMENSIONS ARE NFPA STANDARDS AND SHALL MEET THE APPROVAL OF THE OWNER'S INSURANCE 3. VERIFY IN FIELD ALL DIMENSIONS AND LEASE LINES T UNDERWRITER, IRI, AND LOCAL AUTHORITIES HAVING JURISDICTION. 711 N. FIELDER RD. O GRID LINE OR FACE OF WALL FINISH UNLESS OTHERWISE NOTED. GROSS 18. GENERAL CONTRACTOR SHALL MAINTAIN AND PROVIDE PROOF OF ALL FORMS OF 4. DO NOT ATTACH TRACK, CONDUIT, ETC TO ROOF DECK ARLINGTON, Tx 76012 LEASABLE AREA SHALL BE MEASURED USING BOMA STANDARDS. DO NOT SCALE INSURANCE REQUIRED BY LOCAL, STATE AND NATIONAL CODES, LANDLORD, AND 5. ONLY APPROVED SPRINKLERS AND DEVICES SHALL BE USED IN AUTOMATIC DRAWINGS. PH: (817) 635-5696 TENANT. INSURANCE(S) IS TO BE PUT IN EFFECT PRIOR TO STARTING WORK AND UNTIL SPRINKLER SYSTEMS. SHOP DRAWINGS SHOWING COMPLETE LAYOUT OF THE SYSTEM 5. TENANT TAKES THE SPACE IN AN "AS-IS CONDITION". BY DOING SO, ALL ALL WORK IS COMPLETED. THIS INCLUDES FINAL PHASES OF OBTAINING SHALL BE SUBMITTED TO THE BUILDING OFFICIAL FOR PERMIT AND APPROVAL PRIOR UPGRADES, WHATSOEVER, THAT MUST BE PERFORMED TO THE SPACE TO Fax: (817) 635-5699 3. BEFORE STARTING WORK THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS CERTIFICATES OF OCCUPANCY AND AOF ALL LANDLORD AND TENANT PUNCH LIST TO INSTALLATION. ACCOMMODATE THE NEW TENANT WILL BE DONE BY THE TENANT AT THE SHALL BECOME FAMILIAR WITH ALL APPLICABLE REQUIREMENTS OF CODE, LANDLORD ITEMS TO THE SATISFACTION OF ORIGINATING PARTY. CRITERIA, TENANT'S CRITERIA, AND CONSTRUCTION DOCUMENTS, GENERAL TENANT'S EXPENSE. SOME TENANT WORK WILL BE REQUIRED TO BE6. ALL FIRE PROTECTION EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE COMPLETED BY THE LANDLORD'S APPROVED CONTRACTORS CONTRACTED -y CONTRACTOR TO REVIEW CONSTRUCTION DOCUMENTS AND RESOLVE ANY 19. GENERAL CONTRACTOR SHALL EXPEDITE COMPLETION OF ALL LANDLORD AND MANUFACTURER'S RECOMMENDATIONS. DIRECTLY BY THE TENANT'S GENERAL CONTRACTOR. QUESTIONS PRIOR TO STARTING WORK AT PRECONSTRUCTION CONFERENCE WITH TENANT PUNCH LIST ITEMS TO COMPLETE SATISFACTION OF ORIGINATING PARTY TENANT PROJECT MANAGER. WITHIN FIFTEEN DAYS FROM DATE OF FINAL PUNCH LIST GENERAL CONTRACTOR'S 7. FIRE HOSE THREADS USED IN CONNECTION WITH AUTOMATIC SPRINKLER SYSTEMS 6. ALL ROOFING AND ROOF PENETRATIONS BY THE LANDLORD'S ROOFING . CONTRACTOR AT TENANT'S EXPENSE. 4. IN THE EVENT THAT ANY PROBLEMS ARISE DURING THE COURSE OF THE PROJECT, WORK WILL NOT BE DEEMED FINAL UNTIL WRITTEN ACCEPTANCE IS RECEIVED FROM SHALL BE APPROVED AND COMPATIBLE WITH FIRE DEPARTMENT HOSE THREADS DESIGNATED REPRESENTATIVES. � � 0 DUE TO UNKNOWN SITE CONDITIONS OR CODE AND LANDLORD REQUIREMENTS THAT 8. ALL PIPING ABOVE GRADE MUST BE SUPPORTED BY THE BUILDING STRUCTURE AND 7. ALL WORK IN THE LANDLORD'S ELECTRICAL ROOM BY THE LANDLORD'S N CONFLICT WITH THE TENANT'S DRAWINGS, THE GENERAL CONTRACTOR SHALL INFORM 20. GENERAL CONTRACTOR SHALL PROVIDE A WARRANTY ON ALL LABOR, MATERIALS SHALL NOT REST ON CEILING TILES OR CEILING STRUCTURE. PIPING HUNG FROM ELECTRICAL CONTRACTOR AT TENANT'S EXPENSE. ( THE ARCHITECT AND TENANT IMMEDIATELY. THE TENANT SHALL CONTACT THE AND EQUIPMENT PROVIDED BY THE GENERAL CONTRACTOR AND SUBCONTRACTORS. JOISTS SHALL BE HUNG FROM THE CHORDS OF THE JOISTS. LLJ TENANT'S CONSTRUCTION DEPARTMENT TO RESOLVE ALL QUESTIONS AND PROBLEMS. THE WARRANTY WILL PROTECT TENANT FROM ALL DEFECTIVE LABOR, MATERIALS AND 8. TENANT'S GENERAL CONTRACTOR MUST CONTRACT WITH LANDLORD W 0 EQUIPMENT FOR A PERIODS OF ONE YEAR FROM DATE OF FINAL WRITTEN 9. SPRINKLER PIPING IN ATTICS SHALL BE LOCATED ON HEATED SIDE OF INSULATION APPROVED SPRINKLER CONTRACTOR AT GENERAL CONTRACTOR'S 5. GENERAL CONTRACTOR SHALL COMPLETE ALL WORK IN A NEAT AND L 0 ACCEPTANCE BY TENANT. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE AND SHALL BE INSULATED AS COLD WATER PIPING. EXPENSE. COORDINATE WITH LOCAL MALL MANAGEMENT. Z - PROFESSIONAL MANNER. SHELL WORK TO BE COORDINATED WITH TENANT REPAIR OR REPLACEMENT OF ALL LABOR, MATERIALS OR EQUIPMENT COVERED BY ® C) IMPROVEMENT DRAWINGS. AS BUILT CONDITIONS EXIST, NO WORK BY LANDLORD. THIS WARRANTY AT NO ADDITIONAL COST TO TENANT. 10. ALL SPRINKLER PIPING IN ATTICS SHALL BE ROUTED TO MAINTAIN MINIMUM CLEAR 9. TENANT'S GENERAL CONTRACTOR MUST CONTRACT WITH ALL APPROVED ® IiJ ~ 6. THE GENERAL CONTRACTOR SHALL EMPLOY A QUALIFIED, FULL TIME 21. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR TURNING OVER THE PREMISES HEIGHTS INDICATED ON ARCHITECTURAL DRAWINGS. SPRINKLER CONTRACTOR (SEE LANDLORD SUBCONTRACTOR LIST) SUPERINTENDENT FOR THE PROJECT WHO SHALL BE RESPONSIBLE FOR THE OVERALL IN A BROOM CLEAN CONDITION. 11. ALL SPRINKLER WORK BY LANDLORD SPRINKLER CONTRACTOR 10. NO SIGN MANUFACTURER'S OR INSTALLER'S LABELS ALLOWED VISIBLE Q CONSTRUCTION AND WHO SHALL HAVE AUTHORITY TO MAKE CONSTRUCTION TO PUBLIC VIEW. LLJ DECISIONS ON BEHALF OF THE CONTRACTOR. CONTRACTOR TO PROVIDE PHONE AND 22. SPACE TO REMAIN SECURE AND LOCKABLE AT ALL TIMES. CONTRACTOR TO GLAZING � V) FAX MACHINE ON THE JOB SITE FOR THE SUPERINTENDENT'S USE. COORDINATE WITH LANDLORD TO ENSURE SECURITY. 1. GLAZING INCLUDING GLASS MIRRORS AT ALL HAZARDOUS LOCATIONS AS 11. TENANT'S GENERAL CONTRACTOR SHALL ARRANGE AN ON-SITE MEETING - W O 7. GENERAL CONTRACTOR SHALL EMPLOY EXPERIENCED, FULLY QUALIFIED AND DESCRIBED BY THE BUILDING CODE SHALL MEET THE REQUIREMENTS OF SAFETY WITH LOCAL MALL MANAGEMENT PRIOR TO STARTING ANY PORTION OF THE 0 LL () 23. ALL WORK AND MATERIALS SHALL CONFORM TO APPLICABLE LOCAL, STATE AND GLAZING. ALL SAFETY GLAZING SHOULD BE TEMPERED UNLESS NOTED OTHERWISE. WORK, SUBSEQUENT TO LANDLORD'S CONSTRUCTION RELEASE. 0 LA LICENSED SUBCONTRACTORS AND MAINTAIN COOPERATION AMONG ALL TRADES AT NATIONAL CODES AND LANDLORD REQUIREMENTS. INCLUDING BUT NOT LIMITED JE ALL TIMES. USE LANDLORD SUBS IF REQUIRED. TO MIN. ADA ACCESSIBILITY STANDARDS OR STATE OR LOCAL BARRIER FREE M.E.P. 12. THE LANDLORD'S ON-SITE REPRESENTATIVE RESERVES THE RIGHT TO W 8. GENERAL CONTRACTOR � (1) � ORDER AMONG ITS EMPLOYE z REQUIREMENTS. 1. ELECTRICAL BOXES LOCATED ON OPPOSITE SIDES OF A 1 HOUR RATED WALL MAKE CHANGES AS REQUIRED TO THE LANDLORD APPROVED PLANS.EMPLOYEES AND CONTRACTORS TO ENSURE A HARMONIOUS ALL TIMES SHALL ENFORCE STRICT DISCIPLINE AND 24 ASSEMBLY MUST BE SEPARATED BY A MINIMUM HORIZONTAL DISTANCE OF 24". < < (1) 0 ry BOTH T WORKING RELATIONSHIP. . TENANT AND CONTRACTOR AT ALL TIMES WILL MAKE BEST EFFORTS TO 13. PATCH UTILITY LEAVE-OUTS AND TRENCHING PER LANDLORD ENFORCE STRICT DISCIPLINE AND GOOD ORDER AMONG ITS EMPLOYEES AND EXIT SIGNAGE REPRESENTATIVE'S SPECS. -- W W = CONTRACTORS TO ENSURE A HARMONIOUS WORKING RELATIONSHIP. 1. MEANS OF EGRESS AND EXITS SHALL BE MARKED PER THE CONTRACT DOCUMENTS 9. GENERAL GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND �- AND AS REQUIRED BY THE REGULATORY AGENCY HAVING JURISDICTION USING 14. TENANT'S GENERAL CONTRACTOR SHALL PREPARE A RECORD SET OF W REQUIREMENTS TO COMPLETE WORK AS REQUIRED BY ALL LOCAL, STATE, NATIONAL 25. ALL CHANGES TO THE SHELL OR INTERIOR CONSTRUCTION OR DOCUMENTS SHALL APPROVED EXIT SIGNAGE. AS - BUILT DRAWINGS WHICH REFLECT ANY CHANGES, ADDITIONS OR 0 CODES AND LANDLORD'S CRITERIA. BE APPROVED BY THE LANDLORD AND TENANT'S CONSTRUCTION OR ARCHITECTURAL DELETIONS TO THE LANDLORD APPROVED SET OF DRAWINGS AND TURN E r- DEPARTMENTS BEFORE ANY WORK IS BEGUN. 2. AN INDEPENDENT AND SEPARATE SOURCE OF POWER IS PROVIDED FOR ALL EXIT THEM OVER TO LOCAL MALL MANAGEMENT UPON COMPLETION OF THE V) 'i 0. GENERAL CONTRACTOR SHALL FURNISH, INSTALL AND REMOVE ALL BARRICADES SIGNAGE AND EMERGENCY LIGHTING. PROJECT. �- � � IF REQUIRED BY CODE, OR LANDLORD. COORDINATE W/ MALL MANAGER. 26. ALL COSTS RESULTING FROM DAMAGE TO ADJACENT TENANTS' OR LANDLORD'S PROPERTY DUE TO GENERAL CONTRACTOR'S FAULTY WORK SHALL BE SECURITY 15. TENANT'S GENERAL CONTRACTOR MUST CONTRACT WITH A LANDLORD 11. GENERAL CONTRACTOR SHALL DISPOSE OF EQUIPMENT AND MATERIALS AS RESPONSIBILITY OF THE GENERAL CONTRACTOR. 1. ALL BUILDING SECURITY COMPONENTS TO BE SELECTED AND APPROVED BY OWNER. APPROVED DEMOLITION CONTRACTOR. REQUIRED. RUBBISH IS TO BE REMOVED DAILY IN COORDINATION WITH LANDLORD'S REGULATIONS AND DISPOSED OF IN A LEGAL MANNER. 2. ALL BUILDING SECURITY COMPONENTS TO BE COORDINATED BY OWNER AND 27. APPLICATION FOR PERMANENT ELECTRICAL, GAS, WATER, AND SEWER SERVICE CONTRACTOR. ' I- 12. THE PROPER RECEIPT AND UNLOADING OF ALL NEW MATERIALS AND EQUIPMENT FROM THE UTILITY COMPANIES WILL BE OBTAINED BY THE TENANT. THERMAL PROTECTION AT THE JOB SITE IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. SECURE 28. STRUCTURAL, MECHANICAL, ELECTRICAL, & PLUMBING DRAWINGS ARE 1. ALL OCCUPIED SPACES SHALL RECEIVE AN INSULATION BARRIER THAT IS AND SAFE STORAGE OF ALL MATERIALS AND EQUIPMENT WILL BE PROVIDED BY THE SUPPLEMENTAL TO THE ARCHITECTURAL DRAWINGS. THE CONTRACTOR SHALL CONTINUOUS AT ALL EXTERIOR WALL, CEILING AND FLOOR SURFACES. GENERAL CONTRACTOR. GENERAL CONTRACTOR SHALL ADVISE TENANT OF ALL REVIEW ALL PLANS AND DRAWINGS. IN THE EVENT OF CONFLICTING STATEMENTS, 3` DAMAGED, DEFICIENT OR OVER SHIPMENTS OF TENANT SUPPLIED MATERIALS. INSUFFICIENT INFORMATION OR ERRORS, THE CONTRACTOR SHALL IMMEDIATELY 2. TENANT SHALL INSULATE WATER LINES AND PROVIDE THERMAL PROTECTION FOR `; ,� �,;,.',�'4+,;;.. GENERAL CONTRACTOR SHALL COMPLETE AND SUBMIT ALL NECESSARY PAPERWORK NOTIFY THE ARCHITECT AND THE TENANT TO OBTAIN CLARIFICATION BEFORE ANY SPRINKLER SYSTEM (TO PREVENT GRID FROM FREEZING) ,. �;�,� / J D ARRANGE INSPECTIONS OF DAMAGED GOODS AND RETURN AS PER TENANT'S •WORK IS BEGUN. WORK INSTALLED WHERE CONFLICTING CONDITIONS EXIST SHALL BE ; 4. : CONSTRUCTION DEPARTMENT REQUIREMENTS. CORRECTED AT THE CONTRACTOR'S EXPENSE. FIRE RESISTANCE RATED CONSTRUCTION 1. GENERAL CONTRACTOR SHALL UNSURE THAT ALL FIRE RESISTANT RATINGS SHALL 'y c; 13. SUBSTITUTION : THE CONTRACTOR IS TO SUPPLY ALL MATERIALS AND EQUIPMENT '� =�(J AS 29. MAKE CONCRETE SLAB LEVEL SMOOTH AND FREE FROM .ANY DEFECTS OR FLOOR COMPLY WITH ALL APPLICABLE CODES AND STANDARD PRACTICES INCLUDING ALL '%��Io' SPECIFIED ON PLANS. WHEN THE TERM "OR EQUAL" APPEARS, IT SHOULD BE IRREGULARITIES DUE TO THE CONSTRUCTION JOINTS, ETC. PATCH AS REQUIRED & FEDERAL, STATE AND LOCAL BUILDING CODES. f�'1%1tt7�tfl 11ti 1.`ii UNDERSTOOD THAT SUCH SUBSTITUTIONS SHALL BE MADE ONLY AFTER WRITTEN THOROUGHLY CLEAN BEFORE ANY APPLICATION OF NEW FLOORING MATERIALS. CONSENT IS OBTAINED FROM TENANT, LANDLORD, AND ARCHITECT. THE BURDEN OF 2. APPROVED FIRE RESISTIVE CONSTRUCTION SHALL BE MAINTAINED AT MEMBRANE PROVING EQUALITY OF PROPOSED SUBSTITUTIONS RESTS WITH THE CONTRACTOR. 30. SUPERINTENDENT SHALL BE ON SITE DURING ALL WORK OR NOTIFY LANDLORD OR THROUGH PENETRATIONS OF RATED ASSEMBLIES FOR ALL MECHANICAL, REQUEST FOR SUBSTITUTION SHALL BE ACCOMPANIED BY SUCH TECHNICAL DATA, REP. ELECTRICAL, PLUMBING AND FIRE PROTECTION SYSTEMS AS REQUIRED. TEST REPORTS, SAMPLES, VERIFIED EXPERIENCE RECORDS FROM PREVIOUS USERS 'A' - FOR PERMIT AND OTHER PRINTED OR WRITTEN INFORMATION VALID IN THE CIRCUMSTANCES. 31. NO WORK BY LANDLORD - TENANT TAKES SPACE AS IS. 3. ALL. WALLS/PARTITIONS INCLUDING ASSEMBLY COMPONENTS ON ALL SIDES 09-12-11 REQUESTS FOR SUBSTITUTION SHALL BE ACCOMPANIED BY COMPLETE COST DATA ENCLOSING VERTICAL OPENINGS SUCH AS STAIRWAYS, UTILITY SHAFTS AND AND SAVINGS, IF ANY, RESULTING FROM PROPOSED SUBSTITUTION. FIRE BLOCKING ELEVATOR SHAFTS WHICH ARE REQUIRED TO HAVE A FIRE RESISTANCE RATING SHALL 1. WALLS AND STUD PARTITIONS SHALL BE FIREBLOCKED AT ALL FLOORS, CEILINGS EXTEND FROM FLOOR TO FLOOR OR FLOOR TO ROOF. THESE WALLS/PARTITIONS 14. THE GENERAL CONTRACTOR SHALL MAINTAIN ON SITE, ONE COMPLETE AND AND ROOFS. FIREBLOCKING SHALL CONSIST OF APPROVED MATERIALS AS SPECIFIED SHALL BE CONTINUOUS THROUGH ALL CONCEALED SPACES SUCH AS THE CURRENT SET OF ALL CONTRACT DOCUMENTS, SHOP DRAWINGS, LANDLORD BY THE BUILDING CODE. MATERIAL SHALL BE SECURELY FASTENED IN PLACE. INTERSTITIAL SPACE ABOVE THE CEILING MEMBRANE. THE SUPPORTING STRUCTURE DRAWINGS, SAMPLES, ETC. SHALL HAVE A FIRE RESISTANCE RATING EQUAL TO OR GREATER THAN THE FIRE 2. FIREBLOCKING SHALL BE PROVIDED IN ALL WALLS AND PARTITIONS TO CUTOFF RESISTANCE RATING REQUIRED FOR THE VERTICAL ENCLOSURE. WHERE THE 15. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS,(EXCEPT ALL CONCEALED DRAFT OPENINGS BOTH HORIZONTAL AND VERTICAL AND TO FORM A OPENINGS ARE OFFSET AT INTERMEDIATE FLOORS, THE OFFSET AND FLOOR SIGNAGE) LICENSES, FORMS CERTIFICATES, FEES AND SHOP DRAWINGS THAT ARE FIRE BARRIER BETWEEN FLOORS AND BETWEEN THE UPPER FLOOR AND THE ROOF OR CONSTRUCTION SHALL BE OF CONSTRUCTION HAVING A FIRE RESISTANCE OF NOT REQUIRED FOR THE SATISFACTION OF CODE OR LANDLORD GENERAL CONTRACTOR ATTIC SPACE. LESS THAN THAT REQUIRED FOR THE ENCLOSING PARTITIONS. TO VERIFY ALL REQUIREMENTS PRIOR TO START OF WORK. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO CONTACT ALL VENDORS PRIOR TO START OF 3. THE ANNULAR SPACE AROUND PIPES, TUBES, CONDUIT, WIRES, CABLES AND VENTS 4. CORRIDOR PARTITIONS, SMOKESTOP PARTITIONS, HORIZONTAL EXIT PARTITIONS,WORK TO NOTIFY THEM INDIVIDUALLY AS TO EXPECTED DELIVERY DATES. THE SHALL BE PROTECTED IN ACCORDANCE WITH ALL BUILDING CODES. EXIT ENCLOSURES, AND FIRE RATED WALLS REQUIRED TO HAVE PROTECTED GENERAL GENERAL CONTRACTOR IS RESPONSIBLE TO FOLLOW UP WITH THE VENDORS AS TO OPENINGS SHALL BE EFFECTIVELY AND PERMANENTLY IDENTIFIED WITH SIGNS OR ACTUAL DELIVERY DATE EXPECTED AND REPORT ANY DISCREPANCIES TO THE TENANT 4. FIREBLOCKING SHALL NOT BE COVERED OR CONCEALED UNTIL INSPECTED BY THE STENCILING IN A MANNER ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION. PROJECT MANAGER. BUILDING OFFICIAL. SUCH IDENTIFICATION SHALL BE ABOVE ANY DECORATIVE CEILING AND IN CONCEALED SPACES. SUGGESTED WORDING: "FIRE AND SMOKE BARRIER - PROTECT ALL 16. GENERAL CONTRACTOR IS RESPONSIBLE FOR SCHEDULING ALL WORK AND FIRE SUPPRESSION & FIRE ALARMS OPENINGS". SHEET NUMBER DELIVERY OF MATERIALS AND INSPECTIONS. THIS INCLUDES, BUT IS NOT LIMITED TO 1. SMOKE DETECTORS TO BE HARDWIRED WITH BATTERY BACK-UP AS REQUIRED BY WORK AND MATERIALS BY LANDLORD, UTILITY COMPANIES, SUBCONTRACTORS, CODE. 5. COLUMNS, GIRDERS, TRUSSES, BEAMS, LINTELS OR OTHER STRUCTURAL STEEL TENANT, AND GOVERNMENT AGENCIES HAVING JURISDICTION. MEMBERS THAT SUPPORT MORE THAN TWO FLOORS OR ONE FLOOR AND ROOF, OR 2. FIRE SPRINKLER SYSTEM TO BE COMPLETELY DESIGNED BY DESIGN BUILD SUPPORT A LOAD BEARING WALL OR A NON-LOADBEARING WALL MORE THAN TWO CONTRACTOR. CONTRACTOR TO COORDINATE ALL INSTALLATION REQUIREMENTS. STORIES HIGH SHALL BE INDIVIDUALLY PROTECTED ON ALL SIDES FOR THE FULL LENGTH WITH MATERIALS HAVING THE REQUIRED FIRE RESISTANCE RATING. TYPE 01113" DO NOT SCALE LINE OF REFER TO PARTITION HEAD DETAILS AT STRUCTURE RATED CONDITIONS DATE: OS/12/11 JOB NO: HI - PHC - It SEALANT DRAWN:STAFF MTL RUNNER CHECKED:CM LINE OF ' CEILING —� — REFER TO SCHEDULE BELOW FOR PARTITION WIDTH 2 LAYERS 5/8"115mm]GYP BD C 0 R T L A N 0 EACH SIDE M 0 R G A N MTLRUNNER A R C H I T E C T LINE OF STRUCTURE - A] SEALANT 711 N. FIELDER RD. ARLINGTON, TX 76012 TYPE "G" - MILLWORK ASSEMBLY DO NOT SCALE FLOOR PLAN FLOOR PLAN STC: PH: (817) 635-5696 TYPE DO NOT SCALE""E"" DESIGNATION DESIGNATION NO SOUND ASSEMBLY FOR SHELVING STANDARDS TO BE APPLIED ON TOP OF NO SOUND WITH SOUND STUD PART FIRE UL FAX: (817) 635-5699 REFER TO PARTITION ATTENUATION ATTENUATION S1ZE WIDTH RATING LISTING WITH SOUND OTHER COMPLETE PARTITION TYPE AS MILLWORK LINE OF HEAD DETAILS FOR STRUCTURE APPLICABLE RATED OR g6 86 48 NON-RATED 0 81m TWO 56 LINE OF CONDITIONS 150mm 212mm HOUR U411 W/3"[75mm]SAB STRUCTURE _ B6 TWO 48 2x4 WD VERTICAL SEALANT 6" 81/2" HOUR! U411 56 150mm 212mm SMOKE FRAMING @ 16"O.C. / RESIST W/3"[75mm]SAB PER STANDARD TO / SUIT SHELVING SYS. MTL RUNNER FIRE-RETARDANT- TYPE "N' DO NOT SCALE TREATED WOOD REQ. LINE OF CEILING TYPE A LINE OF Fi7 (IBC 603.1 -1(1.1)) / CEILINGT 7 — c O 2x4 WD STUD J� — REFER TO PARTITION HEAD (V HORIZONTAL @ 16"O.C. LINE OF DETAILS FOR APPLICABLE STRUCTURE RATED OR NON-RATED FIRE-RETARDANT- REFER TO CONDITIONS c t TREATED WOOD REQ. FFLOOR PLAN r , T{\ o (IBC 603.1 -1(1.1)) iJ V� 0 REFER TO SCHEDULE BELOW SEALANT 1 /off FOR PARTITION CROSS BRACING 1D V! , ^ LINE OF STRUCTURE WIDTH I ® ` v , OR OTHER WALL / 5!8"[15mm]GYP BD MTL RUNNER PARTITION PROVIDING L .. II EACH SIDE BACK-UP FOR STUD LINE OF �•— BRACING / MTL RUNNER CEILING v / 518"[15mm]GYP BD LINE OF _ _ } STRUCTURE SEALANT , ) IrVVJC I_1_I v , REFER TO SCHEDULE STRUCTURE n/ LINE OF CTURE BELOW FOR PARTITION �n LIB / SEALANT WIDTH V I 5/8"[15mm]GYP BD SECTION FLOOR PLAN FLOOR PLAN STC: EACH SIDE ® ® W (� DESIGNATION DESIGNATION NO SOUND - MTL RUNNER r LINE OF STRUCTURE NOTE: NO SOUND WITH SOUND STUD PART FIRE UL LINE OF OR OTHER WALL GC TO DETERMINE ATTENUATION ATTENUATION SIZE WIDTH RATING LISTING WITH SOUND STRUCTURE SEALANT 7 �J / ry PARTITION PROVIDING 1 EXACT LOCATION OF BACK-UP FOR STUD STANDARDS E3 E3 3 5/8" REF NIA BRACING FLOOR NOW NIA 52 n, 90mm PLAN RATED W/3 1/2"[87mm]SAB VJry FLOOR PLAN FLOOR PLAN STC: ® 1 - 1 DESIGNATION DESIGNATION NO SOUND e � � NO SOUND WITH SOUND STUD PART FIRE UL �y ATTENUATION ATTENUATION SIZE WIDTH RATING LISTING WITH SOUND '"� ^r'' /w :D TYPE "D" DO NOT SCALE A3 A3 40 � W 3518" 47/8' NON- N/A 49 ry (� O 90mm 121mm RATED ]!'�� LINE OF REFER TO W/3"[75mm]SAB c� — STRUCTURE PARTITION HEAD / r1 DETAILS A6 6 6., 7114" 40 O ® V 2x4 WD STUD 2x4 WD VERTICAL SLOTTED FLUSH 150mm 181mm NON- N/A 49 (� RATED W!3"[75mm r1 . HORIZONTAL @ 16"O.C. FRAMING @ 16"O.C. WITH GYP TYP �„� / FIRE-RETARDANT- PER STANDARD TO STANDARDS ONE 40 TREATED WOOD REQ. SUIT SHELVING SYS. 3518" 4718" HOUR/ 49 (IBC 603.1 -l(1.1)) FIRE-RETARDANT- 518"[15mm]GYP BD MTL RUNNER 90mm 121mm SMOKE U465 TREATED WOOD REQ. RESIST W!3"[75mm]SAB PLAN (IBC 603.1-1(1.1)) A ONE ^, --1J1Jlllll"""-y- 40 6" 71/4" HOUR/ W U465 49 150mm 181mm SMOKE RESIST W/3"[75mm]SAB FLOOR PLAN FLOOR PLAN DESIGNATION DESIGNATION SOUND NO SOUND WITH SOUND STUD PART FIRE UL TRANS LINE OF CEILING NOTES ATTENUATION ATTENUATION SIZE WIDTH RATING LISTING CLASS REMARKS REFER TO � 1. PARTITIONS ARE DISTINGUISHED ON FLOOR PLANS BY SYMBOL DESIGNATION,GRAPHIC DESIGNATION,OR A G3 SCHEDULE BEL COMBINATION OF BOTH DESIGNATIONS. 2 X NON 5/8"[15mm]GYP BD NIA 2X4 3 518" NIA N/A FOR PARTITION RATED WIDTH 2. THERE ARE TWO TYPES OF SYMBOL DESIGNATIONS,ONE FOR PARTITIONS NOT REQUIRING SOUND ATTENUATION MTL RUNNER AND ANOTHER FOR PARTITIONS WHICH REQUIRE SOUND ATTENUATION.REFER TO PARTITION MATRICES FOR UOUND ATTENUATION BLANKET(SAB)MINIMUM THICKNESS'FOR STC INDICATED. DO NOT SCALE LINE OF SEALANT < ? STRUCTURE TYPE "F" SYMBOL DESIGNATION Q SYMBOL DESIGNATION (NO SOUND ATTENUATION) I (WITH SOUND ATTENUATION) ir`-,u.✓ 7 %'� LINE OF STRUCTURE FLOOR PLAN FLOOR PLAN DESIGNATION DESIGNATION SOUND 3. THE SYMBOL DESIGNATION HAS TWO CHARACTERS,THE FIRST CHARACTER IS A LETTER INDICATING THE _ NO SOUND WITH SOUND STUD PART FIRE UL TRANS PARTITION TYPE.THE SECOND CHARACTER IS NUMERIC INDICATING THE STUD WIDTH.REFER TO LEGEND BELOW. <<Jl�� ^�r4�'•V"'�.,V•Z• •`` AT ATTENUATION SIZE WIDTH RATING LISTING CLASS REMARKS NUMERIC STUD '7!/:Iliiilitt5!t� [mmj CHARACTER SIZE D3 3 518" 4 1/4" NOW NIA 1 518"[40] / N/A RATED N/A N/A 2 2 1/2"[62] 3 3 5/8"1901 D6 4 4"[901 BRACE EACH STUD AT 4'-0" N/A 6" 6 5/8=NONN/A N!A g 6"[140][1200mm]OC VERTICALLY 'A' - FOR PERMIT / 4. IF NO SYMBOL DESIGNA-ION IS PROVIDED,THE STUD SIZE WILL BE 3 518"[90mm]. OS-12-11 LINE OF CEILING — 5 THE GRAPHIC II R PARTITIONS REQUIRED TO BE SMOKE RESISTANT,FIRE RESISTANT,OR BOTH FIRE AND SMOKE RESISTANT. - TYPE "C" DO NOT SCALE 6, "LINE OF STRUCTURE"INDICATED FOR EACH PARTITION IS DIAGRAMMATIC ONLY AND DOES NOT INDICATE EXACT REFER TO CONSTRUCTION CONDITIONS OR GEOMETRY. SCHEDULE BELOW LINE OF REFER TO LINE OF STRUCTURE FOR PARTITION STRUCTURE PARTITION 7. ALL DIMENSIONS ARE FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.REFER TO PARTITION OR OTHER WALL WIDTH HEAD DETAILS MATRICES FOR PARTITION WIDTH DIMENSIONS UNLESS INDICATED TO BE SHOWN ON PLAN. CONSTRUCTION 8. SEALANT: PROVIDING BACK-UP FOR STUD BRACING / - 5/8"[15mm]GYP BD C FIRE RESISTANCE RATED PARTITIONS SHALL.USE RATED M RESISTANT FILL MATERIAL IN CONJUNCTION WITH AN APPROPRIATE RATED FIRE/SMOKE FIREIRE STOPPING NG SYSTEM. MTL RUNNER 2. NON-RATED PARTITIONS AND NON-RATED SMOKE RESISTANT PARTITIONS SHALL USE MTL RUNNER ACOUSTICAL SEALANT. LINE OF / SEALANT 9. INSULATION:-HEAD CONDITIONS AT FLOORIROOF DECK STRUCTURE � 1. FIRE RESISTANCE RATED PARTITIONS SHALL USE MINERAL WOOL INSULATION. — 2. NON-RATED PARTITIONS REQUIRING SOUND ATTENUATION SHALL USE SOUND ATTENUATION BLANKETS(SAB.) C LINE OF 3. PROVIDE FULL THICKNESS INSULATION INSIDE ALL STUD BOX BEAMS AND HEADERS. PARTITION m CEILING 10. REFER TO SPECIFICATIONS FOR MINIMUM STUD THICKNESS,MAXIMUM SPACING AND ALLOWABLE LIMITING HEIGHTS DEFLECTION CRITERIA FOR GYPSUM BOARD ASSEMBLIES. T Y�L_'� FLOOR PLAN FLOOR PLAN REFER TO '—" I e��ii DESIGNATION DESIGNATION STUD/HAT SOUND SCHEDULE BE 518"[15mm]GYP BD 11. FOR PARTITIONS INDICATED TO RECEIVE SOUND ATTENUATION BLANKETS(SAB),EXTEND SAB TO FULL HEIGHT OF NO SOUND WITH SOUND CHANNEL PART FIRE UL TRANS FOR PARTITION PARTITION UNLESS OTHERWISE INDICATED.FLOOR TRACK TO BE SET IN A CONT.BED OF SEALANT. ATTENUATION ATTENUATION SIZE WIDTH RATING LISTING CLASS REMARKS WIDTH MTL RUNNER 12. FIF:E RESISTANT AND FIRE RESISTANT SMOKE BARRIER RATINGS ARE TO SURROUND ALL OPENINGS IN RATED FX LINE OF PARTITIONS. SHEET NUMBER i NIA 718" 11/2" NON N/A NIA STRUCTURE SEALANT RATED z 13. SMOKE RESISTANT,FIRE RESISTANT,AND FIRE RESISTANT SMOKE BARRIER PARTITIONS SHALL EXTEND AND SEAL � .TO INSIDE FACE OF EXTERIOR SHEATHING,INCLUDING EXTENSIONS THROUGH SOFFITS. F1 NON 14. EACH PARTITION SHOWN ON THE DRAWINGS TO HAVE A FIRE AND OR SMOKE RESISTANT RATING SHALL BE N/A 15181, 21/4" RATED NIA NIA FLOOR PLAN FLOOR PLAN 1DEN71FIED AS SUCH WITH A LABEL ABOVE THE CEILING ON EACH SEGMENT OF THE WALL AND 20'-0.,[6000mm]OC DESIGNATION DESIGNATION SOUND MAX EACH SIDE OR AS REQUIRED BY THE AHJ. c e= F2 NO SOUND WITH SOUND STUD PART FIRE UL TRANS NON ATTENUATION ATTENUATION SIZE WIDTH RATING LISTING CLASS REMARKS 15. REFER TO TOILET ACCESSORIES SHEET,AND CASEWORK SHEET FOR MOUNTING DETAIL INFORMATION. i N/A 2112" 3118" RATED NIA N/A C3 3 5/8" 4 1!4" 16. REFER TO THE METAL FABRICATIONS DETAILS FOR MF REFERENCES IN PARTITION SECTIONS. F3 N/A NON- NIA N/A N/A 3 5/8" 4 t/4„ NON NIA NIA 90mm 106mm RATED 17. NOT ALL PARTITION TYPES SHOWN ON THIS SHEET ARE USED ON THIS PROJECT. RATED 18. PROVIDE FIRE RETARDANT TREATED WOOD BLOCKING FOR SIGNAGE,AWNINGS, STOREFRONT,CABINETRY,ETC, PARTITION BEAD DETAILS CONT 22 GA 3"[75mm]DEEP d .a LEG DEFLECTION TRACK WHEN PARTITION IS ALIGNED AT DECK FLUTE a - a - e ° d a RECESS-PROVIDE A 6"X 10" 150mm X FILL FLUTES ABOVE ._ ° ° a d CONT 20 GA FORMED Z [300mm]OC MAX ATTACH TO DECK AT 12" - d'. ' 250mm]X 22 GA MTL PLATE AT DECK FLUTE BEAMS WITH SPRAYED ° CLIP WITH 2"[50mm] a a d DATE: OB/12/11 RECESS THAT IS CONTIGUOUS WITH FIRE RESISTIVE •- t' ;� LEGS-ATTACH TO BEAM FILL GAP BETWEEN 'a m^ PARTITION-ATTACH MTL PLATE TO DECK d MATERIAL \ �-5 < AT 16"[400mm]OC MAX SLAB AND TOP OF a mo WITH POWDER DRIVEN FASTENERS AT SAME -=� CONT 22 GA 3"[75mm]DEEPa CONT 22 GA 3"[75mm]DEEP WALL WITH MINERAL JOB NO: HI - PHC - II d d. 4 LEG DEFLECTION TRACK FILL GAP BETWEEN - WOOL INSULATION SPACING REQUIRED FOR PARTITION TOP LEG DEFLECTION TRACK •. TRACK ATTACH TO DECK AT 12" ATTACH TO DECK AT 12" SPRAYED FIRE DRAWN:STAFF a [300mm]OC MAX DO NOT ATTACH GYP [300mm]OC MAX RESISTIVE MATERIAL �`. CONT 22 GA 3"[75mm] DO NOT ATTACH GYP BD OR STUDS TO AND TOP OF WALL WITH DEEP LEG BD OR STUDS TO CHECKED:CM DEFLECTION TRACK MINERAL WOOL DEFLECTION TRACK DEFLECTION TRACK IN < SEAL ONE SIDE OF PARTITION IN THIS AREA '� SPRAYAPPLIED : INSULATION '- ATTACH Z CLIP AT THIS AREA ry AGAINST PASSAGE OF WHERE GYP BD IS .. -• ' _"- 16"[400mm]OC MAX FIRESTOP MATERIAL SMOKE �n CONCURRENT WITH DECK 1'_� EACH SIDE-MIN 1/2" 0 CONT 2"[50mm)WIDE vFLUTE RECESS EXTEND UP INTO RECESS AS SHOWN ( CONT 2"[50mm]WIDE X 22 u;00 NOT ATTACH GYP BD OR �n y i-n GA MTL STRAP FOR TOP SPRAY APPLIED X 22 GAMETAL STRAP N i [12.5mm]OVERLAP AT STUDS TO DEFLECTION m L ATTACHMENT OF STUDS [ I�vBD OR STUDS TO N, DO NOT ATTACH GYP STRAP AT 8° 200mm GYP BD AND DECK TRACK IN THIS AREA -ATTACH GYP SO TO FIRESTOP MATERIAL v DEFLECTION TRACK IN OC MAX CONT 2"[50mm]WIDE EACH SIDE-MIN 1/2" _ V THISAREA X 22 GA MTL STRAP LINE OF CEILING [12.5mm)OVERLAP AT _ c: FOR TOP AS SCHEDULED GYP BD AND DECK CONT 2"[50mm]WIDE FLUTED STEEL DECK/CONCRETE FLOOR ' ATTACHMENT OF X 22 GA METAL STRAP OR ROOF PARALLEL TO FLUTES FLUTED STEEL DECK/CONCRETE FLOOR OR GYP BD FLUTED STEEL DECKICONCRETE FLOOR OR ROOF •ATTACH GYP BD TO ROOF PARALLEL TO FLUTES - PERPENDICULAR OR DIAGONAL TO FLUTES STRAP AT 8"[200mm] FLUTED STEEL DECKICONCRETE TWO HOUR FIRE RESISTANT AND TWO HOUR C G R T L A N D FLOOR OR ROOF PERPENDICULAR OR ONE HOUR FIRE RESISTANT AND ONE FIRE RESISTANT SMOKE BARRIER M 0 R G A N NON-RATED OR SMOKE RESISTANT DIAGONAL TO FLUTES UL-HW-D-0107 HOUR FIRE RESISTANT SMOKE BARRIER NON-RATED UL-HW-D-0267 A R C H I T E C T NOTE: NOTE: REFER TO UL LISTING FOR COMPLETE REFER TO UL LISTING FOR COMPLETE ASSEMBLY REQUIREMENTS ASSEMBLY REQUIREMENTS 711 N. FIELDER RD. ARLINGTON, TX 76012 d .4 ° . a °' CONT 22 GA 3-[75mm] CONT 22 GA 3"[75mm]DEEP PH: (817) 635-5696 LEG D22 E 3" N[75mm]DEEP o d DEEP LEG DEFLECTION SPRAY APPLIED LEG DEFLECTION TRACK LEG DEFLECTION TRACK ° a . .a a ' - FILL FLUTES ABOVE TRACK ATTACH TO DECK FIRESTOP MATERIAL ATTACH TO DECK AT 12" °. e a c FAX: (817) 635-5699 ATTACH TO Z CLIP AT 16" BEAM WITH SPRAYED AT 12"[300mm]OC MAX —�-•�— a m^ EACH SIDE-MIN 1/2" [300mm]OC MAX m WHEN PARTITION IS ALIGNED AT DECK FLUTE [400mm]OC MAX ° FIRE RESISTIVE a - K RECESS-PROVIDE A 6"X 10"[150mm X a ' _ - - a [12.5mm]OVERLAP AT } a. m 250mm]X 22 GA MTL PLATE AT DECK FLUTE _ : MATERIAL ° �14 o GYP BD AND DECK FILL DECK FLUTE ° d RECESS THAT IS CONTIGUOUS WITH FILL GAP BETWEEN _' ` ° RECESS WITHdPARTITION-ATTACH MTL PLATE TO DECK - °d DILLGAP ETWE TOP OF "'''"'�'� '- -' '�" "d a° MINERAL WOOL SAME - CONT 22 GA 3"[75mm]DEEP a CONT 22 GA 3"[75mm]DEEP WALL WITH MINERAL WOOL "<���' ?;`" ."•�: '<',`-';;'..' DO NOT ATTACH GYP INSULATION WITH POWDER DRIVEN FASTENERS AT S a d - :;tics f,",'-;sp; BD OR STUDS TO SPACING REQUIRED FOR PARTITION TOP - d. 4 LEG DEFLECTION TRACK DO NOT ATTACH GYP LEG DEFLECTION TRACK INSULATION - - - d =^�]'�*:`di'„• - BEAM FLANGE BEYOND DEFLECTION TRACK IN DO NOT ATTACH GYP BD V TRACK - d ATTACH TO DECK AT 12" BD OR STUDS TO ATTACH TO DECK AT 12" 1 :'�,�i' i;vi:rl IE';""i,i 300mm OC MAX 300mm OC MAX SPRAY APPLIED FIRESTOP -' '� ,� THIS AREA eS ( OR STUDS TO DEFLECTION [ 1 DEFLECTION TRACK IN [ 1 Q �- y _ 7..F THIS AREA MATERIAL EACH SIDE MIN 1!2 ° ° t�'s. n +. FILL GAP BETWEEN TRACK IN THIS AREA SPRAYAPPLIED SEALANT MIN 2"m]OVERLAP AT GYP BD -cu i '--•°-!,: FIRESTOP MATERIAL o ? SLAB AND TOP OF WA L MIN 2'150mm]OVERLAP AT _- 'q •"•"N'"'•'- ' •n DO NOT ATTACH GYP BD OR � �, ( ] - CONT 2" SOmm WIDE X22 GA �+ WITH MINERAL WOOL ? - EACH SIDE-MIN 1/2" CONT 2"[50mm)WIDE X 22 BEAM [ ) "' [12.5mm]OVERLAP r CONT 2°[SOmmJ WIDE X 22 STUDS TO DEFLECTION �, a DO NOT ATTACH GYP BD METAL STRAP-ATTACH GYP INSULATION CONT 2"[SOmm]WIDE X a o GA MTL STRAP FOR TOP AT GYP BD AND GA MTL STRAP FOR TOP o; TRACK IN THIS AREA u ' m I� a OR STUDS TO BD TO STRAP AT 8"[200mm]OC 22 GAMETAL STRAP- .- i ATTACHMENT OF STUDS ^' ^ ' ATTACHMENT OF STUDS •- u DEFLECTION TRACK IN MAX ATTACH GYP SOTO00mm DECK V/ ` V g THIS AREA STRAP AT 8"(200mm]OC j CONT 2"[50mm]WIDE X a)CONCRETE FLOOR OR ROOF SLAB MAX Lo 22 GA METAL STRAP- FLUTED STEEL DECKICONCRETE LINE OF CEILING STEEL DE ATTACH GYP BD TO FLOOR OR ROOF PERPENDICULAR O FLUTED L DECKICONCRETE FLOOR OR ROOF AS SCHEDULED PARALLEL TO FLUTES STRAP AT 8"[200mm]OC OR DIAGONAL TO FLUTES CONCRETE FLOOR OR ROOF MAX TWO HOUR FIRE RESISTANT AND TWO HOUR L (.0 TWO HOUR FIRE RESISTANT AND TWO HOUR FIRE RESISTANT SMOKE BARRIER ONE HOUR FIRE RESISTANT AND ONE HOUR FIRE RESISTANT SMOKE BARRIER UL-HW-D-0108 (1) ~ Q FLUTED RSTEEL OOF PARALLEL TO FLUTES OR OR NON-RATED OR SMOKE RESISTANT FIRE RESISTANT SMOKE BARRIER UL-HW-D-0107 UL-HW-D-0299 O NON-RATED NOTE: NOTE: Lv REFER TO UL LISTING FOR COMPLETE REFER TO UL LISTING FOR COMPLETE I n REFER TO UL LISTING FOR COMPLETE ASSEMBLY REQUIREMENTS ASSEMBLY REQUIREMENTS ASSEMBLY REQUIREMENTS v n ae d SPRAY APPLIED a CONT 22 GA 3"[75mm] a: d FIRESTOP MATERIAL a SPRAYED FIRE LEG D22 E 3" N[75mm]DEEP DEEP LEG DEFLECTION V) 0 6i EACH SIDE-MIN 1/2" V! FILL FLUTES ABOVE a - RESISTIVE MATERIAL LEG DEFLECTION TRACK TRACK ATTACH TO DECK m O BEAMS WITH SPRAYED ATTACH TO DECK AT 12" a' AT 12"[300mm]OC MAX - o .a y [12.5mm]OVERLAP AT ^ CONT 22 GA 3" 75mm DEEP FIRE RESISTIVE 300mm)OC MAX a. ° u. -° a a a N GYP BD AND DECK ® a- V / CONT 20 GA FORMED Z [ z l 1 MATERIAL CLIP WITH 2"[50mm] ° m a O d LEG DEFLECTION TRACK d LEGS-ATTACH TO BEAM FILL DECK FLUTE a ° - Q ATTACH TO DECK AT 12" o CONT 22 GA 3" 75mm DEEP RECESS WITH "� DO NOT ATTACH GYP a d SEALANT a a [ ) r' AT 16"[400mm]OC MAX - BD OR STUDS TO [300mm]OC MAX DO NOT ATTACH GYP LEG DEFLECTION TRACK MINERAL WOOL L[,J BD OR STUDS TO ATTACH TO DECK AT 12" FILL GAP BETWEEN INSULATION DEFLECTION TRACK IN THIS ) DO NOT ATTACH GYP [300mm]OC MAX - V DEFLECTION TRACK IN SPRAYED FIRE RESISTIVE THIS AREA a. CONT 22 GA 3"[75mm] ,� 8D OR STUDS TO EXTEND AT MINIMUM ONE DO NOT ATTACH GYP FILL GAP BETWEEN THIS AREA MATERIAL AND TOP OF DEEP LEG DEFLECTION V J v 5 DEFLECTION TRACK LAYER UP INTO FLUTE c WALL WITH MINERAL WOOL I - BD OR STUDS TO I a SLAB AND TOP OF WALL IN THIS AREA RECESS AND SEAL of INSULATION �`. - TRACK ATTACH TO Z DEFLECTION TRACK I CONT 2"[50mm]WIDE X ¢ WITH jWIDE X - .. ML, AT i6"[400mm]OC THIS AREA ' c FIRESTOP MATERIAL INSULATION WOOL ry CONT2" TRAP FOR 22 GA METAL STRAP- ® Z -0 I..L ^n N 3 GA MTL STRAP FOR TOP '=•�'%" ' _ d' o - EACH SIDE-MIN 1/2" <J W o m vi ATTACH GYP BD TO of ATTACHMENT OF STUDS �. _ CONT 2"[50mm)WIDE X 22 u [72.5mm]OVERLAP AT STRAP AT 8" 200mm OC .J CONT 2"(50mm]WIDE X 22 SPRAY APPLIED DO NOT ATTACH GYP BD [ 1 GA METAL STRAP-ATTACH GYP BD AND DECK MAX r '� 'v �. GA MTL STRAP FOR TOP FIRESTOP MATERIAL �n OR STUDS TO y. N ? GYP BD TO STRAP AT 8" ATTACHMENT OF STUDS LINE OF CEILING EACH SIDE-MIN 112" in DEFLECTION TRACK IN AS SCHEDULED [12.5mm]OVERLAP AT `�' THIS AREA [200mm]OC MAX GYP BD AND DECK 411 ' Q) O CONT 2"150mm]WIDE X FLUTED STEEL DECK/CONCRETE CONCRETE FLOOR OR ROOF SLAB Ae.r� 22 GA METAL STRAP- FLOOR OR ROOF PERPENDICULAR FLUTED STEEL DECK/CONCRETE FLUTED STEEL DECK/CONCRETE FLOOR OR ROOF ATTACH GYP BD TO OR DIAGONAL TO FLUTES E tom. / /1 FLOOR OR ROOF PERPENDICULAR OR PERPENDICULAR OR DIAGONAL TO FLUTES STRAP AT 8"[200mm]OC ONE HOUR FIRE RESISTANT AND ONE HOUR V DIAGONAL TO FLUTES CONCRETE FLOOR OR ROOF MAX TWO HOUR FIRE RESISTANT AND TWO HOUR FIRE RESISTANT SMOKE BARRIER O O NON-RATED TWO HOUR FIRE RESISTANT AND TWO HOUR FIRE RESISTANT SMOKE BARRIER UL-HW-D-0108 L_ Ln NON-RATED OR SMOKE FIRE RESISTANT SMOKE BARRIER UL-HW-D-0107 n RESISTANT UL-HW-D-0267 NOTE: NOTE: NOTE: REFER TO UL LISTING FOR COMPLETE REFER TO UL LISTING FOR COMPLETE REFER TO UL LISTING FOR COMPLETE ASSEMBLY REQUIREMENTS ASSEMBLY REQUIREMENTS ASSEMBLY REQUIREMENTS '— s ACCESSORYIEQUIPMENT MOUNTING DETAILS TYPICAL INTERIOR PARTITION FRAMING 2"[50mm]X 22 GA 22 GA MTL TOP METAL STRAP TRACK(TYP UNC UNDERSIDE OF SLAB,FLOOR OR ' CONT 20 GA 4'• MTL WALL VE O4 GE ABOVE O�ENIN6A O�VE CEILING ROOF DECK :. 100mm WIDE CEILI c CEI b WHICH INTE R ®o <„Ez"__ ( ] STUDS P - G S JAM ST ;•� i MTL BACK-UP PLATE - CEILING LINE x a ®o `o / \ / o LARGE o o Vr. t� ,,` -•.;: "" w z BEL\O 04 a w z 350' / CEI ® OPENIG z w 0 [90mm]MIN / ONING t>_ z ( t>: DEEPER IFDO In O REQUIRED O R ING DO EN G DO In 0 O ING 20 GA MTL RUNNER NOTES: OS 05 05 05 'A' FOR PERMIT TRACK-CLIP 22 GA BOTTOM TYPE F FLANGES TO FIT TYPE © 1. ALL STUDS ARE SPACED 16"[400mm]OC MAXIMUM. ® TRACK(7YP) (D9 I2-1I OVERSTUDS 2, ALL STUDS SHALL BE"C"STUDS WITH 1/4"[6mm]FLANGE MINIMUM. Ld FLOOR LINE DOUBLE DOUBLE DOUBLE DOUBLE DOUBLE DOUBLE STUDS ®DENOTES SHELVING OR CABINETRY. MOUNTING DETAIL © STUDS STUDS STUDS STUDS STUDS 3 DENOTES STONE. 16 GA.STUDS 20 GA.STUDS ® 4 IN NO CASE SHALL DOUBLE STUDS AT SIDES OF OPENING BE CUT FOR AT STONE AT WALL MOUNTED 5- DUCTWORK OR OTHER MECHANICAL SYSTEMS. ARCHITECTURAL "MAX 8'-6"MAX M1'-6"MAX M1'-fi"MAX B'-8"MAX 8'-6°MAX 8'-6"MAX CABINETS/MILLWORK/ 113501 [25501 (1350j (13501 [25501 [25501 [25501 AT LEAD LINED PARTITIONS STUDS SHOULD BE 20 GA. ATTACHED SHELVING 6 IF GREATER THAN V-6" ALL STUDS ARE TO BE MIN 20 GA MTL STUDS 20 GAGE FACING OPPOSITE DIRECTIONS TO - PARTITION FRAMING DETAILS ALLOW MOUNTING Omm]MIN PLATE ATTACHMENT MIN 20 GA DOUBLE MTL A RT I T I DN HEAD 'ER IF STUDS AT 16"OC TO FRAME ANCHORS 22 GA MTL TRACK AT 11RED 8"[200mm] ALLOW MOUNTING FLOOR DOUBLE 20 GA PA MIN DEEPER PLATE ATTACHMENT BOTH JAMBS 22 GA MTL TRACK AT DOUBLE 20 GA MTL FRAMING r IF REQUIRED MTL STUDS AT FLOOR STUDS OGA r r 22 GA MTL TRACK ._, DOUBLE[9Omm]OR 6" O 9x - 22GAMTLSILL DET�LILS [150mmj MTL STUDS \ a = r TRACK BELOW 22 GA MTL TRACK 22 GA MTL TRACK I I W z \ r a Z _ I'_' �'' 20 GA X 1 1/2"X r _ -J CLIP ANGLE- SHEET NUMBER Z - 22 GA MTL TRACK 1 1/2"X 3"[38mm X 38mm w tG - CLIP ANGLE- X 75mm]FOR 3 SIB" w O - CLIP ANGLE- CLIP ANGLE- 20 GA X 1 1/2"X [90mm]STUDS AND 5" - 1"[25mm]X 22 GA MTL 20 GA X 1 1/2"X 1 112"X 3" 20 GA X 1 1/2"X 1 112"X 3" 1 1/2"X 3"[38mm X 38mm X [125mm)FOR 6"[150mmj :STL RUNNER STRAP PLATES ATE [38mm X 38mm X S75mm]FOR 3 [38mm X 38mm X 75mm]FOR 75mm]FOR STUDS-EA SIDE :K-CLIP FLANGES AND 14 GA STL RUNNER SCREW STUDS 1"[25mm]X 22 GA MTL [1050mm]OC EA SIDE 5/8"[90mm]STUDS AND 5" 3 5/8"[90mm]STUDS AND 5" 3 5/8"[90mm]STUDS AND 5" WEB TO FORM TRACK-CLIP FLANGES AND TOGETHER AT 3'-6" STRAP PLATES AT T-6" (125mm)FOR 6"[150mm]STUDS [125mm)FOR 6"[150mm) [125mm]FOR 6"[150mm) CHMENT FLANGE FOLD WEB TO FORM [1050mm)FULL (1050mm]OC FA SIDE STUDS STUDS TYPE © ATTACHMENT FLANGE LENGTH OF STUDS 7 4 TYPE ❑D DOOR OPENING DOOR OPENING LARGE OPENING DOOR DOUBLE DOOR/ 6 JAMB STUDS 5 JAMB STUDS JAMB STUDS _ OPENING HEADER 2 OPENING HEADER 1 NOT TOLRG OPENING HEADER 3 NOT TOSCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE SCALE NOTE. DATE: ®5/12/11 1 . ALL GLASS TO BE 1 " INSULATED JOB NO: HI - PNC - 11 LOW - E DRAWN:STAFF TEMPERED AS REQUIRED BY CODE. CHECKED:CM 2. ALL STOREFRONT GLASS SHALL BE DOUBLE PANE INSULATING PANELS (z N C 0 R T L A N D M 0 R G A N ARCHITECT 112� 36'-T 711 N. FIELDER RD. FIELD VERIFY FIELD VERIFY ARLINGTON, TX 76012 e B PH: (817) 635-5696 A6.00 A6.00 FAX: (817) 635-5699 12IF Q. 12 As.00 ®- (D IN �- As.oD a) (D U 0 � w � o A6DD o o o A6°° o T o ® o W (-- o LLJ (A V) O CL EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. ® LL O V) Ld 0 T 7 I� Ld A6.00 < c LLJ Li O A6100 O O O O A6.00 O O O O S5 1'-6"A.F.F. S4 1'•6"A.F.F. '� � � / /� OO ELEVATION - MARK S5 ELEVATION - MARK S4 Lo 5 1/2" = 1 '-0" 1/2" = 1 '-0" Z6'•1q' OAT, FIELD VERIFY 2'-88' FIELD VERIFY 12 58 1'•88" 12'-5" FIELD VERIFY B 8 8 8 A6.OD A6.00 A6.00 A6.00 �. :' � 1S3 •'G COVER TO MATCH STOREFRONT FRAME g <'p ED A . \ 12 rrr/!I!lpfl14119e1e, A6.00 6 SIM A6.OD 6 SIM � A6.00 12 io A6.00 12 A6.Oo A6.00 'A' - FOR PERMIT ` 11 09-12-II •\\ 11 � 11 11 \��, A6.00 A6.00 O O A6.0ZD 0 M m J J J W W W LL Ll LL 6 SIM EQ. EQ. EQ. u EQ. EQ. EQ. EQ. EQ. A6.00 ti M1 Asao 6 SIN �v'T®REF1w®NT A6.DD ELEVATIONS 1 1 1 1 O O A6.00 O O O A600 ` I / O A6.00 T T A6.00 SHEET NUMBER S3 V-6"A.F.F. S2 S2 1'-6"A.F.F. St 1'-6"A.F.F. ELEVATION - MARK S3 ELEVATION - MARK S2 ELEV - MARK S 141:. o� 3 1/2" = 1 '-0' 1/2" = 1 '-01, NOTE: DATE: OS/12/11 1 . ALL GLASS TO BE 1 " INSULATED JOB NO: HI - PHG - II LOW - E DRAWN:STAFP TEMPERED AS REQUIRED BY CODE. CHECKED:CM 2. ALL STOREFRONT GLASS SHALL BE DOUBLE PANE INSULATING PANELS C 0 R T LA N D M 0 R G A N ARCHITECT 711 N. FIELDER RD. ARLINGTON, TX 76012 14'-5" 141-4" PH: (817) 635-5696 FIELD VERIFY FIELD VERIFY FAX: (817) 635-5699 V 6'-4" FIELD VERIFY EXISTING STOREFRONT EXISTING STOREFRONT EXISTING STOREFRONT EXISTING STOREFRONT EXISTING STOREFRONT EXISTING STOREFRONT 5 FROSTED GLASS TO BE REPLACED W/ FROSTED GLASS TO BE REPLACED WI FROSTED GLASS TO BE REPLACED WI > FROSTED GLASS TG BE REPLACED WI FROSTED GLASS TO BE REPLACED Wl FROSTED GLASS TO BE REPLACED WI N N A6.00 CLEAR DOUBLE PANE LOW-E GLASS CLEAR DOUBLE PANE LOW-E GLASS CLEAR DOUBLE PANE LOME GLASS 9 CLEAR DOUBLE PANE LOWE GLASS CLEAR DOUBLE PANE LOW-E GLASS CLEAR DOUBLE PANE LOW-E GLASS ' t LL lJ.�d U 0) W O 8'-0"A.F:F. O O O T O O D j V) O 10 ® O Li p j b j J \4 LL \ LL Lj V PAIR OF A6.00 EQ. EQ. EQ. FIELD VERIFY FIELD VERIFY FIELD VERIFY V) ry > 3'-0"X 7'.0', O w O FULL LITE 0 > DOORS EXISTING STOREFRONT EXISTING STOREFRONT EXISTING STOREFRONT ® O W v j o T � EXISTING STOREFRONT EXISTING STOREFRONT EXISTING STOREFRONT LL W FROSTED GLASS TO BE REPLACED W/ FROSTED GLASS TO BE REPLACED WI FROSTED GLASS TO BE REPLACED WI FROSTED GLASS TO BE REPLACED Wl FROSTED GLASS TO BE REPLACED WI FROSTED GLASS TO BE REPLACED WI CLEAR DOUBLE PANE LOWE GLASS CLEAR DOUBLE PANE LOW-E GLASS CLEAR DOUBLE PANE LOW-E GLASS CLEAR DOUBLE PANE LOWE GLASS CLEAR DOUBLE PANE LOW-E GLASS CLEAR DOUBLE PANE LOW-E GLASS bj I — ' ^ a \ Q IV A6.60 0 0 0 0 0 0 ® z W\ A6.00 2'-0°A.F.F. c- S11 2'-0"A.F.F. S10 ��// noo W O 512 E o O ELEVATION - MARK S12 - MARK C S11 ELEVATION = MARK S10 1 2 &ELE.VATION 1 '-0" 10 1/2" = 1 '-0„ 10'-0" FIELD VERIFY Q) 16-2t" 10'-0" FIELD VERIFY FIELD VERIFY 8 8 ' A6.Op A6.00 r V �I u 7-1 A6.00 .- 7 A6.00 7 �/ITlittllll11141i\\4� 7 A6.00 7 A6.00 A6.00 7 A6.00 A6.00 ` A' - FOR PERMIT A6.00 TOA6.00 11 \ 11 o T (09-12.11 O O A6.00 O O A6.00 O 2 6" o w FIELD VERIFY >o B'-O"A.F.f. w ` w A6.00 LL � 4 SIM A6.00 A6.00 A6.00 EQ. EQ. EQ. EQ. EQ. w PAIR OF 0 1 T-0"X T-0FULL I( " LL 7 D A6.00 O O DOORSTE �TOREFROI�lT s7 4'-o°aF.F. 1 O ELEVATIONS 1 1 A6.00 T O O A6.00 O O A6.00 O 3 A6.00 1'-6"A.F.F. SHEET NUMBER 04 S9 1'•6°A.F.F. SO 1'-6°A.F.F. ELEVATION MARK S9 Q ELEVATION MARK S8 E LEV - MARK S7 ELEVATION - MAAS6 ?� 1 '-0" 1 /2" = 1 '-0„ DATE: ®9/12/11 JOB NO: Nl - PNC - 11 DRAWN;STAFF CHECKED:CM TOILET 1 ACCESSORY i MOUNTING DIAGRAMS SCALE: 1X' = 1'-0" NOTE: NOT ALL DIAGRAMS APPLY TO PROJECT C 0 R T LA N D FINISH FACE M D R G A N OF WET WALL �—FINISH FACE FINISH FACE -FINISH FACE — FINISH FACE FINISH FACE 3•_p^ FINISH FACE FINISH FACE FINISH FACE A R C H I T E C T ® OF WET WALL OF WET WALL OF WET WALL OF WET WALL OF WET WALL OF WET WALL OF WET WALL OF WET WALL 3 -0" 3'-0" -0 3 -0 MAX 3' 3'-0" 3'-0" 3'-0" � cMI a0 s M N z �clI' w ® r ® UwO I a s I ODFlM MAX MAX MAX MAX N a M o Z oz 711 N. FIELDER RD. MAX MAX MAX o o oN O Z Zz z Z Z— a zZ ARLINGTON, TX 7601 2 wp o w— w o WO U aO PH: (817) 635-5696as I s OZ Oz N N O p o O O 'm � N a- NU -5699FINISH FLOOR p PAPER PAPER PAPER PAPER TOILET TOILET TOILET TOILET TOILET TOILET TOILET TOILET TOILET FACIAL TOILET TOWEL TOWEL TOWEL TOWEL TISSUE TISSUE TISSUE TISSUE TISSUE TISSUE TISSUE TISSUE TISSUE TISSUE ACCESSORY DISPENSER DISPENSER DISPENSER DISPENSER DISPENSER DISPENSER DISPENSER DISPENSER DISPENSER DISPENSER DISPENSER HOLDER DISPENSER DISPENSER TYPE Al SURFACE A2 RECESSED A3 CONCEALED A4 OWNER Bi SURFACE MOUNTED B2 SURFACE MOUNTED O O O MOUNTED O O O O O v B3 SURFACE MOUNTED 84 RECESSED B5 PARTITION B6 OWNER 67 RECESSED BB SECURITY- B9 TWIN 610 RECESSED DRAWING MOUNTED FURNISHED DOUBLE ROLL SINGLE ROLL MULTI ROLL MULTI ROLL FURNISHED RECESSED JUMBO-ROLL S DESIGNATION O cl- N N L1 REFER TO PLAN REFER TO PLAN 3 -4 0 FOR LENGTH AND FOR LENGTH AND CONFIGURATION CONFIGURATION TO CL W f^ ._._..._. .__._ J d w - U O CIO w a o w w N J �o� ¢O O W 0111 Um j ww �w E o Uo ao o o U a�aww �a oao I waw or I o I o M ac¢i v I o, Nl O O O O r r '� O Or N r N �OJ ,..F� >— U FINISH FLOOR WASTE WASTE WASTE WASTE COMBINATION GRAB BAR ACCESSIBLE TOILET SECURITY VERTICAL W TOILET RECEPTACLE RECEPTACLE RECEPTACLE RECEPTACLE PAPER TOWEL STALL OR SHOWER GRAB BAR GRAB BAR !_{_ ACCESSORY DISPENSER/ WITH SEAT GRAB BAR TYPE WASTE RECEPTACLE ® O �� / ) C1 SURFACE C2 RECESSED C3 SEMI C4 OWNER D1 SEMI-RECESSED E1 12" E14 30 X 42 FINISH E9 24" E15 18.1 P 1 I VC DRAWING MOUNTED RECESSED FURNISHED y Li 7 DESIGNATION E2 is., 30" V) LL 24 L D2 RECESSED O E16 NON- E10 NON-SLIP P FINISH E3 " E11 35" 12 GAL 0 SEMI-RECESSED E4 36" E12 42" 18 GAL w E5 42" E73 48" w TILE TO EXTEND 2 -6" BEHIND MIRROR 2'-6" FROM CORNER o BACKSPLASH o 3 N J O O LAVATORY w r e® COUNTER 1CL ¢m =w J O I a a > j O 0 C,O O W aa ' a aY jo COUNTER Q o O p r O O jO VATOR FINISH FLOOR oN r Spry N MULTI-PURPOSE SOAP SOAP SOAP SOAP TOILET DIAPER ADULT SHELF STAINLESS TOILET UNIT DISPENSER DISPENSER DISPENSER DISPENSER SEAT CHANGING CHANGING STEEL ACCESSORY COVER STATION STATION FRAMED TYPE DISPENSER MIRROR H1 SOAP AND PAPER TOWEL J1 SURFACE J2 RECESSED J3 MOUNTED J4 O O O O OWNER K1 SURFACE O1 SURFACE 06 RECESSED O8 18" R1 24 X 36 DRAWING MOUNTED FURNISHED MOUNTED MOUNTED STAINLESS STAINLESS WITHOUT I+ -- -� DISPENSER STEEL STEEL SHELF DESIGNATION RECESSED K2 MOLDED RECESSED HOPE SHELF SURFACE r, MOUNTED 07 SURFACE H2 MULTI-PURPOSE �'" '" ;'t"• .y-,G '^^ UNIT - RECESSED OS RECESSED MOUNTED O9 24" TOILET TISSUE, STAINLESS STAINLESS SURFACE R2 24 X 36 SEAT COVER, STEEL STEEL MOUNTED WITH SHELF ti SANITARY NAPKIN TOWEL SURFACE r asa H3 MULTI-PURPOSE UNIT SHELF MOUNTED '' �.(•� S i� .y PARTITION '/�• ` D MOUNTED TOILET ✓ +( °.,°1 +: ..��ll ltilleill \S'aS. TISSUE, SEAT COVER, SANITARY NAPKIN - STANDARD ACCESSIBLE LAYOUTS SCALE: 1/4" = 1'-0" 1=1XTURE MOUNTING DIAGRAMS 'A' - FOR PERMITOg-12-11 7,-1„ EDGE OF MIRROR R1 .36 min 5. 1370 in::. I sis Al 27.°IT" .. 12 min 12-min 12 42 min to loe of J i N FRONT MIRROR ••„• 3 8' '3D5 30 065 riAAg� LGf OF LAV E3 npr - 30"X48,• w<e �, .. ! _. f E �" i`--�. =--.� �•...-._ B1 LAVATORY : i a �. " � + CLEAR rn 1 -6 1 -6 x m — — ' cmp 1p 6 E ¢ N Xifl msc .. m ._.._� .� E75 SPACE -I IF om-coINSULATE : o I : a N ses .,.. R..,60"X66,. No o N o M N - AB min _ u,,,�rc. :oTOILET > .o a w ALL PIPING I I I- I ¢ zoUCLEAR SPACE ' C3 i N o m AT HCz12 VI : Vt xw ro C3 30"X48' m� 1 60" ¢ N WALL MOUNTED MAX MIN CLEAR TURNING R LAVATORY EWC SHEET NUMBER FLOOR CIRCLE SPACE ELEVATION 54"X60" DOOR APPROACH SPACE STANDARD ACCESSIBLE TOILET HOLUONTAIN/COOLER PLAN DESIGNATION Tt PLAN DESIGNATION EWC3 0 vw DATE: 015/12/11 JOB NO: HI - PHC - II DRAWN:STAFF CHECKED:CM C 0 R T L A N D M 0 R G A N ARCHITECT 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5696 FAX: (817) 635-5699 I-- O LLJ U O V) O 0 0 w i-- U D E F T Li 0 ry z O I O O W cn EXISTING STOREFRONT EXISTING EXISTING STOREFRONT STOREFRONT W Z -------- - V , ry _ % z�j/% / / i / / � j / / / // J , �% — v Ljj ST Ld I 8"X 10"STEEL LTENANT I I ° 8"X10"STEEL 8 X10"STEEL I ------COLUMN COLUMN COLUMN UTILITY SLAB O ,Ory v BLOCK-OUT L J L't IZ EXISTING TENANT EXISTING ----- DEMISING WALL �4"CONCRETE SLAB RATED-/- SEPARATION �-- I WALL i TENANT UTILITY SLAB BLOCK-OUT 8"X 10"STEEL 8"X 10"STEEL 8"X 10"STEEL 8"X 10"STEEL j I COLUMN� r. •' :.' cC: `;- COLUMN COLUMN COLUMN - // / l i;, - - - - " jP C E 62? 0 �%_';_,/ /I I I �r�// ! N OF'ENIN RAMED ,ltSi RENTABLE AREA 9,671 SF / NO STOREFRONT VERIFY CONDITIONS � 'A' - FOR PERMIT IN THE FIELD ! 093-12-11 8"X 10"STEEL EXISTING TENANT COLUMN DEMISING WALL CONTINUOUS STOREFRONT EXISTING FRAMED SLAB BLOCKOUT i / IN OPENING - 8"X 10"STEEL NO STOREFRONT 8"X 10"STEEL 8"X 10"STEEI 8"X 10"STEEL i 8"X 10"STEEL COLUMN COLUMN COLUMN - I - 717 COLUMN I COLUMN - �r �"T , '�i77 /- - 7 , --� EXISTING FRAMED IN OPENING - EXISTING FRAMED IN OPENING - EXISTING FRAMED FLO®i?i�L�4N NO STOREFRONT NO STOREFRONT IN OPENING - NO STOREFRONT EXISTING FRAMED IN OPENING - NO STOREFRONT SHEET NUMBER F.6 F.8 4G.2 N EXISTING FLO© R FLAN � � � 1 DATE: 09/12/II JOB NO: HI - PHC - it DRAWN:STAFF CHECKED:CM C O R T L A N O M O R G A N ARCHITECT 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5696 FAX: (817) 635-5699 Ne F" O CL. N N U O W 00 > Ld F G ` REMOVE EXISTING FROSTED � 5 �y AIN REMOVE KNEE WALL AND GLAZING FROM ALUMINUM �—L STOREFRONT FOR NEW FRAME FOR NEW FUTURE O RECESSED DOUBLE DOOR I DOUBLE PANE LOW—E CLEAR ® C GLASS / ^ I v - ---- _ I S W I) 1.1 — a 2, I cl:f ® Ld W I w �—' a� D I ' � O v / I a- OL. O I � I I I I I W I H I I I I I Lo REMOVE EXISTING TEMPORARY ACCESS 3 1 I 1 DOOR e STORE EXISTING DOORS 68 AND I DOOR FRAMES FOR "., . i•. I I i POSSIBLE REUSE OR Ilsttt RETURN TO LANDLORD II I I I II� I I 1 I REMOVE EXISTING STUD A' FOR PERMIT FRAME IN STOREFRONT 09-12-I1 OPENING FOR FUTURE NEW I STOREFRONT, TYP. I I II I III REMOVE EXISTING STUD 1� FRAME IN STOREFRONT OPENING FOR FUTURE NEW STOREFRONT, TYP. — — — — — - - - - - - - - - - - - _ _ _ _ _ _ _ _ _ — _ _ _ _ _ _ _ _ _ _ _ _ DEMO FRAME IN STOREFRONT REMOVE EXISTING STUD OPENING FOR FUTURE NEW FRAME IN STOREFRONT STOREFRONT, TYP, OPENING FOR FUTURE NEW I I I STOREFRONT, TYP, SHEET NUMBER IV DEMO FLOOR PLAN F.6 F.8 G.2 1 I DOOR SCHEDULE DOOR NUMBER LOCATION SIZE TYPE MATERIAL FINISH GLAZING HARDWARE NOTES D -01 SOUTH ENTRY/EXIT PAIR 3'-0"X 7'-0" SIDE HUNG ALUM YES Ball Bearing Hinges-Stainless HARDWARE TO MEET CODE WHERE APPLICABLE DATE: 09/12/Il Steel Finish-Closers CONSULT WITH OWNER ON SPECIFIC HARDWARE JOB NO: Hl - PHG - 11 D-02 VESTIBULE DOOR PAIR 3'-0"X 7'-0" SIDE HUNG ALUM YES Ball Bearing Hinges-Stainless REQUIREMENTS AND SPEC Steel Finish -Closers Means of egress doorways(1008): DRAWN: STAFF D-03 WOMENS TOILET 3'-0"X 7'-0" SIDE HUNG HOLLOW MTL PT04 NO Ball Bearing Hinges-Stainless 1 All exit doors must swing in the direction of exit travel Steel Finish, Privacy Latch, ) Stainless Accessible Handles, 6" where serving an occupant Toad of 50 or more. CHECKED: GM Stainless kickplates 2) Maximum leaf width is 48 inches and the minimum clear Ball Bearing Hinges-Stainless opening width Is 32 inches, measured between door face D -04 MENS TOILET 3'-0"X 7'-0" SIDE HUNG HOLLOW MTL PT04 NO Steel Finish, Privacy Latch, and the stop with the door open 90 degrees. ' Stainless Accessible Handles, 6" 3) Doors serving spaces with an occupant load of 50 or Stainless kickplates more must swing in the direction of egress. The door latch must release when subjected to a 15 pound force, be set in D -as STORAGE PAIR T-0"X 7'-0" SIDE HUNG HOLLOW MTL PT04 NO Ball Bearing Hinges Stainless Steel Finish, Stainless Accessible motion when subjected to a 30 pound force, and swing to a Handles, Door Closers, Flush Bolts, full open position when subjected to a 15 pound force. 34"x34" Stainless Kick Plates 4) A door must not reduce the width of a corridor to less than one-half the required width during any point of its swing D -06 NORTH EXIT PAIR 3'-0"X 7'-0" SIDE HUNG ALUM YES Ball Bearing Hinges-Stainless and must not project Into the required width of a corridor Steel Finish-Closers more than 7 inches. C 0 R T L A N D 5) All egress doors must be readily openable from the side from which egress is to be made without the use of a key or NI 0 R G A N special knowledge or effort. Manually operated edge or A R C H I T E C T surface-mounted flush bolts and surface bolts are prohibited. 6) Doors in series must have space between them or not less than 7 feet when measured in their closed position 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5696 FINISH SCHEDULE PAINT SCHEDULE FAX: (817) 635-5699 ROOM NUMBER NAME FLOOR CEILING WALL BASE CROWN PAINT NO. COLOR Scofield Lithochrome Chemstain #218 PT04 #DW-58 PT01 Baked Clay 035 GYPPT01 +/,z 5-1/4 FJ 11/16 x 5-5/e FJ Egg Shell 100 ENTRY Dark Walnut(or Equivalent) Scofield Lithochrome Chemstain CEILING TILE REF INT. ELEV. #218 PT04 #DW-58 PT02 Yellow Oxide 2154-10 101 STORE Dark Walnut(or Equivalent) ARMSTRONG 770 %x 5-1/4 FJ 11/16 x 5-5/B FJ Egg Shell Scofield Lithochrome Chemstain #218 PT04 #DW-58 PT03 Moccasin 1059 102 COFFEE/TEA Dark Walnut(or Equivalent) GYP PT03 ' V x 5-1/4 FJ 11/16 x 5-5/8 FJ Egg Shell Scofield Lithochrome Chemstain PT03 #218 PT04 #DW-58 PT04 French Press AF-170 103 GOURMET Dark Walnut(or Equivalent) GYP A x 5-1/4 FJ 11/16 x 5-5/8 FJ Scofield Lithochrome Chemstaln PT02/TILE Antares 10T Brown TILE 48'.HIGH (78" #DW-58 STONE SCHEDULE 104 WOMENS TOILET Dark Walnut(or Equivalent) GYP CCI8503 13x13' Q MIRROR A0.06/R1) 11/16 x 5-5/8 FJ � /� O PT02/TILE Antares 10T Brown TILE 48" HIGH (78" #DW-58 TYPE A (]•��) 105 MENB TOILET Scofield Lithochrome Chemstain GYP CCI8503 13x13" @ MIRROR A0.06/R1) 11/16 x 5-5/8 FJ STONE NO.Dark Walnut(or Equivalent) ST01 Stack Stone- Imperial (D r 0 106 STORAGE SEALED CONCRETE NO FINISH NO FINISH ' NO FINISH NO FINISH Stack-Mesa Gray 1 _ 1 VJ \SJ 'NOTE: GREEN BOARD TO BE USED IN ALL WET T'l1 o AREAS-HANOSINK, MOP SINK, RESTROOMS, U 0) DRINKING FOUTIANS. NOTE: CAPSTONE 2.5"-2'x 18"TO MATCH VENEER OR EXISTING CAPSTONE AS APPROPRIATE PER IN FIELD REQUIREMENTS :DO SCHEDULES 2 O O > to W V) Q D E F G 3: � Z 0 O O LL_ o w U It- LLJ 131'-0" BETWEEN I I N;34 1 V I ry EXITS (49'-9"MIN) z sts sg s10 ------ - o < (3) n�N� �oPtV - - - �' 7 LJ .51„ q 7 54 _ -Az.o1 1.1 00 I 11 1[.-ARCHED 4 D3 A2.01 N D3 \ ' 3'-6a" Az.00 i OPENING S A6 12 8 G o N I / I - ¢D = ; ------1 Az.00 A6 WATER m Az.00 m G3 c3 31L0" o LLJ B, 3, B„ Aa 10 "1 14'-3 " FOUNTAINS it A3 _ �Im i� I N.I.C. 1 -ir 1 _ = 7,_O" 1,_ 7,_0n 1, r n E3 E3 -r�j i !J� O • C I I - _-_ _ _ _ _ - _ Yr l D04 I _ _ _ _ - - - - - ' _ _ _ _ - _ _ _ - - ____-J t n rn oos r -- - 1„ L7. „Do3 O - - ini - - I ��m - m '_6„ 4,_O„ - - - -14,_O'� 4,_O„ ,_6„ - o �o o O v I m I E3 I 1.0" GRAPHIC 1'-0" 1'_O„ aD D3 C L -. --------� lf7 FLOOR SI K- � 01L£FT/ TOILj{�7' � - WALL - 36' HT FR TO ias ��� A3 1_ " �7.0„ ----- 0- i I 13'-10" -- EXTEND 6' O Z 9 /2 OPP I - I A2.01 ? N I PAI,ST rD a I f � I o COFFEE/TEAa , � _ - _ ` „ I � A2.01 23 -- I N.I.C. 1 1 „ I 4'-31' 15'-2�„ 102 0l o �6 �d I ----- s 41, -6„ 6 r1 m cn i o I I N.I.C. I I i ' i •.. i_. m 34'-6"TO EXIT a (75,_O„MAX) A3 A2.01 I r7 TOR IGE I I l Ir-- � ...-r•�----1 I I I / I I ,., 90° N I 106 F I I J _J \ mCP ❑ fI/ I / 3/A1.02 - 4POS61BIiESTbRAGE li �_ '' I TYP I 95i 10-61" SHE�VIt G LA�'OU,i 7 i ,' / ENSURE WALL THIC NESS I 6'-6" CL3 e 6 _ I IS SUFFICIENT TOE CLOSE o % COLUMN CL2 I j 4\ r A2.01 -J----` J - 85 NOTES: A3 / 3/A .02 io \ ` - - ENSURE WALL THICKNESS I ' 13' 10" 13' 10{" f7�'�O" A3 1_ "^° o I Ty dJ" I °� IS SUFFICIENT TO ENCLOSE I 1 '^ 8 ' //,'1.) ` o3 G3 I = �'0 1 COLUMNf 1. PROVIDE BACKING FOR ALL WALL MOUNTED ACCESSORIES IN GOURMET I 20'-0" s'-s" I 6 I $ o ~ 8 F. 7„ 103 I 6 14 \ �� I A2.01 to Q� n6 POS o +11FIIItti.l. TOILET _ _ _ _ / I D - - o n m i i A2.00 I�- - ao o \\ c rA / 11'-0" STORE I r 3/A1.02 R7 , \ 9 / :�, o,\ 101 II A2.01 3 TYP o° �.6„ E3 j aN i f P"' ' I I psoa al, A' FOR PERMIT 2'-6 i 1I 8'_78'Is J09-12-i1 N.I.C. E3 I m \, rn / 0 h msm ° a II a� 17-0 es / �Sq r0 m. y A3 na �` ti. 2.6 PROVIDE WOOD BLOCKING G3 _ �o� -w FURTHESTTRAVEL 6�,. Doz _ . - . „,.. I DISTANCE 3 " AS REQUIRED FOR SHELF STUD G3 A2.01 1 1 011 A2 01 G3 -.. z i1 c3 0 MAX) g D 1 6 11 13 11 - 11 A6 (25 1 5 TAN ATTACHMENT A6 1'-0" 1'-0" 1'-0 1'-0' As 1 0 1'-0" A3 < r 0 6" 4 O„ ,_6 i A201 tY 6„ 4' „ 6, A2 -6 4 0„ 6 o CLOSE WALL WITH 518°GYP BD I1 - - - - - - - - - - - - - _.,_ G' - - - - - _ - - _ - _ _ - - __ - - - - _ - �_= 0 ENTRY PRIOR TO SHELF CONSTRUCTION - Hm o- - - - - - - - _ - o - - - - - - - E3 O a ° i00 - v E I �A2.007 A2.00 I `A2.00 O oo '-3 ' bm V _ bm 1 b 11 0" �o V D m� A� Pv ti ,3 PLAN DTL 11 0" 0 11 0" _ N rn r, 4,_9LI„ 3'_ 1 ge' 1 .__ .,T IV /12\ a 3 g 9A ,nlm iD I e0 A3 T.0,STL STUD 3 ` 4. '~ 12 - 3'-8" - �' Az.01 - o _ - Az.61 _ Do1 _ v 9'-fi-" 4'-0"AFF REF FLOOR PLAN FOR LOCATION -- 5zt= sa O O _ m y1 _ 32 PLOORPLI�IN ?r SPECIFIC WALL THICKNESS WALL TO MATCH EXISTING e WALL TO MATCH EXISTING z EIFS CONSTRUCTION ABOVE EIFS CONSTRUCTION ABOVE N s 131'- " BETINE[EN 1 � EXITS 2'-5, SHEET NUMBER - 5/8°GYP BD TO FRONT,TOP,AND BOTTOM FACE OF 18 GA 3 518"STL G.2 STUD FRAMED SHELF 18 GA CONT ANGLE CORNERSUPPORT o - BUILT IN SHELF DETAIL FLOOD PLAN Cw DATE: OIB42/11 JOB NO: HI - PIHC it DRAWN:STAFF CHECKED:CM C 0 R T LA N 0 M 0 R G A N ARCHITECT 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5696 FAX: (817) 635-5699 C) I— O a� N �. Ld (.0 O Z L O O ® w o C) I ESTABLISH ACTUAL STRUCTURAL p E F G 0 CONDITION IN FIELD 0® oUTILIZE FLEX TRACK w TO FORM RADIUS V I WIRE HUNG SUPPORTED V CONTINUE STL STUDS TO - - - - - - - - - - - - - - - ry - CEILING SYSTEM SUSPENDED STRUCTURE ABOVE WIRE HUNG 15'-0"AFF FROM STRUCTURE ABOVE 15'-0"AFF 15'-0" AFF o 'I.') GYP BD _ WIRE HUNG � W a \w WIRE HUNG SUPPORTED 15'-0" AFF PT03 0 0 0 o mo o -� GYP BD -�, p PT03 0 r CEILING SYSTEM SUSPENDED o , ]- L " • ^� FROM STRUCTURE ABOVE O PT03 WIRE HUNG PTa1 Prot PTo1 a i J GYP BD 9'-4 1/2"AFF 9'-4 1/2" AFF N.LC. � �11 8'-0" AFF 1 '-O" AFF o 8'-0" AFF lUF o 12'-0"AFF 8'-0"AFF 5.•.y O - _ i/ PT02 PT02 io PT02 -----J o O 10'-O" AFF 10'-0" AFF 518"GYP BD WIRE HUNG �" 0 0 13'-4" Proz LLn SUPPORTED CEILING SYSTEM / 3'-Sq o M TOILET W TOILET I 'n O 105 104 0 a e 6" _____1 518"GYP BD ON STL STUDS AT 16"OC �] PT03 PT03 11'-0"AFF � � 3 518"METAL STUD DIAGONAL COFFEE/TEA O = SUPPORT AT 48'OC MAX N.I.C. WIRE HUNG 2'- " FF 6 a N.I.C. LL 518"GYP BD WIRE HUNG OP NTO STRUCTURE 4 616 -----J SUPPORTED CEILING SYSTEM STORAGE GYP BD 0 ® ® O . 106 f PT03 a p PT03 0 Proz (AR LAY IN CEILING (ARMSTRONG 770), TYP - 5'_0" 8,_0„ 8'_O" a 8'-0„AFF G n ® ® 8" o 91-4 1/2" AFF UTILIZE FLEX TRACK 0" AFF Q - - TO FORM RADIUS 9'-4 1/2"AFF ti 11'-O"AFF FURR DOWN DETAIL 2 - - - - IX -o—� - WIRE HUNG 13-4 PT02 Pro3 12'-O" AFFGYP BID11'-O"AFF C AN E IE 0 I 2'" " FF GOURMET - -I (o� � ion -®- -- '.� WIRE HUNG 103 PT0321-0" 0 10. GYP BD71 l'-O" AFF �O�WIRE HUNG WIRE HUNG ® s-GYP BD 11'-O" A� GYP BD0 0 0 Pro3 1 1 p g p ® ,L°i 'A' - FOR PERMIT ® ® GYP gpUNG 0 11'-O" 0 H N EL R 09-12-11 15'-0"AFF �FLEX TRACK AT 11' 2'X2' LAY IN CEILING a 1 '-6' A F Pro3 0 GYP BDWIRE UNG CEILING AND AT �� (ARMSTRONG 770), TYP ROOF DECK 0 ® \ n PT03 % 8'-0"AFF a g O F ° ?6� 9'-4 1/2" AFF El 0"AF 8-0" F p 15'-0"AFF ® ENTRY ° ° CD 12'-0"AFF ° 12'-O"AFF 100 PT°1 CHANDELIER �'T01 I 15'-0"AFF O O — 15'-0" AFF �R ° 8" � 0 WIRE HUNG 0 PT03 PT01 p O O ` 0 PT03 0 2'X2'ACCESS bo 15'-0" AFF GYP BD HUNG O �-�� 15'-0" AFF ` ° HATCH ° s REFLECTED ------------ CE I L INCS f'LAN O O SHEET NUMBER F.6 F.8 G.2 ENLARGED CLOUD REFLECTED CEILING PLAN c' DATE: OS/12/11 JOB NO: H1 - PHI - II DRAWN:STAFF L% CHECKED:CM PT03 PT03 PT03 � i \\ r , \ 1 PT03 I ,, C 0 R T LA N 0 BASE REF s BASE REF BASE REF M 0 R G A N SCHED SCHED SCHED A R C H I T E C T PT03 PT03 PT03 PT03 \ IL PT03 711 N. FIELDER RD. ARLINGTON, TX 76012 20'-78" 7'-54' 14'-34" 3-5q" 14'-24" 7-54 14'-4 1 ,4, '-38' 11'-921" PH: (817) 635-5696 81'-98" 29' 1g' FAX: (817) 635-5699 In ELEVATION q INTERIOR ELEVATION 12 1 /4" = 1 '-0" 2X6 WD HORIZONTAL 2X6 WD HORIZONTAL 0 BLOCKING - FIRE RETARDANT BLOCKING-FIRE RETARDANT = CROWN _:� PT03 m TREATED WOOD REQ. `;� PT03 CROWN TREATED WOOD REQ. PT03 m REF SCHED PT03 PT03 CROWN CROWN J� PT03 REF SCHED CROWN REFSCHED LLjj 0 PT02 - PT02 REFSCHED —_— ------ _ Prot REFSCHED u � PT02 O E— LLJ PT02 O .- PT02 _ - I I b ! ! ! O PT02 .=icy Pr03 I� ! I i ! -F / 1 o i <= `D N °D PT02 PT03 ! ! PT03 ! I ! -co PT03 � �. BASE REF - -- ---- - -- ==_ — � ------ - - -- --- .. _... - -- _ --- - - - - - -- - SCHED - - - - - - - - - o — --- --- — -- — — - - --- z UJ 3. 0 3+_0�� -� (� + 3�. 0' 7cr '-0" 1-0' 7' 0" 01 4 08 I-0' 13' 10" 1' 6" 1'•6" 6' 0" 3.2" 0' 7'-0" 7 01 I.01 13'-10" 3' 104' 6' 112' 0' 17'-0" 27 94 17' 0° 25' 84" z N c INTERIOR ELEVATION ��ELEV Q INTERIOR ELEVATION ry INTERIOR ELEVATION n6 INTERIOR ELEVATION ® _ 1/4" = 1 '-0" 1/4" = 1 '-0" W ~ O O Coll In PT03 PT03 o - PT03 PT03 • '•�y',g1ligfPlli6t;F'.t\ 11'-Oz" 3'-54" 36' 54' 4'-9'" 20'4e,. 3-8 12' 3$' 1'.48" 12'-3a' 3-8 2.8 4g n n n 3n 112'-5Z" INTERIOR ELEVATION 'A' - FOR PERMIT 5 1/4" = 1 '-01, 09-12-11 2X6 WD HORIZONTAL N BLOCKING-FIRE RETARDANT CROWN TREATED WOOD REQ. o q <= 6 REFSCHED <= °O PT01 r CROWN , PT02 PT02 REFSCHED ' C?4- c- CY)o PT01 '� PT02 i INTERIOR 1 r O , \ — O' I o o C? PT03 ELEVATIONS i i PT03 i q PTOZ N m \ i co i PT03 SHEET NUMBER 3._0" 3+_0++ 3. 0 31_01 I 3�_0,� 3._0 4' 114 0' T 0" 0' T 0" 0' 13' 10" 4s 1' 10" 6'-4" 1' 10" 4'-0" 1178! 2' 6. 18' 1. 6. 7 0+, +_0 2' S81 16' Oz' 4'-e" 9' 104" - 35'-94" 14'-4a' 5'-3z' 42' 74" INTERIOR ELEVATION I TERIOR ELEVATION I T ELEV I TERIOR ELEVATION 4 1/4" = 1 '-0" 1 /4" = 1 '-0" � 1/4" = 1 '-0" 1 a a a CROWN a DATE: 09/12/II GYP BD f7 GYP BD GYP BD REF SCH D _ - JOB N0: HI - PHG - II PT03 I co PT03 ` - - - - I - `9 LLL � � - - - - - - - - - `� - - - - - - - - DRAWN:STAFF FLEX TRACK FLEX TRACK - FLEX TRACK FLEX TRACK FRAMING AT CHECKED:CM FRAMING AT FRAMING AT FRAMING AT CEILING AND DECK ABOVE CEILING AND CEILING AND CEILING AND DECK ABOVE �, DECK ABOVE �, DECK ABOVEao C PT03 I 0 i FRAMED WD I WD =, SHELF SHEET METAL VENEER I SHEET METAL VENEER 3/A1.02 BASE C 0 R T L A N O OVERLAY - 'I - - m OVERLAY - _ _-' li `� � REF SCHED M R 6 N D U N ['fJ N ARCH I T E C T cz 711 N. FIELDER RD. 2''4811 3'-0" 2'44' 1' 108" 4'-10" 1' 108' 7' 6a" 0' 9' 6" ARLINGTON, TX 76012 a'-64" 8'-6a 10`-611 PH: (817) 635-5696 21, I'llFAX: (817) 635-5699 p INTERIOR ELEV INTERIOR ELEV INTERIOR ELEV INTERIOR ELEV 1 S 1/4" - 1 ' 0" 0 17 1/4" = 1 '-0" -S a GYP BD 0 - IT GYP BD 0 GYP BD — — — PT03 — — —`� — — SAME PLANE PT03 - O FLEX TRACK FRAMING AT CROWN _ N N P CROWN CEILING AND DECK ABOVE REF SCHED q GY BD d REF SCHED CROWN <= LI,J PT03 PT03 REF SCHED CROWN PT03 SEE SCHED ^o U w a GYP BD 11_az, o GYPYP BY� GYP BD -� ® > O PT03 b� O GYP BD PT03; ! w BASE _ �M FRAMED BASE PTD1 `o i BASE REF SCHED " SHELF REF SCHED BASE T REF SCHED " 31A1.02 BASE REF SCHED b� L,_I REF SCHED -_ � z (n � Q V O 9' fill OI 91 fill 1'-6" 11_61, „ ® �y O Z (f� 0' 01 7 21_U6„ -0' 4'-0„ -0' 2' 6" S Ww 20.0 121.011 11'-011 r/ Z INTERIOR ELEVATION INTERIOR ELEVATION Q N INTERIOR ELEVATION INTERIOR ELEVATION ® Z -0 14 13 12 11 > � w � GYP BD o _ O 2X6 WD HORIZONTAL `" SAME PLANE PT03 c, O O cn BLOCKING-FIRE RETARDANT TREATED WOOD REO. = o CROWN BD L- SEE SCHED CROWN PT01 �— CROWN PT03 REF SCHED PT02 REF SCHED PT02 0 GYP BD r' -� — — — — — o o PT031 PT03 PT03 PT03 CS iCV T f -- (__--- - -- --— � GYPBY� --- ----� ---__ PT01 4, _-- o BASE BASE BASE r N PT02 REF SCHED REF SCHED REF SCHED BASE BASE REF SCHED , 11_611 ' 1'-6,1 , r a' 93„ 31' 0" 'c e 1, 11 4'-01, 2 6 0 4-0 0 14-0 10 13-10 3-2 +ItlJ;(1191F1�;' INTERIOR ELEVATION INT ELEVATION INTERIOR ELEVATION INTERIOR ELEVATION 'A' - FOR PERMIT 09-12-II GYP BD M 4' fie _ =1N PT03 GYP BD PTo3 = _ - �� CROWN CROWN ;� CROWN ��� PT03 CROWN ; Prot ti M REF SCHED PTo3 M REF SCHED M REF SCHED "' PT03 REF SCHED co PT03 -r�i _— PT02 PT02 PT02 C? -N CD I I - 1 1 P 03 r' 1 I 1 1 PT02 N 0 N PT03 N PT03 N �T INTERIOR �, i If i f I I BASE BASE ~ I BASE REF ELEVATIONS = —SC— HE -bREFSCHED REFSCH LAI --- ----- ---- --- - --- - _b'N - --- -- -- -TIIIII ---------- iLSHEET NUMBER 1, 31_011 •11.(11'1 11_(1111 31_O,I ,I I ,J1_OII 31_OII I, 11 31_011 31_0" I II 31_011 1'-114" 1'-114' 31_OII 11 Ca 8 4'-0311 J 31, 111 5,1 3' 7411 6 4„ 31.73" 31-94' gl.4l T-94' 1' 91 10", 1' 6" a 1' fill 71_011 O, 2 fig 0' 7' 0" 1' 6" 1' 6" 10 10z 1 98 112' 13'l 9'-611 27'-24' o INTERIOR ELEVATION INTERIOR ELEVATION INTERIOR ELEV INT EEV INT ELEV INTERIOR ELEVATION �/ L 1/4'= 1 '-0" DATE: 015/12/II JOB NO: HI - PHC - Il DRAWN:STAFF CHECKED:CM C 0 R T LA N 0 M 0 R G AN ARCHITECT 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5696 12 3 2.8 2.6 FAX: (817) 635-5699 Q l ES I II � F E O t 2 O I I I CL I N C0 $� ri FIN rr ii rr __ i� ri ii li i 1 Lli O N g _ V -- ---- _ -- ------ --- - ----- ----- ='- --- '- ------ -- -- -- -- -- -.:- --- -----=-=- -- - - -- - - - --_- ----- ---------- -=-=-- _ Q ----- ------------- ------- - - a cn — F— (n W Z a a - - Q a I a Z Of LIE][ _ W W = --J------------------ ------------- --- -- ------------- --- -------------- --------- --------------------------------- --------------------- -------- ----- -- - --- - --------- --- - I-- W 516 Sit Sf2 57 SB Sfi ^' 14'-0' 3'-0' 14'4' 41• t @A• 1 16'L' A'-0I• 16'Y' r V/ REPLACE GLAZING ONLY REPLACE GLAZING ONLY o IN THIS AREA IN THIS AREA TEXAS STACK STONE SILL TO MATCH < r / /1 TEXAS FLAGSHIP STORE,TYP EACH O O �J STOREFRONT BAY n NOTE-ALTERNATE STONE TO (� L- Ln MATCH EXISTING n NORTH ELEVATION EAST ELEVATION �L 4 1 /8" = 1 '-0" 3 1/8" = 1 '-0" F.6 F.8 G a -® ell, ujaarrttttt�4, — Dsu1 �{ a s s _ i _ 'A' FOR PERMIT I 1 17 09-12-11 -I --- - --- ------- - -- ---- - --- ----- -- -- ----- ------ - -- ------ - -------- ❑ 0 Ii NORTH - WEST ELEY14T 101�15 -- --- ------------ - z - - - -------------------------- ------- ----------- -------- - --------------------- ---- --- -- -- -- - - --- - ---- -------- -- - -- -nSTACK 17S12'31• 4. 36'.7k 3'-0' 17'.4. 7'-70' 6'-0. 1'.10, SHEET NUMBER ZDRY STONE SILL TO MATCH EIFS COLOR,SURFACE,AND DRY STACK STONE SILL TO MATCH TEXAS FLAGSHIP STORE,TYP EACH CONSTRUCTION TO MATCH TEXAS FLAGSHIP STORE,TYP EACH STOREFRONT BAY EXISTING EIFS ABOVE STOREFRONT BAY NOTE-ALTERNATE STONE TO NOTE-ALTERNATE STONE TO MATCH EXISTING MATCH EXISTING SE ELEV q SOUTH ELEVATION DATE: 09/12/11 JOB NO: HI - PHC - II DRAWN:5TAFF CHECKED:CM C 0 R T L A N D M 0 R G A N ARCHITECT 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635-5696 FAX: (817) 635-5699 sse I— 0 Ld C9 1.1 2 3 m ui O ® D I Uow n � }— U � I I I cj z o I I I w o Ld cl:� a� o i I o o cn I I Ltd 2 BUILDING SECTION DIAGRAMATIC PURPOSE ONLY i; W�g '���~ I I ' ' '!'17ll1iR61(hie`t I I I I I I 'A' - FOR PERMIT Vrl -- I I I I I I I I I i Ir --- I I I I 1 I I ilr= f- I � SECTIONS 1 1 I I 1 1 •\� I ...�._._ II I I I 1 SHEET NUMBER I I n1BUILDING SECTION DIAGRAMATIC PURPOSE ONLY DATE: OIB/12/11 JOB NO: HI - PHC - 11 DRAWN:STAFF CHECKED:CM C 0 R T L A N 0 M 0 R G A N ARCHITECT 711 N. FIELDER RD. ARLINGTON. TX 76012 i PH: (817) 635-5696 FAX: (817) 635-5699 COL COL Ld ® � > o O w U I EXISTING FACADE EXISTING FACADE T EXISTING ROOF AND STRUCTURE 7 L ^ O _ I p EIFS CORNICE,TYP. _ RI BATT INSULATION PROVIDED BY j R13 BATT INSULATION PROVIDED BY EXISTING FACADE _ — — — — — — — — — — W LANDLORD&INSTALLED BY TENANT -; I LANDLORD&INSTALLED BY TENANT T/EORN 16E0" I @EXTERIOR WALL CONSTRUCTION TYP @EXTERIOR WALL CONSTRUCTION TYP I \\\ I I . I // I BRACING STL TUDS �-- EXISTING CONSTRUCTION - TO EXISTING S RUCTURE AS REOD L,LJ _ _ _ _ _ _ _ T/STOREFRONT _ T/STOREFRONT NEW CONSTRUCTIONELEV. 115'-0" I IELEV. 115-0 I CEILING AS SCHEDULED E ,o^ CEILING AS SCHEDULED d I I O O v ' _ CEILING AS SCHEDULED ALIGN I // A6.00 siM NEW SOFFIT PANELS(TO MATCH SIDING) BRACE STL STUDS BACK TO - /�/ Ln ON AIR AND WATER BARRIER OVER EXISTING STRUCTURE AS REOD 5l8" INTERIOR GYPSUM 5/8"GYP SHEATHING ON 3 518"STL STUDS THINSET STONE VENEER OVER T-51 // I 5/8"GYP BD ON 3-5/8"STL STUDS @ IF OC BOARD BY TENANT,TYP. @ IF OC WITH R13 BATT INSULATION CEILING AS SCHEDULED MORTAR SETTING BED AND MTL LATH AND SCRATCH COAT R-13 BAIT INSULATION PROVIDED I I BY LANDLORD & INSTALLED BY VOID I I TENANT @ EXTERIOR WALL �`� \\ GLAZED ALUM STOREFRONT \ II CONSTRUCTION SYSTEM WITH 1"TEMPERED GLAZING GLAZED ALUM STOREFRONT REVEAL _ _ _ SYSTEM WITH 1°TEMPERED GLAZING AIR AND WATER BARRIER ON n 20 GYP SHEATHING(EACH SIDE)ON 6"2D GA , ELEV. 110'-O" STL STUDS AT 12"OC 1 \�\ I 3-518"STL STUD BRACING AS REOD 3/4"x3/4" ROUTED REVEAL EX R F PIAN r I \\ ','�i^ u ''_i,'',. •^,= ( EXISTING FACADE LINE BEYOND T j( I 2 o as.00 X Fz - As ao NEW SIDING TO MATCH EXISTING — — — n rio TYPICAL EIFS WALL FRAMED PICTURE(BY TENNANT) CONSTRUCTION ON4" EX Imo— TO CONCEAL AND SECURE 8"METAL STUD OVERBUILD - DISPLAY WINDOW FROM STORE SIDE j%%%%%MIMI.t' REF PLAN NEW 4°TRIM(TO MATCH SIDING) LOOSE LINTOL -_ — AT INTERFACE OF EXISTING o DI PLAY WINDOW 5/8"GYP BD ON 3-5/8"STL STUDS @ 16"OC AND NEW SIDING GLAZED ALUM STOREFRONT RECESSED TENANT STOREFRONT/DOORS I TO BE LOCATED ON SLAB INFILL BY TENANT SYSTEM WITH!"TEMPERED GLAZING 518°GYP BD TO JAMB(S)TYP I 'A' - FOR PERMIT NEW STONE RETURN STONE SILL — — — — — 09-12-II ALIGN WITH 6"SPLITFACEMASONRY AOJACENTSTONENG f 1 - - -/ I KNEE WALL TO MATCH EXISTING L1 WALL CONSTRUCTION 1� STONE SILL KNEE WALL CONSTRUCTION(SEE 1 RECESSED CONCRETE SLAB A6.00 sIM } ORIGINAL BUILDING PERMIT SET) — BY TENANT THINSET STONE VENEER OVER � As.ao �`� /// 13a18°STL STUD BRACING AS READ T/BASE_ _ CONCRETE SLAB BY TENANT MORTAR SETTING BED AND CONCRETE SLAB BY TENANT q CONCRETE SLAB BY TENANT ELEV. 102'-0" MTL LATH AND SCRATCH COAT I FLOOR FINISH AS SCHEDULED / I FLOOR FINISH AS SCHEDULED 6"X 6"CONC CURB FLOOR FINISH AS SCHEDULED t } / I I FLOOR FINISH AS SCHEDULED AIR AND WATER,BARRIER ON 518"GYP 1 ? 6"X 6"CONC CURB { // - i DOWELS,REINFORCEMENT AND DOWEL TO SLAB 16"OC / VOID DOWELS,REINFORCEMENT AND DOWELS,REINFORCEMENT AND SHEATHING(EACH SIDE)ON 6°20 GA DOWELS,REINFORCEMENT AND X @ {' I 1 " r; w CONSTRUCTION JOINT,TYP. - • - I CONSTRUCTION JOINT,TYP. STL STUDS AT 12"OC CONSTRUCTION JOINT,TYP. 1 CONSTRUCTION JOINT,TYP. T/SLAB i 1 T/SLAB I T/SLAB SLOPE I I T�/SLAB ELEV. 100'-O" - I - ro ELEV. 100-0 ELEV. 100'-0" ELEV. 100'-O" U`( b 3 W Wt A6.00 SECTIONS P � I q L 4 F SHEET NUMBER i WALL SECTION WALL SECTION ry WALL SECTION WALL SECTION GYP. BOARD ISEALANT V DATE: 015/12/11 ALUMINUM FRONT DOOR JOB F): Hl - PNC II SEALANT BED&4 SHIM MIN. 41,E 1 i i EXISTING FRAMING ALUMINUM STORE FRONT U) DRAWN:STAFF 2 AND INSULATION SYSTEM, ATTACHED TO FRAMING PER CHECKED:CM MANUFACTURER'S SPECS. > 518"GYP SILICONE SEALANT JOINT GLAZING ON 21/2" 20 GA STL STUD AND BACKER ROD INFILL AT 12"OC ALUMINUM STORE EXISTING FACADE SYSTEM BRICK OR STONE VENEER FRONT SYSTEM METALCORNER BEAD C 0 R T L A N D > O BACKER ROD AND SEALANT,TYP BACKER ROD AND SEALANT S . F . DOOR JAMB DETAIL M 0 R c A N BOTH SIDES AT STOREFRONT WRAP FRAMING WITH A A R C H I T E C T GLAZED ALUM STOREFRONT MEMBRANE FLASHING 6" SYSTEM WITH 1"TEMPERED GLAZING LOW-E GLAZING + III 711 N. FIELDER RD. S . F . HEAD DETAIL @ E I F S FROSTING STORE � I A GTON, TX 76 012 FRONT DOOR PH: (817) 635-5696 = I I FAX: (817) 635-5699 WALL MEMBRANE FLASHING UP I ALUMINUM THRESHOLD,SE- IN FULL BED OF MASTIC ALIGN I ADHESIVE mt HORIZONTAL S . F . DTL . ' a I - 1 � ALUMINUM HOOD EXPANSION JOINT 42 VFY SYSYS" 41„ VFY SYS � CEMENTITIOUS FIBER BD CEMENTITIOUS FIBER BD TRIM I d? Q ' ' ^�, ILD ` v GLAZING 1 GYP. BOARD 4a Q a a U 0) W 0 ALUMINUMSTORE ALUMINUM STORE I�FRONT SYSTEMFRONT SYSTEM 1/2"SILICONE SEALANT d a a ® ® O Pn } JOINT AND BACKER ROD v / METAL CORNER� a m`v BEAD > SEALANT BED&SHIM SEALANT F . DOOR SILL @GRADE OPTIONAL STEEL T-0"A.F.F. WRAP FRAMING V 0 REINFORCING IF REQ. W/ MEMBRANE ALUMINUM FRONT FLASHING Z V) O GLAZING DOOR ALUMINUM STORE FRONT G)fs�= SYSTEM,ATTACHED TO I ® O FRAMING PER LiJ �\kA MANUFACTURER'S SPECS. I S d 42 3" II ~ Z VFY SYS FIELD VFY I) II I I 2x FIRE RETARDANT VERTICAL S . F . DTL . S . F . DOOR HEAD DTL . S . F . JAMB DETAIL @FIBERBOARD TREATED WOOD ® -0 W BLOCKING � � � W BRICK OR STONE VENEER METAL CORNER v— BEAD I ' Lo O O SILICONE SEALANT JOINT SEALANT c ^ :ll AND BACKER ROD GLAZED ALUM STOREFRONT ( WRAP FRAMING SYSTEM WITH I"TEMPERED :II „ W/ MEMBRANE LOW-E GLAZING SEALANT BED&a SHIM MIN. FLASHING N I ALIGN I ALUMINUM STORE FRONT PROVIDE HEAD 518 GYP BD ON 3-518 STL STUDS @ 16°OC I BACKER ROD AND SEALANT,TYP TO BOTH SIDES AT STOREFRONT STUCCO SYSTEM SYSTEM,ATTACHED RECEPTORS GYP. BOARD TO FRAMING PER ACCOMODATE gyp. "J" MOULD MANUFACTURER'S SPECS. DEFLECTION AS \ 42, �, ' 1/2"SILICONE SEALANT REQUIRED, SEE l -/---------------- ------ ------- JOINT AND BACKER ROD VFY SYS FIELD VFY SPECS. EXISTING FACADE , METAL CORNER .`;?• G PJ,v,,, �",J,• BEAD c� ..•n k;Ur, L�,,'.�^ �" \ SEALANT BED&SHIM 2 S . F . HEAD DETAIL @BRICK / STONE FRAMED PICTURE(BY TENNANT) SEALANT 6" TO CONCEAL AND SECURE DISPLAY ' ,' ' c WINDOW FROM STORE SIDE ,' .' ` \ VOID W/ MEMBRANE ` A t :r FLASHING ALUMINUM STORE FRONT 'Pik f'•'. �\ SYSTEM,ATTACHED TO i�<P�S D A FRAMING PER rrrrgpnlpttUP� � MANUFACTURER'S SPECS. 41, VFY SYS FIELD VFY GLAZED ALUM STOREFRONT 900 SYSTEM WITHI°TEMPERED 'A' - FOR PERMIT ` . LOW-EGLAZING ENSURE SYNTHETIC SHEETAIRIWATER ' 518"GYP BD ON3-518"STL STUDS @16"OC `. S . F . JAMB DETAIL 0) STUCCO BARRIER IS ADHERED TO ADJACENT 09^12-II G ALUM SUB-SILL PLATE WALLS AT ALL VERTICAL INTERFACES 6" = 1 '-O" FULLY BEDDED IN SEALANT WITH FULLY LAPPED AND TAPED JOINTS DISPLAY WINDOW \ ALIGN , EXISTING FACADE `5f8"GVP BD SOFFIT AND SILL RUBBERIZED ASPHALT FLASHING SLO E BACKER ROD AND SEALANT ' \�, \ r STONE SILL WITH DRIP EDGE — I 518"GYP BOARD I I FULLY ADHERED STONE VENEER ON FULL MORTAR SETTING BED, cci _ i i i STL STUD STARTER TRACK ' SCRATCH COAT AND MTL LATH LL 1 i BEDDED IN SEALANT GYP. BOARD z : W BACKER ROD AND SEALANT,TYP SYNTHETIC SHEETAIR/WATER a o BASE BOARD AS SCHEDULED ABRICK OR STONE VENEER BOTH SIDES AT STOREFRONT BARRIER ON 518°EXTERIOR GYP oSHEATH THIN SETSTONEVENEERON STUDSAITG6"OC ON 3 518"18GASTL ¢ � �6"CONCRETE CURB a T®REFROIv(T METAL CORNER �a MORTAR SETTING BED WITH BEAD w o ' STL DOWEL @ 24"OC G, MTL LATH AND SCRATCH COAT R19 BATT INSULATION MINEl— INTERIOR R FINISH ®�T I "' "SILICONE SEALANT JOINT 41'` AS SCHEDU FLOOR SYNTHETIC SHEET AIR/WATER AND BACKER ROD MTL FLASHING n BARRIER ON 518"EXTERIOR GYP SEALANT '-Al SHEATHING(EACH SIDE)ON 6" 20 GA STL STUDS AT 12"OC SEALANT BED&4"SHIM MIN. WRAP FRAMING EXISTING GRADE 6° SHEET NUMBER W/ MEMBRANE BACKER ROD AND SEALANT e e R19 BATT INSULATION MIN ALUMINUM STORE FRONT FLASHING 108• GLAZED ALUM STOREFRONT SYSTEM WITH 1"TEMPERED SYSTEM,ATTACHED TO 41ER „ 21 , TYP WALL THICKNESS LOW-E GLAZING MANUFNG ACTURER'S CTURER'S SPECS. VFY SYS FIELD VFY REGARDLESS OF ADJACENTENT � o % ✓ LINE OF STONE SILL BELOW WALL THICKNESS DISPLAY WINDOW PLAN DTL S . F . JAMB DETAIL @ BRICK / STONE S . F . SILL DETAIL @STONE 9 i DATE: 08/12/11 JOB NO: H1 — PHC — 11 MECHANICAL GENERAL NOTES DRAWN:CHECKED: NOTE DESCRIPTION 1• CONTRACTOR SHALL VISIT SITE AND CAREFULLY EXAMINE tr,......•_. r .. EXISTING CONDITIONS PRIOR TO SUBMITTING BID. NO ALLOWANCE SHALL BE MADE FOR LACK OF KNOWLEDGE OF ` ' �I�,•„• /�)} I€ EXISTING CONDITIONS. ANY ADJUSTMENTS IN DUCTWORK AND / C PIPING ROUTING SHALL BE PROVIDED AT NO ADDITIONAL COST I` CJ I E ) �! UU G � U TO OWNER. ,' ( F I C O R T L A N ll 2, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO i J C 0 R 0 A N VERIFY THE ACTUAL LOCATION OF EXISTING STRUCTURAL MEMBERS AND COORDINATE INSTALLATION OF THE A R C H I T E C T IMPROVEMENTS ACCORDINGLY. 3• EXCEPT WHERE SPECIFICALLY SHOWN OR SPECIFIED 3 OTHERWISE, EXISTING WORK IS TO REMAIN. +.-........._............ ......... - -, '-- _ _ 711 N. FIELDER RD. 4. FLEXIBLE DUCT RUNOUTS TO CEILING DIFFUSERS SHALL B " -E AS ( 1.1 i.... -€ — STRAIGHT AS POSSIBLE AND FREE SAGS AND KINKS. FLEX Fu)I Size 0"AFF 7601 ' I� _ Plenum II -ARCHC (5)A/320 15' " FF , DUCT SHALL BE THE SAME SIZE AND THE DIFFUSER NECK IT ^ � 15-0 AFF - 696 C.' ( ...........G............ :...........P......... 2(7" l�9e� � G ARLINGTON TX 2 PH: (817) 635 5 SERVES AND A MAXIMUM OF 6 FEET IN LENGTH. II c cal - y c 5. YP - - ""T' i RTU 4 (I MOUNT TEMPERATURE SENSORS WHERE INDICATED ON PLANS - i € � 2)Df AT 4'-0" AFF. I / 8'-0"AFF - 1 '..0„ AFF N.I,C. ... FAX: 817) 635 5699 PROVIDE FIRE DAMPERS 6. AT ALL DUCT PENETRATIONS I _NS THROUGH _r......->::._:,: — FIRE RATED ( (.. 4- 7 w <e . € . . .... � ... ......:: 1 G2AR,I IC_ 7 PROVIDE AND INSTALL DUCT MOUNTED HINGED ACCESS DOORS —G— 3 I =F !. .. : — FOR ALL FIRE DAMPERS NOT OTHERWISE ACCESSIBLE. � - N..c. — CON 20 ? /18 � (.,b2j u 3 8 TRACTOR SHALL COORDINATE WITH OTHER TRADES TO MECHANICAL I ONE - 1 - -- -I- --- -- ' ?A%21I5 - - -� i 0 AVOID FIELD INTERFERENCES. J - j'rT n BOUNDARY IE STO 20/14 —`I — -- - ._ _ - - N.I. - _ -{ " �"AFF _ Di o A/215 I A '- /r 9. MOUNT CO2 SENSORS WHERE INDICATED ON PLANS AT 7' 0" I ipp J /215y - - AFF. D v .4 10. COORDINATE GRILLE AND DIFFUSER CONNECTIONS WITH THE ! - - CEILING MOUNTED LIGHT FIXTURES AND THE REFLECTED r � ,/� A/215 E -- 3L= ---- _ 3 '� II CEILING PLAN. WHEN CONFLICTED, LIGHTS HAVE PRIORITY AND / '' /�;` ;!�1 ,p ( 1 I .... � E-- CO Ljj e G� > O DIFFUSERS ARE TO BE LOCATED AS CLOSE AS POSSIBLE TO __�� €�_' AFC ; ! - DRAW -DRAWING LOCATION. - -: - 0 O w � ! - - - - — - - — — :� — I /L C/650 11. ALL DUCT SIZES ARE IN INCHES AND ARE CLEAR STREAM 2 I""" "" ...........�'� ' ' ..., DIMENSIONS. -- U ... ..\ ........ ... .J ... if t 3''N--^----~• szf.SF,: ALL LOW PR ESSURE RESSU _...- T -.....- - :_ �l RE SUPPLY DUCT TAPS SHALL BE EQUIPPED II - - `� --:—p_WITH LOCKING MANUAL VOLUME BALANCING DAMPERS FOR - - SYSTEM BALANCE U.N.O. TB�-2 `' -- - - I� O � --- II — — AFF zry G u — 1., _ I F A/215 0 i A/21;5 €2:_ " AFF (n i ALL -- O WORK .� �:13. SHALL COMPLY WITH APPLICABLE MECHANICAL, =::,. __ f A/P15` 1b'_0"AFF II ® _ PLUMBING, AND BUILDING CODES AND LOCAL AUTHORITIES II � � sb fi1:;� 5 A/?15` - � - - (� Jc HAVING JURISDICTION. L• -- -. X 6QUNDARY,fLIN F� - - _ - I[� I#iF. j " j i < „ ALL DUCTWORK AND PLENUMS SHALL BE EXTERNALLY 14. of w .u ,.._:...._"........... N '�'_ ... G � �% —'��;. u _` ,`e -- -"-i—�^-T-OF2E .:a,.,;:—,— .; I. .. ................. ..... .:.. INSULATED TO PROVIDE INSTALLED VALUE OF R-6 (MIN) WITH I a - - = / I 00 Z VAPOR '.�-;_- •, MECH NI L Z N - A 3 `" BARRIER UNLESS NOTED OTHERWISE. �-------;---� %: - o ! it / F11 — l N.:.G. OUNDARY.. LINE . x / -- - q 1 ' N u � i ,,_- �,� . I E o : /2 ' (3)I3 I < C 7 15. ALL NEW DUCTWORKEE - — SHALL a==1::BE F =<:.::<:.E ABRICATED T I :: ::! i.,, ., i :,:.::::..,�... '........: 2�p ,.�. A 215 ,, j I � €'I p'I 0 THE LATEST EDITION OF SMACNA. ��:°� ` F": ' € \ i / € ,. _ , ' Q ? I �6 �,,•' 1 Z 4 - — 777 T , Li —.._... _ Lij 16. ALL MECHANICAL EQUIPMENT SHALL BE AS SCHEDULED OR - _ 20 14 -- ENGINEER APPROVED EQUAL. / - 00 {{ _- _ ....... � CGS :.: 17. OBTAIN ----- -- , �._- t�L. � ALL PERMITS AND PAY ALL FEES AND CHARGES TO ALL "' � 5 A :400 , E i16 -16 LOCAL AND OTHER RELATED AGENCIES AS REQUIRED. , - s ---- \% 15'-0"AFF r-- / ^ 12'-O:'AFF (4)A/400 �- v / ENTRY 18. ALL ROOF PENETRATIONS ARE TO BE PERFORMED BY 1b'-0' AFF = - I 12'� p AFC I �ooi L(�LANDLORD'S CONTRACTOR AT TENANT'S EXPENSE. -' I I 15'-0"AFF G 15- AFF SOoFull Size -�'J�_ �/ $ �F-- -- v ...y:...................,..... 15'-0"AFF . . - 2'x2'ACCESS 20" Deep ......�.,• I � _.._............ -.—::— ,r --.... HATCH � \ ....._................... .............._ $............:........ : .. ....:.....:. . 6 MECH KEY NOTES O 1 REF. M3.1 FOR RTU INSTALLATION DETAIL (TYP). 2 REF. M3.1 FOR CEILING MOUNTED EXHAUST FAN INSTALLATION DETAIL. F.6 � F,$ I I C,2 � '�V�`' = z a. O n 6 V. 3 REF. M3.1 FOR DIFFUSER DETAIL / DUCT RUNOUT SIZE SCHEDULE. ; verso Z �ti.............OQ 4 REF. M3.1 FOR ROOF VENTILATOR DETAIL. 1S .o ORTU'S HAVE BEEN LOCATED BETWEEN STRUCTURAL MEMBERS PER LANDLORD PROVIDED ROOF FRAMING PLAN. FIELD COORDINATE EXACT PLACEMENT WITH EXISTING STRUCTURAL MEMBERS. MAINTAIN PLACEMENT WIHIN MECHANICAL ZONE. MECHANICAL PLAN O (2) TYPE D RETURN GRILLES (ONE ON EACH SIDE OF WALL) FOR AIR TRANSFER UP SCALE: 1l8"=1'=0" HIGH MECH LINETYPE LEGEND ALL SYMBOLS ON THIS LIST ARE NOT NECESSARILY USED RTUWA L K P A D NOTE LINETYPE DESCRIPTION NEW EQUIPMENT CONTRACTOR SHALL PROVIDE AND INSTALL WALKPADS TO SERVICE RTU'S. TALLATION DETAIL (TYP). d DON PENN, P.E. 635 Westport Parkway, Suite 300 EQUIP. ON ROOF Grapevine, TX 76051 (817) 410-2858 fax 817-251-8411 ROUND DUCT NOTE SUPPLY DUCT RETURN / EXHAUST DUCT SHEET NUMBER CONTRACTOR MAY SUBSTITUTE ROUND DUCT OF SAME FREE AREA FOR RECTANGULAR DUCT N SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE DUCT FITS IN SPACE PROVIDED IF EXISTING EQUIPMENT A w SUBSTITUTION IS MADE. '\Y/' 'I MECHANICAL PLAN i MECHANICAL SYMBOLS LEGEND DATE: 08/12/11 SINGLE DESCRIPTION DOUBLE SINGLE DOUBLE JOB N0: Hl - PHC - 11 LINE LINE LINE DESCRIPTION LINE 90' ELBOW DOWN SPLIT BRANCH TAKE-OFF DRAWN: TAVr7 WITH SQUARE ELBOW & CHECKED: SPUTTER DAMPER -m 90' ELBOW UP ® WITH RADIUS ELBOW &T BRANCH FF SPUTTER DAMPER AIR DEVICE SCHEDULE OFFSET TO CHANGE BRANCH TAKE-OFF WITH SIZE 3�} ELEVATION WHEN 6 RADIUS HEEL & DAMPER Ml POSSIBLE ARROW SLOPES DN.) MARK SERVICE TYPE NECK FACE ACCES. MFR. MODEL NOTES ROUND RADIUS ELBOW BRANCH TAKE-OFF WITH ROOF TOP UNIT SCHEDULE AIR EXTRACTOR A SUPPLY CEILING SEE DETAIL 24x24 l c: m 45' ELBOW I` TEE WITH SPLIITER $ . TITUS TMS 1,2,3,4 C 0 R T L A N MARK f # 0 RTU-1 RTU-2 RTU-3 RTU-4 M � R G A N B RETURN CEILING EE PLANS 24x24 -- TITUS 50F 1,3,4 NOMINAL TONNAGE A R C H I T E C T 90' STRAIGHT ELBOW � LINED DUCTWORK � 5.0 7.5 7.5 5.0 90' CONICAL TEE � -®- SQUARE NECK CLG. DIFFUSER � C SUPPLY WALL 3EE PLANS i8x12 OBD TITUS 272RS 1,2,4,5,E MANUFACTURER & MODEL No. TRANE YSCO60 YSC090 YSCO90 YSC060 711 N. FIELDER RD. TOTAL CFM 2000 3000 3000 2000 ARLINGTON, TX 76012 45' BRANCH �--� o PH: (817) 635-5696 ROUND NECK CLG. DIFFUSER F---� D RETURN WALL EE PLANS 24x16 OBD TITUS 355RL 1,4,5,E � EXTERNAL STATIC PRESSURE IN W.C. ( ) 0.5" 0.5" 0.5" 0.5" FAX: (817) 635-5699 45' CONICAL TEE WA } NOTES: o FAN HORSEPOWER (BHP) 0.7 0.9 0.9 0.7 SIDEWALL SUPPLY GRILLE 1. OR APPROVED EQUIVALENT. oz FAN MOTOR (HP) 1.0 1.0 1.0 1.0 -►-- SIZE TRANSITION 6_r=3 RETURN GRILLE 2. PROVIDE BALANCING DAMPER AT BRANCH TAP. TOTAL CAPACITY (MBH) (APPROX. ® 80/67) 61.8 89.0 89.0 61.8 $ SHAPE TRANSITION 3. COLOR TO MATCH CEILING. o 6:2� ® EXHAUST GRILLE ® z SENSIBLE (MBH) (APPROX. ® 80/67) 35.9 67.3 67.3 35.9 4. CONTRACTOR IS RESPONSIBLE TO PROVIDE THE AIR DEVICE FRAME AND MOUNTING SYSTEM TO MATCH o -AVV ROUND FLEXIBLE DUCT THE INSTALLATION APPLICATION. SEE ARCHITECTURAL DRAWINGS FOR COORDINATION.® $ AMBIENT TEMPERATURE 'F 91 91 91 91 O SUPPLY DUCT IN RISE/TOWAR ® - 90' ELBOW DOWNS 5. COLOR TO MATCH WALL. GAS HEATING DATA INPUT (STAGEI/STAGE2) 130/-- 200/140 200/140 130/-- MBH) SUPPLY DUCT IN DROP/AWAY 6. MOUNT GRILLE ABOVE CEILING LEVEL. LJ� - ® 90' ELBOW UP OUTPUT (STAGEI/STAGE2) 104/-- 160/112 160/112 104/-- w (� SUPPLY DUCT THRU ROOF ® VOLTS 480 480 480 480 (, W OFFSET TO CHANGE O¢ PHASE 3 3 3 3 �-- i' W ELEVATION (AT W WHEN RETURN OR 0 A DUCT IN RISE POSSIBLE ARROW SLOPES DN.) / COMPRESSOR1 RLA 9.6 12.8 12.8 9.6 ® V) O RECTANGULAR RADIUS ELBOW RETURN OR O/A DUCT , W COMPRESSOR #2 RLA / I W'� IN DROP OR AWAY � -- `J RECTANGULAR ELBOW OUTDOOR FAN MTRS. I iWITH TURNING VANES � ® THRURROOF 0/A DUCT ® (QTY/FLA) 1/1.0 1/1.8 1/1.8 1/1.0 = -1-- � U MCA 15.5 19.5 19.5 15.5 w (n 0 Q -I-i VOLUME DAMPER ® EXHAUST DUCT IN RISE/TOWAR MOCP - $' ® 25 30 30 25 z BRANCH AND OUTLOCKING WITH SPIN EXHAUST DUCT IN DROP/AWAY `�� EER 13.0 11.2 11.2 13.0 ® 11 z O IN TAP AND LOCKING DAMPER � � O w VENTILATION AIR REQUIREMENTS FILTER TYPE / THICKNESS (IN) 30% PLEATED / 2 30% PLEATED / 2 30% PLEATED / 2 30% PLEATED / 2 = 0 Q F FIRE DAMPER F-O -�(� EXHAUST DUCT THRU ROOF LOCATION ROOF ROOF ROOF ROOF Z Z I_� CEILING RETURN AIR UNIT WEIGHT (LBS) 613 821 821 613 < Q CD SMOKE DAMPER Fs �L TYPE GRILLE OR REGISTER icr SPACE RETAIL STORAGE NOTES 1,2,3,4,5,6,7 1,2,3,4,5,6,7 1,2,3,4,5,6,7 1,2,3,4,5,6,7 Q z ry NOTES: w SQ. FOOTAGE V,J Fs FIRE / SMOKE DAMPER s � DOOR GRILLE � 8875 796 1. PROVIDE WITH METAL HAIL GUARDS AND LOW AMBIENT CONTROLS TO 40 �",'� -� MOTORIZED DAMPER I- xJ L_J ROOF MOUNTED EQUIPMENT r _1 VENTILATION REQUIREMENTS (0.3 CFM/SF) 2662 -- DEGREES F. �•� L- J 2. PROVIDE 30% PLEATED FILTERS. SEE SCHEDULE FOR SIZE. O O THERMOSTAT T VENTILATION REQUIREMENTS 0.15 CFM/SF) -- 119 3. PROVIDE SMOKE DETECTOR IN RETURN DUCT AND CONNECT TO BUILDING FIRE O O N O ® CONNECT TO EXISTING ® ( 4. PROM SYSTEMINSUSMOKE ED ROOFDETECTOR CURB.SHALL SHUT DOWN UNIT UPON DETECTION OF SMOKE. /1 5. PROVIDE WITH 14 DAY PROGRAMMABLE THERMOSTAT. THERMOSTAT MUST BE CAPABLE LL O CO2 SENSOR O SD SMOKE DETECTOR SD OF CONTROLLING RTU PER THE SEQUENCE OF OPERATION SCHEDULE.TOTAL REQUIRED VENTILATION AIR 2662 + 119 = 2781 6. PROVIDE WITH CO2 SENSOR AND DEMAND VENTILATION CONTROL KIT, INCLUDING MODULATING MOTORIZED OUTSIDE AIR DAMPER. REF. REF. VENTILATION RATE SCHEDULE FOR VALUES. ALL SYMBOLS ON THIS LIST ARE NOT NECESSARILY USED ON THIS JOB DESIGN VENTILATION AIR 2800 7. OR APPROVED EQUAL BY CARRIER, YORK, LENNOX OR GOODMAN. NOTES: - 1. PER IMC 2003 RTU SEQUENCE OF OPERATIONS \` ; � . •"' •• 4I m N. o Ui . W Z COORDINATE WITH OWNER TO DETERMINE OCCUPIED ly •.........• 'o� UNOCCUPIED SCHEDULES. UN-OCCUPIED MODE: EXHAUST FAN SCHEDULE 1. O/A DAMPER AT UNOCCUPIED VENTILATION POSITION. 2. UNIT CYCLES TO MAINTAIN SPACE FAN UNIT TAG (EF-) 1.2 TEMPERATURE. MANUF. GREENHECK OCCUPIED MODE: MODEL SP-B110 1. O/A DAMPER AT UNOCCUPIED VENTILATION ROOM SERVED POSITION RESTROOMS 2. INDOOR FAN STARTS AND RUNS VENTILATION RATE CFM 75 FAN CONTINUOUSLY. SCHEDULE S.P. (IN. W.G.) 0.25 3. O/A DAMPER MODULATES PROPORTIONATELY ON SIGNAL FROM CO2 SENSOR RPM 700 FROM UNOCCUPIED TO OCCUPIED RATE. SEE UNIT TAG VENTILATION RATE SCHEDULE FOR VALUES. RTU-1 RTU-2 RTU-3 RTU-4 VOLTS / PH 115/1 4. FURNACE (HEATING) OR CONDENSING UNIT OUTSIDE MOTOR MOTOR RPM 700 (COOLING) CYCLES TO MAINTAIN UNOCCUPIED 40 40 40 40 SPACE SETPOINT. AIRFLOW wATrs 50 d DON PENN, P.E. SETPOINTS OCCUPIED INSTALLATION TYPE CEILING 635 Westport Parkway, Suite 300 (CFM) 1200 700 450 450 Grapevine, TX 76051 SETP OCCUPIED: Grapevine, P (817) vine, T58 fax 817-251-8411 OCCUPIED: 68'F. (HEATING) AND 72'F CO2 UNOCCUPIED 500 500 500 500 NOTES: 1,2,4 (COOLING), SENSOR UN-OCCUPIED: 63'F. (HEATING) & 837 SETPOINTS (COOLING). CO2)(PPM OCCUPIED 1100 1100 1100 1100 NOTES: SHEET NUMBER SETPOINTS SHALL BE ADJUSTABLE. I. PROVIDE WITH UNIT MOUNTED DISCONNECT. N 2. PROVIDE WITH SPEED CONTROL. MECH. SCHEDULES 3. FAN TO BE CONTROLLED BY WALL SWITCH. M2 . 1 /1 ■ w DATE: 08/12/11 JOB NO: H1 — PHC — 11 DRAWN: CHECKED: I C 0 R T L A N 0 CONTINUOUS ROOF DECK UNDER UNITS EXCEPT AT ROOF M 0 R 6 A N HVAC UNIT PENETRATIONS. COVER DECK COMPLETELY INSIDE CURB W/ PROVIDE 8 WIDE X 8 LONG RIGID DUCT LINER. SEAL AROUND DUCTS TIGHTLY W/ A R C H I T E C T " „ 16 GAUGE SHEET METAL STRAP. INSULATION TO ELIMINATE NOISE LEAKS. SECURELY FASTEN TO CURB AND 711 N. FIELDER RD. AC UNIT. PROVIDE ONE STRAP SEAL PENETRATION THROUGH CURB PER SIDE FOR UNITS UP TO ARLINGTON, TX 76012 ROOF VENBTILATOR 5000 LBS. AND TWO STRAPS SECURELY WITH 'MASTERFLASH' EPDM pH: (817) 635-5696 SIZE PER SCHEDULE RUBBER GASKET PER SIDE FOR UNITS OVER MINI SQUARE BASE PIPE SEAL OR 5000 LBS. EQUAL. FAX: (817) 635-5699 CONDENSATE DRAIN TRAP — REF. / OA HOOD PRE—FAB CURB BY NAILER STRIP DETAIL. DISCHARGE THROUGH CURB TO DRAIN BELOW. ROOFTOP UNIT AC—UNIT MANUFACTURER. FLEXIBLE FLASHING CONNECTION ROOF CURB — n REF. RTU CURB GAS TO RTU DETAIL SEE ARCHITECTURAL NOTE: RIGID INSULATION REF. PLUMBIC—G—i� DWGS. FOR FLASHING COORDINATE EXACT DETAIL DETAILS WITH HVAC UNIT MANUFACTURER ROOFING ROOF I I PREFABRICATED CANT STRIP SA F LJ L - O CURB (IF APPPLICABLE) SD SOUND Al f ENUAI I I ROOF ��'' SECURELY FASTEN CURB LJ_1 � TO ROOF DECK AS LEVELING STRIP INSULATED SA DUCT LINED RA DUCT, MIN 6 REQUIRED PER MANUFACTURER'S ROOF DECK SMOKE DEFECTOR LONG O INSTALLATION RECOMMENDATIONS. CEILING Q REF. PLANS FOR DUCT SIZE ----- ROOF FRA LNG NOTE: VERTICAL DUCTS SHALL BE FULL 0 C) > N SIZE OF UNIT CONNECTION, TRANSITION ! , 0 w DUCTS TO SIZES REQUIRED ON FLOOR V I U PLANS (D_ELO O%.�EN.TILAT.QR DETAIL n RTU ROOF CURB DETAIL _ SCAL 2 SCALE: NONE ROOF TOP UNIT INSTALLATION DETAIL W ry 1 SCALE: NONE Z 0 0 �-- o w _ C w o z r) ry Q o � w C) > s SINGLE LINE SYMBOL E 0 NOTE: 0 O N TAPS & RUNOUTS SIZED PER SCHEDULE B SPECIAL NOTE: THIS OPTION IS SUBJECT TO REVIEW AND � Ln UNIT TYPE "A" " " APPROVAL OF THE LOCAL AND STATE INSPECTION AUTHORITIES, n DRAW THRU 2" + X X PRIOR TO FABRICATION OR INSTALLATION. _ BLOW THRU 1" MIN. 2.OX AIRFLOW WHERE X = STATIC PRESSURE IN PAN DRAIN LINE SHALL BE AT LEAST THE N CLEAN OUT DIELECTRIC SAME SIZE AS THE NIPPLE ON THE S ROUND SPIN IN TAP WITH UNION DRAIN PAN. n LOCKING QUADRANT VOLUME DAMPER (TYP) VENT WITH SEAL TAP W/ DUCT D v INSECT SCREEN JOINT SEALANT BAND PER FLEX DUCT MFR'S RECOMMENDATIONS �_ UNIT 4" THREADED ROD SECURED TO STRUCTURE ROUTE DRAIN THROUGH ."''• THERMAFLEX M-KC FLEX DUCT WITH R-6 INSULATION VALUE. CURB (REF. RTU T- ��VJ�'' b���% EXHAUST FAN FLEX-DUCT TO BE 6'-0" MAX U.N.O. ` INSTALLATION DETAIL) �;z may.• =fin REF. PLANS FOR DUCT CONTINUATION AND SLOPE AT 1/B" "A" =z;w r m N: _ SHEET METAL DUCT FOIL FACED INSULATION PER FOOT. _ ' _ BLANKEF R-6 MIN. DRAIN PAN as v- z �' SEAL WITH SMACNA APPROVED SEALER O UNIT MOUNTED %�d�b7S...... ego\\ DISCONNECT INSULATE WITH FOIL v``` "n,, �� FACED DUCT WRAP �— SUPPLY AIR GRILLE OR "B" SPEED CONTROLLER 0 R-6 MINIMUM DIFFUSER PER PLANS CURB DIFFUSER LEGEND DIFFUSER NECK CEILING RUNOUT SIZES INTEGRAL GRILLE (3) A/400 SQUARE RUNOUT / RCFM ANGE —•// L NECK SIZE. ROUND NECK SIZE RANGE ROOF CEILING MOUNTED EXHAUST FAN DETAIL QTM 6x6 6"0 0-100 CFM BLANK FOR 1 AIRFLOW 6 SCALE: NONE SEE GRILLE IN CFM 9x9 B"0 101-240 CFM 0RTU ��ND.ENSA.TED.RAIN.DET.AIL FOR NECK SIZE 12x12 10"0 241-400 CFM SCALE: 15x15 12"0 401-650 CFM 18x18 14"0 651-900 CFM DON PENN, P.E. DIFFUSER CONNECTION DETAIL 635 Westport Parkway, Suite 300 5 Grapevine, TX 76051 SCALE: NONE (817) 410-2858 fax 817-251-8411 SHEET NUMBER N MECH. DETAILS M3 . 1 PLUMBING GENERAL NOTES DATE: 08/12/11 1.) THE PLUMBING WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE LATEST EDITION OF THE JOB NO: H1 - PHC - 11 APPLICABLE PLUMBING AND BUILDING CODES AS WELL AS ALL LOCAL REGULATIONS THAT MAY APPLY. IN CASE OF CONFLICT BETWEEN THE CONTRACT DOCUMENTS AND A GOVERNING CODE OR ORDINANCE THE MORE DRAWN: STRINGENT STANDARD SHALL APPLY. 2. ALL PLUMBING WORK SHALL BE COORDINATED WITH ALL OTHER TRADES BEFORE PROCEEDING WITH THE CHECKED: INSTALLATION. 3.) INVERT ELEVATIONS AND EXACT LOCATIONS OF ALL EXISTING UTILITIES SHALL BE CHECKED BEFORE PROCEEDING WITH NEW WORK. 4.) NO CHANGES ARE TO BE MADE IN PLUMBING LAYOUT WITHOUT WRITTEN PERMISSION BY THE ARCHITECT OR ENGINEER. 5.) NO PIPING SHALL RUN EXPOSED IN FINISHED AREAS. I D 11 I E 11 I F ,I G '` 6.) PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND FOR C 0 R T LA N 0 PAYING RELATED FEES. 7.) ROUGHING DIMENSIONS OF TOILET FIXTURES MUST BE COORDINATED WITH THE GENERAL CONTRACTOR. M 0 R G A N ARCHITECT 8.) PROVIDE SHUTOFF VALVES FOR WATER HEATER BRANCH. PROVIDE DIELECTRIC FITTINGS OR COUPLINGS WHEREVER DISSIMILAR METALS ARE JOINED. 3 2 1 9.) PROVIDE SHUTOFF VALVES AT EACH FIXTURE ON WATER SUPPLY PIPES COLD AND HOT. ...............: 711 N. FIELDER RD. - - - - - - - - ................: ....: ..... ....... .--....-...... .................. ... .. . .,.y .............. �...-... . ......... ..: : ........... - -. / d :::: .. ......................... __.............__.......... 10.) ALL ACCESS PANELS SHALL BE BY GENERAL CONTRACTOR. PLUMBING CONTRACTOR SHALL BE I = - � ARLINGTO) TX 76012 RESPONSIBLE FOR THEIR LOCATION. PH: (817 635-5696 Y: 23"U/F 4"U/F 1 1/2" FAX: (817) 635-5699 11.) INSTALL ALL REQUIRED CLEANOUTS TO CLEAR EQUIPMENT AND FIXTURES. `- 3 VTR ...; 12. ALL WORK SH ALL BE PROPERLY TEST ii ED, BALANCED, AND CLEANED AND DISINFECTED. PROVIDE A I. ;; G =. ONE YEAR WARRANTY FROM DATE OF FINAL INSPECTION ON ALL PARTS AND LABOR. EWO g 2" WC_1 3„ P ,..,..;...: ::::::::::::.:................................................................... _,yl; " N.I.C. �Q 2 I I f 2 : [ r TF.... :......... ........... .... .... ........... ........... ........... ... .....< ........... .........f...........�.'.I........ .......1....�.......... .......... .......... .......... .........�.`.1........ .......i.`..............1.---- .i---. .......... .......... ......... .......... .........i t ........ 13.) ALL PLUMBING FIXTURES SPECIFIED ARE FOR INFORMATION ONLY. EQUAL EQUIPMENT MAY BE I 1 1/2 ;; J : ........ ..... ... '�. ............. ........... ..-.-. - . ...... ........ .......... .......... .......... .......... .......... --- ---- ......... ....... .......... ........ Q 3 _ INSTALLED SECURING FIRST THE ENGINEER'S APPROVAL. it it " nruuzz +iza[r[r' :: a\i mxxri\tti ti\d 14. PITCH ALL WASTE AND SOIL PIPING AT MAXIMUM SLOPE POSSIBLE, BUT NOT LESS THAN 1 4" PER 6 '" '' ...... ............ / ......................................... " .. FOOT. SAW CUT & PATCH EXISTING SLAB FOR ALL NEW PIPING UNDER FLOOR. f " - > -1-1 -2 a - `€ , 15.) PROVIDE ALL PIPE OPENINGS THROUGH PARTITIONS WITH PIPE SLEEVES. PENETRATING FIRE RATED Pd t C '.: ":' U�pFpEE COFFEE/TEA PARTITIONS, THE SPACE BETWEEN THE PIPE AND THE SLEEVE SHALL BE SEALED WITH FIRE STOPPING RTU-4 1`1 -1 inz MATERIAL. (130 CFH) 1.9. .. ... �. - - - RTU 3 /, 11 16.) EXISTING SAN. SEWER BELOW GRADE SHOWN AS REFERENCE ONLY. ACTUAL SITE CONDITIONS AND STORA E P I (200 CFH) ` \ i w UTILITY CONNECTIONS / AVAILABILITY MAY VARY. CONTRACTOR SHALL VERIFY ACTUAL SITE CONDITIONS, " MECHANICAL ZONE . . "" ROUTE AND CONNECT AS REQUIRED PER CITY REQUIREMENTS. 11061 1 4 5 1 % LLJC - - BOUNDARY LIN \ SY1Sl\1CSC`SilSSSCS t1r:Si IS,R ( , 17.) MECHANICAL CONTRACTORS ARE TO EXAMINE ALL FIXTURE SCHEDULES, LEGENDS AND RELATED 1' ` 7 1/4" MISCELLANEOUS DETAILS BEFORE PROCEEDING WITH ANY ROUGH-IN WORK. / 18.) PURGE ALL WATER & GAS LINES BEFORE FINAL CONNECTION. ( i/ �✓ i ......... W 19.) PROVIDE ALL EQUIPMENT, MATERIAL, LABOR, SUPERVISION, COSTS AND SERVICES REQUIRED TO INSTALL II ' ( O COMPLETE AND WORKING SYSTEMS, INCLUDING ALL ITEMS AND APPURTENANCES NECESSARY, REASONABLE INCIDENTAL OR CUSTOMARILY INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS NOT SPECIFIED OR SHOWN. I 2 - - -- - - - ' + (l 20.) ALL ROOF PENETRATIONS ARE TO BE PERFORMED BY LANDLORD'S CONTRACTOR AT TENANTS EXPENSE. """" (:!: :*- -'`C �� 1 1/4' ' \ \' I W N i (130 CFH) 1 1/2" 1„ I Z z 0 PLUMBING KEY NOTES II G°1031 ® � cn O ( iit L—cc - - CD - I W 1 CONNECT NEW 3" SAN. SEWER TO EXISTING SERVICE UNDER FLOOR. CO STORE 7 N OCONNECT NEW 4" SAN. SEWER TO EXISTING SERVICE UNDER FLOOR. RTU-2 i " - - -7 (200 CFH) .. ( i i J I Q > O EXISTING 4" SANITARY SEWER U/F, VERIFY EXACT LOCATION & DEPTH PRIOR TO CONSTRUCTION. N.I.C. it - / I ® z it it O4 EXISTING 2" DOMESTIC WATER SERVICE ABOVE CEILING, VERIFY EXACT LOCATION PRIOR TO CONSTRUCTION. - - - - - -..............._.......................... 2 .........:.. O CONNECT NEW 1" CW LINE TO THE EXISTING SERVICE AND MAKE FINAL CONNECTION. FIELD VERIFY �-+ N � W EXACT LOCATION OF EXISTING WATER TAP. IF EXISTING BUILDING WATER SERVICE IS NOT PROVIDED WITH `, I._L.o 0 BACKFLOW PREVENTION, PROVIDE A BACKFLOW PREVENTER PER LOCAL AUTHORITIES REQUIREMENTS. /.,, PROVIDE A PMM-EBII REMOTE READ WATER METER TO PROVIDE WATER SUB-METERING, TO BE PROVIDED N AND INSTALLED AT TENANT'S COST PER LEASE AGREEMENT. " - - - - - - - - - - - - -._ - - - - - _ - - - - - - - - - - \'� i n - - - - - - - - - -- - I 1 i i i LL ENTRY it rao 'YLL.G4.. lY!>L.^L 1.:::':: ... C/LT u ' O WATER HEATER WH-1 MOUNTED ABOVE MOP SINK, REFER TO DETAIL ON SHEET P2.1 .I. O7 EXTEND 1 1/4" CONDENSATE DRAIN THUR ROOF CURB. �y2.8 g 2 CONDENSATE DRAIN DO ................................. 8 A N DOWN INTO MO S l,I. -- .. ...a t�L—i. P INK WITH AN AIR GAP. ��.......................................................................................... r.. �..—...-€ �!— 3 12 2" (8 OZ) GAS DOWN TO EXISTING GAS MATER MANIFOLD, EST'S DEMAND AT 660 CFH WITH TOTAL , .....,, DEVELOPED LENGTH AT 250 FT. CONNECT TO EXISTING TENANT'S GAS METER. VERIFY EXACT LOCATION PRIOR TO CONSTRUCTION. PROVIDE PRESSURE REDUCING VALVE AS NECESSARY AND COORDINATE ALL METER, MAIN EXTENSION, REGULATOR & CONNECTION FEES WITH LOCAL GAS CO. PAINT GAS PIPING PER ARCHITECT'S DIRECTION 10 CONTRACTOR MAY DELETE FLOOR DRAIN IF ALLOWED BY LANDLORD AND ALL AUTHORITIES HAVING J� •••""b?'�F��`c� JURISDICTION. F.6 F.8 i G.2 . 11 2" GAS LINE THRU PARAPET WALL & EXTEND DOWN ALONG WALL TO EXISTING GAS METER MANIFOLD, \ a w' 2 =� PROVIDE UNI-STRUT SPACER & EXPANSION BOLT - PAINT TO MATCH EXISTING SURFACE. PAINT ALL 3 c� :�, -t �• GAS PIPING FROM MANIFOLD TO MATCH THE ADJACENT WALL FINISH. REFER TO ARCHITECT'S DETAIL 5 �"p'•;O :,< ON SHEET AGS.45.01 FOR FURTHER INSTRUCTIONS. PLING PLAN .�...... 0­SC_AY__._T_-1 . . »»nunnN'• PLUMBING SYMBOLS AND LEGEND • COLD WATER (CW) DCO DOUBLE CLEANOUT - • • - HOT WATER (HW) A/C ABOVE CEILING G GAS LINE (LOW PRESSURE) AS ANGLESTOP D CONDENSATE DRAIN U/F UNDER FLOOR - -- -- - PLUMBING VENT (V) FD FLOOR DRAIN SS SANITARY WASTE - BELOW SLAB/GRADE GCO GRADE CLEANOUT - STORM- STORM DRAIN LINE - BELOW SLAB/GRADE OD STORM OVERFLOW DRAIN �- DIRECTION OF FLOW SO STORM ROOF DRAIN n -a PIPE UP/DOWN FPC FIRE PROTECTION CONTRACTOR j BALL VALVE MC MECHANICAL CONTRACTOR 1�• SOFT COPPER PIPING UNDERFLOOR (CW SHOWN) EC ELECTRICAL CONTRACTOR DON PENN, P.E. EQP FIXTURE IDENTIFICATION B/G BELOW GRADE O* PLAN NOTE POC POINT OF CONNECTION Grapevine, Westport Parkway, Suite 300 Grapevine, TX 76051 (817) 410-2858 fax 817-251-8411 ® CONNECTION TO EXISTING AFF/AFG ABOVE FINISHED FLOOR/GRADE IW INDIRECT WASTE AFF ABOVE FINISH FLOOR VTR VENT THRU ROOF GAS METER SHEET NUMBER PC PLUMBING CONTRACTOR ® PRESSURE REDUCING VALVE N 1 CO CLEANOUT P 1 ■ WCO WALL CLEANOUT PLUMBING PLAN FCO FLOOR CLEANOUT DATE: 08/12/11 PLUMBING FIXTURE SCHEDULE JOB NO: H1 - PHC - 11 ROUGH IN SCHEDULE DRAWN: NOTES CW WW WASTE VENT MARK DESCRIPTION MANUFACTURER MODEL NOTES CHECKED: • - O0'-250' F. SCALE, 3" DIAL WITH BRASS WC-1 WATER CLOSET (TANK TYPE) AMERICAN STANDARD 2467.016 1/2" -- 4" 2" 1,2,7 _ SEPARABLE WELL, ASHCROFT BI (VERTICAL (ADA APPROVED, FLOOR MOUNT) MOUNT) OPIPING IS SCHEMATIC, ARRANGE AS REQUIRED L-1 LAVATORY (WALL MOUNT) AMERICAN STANDARD 0355.012 1/2" 1/2" 2" 1-1/2" 1,3,4,7,9,13 BY CONDITIONS AND HEATER MODEL. (ADA APPROVED) LUCERNE cz N WATTS DET-12-M1 EXPANSION TANK EWC ELECTRIC WATER COOLER (BI-LEVEL) OASIS P8ACSL 1/2" -- 2" 1-1/2" 4,5,12 V C O R T L A N VACUUM RELIEF D PROVIDE A SECTION OF HIGH GALVANIZED M 0 R G A N COMPRESSION STRENGTH INSULATION IRON HANGER MS MOP SINK STERN-WILLIAMS MTB-2424 1/2" 1/2" 3" 2" 6,11 A R C H IT E C T •T EACH HANGER POINT. INSULATION ROD & HANGER COLD WATER SUPPLY LINE SHALL BE HALF ROUND AND EXTEND FD FLOOR DRAIN ZURN ZN-415-SY -- -- 3" 2" 10 2 BEYOND GALVANIZED SHEILD 711 N. FIELDER RD. EACH WAY. WATER HEATER (3 KW) __ WH-1 A. 0. SMITH N0. DEL-15 3/4" 3/4" -- SET TEMP. ARLINGTON, TX 76012 TEMPERATURE AND • (208V/1) ® 1207. PRESSURE RELIEF VALVE 1 • • HOT WATER SUPPLY LINE -- -- -- -- PH: (817) 635-5696 BALL VALVE (TYPICAL) HA WATER HAMMER ARRESTOR JAY R. SMITH 5000 SERIES 8 FAX: (817) 635-5699 GALVANIZED PIPE IRON HANGER THERMOMETERO TP TRAP PRIMER ZURN Z1022 1/2" -- - -" -- INSULATION 16 GAUGE ROD & HANGER 12" MIN GALVANIZED CLAMP 2 WALL UNION (TYPICAL) NOTES: CONDUIT CLAMP — SHEET SHIELD AMP �� 1. INSTALL FOR COMPLETE ADA COMPLIANCE. CO WATTS 'WM' TYPE WALL MOUNT HOSE BIBB DRAIN 2• PROVIDE WITH HEAVY DUTY WHITE PLASTIC OPEN FRONT WHITE SEAT. SUPPORT WITH RESTRAINTS--,,., DRAIN PAN 3. PROVIDE WITH SEVA CENTERSET BATHROOM FAUCET (MODEL 1480.115) IN POLISHED CHROME FINISH. 4. CONFIRM MOUNTING HEIGHT TO SERVE HANDICAPPED OR STANDARD HEIGHT WITH ARCHITECTURAL DRAWINGS. O 5. CONFIRM TOP RIM MOUNTING HEIGHT A.F.F. FOR HANDICAPPED INSTALLATION. ^ ' 6. PROVIDE WITH NO. T-10-VB FAUCET, NO. T-35 HOSE & WALL HOOK, NO. T-40 MOP HANGER & BP METAL SPLASHGUARDS. ` V d- 7. COLOR TO BE WHITE. W N Cfl 8. PDI SIZED PER RISER DIAGRAMS. PIPE 9. PROVIDE 17 GA. P-TRAP, GRID DRAIN, SUPPLIES, STOPS & TRUEBRO NO. 102 UNDER LAV. PIPE INSULATION KIT WITH NO. 105 ACCESSORY KIT. U W Q EXTEND FULL SIZE INSULATION 16 SHEETUGE SHIELDLVFULLYD (OPEN SITE) 101. PROVIDE WITH. E3"BDRAINEWITHADEEP SEAL PP-TRAP.RIMER INLET & DEEP SEAL P-TRAP. z TO MOP SINK BELOW 12" MIN WRAPPED AROUND GALVANIZED IRON 12. PROVIDE WITH 17 GA. P-TRAP, APRON, WALL HANGER, SUPPLY, STOP & TAIL PIECE. O INSULATION TR PEZE OR 13. PROVIDE WITH LEONARD 210 SERIES MIXING VALVE SET AT 110'F. ® C) W OLLALL-MOUNTED U IPIPE HANGER DETAIL NRIC WATER HEATER DETAIL = C3 Q U SCALE NONE w 0 z N 0 LL. 0 w . P G 3 = �— � ct� z ROOF z CEILING 1 r • W w 3/4" • 1" 3/4" 3 1 =� 3/4 1/2" < �-1 1/2" N W 1 3/4 I LL E Ir- r-� 1/2 _•--- --- - --- ----�� 1 -2- --T-------- 1� O O r - , T 2 Si � 2" T 1 � � F � r I Ln WCO 1 " I [WB' 1 i i 2� ,- � 2" 1/2„ L J I 1/2" i 12 1 i 1/2" 1 1 1/2" 1/2" ( 1/2" ' ram 1/2" 1 - 1/2" 11/2^ 3/4" 11/2" 1/2" t IYCQ •� N � 2 I FLOOR • 1 3" D 1 WC-11 WC-1 3" D• 2" ^ 4" 4" 3 " 2" 3 g 2" " SS 4" 4" SS 4" 4- -SS 4" 2" 3" 2" Jet............. `V\�2• �.0��.� •tom. AS COCK PLUMBING RISER GENERAL NOTES: U ;n. 3�vim•-.O 1. REFER TO FLOOR PLANS FOR PLUMBING FIXTURE DESIGNATIONS. CONTRACTOR WILL BE % o'�yd....•. .•Qec ;o RESPONSIBLE FOR PROVIDE PLUMBING FIXTURES AS SHOWN ON THE PLUMBING AND ARCHITECTURAL DRAWINGS. GAS PIPING (REFER TO ROOF TOP UNIT 2. VERIFY ALL LOCATIONS OF HANDICAPPED PLUMBING FIXTURES WITH ARCHITECTURAL DRAWINGS. PLANS FOR PIPE SIZES) UNION 3. INSTALL AIR CHAMBERS ON ALL EACH HOT & COLD WATER ROUGH-IN, ALSO PROVIDE SHOCK ANCHOR STRAP, LOOSE 6" MIN. ABSORBERS ON ALL QUICK CLOSING VALVES. FIT FOR EXPANSION 4. COORDINATE INSTALLATION OF ALL ACCESS PANELS WITH ARCHITECT PRIOR TO INSTALLATION. 5. ARCHITECT RESERVES THE RIGHT TO RELOCATE ACCESS PANELS WITHOUT ADDITIONAL COST. CONTRACTOR MAY RELOCATE TRAP PRIMERS TO ABOVE CEILINGS IF ALLOWED BY ARCHITECT, IF DIRT LEG RELOCATED THE CONTRACTOR SHALL PROVIDE ACCESS PANEL IN GYPBOARD CEILINGS. (FULL SIZE) 6. INSTALL TRAP PRIMERS ON ALL FLOOR/ HUB AND INDIRECT DRAINS UNLESS OTHERWISE NOTED ROOF OR OR ALLOWED BY LOCAL/STATE CODES. 7. ALL VENTS THROUGH ROOF SHALL BE FLASHED A MINIMUM OF 12" ABOVE ROOF. ALL VENTS URA-BLOK DBP SERIES RUNNERS AT 10'-0 SHALL BE MINIMUM OF 12 FT. AWAY FROM ANY OUTSIDE INTAKE. MIN. ON CENTERS AND ALL CHANGES OF DIRECTION INCLUDING BRANCH TAPS. 4 Iy ING RISER DIAGRAMS Q_ GA S CONNECTION DETAIL SCALE: NONE DON PENN, P.E. 635 Westport Parkway, Suite 300 Grapevine, TX 76051 (817) 410-2858 fax 817-251-8411 SHEET NUMBER IV PLB. SCHEDULES P2 . 1 DATE: 08/12/11 JOB NO: H1 - PHC - 11 DRAWN: CHECKED: /-D E F-1\ G C 0 R T L A N M 0 R G A N ARCHITECT 711 N. FIELDER RD. ... ...... ..... ...... ------ ................ ................ ............................... . ..... ................... ................................................................... ........... ....................................................... ......................................... . .......... ARLINGTON, TX 76012 .................. ............. ...................... .. . .......... . ... ....................... ...............11.............................................. .=' B PH: -5696 C� -B-5- (817) 635 ... ... z'OCLG H B-5 CLG CLG B-5 0-0 CLG CLG CLG .... CLG 3 =QCLG qP FAX: (817) 635-5699 PANEL "A" PANEL "H"---j XFMR ..... ..... 8-3 PANEL "B" B-121 --711E�11 .........7 5,1 -1 ...............TEL BD] B 9 .......... ...........ji . B-5 B-5 . ...... .............. G: 1 0 N .C. .... . .......IE=2........ 13- 25 COFFEEVIFEA: ': :..... ................... S. 30/?5/,3P 1! : : : B-34 B-34 H 1,3,5 ..... ..... a) Q0 STORAGE W.P. Lij H ! ! F ..... ..... ..., B-7 B-7 GFCI :L-: _j B-5 0 B-7 . .......... .......... 1-T -a30/30/3P H-14,16,18 > 0 RTU-3 B-7 134 - - - - - - - - - - - - 4F ELECTRICAL SYMBOLS ............. . .................................................. . .......... ...................--------------------------------- ................. ......... . .....13=7........B=7............ ..... ................................................... .... . ......... ..................... 2 ..... ....................IES :. . .. . - - / �'. , B-4 f LIJ . ... ...... — MOUNTING HGT. TO CENTERLINE SYMBOL DESCRIPTION UNLESS OTHERWISE NOTED 30/30/3P B-4 B-4 �7 0 30/25/� 3P H-8,10,121 .......... B-1 0 V) H-2,4,6 z, SEE DRAWINGS CLG Q WIRED JUNCTION BOX 0 GOURM F i 0 Ljj -4 4 05 B B- Z3Q -LJD= B-7 B 9 8 9 Ld POS DUPLEX RECEPTACLE, 3 WIRE GIRD. TYPE, 20A 15- A.F.F. (TYP) RTU=1 W.P. i ........ ........ ........ ....... ......... ........ ... STORE DUPLEX RECEPTACLE, 3 WIRE GRD. TYPE, 20A GFCI Z B-1.1 ILI) ABOVE COUNTER(TYP) L —J 4 CLG B-4 8 P B-91 B-9 ... ........... RTU- B-15j", DUPLEX RECEPTACLE, SHOW WINDOW PER N.E.C., 20A CEILING MTD. (TYP) < (D CLG B-2 U 0 z -0 WP=@ 15- A.F.F. (TYP) Ld DUPLEX RECEPTACLE, WEATHERPROOF,20A 13 I B-9 B-9 IV tj...... 0---------------- Ld C) >................. -------------- A.F.F. (TYP) .....15 GCFIZ:Q GROUND FAULT PROTECTED DUPLEX RECEPTACLE, 20A .... B-2 . LIJ ---'B-15 2,6 DUPLEX RECEPTACLE, FLOOR MOUNTED, 20A FLOOR (TYP) ry QUADRAPLEX WALL RECEPTACLE, 20A 15- A.F.F. (TYP) 0 IG =@ ISOLATED GROUND TERMINAL RECEPTACLE, 20A 15- A.F.F. (TYP) ENTRY CL — — — — — - Ln 2 B-2 In 240V, 1 PHASE APPLIANCE RECEPTACLE, 40A SEE DRAWINGS 3 --------------- ........... TELEPHONE OUTLET 15- A.F.F. (TYP) 14 11 6 B 6 B -6 B-2 B-2 ... . .. .................. ........ ................ 2.8 B 6 -1 =@CB B 6 B-1 B-1 B-1 B-1 B-1 B- B-2 A.F.F. (TYP) CLG �@CLG 60"WALL MOUNTED TELEPHONE OUTLET CLG CLG 6 CLG CLG CLG 1 3 ............ 3.2 DATA/CABLE/TELEPHONE OUTLET 15- A.F.F. (TYP) TYP. ill.... ...._:_'_ ...... . EJ SAFETY SWITCH 15" A.F.F. (TYP) EXHAUST FAN MOTOR 15" A.F.F. (TYP) z -64 -bc� ifi� TOGGLE SWITCH - SINGLE, 3-WAY & 4-WAY 48" A.F.F. (TYP) OS 3 4 OCCUPANCY SENSOR RESTROOM CEILING (TYP) F.6 F18 G.2 0 �T"IAL POWER PLAN L VA I f.a. Y"�. .......... QFO POWER GENERAL NOTES 1. REFER TO MECHANICAL PLAN FOR LOCATION OF MECHANICAL EQUIPMENT. FIELD VERIFY EXACT LOCATIONS. 2. ELECTRICAL CONTRACTOR TO PROVIDE TYPED PANEL DIRECTORY WITH ALL CIRCUITS ACCURATELY DESCRIBED. 3. ALL CONDUITS SHALL BE CONCEALED IN WALLS AND OUTLET BOXES SHALL BE FLUSH WITH FINISHED WALL UNLESS OTHERWISE NOTED. 4. ALL BRANCH CIRCUITING TO BE #12 AWG COPPER CONDUCTORS UNLESS NOTED OTHERWISE. 5. ALL WORK SHALL BE IN STRICT ACCORDANCE WITH NATIONAL ELECTRIC CODE AND ALL LOCAL CODES AND ORDINANCES. FIELD VERIFY ALL CONDITIONS NOTE: FIRE ALARM SYSTEM TERMINATION POINT TO BE VERIFIED AND COORDINATED WITH LANDLORD PRIOR TO FINAL SUBMITTED BID. DESIGN DRAWINGS ARE SCHEMATIC. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING OR DON PENN, P.E. AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL ELECTRICAL KEY NOTES 635 Westport Parkway, Suite 300 LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. FIRE ALARM NOTE Grapevine, TX 76051 THE CONTRACTOR SHALL CONTACT THE ARCHITECT, OR ENGINEER PRIOR TO BIDDING FOR THE CONTRACTOR PROVIDED FIRE ALARM SYSTEM SHALL MEET 1 SHOW WINDOW RECEPTACLE THROUGH TIME CLOCK, TYP. (817) 410-2858 fax 817-251-8411 INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET LOCAL FIRE AND STATE CODES FOR ALL PANELS, DEVICES, THE DESIGN INTENT. CLARIFICATIONS MADE BY THE ARCHITECT, OR ENGINEER AFTER BIDDING MOUNTING, ETC. FIRE ALARM PANELS AND DEVICE WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTOR'S COST. LAYOUT QUANTITY 4c LOCATIONS SHALL BE PREPARED 2 WATER HEATER WH-1, 208V, 1P 3KW. BY A CERTIFIED FIRE PROTECTION CONTRACTOR. THE BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ORDINANCES AND SIGNED/CERTIFIED FIRE PROTECTION CONTRACTOR 3 STOREFRONT SIGNAGE, CIRCUIT THROUGH TIME CLOCK. SHEET NUMBER SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH DRAWINGS SHALL BE SUBMITTED FOR FINAL SHOP N GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL DRAWING APPROVAL AFTER BEING ACCEPTED BY LOCAL ALERT ARCHITECT, OR ENGINEER OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING FIRE MARSHAL. PROVIDE A REMOTE ANNUNCIATOR IN CODES AND DESIGN INTENT. VESTIBULE IF REQUIRED BY LOCAL CODES. E1 . 1 19 W N.I.C.NEI C ELECTRICAL POWER PLAN DATE: 08/12/11 JOB NO: H1 — PHC — 11 DRAWN: CHECKED: , D F C 0 R T L A N D M 0 R G A N ARCH I T E C T \lj 711 N. FIELDER RD. ARLINGTON, TX 7601 2 x c:: — PH: (817) 635-5696 ii O1.1 A-6 D D 1 D FAX: (817) 635-5699 �... IltB1,` B—o20 8-20 B-20 O —20 8 00 —5 B E AP6 erE B 'DB �g D D .. . ._. __`20-1D D og Bi A-6 .... ..... A-5 \ —20 -- - — — — µ \} TLl:LI N.I.C. V 1 B os ..... ; .... ..... . . ,.. . - I qy r iCE .....J .. .. '... J L. .._�F:%.T/_Y.`YUfTIT/L/� .....................o.......y.......t.......i.... o d —6 i Y ,._:... .. .... A�2 — N. — (WLU .:.... : u , /T IITFTYY%% .... I .. :..P >To+Etet' ` t r . .: . .......... LBr f ..I.. #( 1 I ::... .....:.... ......._:...... ..,.......: a,t — a N.I.C. ° OFFEc(TE t [ _ ` In A`5... i.........:.........i.........i.........;......., — � �....� B �2; B ........ ......... N - - - - - - - - � N.I.C. 1 I ..... ...... ... N CO I ............................................ I : Ljj STORAGE I — B B A-2 A-4 // .......... 7-� 1 'lob C .......y.......... I .� !.._......._.._L......_L........ B 1 �� V/ U A 6 A-6 —5 J B-36 ° w I I b� I I ° I I , � � ....._i ... \\aaaS�:�.�...a.�\�\�«� L � O h i ! \ 2 B B \ ................................................. t.� I A-6 _, 4_ 4 I I b " // : Bt v I I B, e, C C E ! / _.. //i 1 ( . � .... � ( w I 2 �.... .: A-2 A-4 s - A-2.... —30 _ A_ B U \B I ° E t .... /•. B1 B1 B i G ... , 4 O t AB; B B, ........ z , L� . a AM // \\w B ....... . B ` i — i i B .............. i 's ...................................................................... i T.. p : D Bt Z GOURMET LL ;A 5 �4 . ° 1: i i :ky".;t.. O A.. . ' Bt A� _ O LLJ tA3 !L D. I B2^. B2 I , I ......y......... 1 2 ,� ........ .................y........j..... .. .. .....i.____j.........�....... {� .....1.........i.........b........ ....., 8...38 _.- _. \g-30 BLJJ i .......... mto B �' a Z 8-32 2 et B STORE'.. „ 2l Pd� / ... . 1Dt I LL.., B BBt .......�.. .'I B B1 .:.............:.........:.........:.........{......;; B/ }....:.. :2 ....................... ......_......i..................i.........i.........i i gpl° Q ............................................................................................................... i i Bl _ 1 . BTS2'...-. B, B, N.I.C. — A _ ' -- B A 2 4 —2..........__............ ......... ........ ................................... A A A-4 V i A-2 A-4... I i B �:............... ° \ ........... ...... ;. a \ \\ 2 f i .. .....�................o.., a w i '. i 1-2 e B;=� O O O l 1 lI ................ .................. ......................... .......... ......... In 'I �B" ENTRY l� B16 : �_1.6... ............ ... . . . _,.._,. i........;.........;.........:......_......._......._'....::: r' L °B3. o g o b 1 651 ...................................... nn �Ij� I ......-..---- ..... ... ...., F i�.:::::::::.. . �: B � � r ,� 6 . I(JI B3..... .....................................................: I B2 BZ B_1U .{:F:GY.:1.::::::::::::..........(1.�'Tf>bLY 4� B-16 B-16 B-16 O B-1G B-16 ro, r 0 0 o i o 0 1.....................: B— 6 B-116 B—'18 B o b B D D B B B ........... B o B B B \ 2 8 8-14 DQD� l — B-14 Dg — -- — 2 B-14 D � B —16 3 ' S 3 — -- -- ---- — — — 1== 1 E L.......,,..,a ...............................:.................................................................................................... ..... ............,........................: =1........................................................... —t ................, _i � — ... ..._.;.....�............. ...... _....;frrr...^-r--e.—er.:...........^^- ...�^....�,r.:::::::-3•:.....:r.....;y;^�.^r'c"-::x......................_......:.. ...... ..__iE:::':--':-�::::-�'-��:.:::'::.:.::':::::.......,.........._................................. . . Ak� .. ............................E B 1 ...!_: .\` . 1� AZ x6 ELECTRICAL LIGHTING PLAN \uCF 8) (9 z W" ,� o o Z SCALE: 1/8„_1,_0„ bU K/ �i �ry7 • .... O, LIGHT FIXTURE SCHEDULE TYPE DESCRIPTION LAMP MANUFACTURER/MODEL NO. NOTES A 2' X 4' FLUORESCENT TROFFER FIXTURE—PARABOLIC LENS (3) �. WHITE, ELECTRONIC BALLAST, 32 CELL, VENTED ON SIDES T8 32W SIMKAR TEP— 244-3-32 120-277 V 3 AE SAME AS ABOVE WITH EMERGENCY/NIGHT LIGHT (3) BATTERY BACK—UP BALLAST T8 32W SIMKAR TEP— 244-3-32 ELS1 120-277 V 1,3 B 6" COMPACT FLUORESCENT DOWNLIGHT FIXTURE (1) JUNO C6H-126/42T 120-277V 3 RECESSED TRT 42W BE 6" COMPACT FLUORESCENT DOWNLIGHT FIXTURE (1) JUNO C6H-126/42T BR 120-277V 1,3 RECESSED TRT 42W B1 INTERIOR PENDANT PENDANT LIGHT — BY OWNER WITH UNIT 2 B2 STOREFRONT CHANDELIER WITH UNIT PENDANT CNANDELIER — BY OWNER 2 63 RECESSED IGHT FIXTURE 50W PAR 20 PRESCOLITE H41C—T41 120V 3 C FLUORESCENT STRIP FIXTURE 8 FT. (4) COLUMBIA LIGHTING CS8-232 EU 3 DON PENN, P.E. ELECTRONIC BALLAST T8 32W CE SAME AS ABOVE WITH EMERGENCY/NIGHT LIGHT (4) SWITCH DESIGNATION " " 635 Westport Parkway, Suite 300 COLUMBIA LIGHTING CS8-232 EU EL 1,3 � OR SWITCHED IN ELECTRICAL KEY NOTES O Grapevine, TX , 76051 BATTERY BACK—UP BALLAST T8 32W SAME ROOM. D TRACK LIGHTING QTY. AS SHOWN JUNO RBWH TRAC, R29 WH ELECT END FEED a (817) 410-2858 fax 817-251-8411 8 FT. ONE CIRCUIT TRAC SYSTEM 1 SHOW WINDOW LIGHTING THROUGH TIME CLOCK, TYP. - 75W PAR 30 R533 OPEN BACK SPOTLIGHTS 3 FIXTURE TYPE A —_------. E LED EXIT LIGHT W/BATTERY BACKUP WITH UNIT LITHONIA LQM—S—W-1—R-120/277—EL 2 TRACK LIGHTING CIRCUIT THROUGH CONTACTOR, REFER TO E3.0 1,3 A—X �- SHEET NUMBER X EXTERIOR EMERGENCY EGRESS EXIT LIGHT WITH UNIT LITHONIA AFN—W—EXT CIRCUIT NUMBER 3 CIRCUIT A-2/SWITCH a , CIRCUIT A-4/SWITCH(b) FOR BI—LEVEL SWITCHING. N W/ BATTERY BACKUP 1,3 CIRCUIT A-1/SWITCH�c3, FOR CONTROL OF TRACK/DOWN LIGHTING � ^ ■ ' LIGHT FIXTURE SCHEDULE GENERAL NOTES: LIGHT FIXTURE DETAIL THROUGH CONTACTOR. REFER TO RISER DIAGRAM SHEET E3.0 L 1. FIXTURES TO BE EQUIPPED WITH EMERGENCY BATTERY BACK—UP FUNCTION. 2. FIXTURE PROVIDED BY OWNER AND INSTALLED BY CONTRACTOR. ELECTRICAL LIGHTING PLAN 3. FIXTURE PROVIDED AND INSTALLED BY CONTRACTOR. PANEL:A SERVES: PARMIDA NEMA1 100 AMP M.C.B. VOLTS: 2771480 3 PHASFJ4 WIRE+GND AIC RATING:10,000 CCT SERVES VA OCP WIRE PH CCT SERVES VA OCP WIRE DATE: OS/12/11 GENERAELECTRICAL NOTES 1 SPARE 2011 A 2 SALES LIGHTING 1,600 2011 2#12,#12G.,3W'C. JOB NO: H1 - PHC - 11 3 SPARE 2011 B 4 SALES LIGHTING 1,600 2011 2#12,#12G.,3/4"C, DRAWN: 5 EMERGENCY LIGHTS 1,600 200 2#12,#12G,314"C, C 6 STOCK LIGHTING 800 2011 2#12,#12G,3/4"C. 7 SPARE 2011 A 8 TRANSFORMER 12,450 7013 3#4,#8G.,1-114"C. CHECKED: 9 SPARE 2011 B 10 •-- 12,000 - --- MATERIALS AND INSTALLATION, AS A MINIMUM, ARE TO CONFORM WITH THE LATEST EDITION IT IS NOT THE INTENT OF THESE PLANS TO SHOW EVERY MINOR DETAIL OF CONSTRUCTION. THE 11 SPARE 2011 C 12 11,520 OF THE NATIONAL ELECTRIC CODE, N.F.PA., LOCAL CODES, ORDINANCES, INCLUDING ALL CONTRACTOR IS EXPECTED TO FURNISH AND INSTALL ALL ITEMS FOR A COMPLETE ELECTRICAL 13 SPARE 2011 a 14 SPARE 2011 AMENDMENTS TO THE N.E.C. EQUIPMENT, WHERE APPLICABLE, WILL BE LISTED WITH THE SYSTEM, AND PROVIDE ALL NECESSARY DEVICES AND COMPONENTS FOR EQUIPMENT TO BE PLACED 15 SPARE 20/1 B 16 SPARE 2017 UNDERWRITERS LABORATORIES, INC. QUALITY AND WORKMANSHIP ESTABLISHED BY DRAWINGS IN PROPER WORKING ORDER. 17 SPACE C 18 SPARE 2017 AND SPECIFICATIONS ARE NOT TO BE REDUCED BY THE ABOVE MENTIONED CODES. 19 SPACE A 20 A SEPERATE, GREEN TYPE THWN COPPER GROUND CONDUCTOR SHALL BE RUN FROM GROUND 21 SPACE B 22 BIDDERS ARE TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND LUG OF EACH GROUNDED RECEPTACLE TO AN APPROVED CONNECTION INSIDE THE ENCLOSING 23 SPACE c N C 24 SATISFY THEMSELVES AS TO THE NATURE AND SCOPE OF WORK. THE SUBMISSION OF A BID STEEL OUTLET O R T L A N 25 SPACE A 26 C C R G A N WILL BE EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE LATER CLAIMS FOR LABOR, BOX. DEVICE MOUNTING SCREWS SHALL NOT BE CONSIDERED AN APPROVED GROUND. 27 SPACE a 28 EQUIPMENT, OR MATERIALS REQUIRED, OR DIFFICULTIES ENCOUNTERED WHICH COULD HAVE 29 SPACE C 30 ARCH I T E C T BEEN FORESEEN HAD AN EXAMINATION BEEN MADE, WILL NOT BE ALLOWED. A SEPERATE GROUND CONDUCTOR SHALL BE INSTALLED IN EVERY CONDUIT AND RACEWAY AND 31 A 32 SECURELY BONDED IN AN APPROVED GROUDING TERMINAL AT BOTH ENDS OF THE RUN. THE 33 B 34 ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR IN A FIRST-CLASS GROUNDING CONDUCTOR SHALL BE SIZED IN ACCORDANCE WITH TABLE 250-122 OF THE N.E.C. 711 N. FIELDER RD. 36 j C 36 WORKMANSHIP MANNER. THE COMPLETED SYSTEM IS TO BE FULLY OPERABLE AND ACCEPTANCE CONTRACTOR SHALL SIZE CONDUIT TO ACCOMODATE ADDITIONAL CONDUCTOR. ARLINGTON, TX 76012 OF THIS SYSTEM BY THE ENGINEER MUST BE A CONDITION OF THE SUB CONTRACT. 37 ; A 38 39 ; B ao PH: (817) 635-5696 LOAD DATA IS BASED ON INFORMATION GIVEN TO THE ENGINEER AT THE TIME OF DESIGN. VERIFY ALL WORK TO BE COODINATED WITH OTHER TRADES TO AVOID INTERFERENCE WITH THE PROGRESS ALL EQUIPMENT NAMEPLATE RATINGS BEFORE ORDERING ASSOCIATED EQUIPMENT AND WIRE. 41 C 42 FAX: (817) 635-5699 OF CONSTRUCTION. CIRCUITS SHOWN ON PLANS ARE TO DETERMINE LOAD DATA AND PANEL SIZES. THE CONTRACTOR CONNECTED DEMAND LOAD BALANCE PER PHASE CONTRACTOR TO GUARANTEE ALL MATERIALS AND WORKMANSHIP FREE FROM DEFECTS FOR PERIOD IS TO PROVIDE CIRCUITS AND ROUTING OF CONDUITS TO SUIT JOB CONDITIONS. S CONTINUOUS i 24,790.0 1.25 30,987.5 PHASEA 14050 OF NOT LESS THAN ONE (1) YEAR FROM THE DATE OF ACCEPTANCE. U RECEPTACLES 12.980.0 NEC 11,490.0 PHASEB 13600 FURNISH AND INSTALL DISCONNECT SWITCHES, WIRING, AND CONNECTIONS ON AIR CONDITIONING M KITCHEN EQUIP, i 0.0 0,65 0A PHASEC 13,920 CORRECTION OF ANY DEFECTS TO BE COMPLETED WITHOUT ADDITIONAL CHARGE AND TO INCLUDE SYSTEM AS SHOWN ON PLANS. ELECTRICAL CONTRACTOR SHALL VERIFY AND COODINATE WITH M HVAC 0.0 1.00 0.0 LOWEST PHASE PLUS IO% REPLACEMENT OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN MECHANICAL CONTRACTOR REGARDING SUPPLY AND INSTALLATION OF ALL REQUIRED CONTROLS. A NON-CONTINUOUS 3,800.0 1.00 3,800.0 13600 +10% 14,960 DAMAGED THEREBY. R LARGEST MOTOR 0.0 0.25 0.0 PHASES ARE BALANCED ALL FLOURESCENT LIGHT FIXTURES SHALL HAVE IN LINE FUSING AND ELECTRONIC BALLASTS. Y TOTALVA 41,570 46,278 O ALL REQUIRED INSURANCE TO BE PROVIDED FOR PROTECTION AGAINST PUBLIC LIABILITY OF (FUSING ONLY REQUIRED IN MIAMI DADE COUNTY). TOTAL AMPS 60.0 55.7 NOTES:20L/1 =BREAKERWITHLOCK-ON DEVICE ^ ' PROPERTY DAMAGE FOR THE DURATION OF THE WORK. 0. W ALL PANELBOARD BREAKERS SHALL BE THE PRODUCT OF EXISTING PANELBOARD MANUFACTURER. LOCATION:STORAGE ROOM �V CONTRACTOR TO PAY FOR ALL PERMITS, FEES, INSPECTIONS AND TESTINGS. THE SYSTEM DESIGN IS BASED ON SIEMENS, HOWEVER, COMPARABLE EQUIPMENT BY G.E. & O SQARE D ONLY WILL BE FIELD VERIFIED. TANDEM AND HALF-SPACE CIRCUIT BREAKERS SHALL PANEL:B 150 AMP MCB VOLTS: 1201208 3 PPHVASF1aWIREID+C-ND A CMRATING:10,000 (- ELECTRICAL INSTALLATION TO MEET ALL STANDARD REQUIREMENTS OF LOCAL POWER AND NOT BE ALLOWED. TELEPHONE COMPANIES. ELECTRICAL CONTRACTOR SHALL CONTACT LOCAL POWER AND ; / ^ O TELEPHONE COMPANIES PRIOR TO START OF CONSTRUCTION. TYPEWRITTEN CIRCUIT INDEX SHALL BE AFFIXED TO INSIDE SURFACE OF EACH PANELBOARD DOOR, CCT SERVES VA OCP WIRE PH CCT SERVES VA pCP WIRE 0 ® V I CLEARLY INDICATING ARE AND T RV'TYPE OF LOAD SEED BY EACH BRANCH CIRCUIT PROTECTIVE ALL WIRING SHALL BE IN CONDUIT UNLESS OTHERWISE NOTED, MINIMUM WIRE SIZE SHALL DEVICE, INCLUDING SPARES. HAND PRINTED WILL NOT BE ACCEPTED. 1* SHOW WINDOW REGEPTS, 1620 2011 2#12,#12G 314"C. A 2 SALES RECEPTACLES 1440 2011 2#12,#12G,314"C. v f 1 BE #12 AWG, EXCLUDING CONTROL WIRING. ALL CONDUCTORS SHALL BE COPPER WITH 3* SHOW WINDOW RECEPTS, 1620 2011 2#12,#12G,314"C. B 4 SALES RECEPTACLES 1080 2011 2#12,#12G.,314"0. THHN/THWN INSULATION. CONDUCTORS #10 AND SMALLER MAY BE SOLID; ALL THOSE ENGRAVED, LAMINATED PLASTIC IDENTIFICATION PLATES SHALL BE FURNISHED AND INSTALLED ON 5 SALES RECEPTACLES 1,G. ^ Q 12fi0 20l1 2#12,#12G.,314"C. C 6 SALES RECEPTACLES 1260 2D/1 2#12,#12 ,314"C. V , #8 AND LARGER TO BE STRANDED. ALL PANELS. PLATES SHALL BE AFFIXED TO FRONT OF PANELS, INDICATING PANEL NAME, VOLTAGE 7 SALES RECEPTACLES 1440 2011 2#12,#12G,314"C. A 8 WATER HEATER 1500 2012 2#12,#12G.3/4"C. �y AND AMPERAGE. 9 SALES RECEPTACLES 1260 2011 2#12,#12G,3t4'C. B 10 -- 1500 ALL UNDERGROUND RACEWAYS SHALL BE MINIMUM 3/4- GALVANIZED RIGID STEEL CONDUIT 11 P.O.S.RECEPTACLE 600 ROUT 2#12,#121.G.,314"C. C � 12 DRINKING FOUNTAIN 800 201t 2#12,#72G.,314"C. Q 7 O OR SCHEDULE 40 PVC. ALL OTHER RACEWAYS TO COMPLY WITH GOVERNING CODES. ALL UNDERGROUND PVC CONDUIT RUNS SHALL HAVE METALLIC RIGID ELBOWS AND METALLIC RIGID 13 P.O.S.RECEPTACLE 600 20U1 2#12,#121.G,314"C. A 14* STOREFRONT LIGHTING 1800 2011 2#12,#12G.,314"C. L WHERE RIGID STEEL IS USED, IT SHALL BE COMPLETELY COATED WITH AN ALKALI AN RUST INSTALLED WHERE SUBJECT TO PHYSICAL DAMAGE. WHERE METALLIC RIGID IS USED, IT SHALL BE 15 P.O.S.GENERALRECEPT. 540 2011 2#12,#12G,314"C. B 16* STOREFRONT LIGHTING 1800 2011 2#12,#12G,3/4"C. T® I.L O I-j-� Q RESISTANT BITUMASTIC PAINT, COPPER NO. 50, AND THREADS SHALL BE COATED WITH ZINC COMPLETELY COATED WITH AN ALKALI AND RUST-RESISTANT BITUMASTIC PAINT, COPPER NO. 50, 17* SIGNAGE 1200 2011 2#12,#12G,314"C, C 18* SIGNAGE 1200 20f1 2#12,412G,3/4"C. 1 ._ L.1_I CHROMATE. RIGID STEEL SHALL ALSO BE USED WHEN CONDUIT IS EXPOSED TO EXTERIOR AND THREADS SHALL BE COATED WITH ZINC CHROMATE. 19 TELEPHONE BD. 200 2011 2#12,#12G,314"C. A i 20* STOREFRONT LIGHTING 1650 2011 2#12,#12G,3/4"C. -- ENVIRONMENT SUCH AS EXTERIOR OF BUILDING OR WHERE IT IS EXPOSED AND SUBJECT TO 21 jHVAC ZONE CONTROLS 600 2011 2#12,#12G,314"C, B 22 TRACK LIGHTS 1800 2011 2#12,#12G,314"C. DAMAGE INSIDE OF BUILDING. THE ELECTRICAL CONTRACTOR SHALL MEET AND COORDINATE WITH THE LOCAL POWER COMPANY Q ` / 23 TRACK LIGHTS 1,800 20/1 2#12,#12G.,314"C, C 24 TRACK LIGHTS 1200 20 2#12,#12G.,314"C. < N AT THE SITE PRIOR TO CONSTRUCTION. AT THAT TIME, THE CONTRACTOR SHALL COORDINATE ALL 25 COFFEE/TEA RECEPT. 800 20/1 A � 26 SPARE 201111 1..1_ OUTLET BOXES SHALL BE PRESSED STEEL IN DRY LOCATIONS, CAST ALLOY WITH THREADED RELATED WORK WITH THE UTILITY COMPANY'S RESPONSIBILITIES TO MEET THE OWNER'S SCHEDULE. 27* SIGNAGE 1,200 2011 2#12,#12G,314"C. B i 28 SPARE 2011 0 w w HUBS IN WET OR DAMP LOCATIONS, AND BE OF SPECIAL CONSTRUCTION FOR OTHER /\ CLASSIFIED AREAS. ALL BOXES SHALL BE RECESSED (FLUSH) IN WALLS OR CEILINGS ALL ELECTRICAL CONDUCTORS SHALL BE INSTALLED SHALL BE INSTALLED IN AN APPROVED RACEWAY, 29 SPARE 2011 C i 30 OOWNLIGiTS 1600 20/1 2#72,#72G,314"C. 31 SPARE 2011 A 32 DOWNLIGiTS 1,500 2011 2#12,#12Gx,314"C. w WHENEVER POSSIBLE. EMT, RIGID OR GALVANIZED CONDUIT. THERE SHALL BE NO 'NM', 'MC', ELECTRICAL NON-METALLIC I 33 SPACE B I 34 TOILET ROOMS 600 2011 2#12,#12G,314"C. 1L 0 TUBING, & FLEXIBLE METAL CONDUIT USED FOR BRANCH CIRCUITING. MAXIMUM NUMBER OF 120V 35 ISPACE C 136 DOWNLIGHTS 600 2011 2#12,02G,314"C. DISCONNECT SWITCHES SHALL BE H.P. RATED, GENERAL DUTY, QUICK-MAKE, QUICK-BREAK CIRCUITS ALLOWED IN A SINGLE CONDUIT SHALL BE (3). THE CONTRACTOR SHALL STRICTLY 37 SPACE A ( 38 SPARE 20/1 TYPE. ENCLOSURES SHALL BE AS REQUIRED BY N.E.C. AND LOCATION (WEATHERPROOF, CONFORM TO THE N.E.C. REQUIREMENTS OF DERATING FOR CONDUCTOR AMPACITY AND CONDUIT 39 SPACE 8 40 SPARE 2011 � EXPLOSIONPROOF, ETC.). ENGRAVED LAMINATED PLASTIC IDENTIFICATION PLATES SHALL BE FILL. 41 ISPACE I C In 42 SPARE 2011 u / FURNISHED AND INSTALLED ON ALL DISCONNECT SWITCHES, CONTACTORS AND STARTERS. CONDUCTORS SHALL BE COLOR CODED AS FOLLOWS: -- CONNECTED DEMAND LOAD BALANCE PER PHASE 208V SYSTEM PHASE SEQUENCE - .....�..,,..._._.--w.- ALL FUSES FOR SAFETY SWITCHES SHALL BE DUAL ELEMENT, CARTRIDGE TYPE. FUSES S CONTINUOUS 19.190.0 1.25 23,987.5 PHASEA 12460 SHALL BE THOSE MANUFACTURED BY EITHER BUSSMAN OR LITTLEFUSE. THE CONTRACTOR NEUTRAL - WHITE ABC TOP TO BOTTOM _.--..--_.. ._._..........._-- -...__ _ __.�._............_ ___ � .. _._. U RECEPTACLES 12,980.0 NEC 11,490.0 PHASEB 12000 S SHALL FURNISH TO THE OWNER ONE SPARE FUSE FOR EACH SIZE AND TYPE OF FUSE PHASE A - BLACK LEFT TO RIGHT __- -...._......_..___...-_ .......___.___-.._._ M KITCHEN EQUIP. 0.0 0.65 0.0 PHASEC 11,520 INSTALLED. FUSES 600 AMPS OR LESS SHALL BE CLASS RKt, TYPICAL UNLESS OTHERWISE PHASE B - RED FRONT TO BACK -.....,._._.-.__ _..-.._..- -....._.._..._...__....-__ NOTED. FUSES OVER 600 AMPS SHALL BE CLASS L PHASE C - BLUE M HVAC 0.0 1.00 0.0 LOWEST PHASE PLUS10% GIRD. COND - GREEN A NON-CONTINUOUS 3,800.0 1.00 3,800.0 11520 +10% 12,672 ALL GENERAL PURPOSE SWITCHES AND RECEPTACLES SHALL BE THE PRODUCT OF A SINGLE R LARGEST MOTOR 0.0 0.25 0.01 1 PHASES ARE BALANCE? CONTRACTOR SHALL BE RESPONSIBLE FOR SEALING ALL CONDUIT PENETRATIONS MADE THROUGH Y TOTALVA 35,970 39,278 MANUFACTURER. SUITABLE MANUFACTURERS ARE; LEVITON, PASS & SEYMOUR, AND BRYANT. COLOR OF DEVICES AND PLATES SHALL BE DICTATED BY OWNER. THE FOLLOWING EXAMPLES FIRE RATED WALLS, CEILINGS, TOTAL AMPS 99.8 109 CEILINGS, SLABS, ETC. PENETRATION SEALS SHALL BE PER U.L ASSEMBLY A NOTES; PROVIDE BOLTONBREAKERS ` b , OF DEVICE GRADES ACCEPTABLE ARE OF LEVITON CATALOG NUMBERS. STANDARDS. *STOREFRONT/SIGNAGECIRCUITS 1,3,14,16,17,18,20,27THRUT.C. J .............; LOCATION:STORAGE ROOM � - ' N'• A. SWITCHES: #CSBN-201 OR EQUAL CONTRACTOR SHALL MAINTAIN A COMPLETE SET' OF CONTRACT DRAWINGS AT JOBSffE WITH COLORED ZW= C) B. RECEPTACLES: #BR20-I OR EQUAL MARKINGS INDICATING PROGRESS OF WORK. THIS SET OF CONTRACT DRAWINGS IS TO BE SEPERATE PANEL:H SERVES: PARMIDA NEMA1 U :: z s C. COVER PLATES: SMOOTH PLASTIC FROM AND IN ADDITION TO CONTRACTOR'S CONSTRUCTION SET. EVERY UNIT OF EQUIPMENT, DEVICE, 100 AMP M.C.B. VOLTS: 2771480 3 PHASE/4 WIRE AIC RATING: %VO•,:0 O ` CONDUIT AND WIRE IS TO BE MARKED WHEN INSTALLED. USE GREEN TO INDICATED INSTALLATION AS '�`�i��V,(S"""' Q°` NOTE: ALL OTHER REQUIRED DEVICES SHALL MATCH IN COLOR AND STYLE. SHOWN ON DRAWINGS AND USE RED TO INDICATE FIELD CHANGES. UPON COMPLETION OF WORK, CCT SERVES VA OCP WIRE PH CCT SERVES VA OCP WIRE THIS SET OF CONTRACT DRAWINGS IS TO BE TURNED OVER TO, AND BECOME PROPERTY OF THE ELECTRICAL ENGINEER. 1 RTUA 4,293 25/3 3#10,#12G.,314"C. A 2 RTU-1 4,293 2513 3#10,#12G.,314"C. 3 -- 4,293 - -- B 4 -- 4,293 - -- 5 -- 4,293 - -- C 6 -• 4,293 - -- 7 SPARE 2011 A 8 RTU-2 5,401 3013 3#10,#12G.,314"C. 9 SPARE 20/1 B 10 -- 5,401 - -- 11 SPARE 2011 C 12 -- 5,401 - -- ROOF 13 SPACE A 14 RTU-3 5,401 30/3 3#10,#12G.,314"C. LANDLORD ELEC. RM. _„ SS PARMIDA SPACE 15 SPACE B 16 -- 5,401 - - ' 17 SPACE C 16 -- 5,407 - -- CONDUITS STUBBED INTO SPACE BY LANDLORD. 19 SPACE A 20 SPARE 20/1 VERIFY LOCATION. 21 SPACE B 22 SPARE 20/1 4#3,#BGND, 1-1/4-C. 23 SPACE C 24 SPARE 2011 25 SPACE A 26 SPACE 27 SPACE B 28 SPACE PANEL PANEL PANEL -5-POLE CONTACTOR CONTROLLED 29 SPACE C 30 SPACE H' 'A' B' BY SWITCH Y FOR SALES LIGHTING. 31 SPACE A 32 SPACE TIME CLOCK TO CONTROL SHOW 33 SPACE B 34 SPACE EXISTING 100AS//WDAF//3P WINDOW LIGHTING & SIGNAGE. 35 SPACE C 36 SPACE DON PENN P.E. OVERCU TENANT EL ISTRIC A710N 37 SPACE A 38 SPACE ' AT TENANT ELECTRICAL SERVICE 635 Westport Parkway, Suite 300 POINT. VERIFY LOCATION 3#4,#8G. 1-1/4'C.7[ 4#1/0,#6G.-2-C. 39 SPACE B ao SPACE Grapevine, TX 76051 41 SPACE C az SPACE (817) 410-2858 fax 817-251-8411 FLOOR #6 GRND. TO BLDG. STEEL CONNECTED DEMAND LOAD BALANCE PER PHASE . 45 KVA TRANSF. S CONTINUOUS 0.0 1.25 0.0 PHASEA 19388 48OV.,3PH.,3W. TO U RECEPTACLES 0.0 NEC 0.0 PHASEB 19388 SHEET NUMBER 120/208V.,3PH.,4W. M KITCHEN EQUIP. 0.0 0.65 0.0 PHASEC 19,388 N NOTE: M HVAC 58,164.0 1.00 58,164.0 LOWEST PHASE PLUS 10% ELEC. SCHEDULES EQUIPMENT AND SIZES STATED ARE ALL ABOVE IS NEW, PROVIDED AND INSTALLED A NON-CONTINUOUS 0.0 1.00 0.0 19388 +10% 21,327 MINIMUM REQUIRED. VERIFY LANDLORD 8Y TENANT EC., UNLESS NOTED OTHERWISE. DISTRIBUTION LOCATION. R LARGEST MOTOR 0.0 0.25 0.o PHASES ARE BALANCED E3 . 1 ^ .Y TOTAL VA 58,164 58,164 -V{ I' RISER DIAGRAM TOTAL AMPS 70.0 70.0 N.T.S LOCATION:STORAGE ROOM SECTION 15010 - BASIC MECHANICAL REQUIREMENTS PART 3. - EXECUTION PART 2 - PRODUCTS PART 3 - EXECUTION DATE: 08/12/11 PART 1 - GENERAL 3.1 MECHANICAL INSTALLATIONS 2.1 JOINING MATERIALS 3.1 INSTALLATION OF HANGERS AND SUPPORTS JOB NO: Hl - PHC - 11 A. General: Sequence, coordinate, and integrate the various elements of mechanical systems, A. Refer to individual Division 15 piping Sections for special joining materials not listed below. A. Install hangers, supports, clamps and attachments to support piping properly from 1.1 DESCRIPTION OF WORK materials, and equipment. Coordinate mechanical systems, equipment, and materials installation with building structure. Comply with the requirements of MSS SP-69 and SP-89, applicable codes, DRAWN: other building components. Verify all dimensions by field measurements. Verify final locations for B. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping limitations of the building structural elements, and standard industry practices. Install hangers and A This Project shall include general administrative and procedural requirements for rough-ins with field measurements and with the requirements of the actual equipment to be system contents. ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch maximum thickness supports complete with necessary inserts, bolts, rods, nuts, washers, and other accessories. CHECKED: the installation of mechanical systems. connected. unless thickness or specific material is indicated. Full-Face Type for flat-face, Class 125, cast-iron B. When used in these specifications the term 'Provide' is defined to mean to 'furnish 3.2 CUTTING AND PATCHING and cast-bronze flanges. Narrow-Face Type for raised-face, Class 250, cast-iron and steel flanges. B. Provide seismic bracing in conformance with specified seismic design criteria. and install' materials, equipment, etc. C. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated. C. Building Attachments: Install building attachments within concrete or to structural steel; A Cut, remove and legally dispose of selected mechanical equipment, components, and space attachments within maximum piping span length indicated in MSS SP-69; Install additional 1.2 APPLICABLE STANDARDS materials as indicated, including but not limited to removal of mechanical piping, heating units, D. Plastic, Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping attachments at concentrated loads, including valves, flanges, guides, strainers, expansion joints, plumbing fixtures and trim, and other mechanical items made obsolete by the new Work. Maintain system manufacturer, unless otherwise indicated. and at changes in direction of piping; at bar-joists, attach to the top cord of the joist, or attach to A. Applicability of Standards: Except where the Contract Documents include more services to areas outside demolition limits. When services must be interrupted, install temporary the bottom cord at panel points. stringent requirements, applicable construction industry standards have the some force and services for affected areas. E. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according effect as if bound or copied directly into the Contract Documents. Such standards are made a to ASTM 8 813. D. Install hangers and supports to allow controlled movement of tin systems, to permit p y B. Protect the structure, furnishings, finishes, and adjacent materials not indicated or scheduled freedom of movement between pipe anchors, and to facilitate action of expansio joints, expansion C U R T LA N D part of the Contract Documents by reference, to be removed. F. Brazing Filler Metals: AWS A5.8, BCuP Series, copper-phosphorus alloys for general-duty loops, expansion bends and similar units. M 0 R G A N B. Conflicting Requirements: Where compliance with two or more standards is specified, brazing, unless otherwise indicated; and AWS A5.8, BAgt, silver alloy A R C H I T E C T and the standards establish different compliance conflicting withrequirements for minimum quantities s or C. Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of for refrigerant piping, unless otherwise indicated. E. Support vertical pipe and duct risers at every floor. req 9 dust and dirt to adjacent areas. quality levels, refer requirements that are different, but apparently equal, and uncertainties to G. Welding Filler Metals: Comply with AWS D10.12 for welding materials appropriate for wall 3.2 EQUIPMENT BASES AND SUPPORTS the Architect for a decision before proceeding. D. Patch existing finished surfaces and building components using new materials matching thickness and chemical analysis of steel pipe being welded. 711 N. FIELDER RD. existing materials and experienced Installers. Installers' qualifications refer to the materials and A. Fabricate structural steel stands to suspend equipment from structure above or support C. Publication Dates: Where the date of issue of a referenced standard is not specified, methods required for the surface and building components being patched. H. Solvent Cements for Joining Plastic Piping: equipment from floor. ARLINGTON, TX 76012 comply with the standard in effect as of date of Contract Documents. PH: (817) 635-5696 3.3 PAINTING 1. ABS Piping: ASTM D 2235. 3.3 ADJUSTING AND CLEANING 817 D. Comply with the requirements of applicable local plumbing, mechanical, fire 2. CPVC Piping: ASTM F 493. FAX: ( ) 635-5699 protection, and building codes. A Factory painted equipment that has been scratched or marred shall be repainted to match 3. PVC Piping: ASTM D 2564. Include primer according to ASTM F 656. A. Hanger Adjustment: Adjust hangers to distribute loads equally on attachments and to original factory color. 4. PVC to ABS Piping Transition: ASTM D 3138. achieve indicated slope of pipe. 1.3 CONSTRUCTION PERMITS AND INSPECTIONS B. All uninsulated black ferrous metal items exposed to sight such as equipment hangers, 2.2 DIELECTRIC FITTINGS B. Touch-Up Painting: Immediately after erection of anchors and supports, clean field welds A. Contractor shall file for and obtain all required permits and licenses, and pay all piping, frames and supports not provided with factory prime coat, shall be cleaned and painted with and abraded areas of shop paint and paint exposed areas with same material as used for shop _ related inspection and permitting fees, as required for the execution of the contract. Arrange one coat of rust inhibiting primer. In addition, such items in finished spaces shall also be painted with A. Description: Combination felting of copper alloy and ferrous materials with threaded, painting to comply with SSPC-PA-1 requirements for touch-up of field-painted surfaces. for necessary inspections required by City, County, State and other Authorities Having two coats of finish paint in a color to match adjacent surfaces or as otherwise selected by the solder-joint, plain, or weld-neck end connections that match piping system materials. Fitting may be Architect Jurisdiction in in timely manner and as required over the complete course of construction. . either union, flange, coupling or nipple type, as appropriate. C. For galvanized surfaces, clean welds, bolted connections and abraded areas and apply galvanizing repair paint to comply with ASTM A 780. Deliver inspection certificates and written approval notices to the Owner at contract closeout. 3.4 PERFORMANCE 2.3 SLEEVES Those items and systems deemed critical or required to obtain a completed Certificate of 0 Occupancy shall take priority over non-critical items. A All equipment and systems shall be protected against freezing, flooding, corrosion, and other A Galvanized-Steel Sheet: 0.0239-inch minimum thickness; round tube closed with welded 1.4 WORKMANSHIP AND QUALIFICATIONS forms of damage prior to acceptance by the Owner. longitudinal joint. SECTION 15071 - VIBRATION CONTROL (1) (0N � B. Design and fabrication features or proven methods not specifically covered by this B. Steel Pipe: ASTM A 53, Typa E, Grade B, Schedule 40, galvanized, plain ends. W L A. All equipment, materials, specialties, etc., shall be installed and connected in specification shall be specifically stated and documented in the proposal. PART 1 - GENERAL accordance with the best engineering practice and standards for this type work. Unless C. Cast Iron: Cast or fabricated 'wall pipe' equivalent to ductile-iron pressure W otherwise specified or shown on the Drawings, the recommendations and instructions of the C. Labor shall be furnished for assembling all pieces of equipment which, due to shipping pipe, with plain ends and integral waterstop, unless otherwise indicated. 1.1 DESCRIPTION OF WORK L (� manufacturer shall be followed for installing the work, limitations, have components which arrive on the jobsite disassembled. 2.4 ESCUTCHEONS A. This Project shall include vibration isolators at all mechanical equipment, unless the N 0 1.5 SUBMITTALS 3.5 OPERATING AND MAINTENANCE INSTRUCTIONS vibration generation components are internally isolated. O > A Description: Manufactured wall and ceiling escutcheons and floor plates, with an ID to 0 w A. Prior to the performance of an work or installation of an materials, obtain approval A. Arrange for each installer of equipment that requires regular maintenance to meet with the closely fit around pipe, tube, and insulation of insulated piping and an OD that completely covers B. Types of vibration control products required include neoprene pads and spring hangers. U I P Y Y PP Owners personnel to provide instruction in proper operation and maintenance. If installers are not opening. } U from the Architect by submitting shop drawings and data sheets. experienced in procedures, provide instruction by manufacturers representatives. PART 2 - PRODUCTS B. Split-Plate, Stamped-Steel Type: With concealed hinge, set screw or spring clips, and 0 Q B. Submittal of shop drawings, product data, and samples will be accepted only when chrome-plated finish. 2.1 ACCEPTABLE MANUFACTURERS W 0 submitted by the Contractor. Data submitted from subcontractors and material suppliers 3.6 FINAL INSPECTION e directly to the engineer of record will not be processed. C. Split-Casting, Floor-Plate Type: Cast brass with concealed hinge and set screw. A. Subject to compliance with requirements, provide vibration control products as (n A Prior to final acceptance, all systems shall be operated to test performance to the satisfaction manufactured by Amber/Booth Co., Korfund Dynamics Corp., Mason Industries, Inc., or approved z 0 C. Any item with a tag number must be submitted for review. Submittals shall provide all of the Engineer. PART 3 - EXECUTION equivalent. o 0 W Q pertinent data and information necessary to evaluate each item. In addition to the = requirements outlined in the Division 1 sections and speck division 15 sections, all submittals B. Defects demonstrated by inspections and tests shall be corrected to the satisfaction of the 3.1 MECHANICAL DEMOLITION PART 3 - EXECUTION must indicate the applicable specification section number and equipment tag number. engineer at the subcontractors expense. W A. Disconnect, demolish, and remove mechanical systems, equipment, and components 3.1. APPLICATIONS ~ N c z D. Architect's review of shop drawings does not release Contractor from responsibility of 3.7 CLEANING OF SYSTEMS AND PREMISES indicated to be removed. Z A. General: Except as otherwise indicated, select vibration control products in accordance coordinating his work at jobsite and taking field measurements. In cases where interferences A Before the systems are tested and balanced, ducts and equipment shall be thoroughly B. If pipe, insulation, or equipment to remain is damaged in appearance or is unserviceable, with ASHRAE Handbook, 1991 Applications Volume, Chapter 42 'Sound and Vibration Control', Q become apparent, the Contractor shall notify Architect so that such interferences may be cleaned so that no dirt dust or other foreign matter will be deposited in or carried through the system. remove damaged or unserviceable portions and replace with new products of equal capacity and Table 34. Where more than one type of product is offered, selection is Installers option., C) resolved prior to proceeding with shop work. No claim will be allowed for work that might have quality. w to be moved or replaced based on a claim that work was placed in accordance with dimensions B. Air handling units shall not be operated without filters in place. All air filters shall be replaced w 0 shown on an approved shop drawing. after completion of construction and prior to air balancing. If air-handling systems are used for 3.2 PIPING SYSTEMS - COMMON REQUIREMENTS �- C L �- temporary heating or cooling, the air filters shall be changed a minimum of every two weeks. A 1.6 CONSTRUCTION DOCUMENTS Drawing plans, schematics, and diagrams indicate general location and arrangement of SECTION 15075 - MECHANICAL IDENTIFICATION �y (1) W C. Water and steam systems shall be thoroughly flushed and cleaned of any and all deleterious piping systems. Indicated locations and arrangements were used to size pipe and calculate friction LL O A. The drawings for mechanical work are in part diagrammatic, intended to convey the materials before the systems are placed in operation. loss, expansion,' pump sizing, and other design considerations. Install piping as indicated unless PART 1 - GENERAL E scope of work and indicate general arrangement and approximate sizes and locations of deviations to layout are approved on Coordination Drawings. < () equipment and materials. Where job conditions require reasonable changes in indicated D. All equipment shall be thoroughly cleaned of dirt and debris at the completion of the project 1.1. DESCRIPTION OF WORK L_I._ 0 0 locations and arrangement, the contractor shall make such changes as directed by the and prior to acceptance by the owner. B. Install piping in concealed locations, except in equipment rooms, service areas, and as L. engineer, without additional cost to the Owner. otherwise indicated. A. This Project shall include identification devices specified in this Section includeing plastic 3.8 PROTECTION pipe markers, plastic tape, engraved plastic-laminate signs, and valve tags. B. Because of the scale of the drawings, certain basic items such as pipe fittings, access C. Install piping at right angles or parallel to building walls. Diagonal runs are prohibited panels, sleeves, etc. may not be shown; but where such items are required by the nature of the A. Guards, barricades, lights, services, etc., necessary for the protection of persons and unless specifically indicated otherwise. B. Codes and Standards: Comply with ANSI A13.1 for lettering size, length of color field, work, they shall be furnished and installed. Rough-in dimensions and locations shall be property shall be furnished and maintained. colors, and viewing angles of identification devices. D. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal. � verified with the supplier of all equipment furnished by other trades, or by the owner, prior to B. Existing work such as pavements, lawns, sidewalks, floors, curbs, and other structures and PART 2 - PRODUCTS the time of rough-in. utilities which are damaged or disturbed due to making connections or any phase of operations shall E. Install piping to permit valve servicing. be restored to the satisfaction of the Owner and the governing authorities. 2.1 ACCEPTABLE MANUFACTURERS C. Equipment specifications may not deal individually with minute items required such as F. Install piping at indicated slopes. components, part, controls and devices which may be required to meet the equipment 3.9 SAFETY A. Subject to compliance with requirements, provide mechanical identification materials as warranties. Where such items are required, they shall be included by the supplier of the G. Install fittings for changes in direction and branch connections. manufactured by Allen Systems, Inc., Brady (W.H.) Co.; Signmark Div., Seton Name Plate Corp., equipment, whether or not specifically called for. A. The Contractor shall be responsible for initiating, maintaining and supervising all safety or approved equivalent precautions and programs in connection with the demolition and installation of this work. Contractor H. Install piping to allow application of insulation. D. The drawings and the specifications are cooperative and supplementary. It is the shall comply with all applicable laws, ordinances, rules, regulations and lawful orders of any public 2.2 MECHANICAL IDENTIFICATION MATERIALS intent of both said drawings and specifications to cover all mechanical requirements in their authority bearing on the safety of persons or property or their protection from damage, injury, or loss. I. Install escutcheons for all pipe penetrations, both new and existing, through walls, ceilings, entirety as nearly as possible. The contractor shall closely check the drawings and and floors. A. General: Provide manufacturers standard products of categories and types required for U,� o•;v Tn B. The Contractor shall be responsible for the identification and prevention of unsafe conditions each application as referenced in other Division 15 Sections. Where more than single type is specifications for any obvious errors or omissions and bring any such condition to the attention in regard to demolition, construction, hazardous materials, and equipment usage. Contractor shall J. Install sleeves for all pipes passing through walls, floors and roof slabs. Sleeves are not specified for application, selection is Installers option, but provide single selection for each product =_ o : o �: c of the Engineer prior to the receipt of bid, in order to permit clarification by means of a mailed : Cf Addendum. If there are no questions prior to the bid proposal date, it shall be understood that comply with all OSHA, Environmental Protection Agency, and local authority requirements. required for core-drilled holes. category. the drawings and specifications are complete and correct, and that the intent of said C. The Contractor shall erect and maintain, as required by existing condition and progress of K. Install dielectric adapters between ferrous and non-ferrous piping or equipment PART 3 - EXECUTION ,J�b� "'•�°'.Q documents will be complied with, and the installation to be complete in all respects, according the Work, all reasonable safeguards for safety and protection, including posting danger signs and connections. s rnnunntt` to said intent. If there is a conflict between the drawings and specifications, the more stringent other warnings against hazards, promulgation safety regulations and notifying Owners and users of 3.1. PIPING SYSTEM IDENTIFICATION requirement shall govern, if not clarified in writing by the Engineer. adjacent utilities. L Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. A. General: Install pipe markers on each system indicated to receive identification, and E. The Contractor shall locate all equipment which must be serviced, operated or D. Remove debris, rubbish and other materials resulting from demolition operations from include arrows to show normal direction of flow. Install on pipe insulation segment where required maintained in full accessible positions. Minor deviations from the contract drawings may be building site. Transport and legally dispose of materials off site. for hot non-insulated pipes. made to allow for better accessibility, but changes of magnitude, or which involve extra cost, shall not be made without approval. Ample space shall be allowed for removal of all parts that E. If hazardous materials are encountered during demolition operations, comply with applicable B. Locate pipe markers and color bands as follows wherever piping is exposed to view in may require replacement or service in the future. regulations, laws, and ordinances concerning removal, handling and protection against exposure or SECTION 15060 - HANGERS AND SUPPORTS occupied spaces, machine rooms, accessible maintenance spaces (shafts, tunnels, plenums) and environmental pollution. exterior non-concealed locations. PART 2 - PRODUCTS PART 1 - GENERAL 1. Near each valve and control device. 2.1 DESIGN BASIS 1.1 DESCRIPTION OF WORK 2. Near each branch, excluding short take-offs for fixtures and terminal units; mark each pipe at branch, where there could be question of flow pattern. A The products/materials materials specifically named in the specification and/or on the Drawings A. This project shall include hangers and supports for mechanical system piping and 3. Near locations where pipes pass through walls or floors/ceilings, or enter P / P ly P / 9 SECTION 15050 - BASIC MECHANICAL MATERIALS AND METHODS equipment, including: horizontal-piping hangers and supports; vertical piping clamps; hanger rod non-accessible enclosures. are the basis of design. The Architect and/or Owners Representative reserves the right to attachments; building attachments; saddles and shields; miscellaneous materials; and equipment 4. At access doors, manholes and similar access points which permit view of concealed reject product/materials, even if from other acceptable manufacturers, if it is felt they do not PART 1 - GENERAL supports. piping. meet the intent of the specification. 1.2 QUALITY ASSURANCE 5. Near major equipment items and other points of origination and termination. 1.1 DESCRIPTION OF WORK 6. Spaced intermediately at maximum spacing of 50' along each piping run, except B. The Architect reserves the sole right for the approval of proposed material for A. Welding: Welding processes and operators shall be certified in accordance with applicable reduce spacing to 25' in congested areas of piping and equipment. equipment, and the phrase, 'or an approved equivalent', used in these specifications, or on the A This Project shall include piping materials and installation common to most piping systems, section of AWS D1.1 and ASME Boiler and Pressure Vessel Code. 7. On piping above removable acoustical ceilings, except omit intermediately spaced drawings, shall be interpreted to mean an equivalent approved by the Architect. including dielectric fittings, sleeves, escutcheons; and grout. markers. B. Engineering Responsibility: Calculations for each multiple pipe support, trapeze hanger, 1.2 QUALITY ASSURANCE and seismic restraint shall be prepared by a qualified professional engineer. Seismic restraints shall DON PENN P.E. C. All changes required by alternate equipment shall be made at no additional cost to the . , be designed a accordance with UBC Division N Earthquake Design for an Essential Facility", 635 Westport Parkway, Suite 300 owner, and all costs incurred by other trades, public utilities or the owner, as a result of the A. Welding: Welding processes and operators shall be certified according to applicable Importance Factor of 1.5. Grapevine, TX 76051 use of such equipment, shall be the responsibility of the contractor. sections of AWS D1.1, 'Structural Welding Code--Steel' and ASME Boiler and Pressure Vessel Code: PART 2 - PRODUCTS (817) 410-2858 fax 817-251-8411 D. The Contractor shall identify the differences in alternate material or equipment as Section IX, Velding and Brazing Qualifications! 2.1 MANUFACTURERS P compared to that specified, and shall indicate the benefits to the project as a result of 1.3 COORDINATION A. Subject to compliance with requirements, pipe hangers and related devices shall be as selecting the alternative. manufactured by Grinnell, or approved equivalent, unless specifically noted on the drawings. A Arrange for pipe spaces, chases, slots and openings in building structure during progress of 2.2 MANUFACTURED UNITS SHEET NUMBER E. The Engineer reserves the right to refuse approval of equipment which does not meet construction, to allow for mechanical installations. the specification, in his opinion, or of equipment for which no local experience of satisfactory A. Unless specifically noted differently on the drawings, piping shall be supported with N service is available. The engineer further reserves the right to reject equipment for which B. Coordinate installation of required supporting devices and set sleeves in poured-in-place galvanized steel clevis hangers with galvanized hanger rods and type 28, 29, or 30 beam clamp. maintenance service and the availability of replacement parts is questionable. concrete and other structural components as they are constructed. MEP SECIFICATIONS B. Provide MSS type 39 thermal hanger saddle inserts for hot piping and MSS type 40 thermal hanger shields for cold piping. w A ^ REFER TO THE EVERGREEN WALK TENANT CONSTRUCTION MANUAL. IF A CONFLICT EXISTS, LANDLORD GUIDELINES TAKE PRIORITY. 3.2 MECHANICAL EQUIPMENT IDENTIFICATION SECTION 15110 - VALVES C. Valves 2-1/2 inches and Larger. SECTION 15150 - DRAINAGE AND VENT SYSTEMS A. General: Install engraved plastic laminate sign or plastic equipment marker on or near PART 1 - GENERAL PART 1 - GENERAL DATE: 08�12�11 each major item of mechanical equipment and each operational device, as specified herein if not SERVICE GATE GLOBE B'FLY CHECK PLUG otherwise specified for each item or device. 1.1 DESCRIPTION OF WORK 1.1 DESCRIPTION OF WORK JOB NO: H1 - PHC - 11 Domestic Hot & Cold Water GA-2 GL-2 BF-1 CK-2 DRAWN: B. Lettering Size: Minimum 1/4' high lettering for name of unit where viewing distance is A. This Section includes general duty valves and strainers common to most mechanical piping less than 2'-0", 1/2" high for distances up to 6'-0', and proportionately larger lettering for greater systems. Special purpose valves and strainers are specified in individual piping system specifications. Natural Gas GA-2 --- --- --- PL-2 A. This Project shall cover the installation of drainage and vent systems including piping, drainage accessories, traps, and floor drains. CHECKED: distances. Provide secondary lettering 2/3 to 3/4 of size of principal lettering. 1.2 QUALITY ASSURANCE PART 2 - PRODUCTS C. Text of Signs: In addition to name of identified unit, provide lettering to distinguish between multiple units, inform operator of operational requirements, indicate safety and A. Comply with ASME B31.9 for building services piping and ASME B31.1 for power piping. 2.1 MANUFACTURERS emergency precautions, and wam of hazards and improper operations. Comply with applicable sections of MSS Standard Practices. D. In addition to the plastic sign, install pressure sensitive label described in PART 2 above PART 2 - PRODUCTS A. Subject to compliance with requirements, provide drainage and vent system products and in Section 16342 on each piece of mechanical equipment. Thoroughly clean equipment SECTION 15140 - DOMESTIC WATER PIPING by one of the manufacturers listed in this specification or on the drawing. surface per label manufacturers instructions prior to installing label. 2.1 MANUFACTURERS PART 1 - GENERAL 2.2 PIPE AND FITTINGS A. Subject to compliance with requirements, provide products from one of the manufacturers listed 1.1 DESCRIPTION OF WORK A. Above Ground Sanitary Waste and Vent Piping 2 1 2'and larger) shall be service in this specification for each valve ry P 9 ( - / ) C 0 R T L A N O p Type or strainer type, or weight cast iron soil pipe and fittings, ASTM A74, with no-hub neoprene couplings conforming approved equivalent A. This Project shall cover the installation of domestic water piping and related to CISPI Standard 310 or Schedule 40 PVC if alllowed by code. M 0 R G A N SECTION 15080 - MECHANICAL INSULATION 2.2 VALVE FEATURES, GENERAL appurtenances such as water hammer arrestors, backflow preventers, unions, trap primers, pipe sleeves, and system commissioning. B. All Waste Piping 2' and smaller shall be Type 'DWV" hard drawn copper tubing, A R C H I T E C T PART 1 - GENERAL A AM B88, with soldered joints and wrought copper, ANSI B16.22, or cast bronze, ANSI Pressure and Temperature Ratings: As required to suit system pressures and temperatures. 1.2 QUALITY ASSURANCE 816.18, socket fittings or schedule 40 PVC if allowed by code. 1.1 DESCRIPTION OF WORK B. Sizes: Some size as upstream pipe, unless otherwise indicated. 711 N. FIELDER RD. A. Standards: Products and installation shall conform to applicable portions of the American C. Below Ground Sanitary Waste and Vent Piping (all sizes) shall be service weight,National Standards Institute (ANSI), American Society for Testing and Materials (ASTM), Federal coated, cast iron soil pipe and fittings, ASTM A74, with gasketed modified hub and spigot ARLINGTON, TX 76012 A. This project shall include mechanical insulation for pipe, duct, and equipment as indicated on C Extended Stems: Where insulation is indicated or specified, provide extended stems arranged to Specifications (Fed. Spec.), Plumbing and Drainage Institute (PDI), and local codes. joints, ASTM C564 or Schedule 40 PVC •d allowed by code. PH: (817) 635-5696 drawings and schedules, and by requirements of this Section. receive insulation.. 1.2 QUALITY ASSURANCE 2.3 GATE VALVES PART 2. - PRODUCTS D. Condensate drains shall be type M copper. FAX: (817) 635-5699 A. Provide composite mechanical insulation (insulation, jackets, coverings, sealers, mastics and A. Subject to compliance with the technical requirements, select manufacturer from the following: 2.1 PIPING AND FITTINGS adhesives) with flame-spread index of 25 or less, and smoke-developed index of 50 or less, as tested by Crone, Grinnell, Hammond, Nibco, or Stockham. ASTM E 84 (NFPA 255) method. A. Underground water service piping (4' and larger) shall be: Class 50 ductile iron pipe, 2.3 TRAPS PART 2 - PRODUCTS B. GA-1 Gate Valves, 2-Inch and Smaller. MSS SP-80; Class 150, body and union bonnet of ASTM AWW C151, with hub and spigot, push on joints, AWWA C11, and class 50 or greater B 62 cast bronze; with threaded ends, solid disc, copper-silicon alloy stem, brass packing gland, 'Teflon" mechanical joint ductile iron fittings, AWWA C110, all cement lined per AWWA C104. A. Traps other than furnished as part of plumbing fixture, shall be of the same material 2.1 ACCEPTABLE MANUFACTURERS impregnated packing, and malleable iron handwheel. and size as the pipe into which they discharge, unless specified otherwise hereinafter. Where B. Underground water service piping (2-1/2' and smaller) from 5-0" outside of building to not underground, traps shall be provided with cleanout plugs on bottom. 2.4 BALL VALVES 1'-0" above finished floor shall be: Type 'K' soft copper tubing, ASTM 888, with soldered joints A. Subject to compliance with requirements, provide products manufactured by one of the following: and wrought copper, ANSI 816.22, or cast bronze, ANSI 816.18, socket fittings. 2,4 FLOOR DRAINS 0 Armstrong World Industries, Inc.; CertainTeed Corp.; Knauf Fiber Glass GmbH.; Owens-Coming Fiberglas A. Subject to compliance with the technical requirements, select manufacturer from the Corp. following: Crane, Grinnell, Hammond, Nibco, or Stockham. C. Above ground water piping shall be: Type 'L' hard drawn copper tubing, ASTM B88, with soldered joints and wrought copper, ANSI B16.22, or cast bronze, ANSI B16.18, socket A. Cast iron body with flashing flange and deep seal sized p-tmp. Drains shall be equipped with N 2.2 PIPING INSULATION MATERIALS fittings. PEX may be use if allowed by code, adjustable strainer as follows; 6' round rough bronze in mechanical rooms; 6 square polished bronze B. BLS Ball Valves, 1 Inch and Smaller. Rated for bronze psi saturated steam pressure, 400 in finished floors; 8" round with funnel top for condensate drainage. e � � psi WOG pressure; two-piece construction; with bronze body conforming to ASTM n 6 e standard D. Underground water piping to tmp primer lines shall be: Type V soft drawn copper 1 W O A. Fiberglass Piping Insulation (Type FG): ASTM C 547; 'k value of 0.24 at 75 degrees F; (or regular) port, chrome-plated brass ball, replaceable 'Teflon" or "TFE' seats and seals, PART 3 - EXECUTION `.J noncombustible. blowout-proof stem, and vinyl-covered steel handle. Provide solder ar threaded ends far tubing, ASTM B88, with soldered joints and socket fittings (No fittings below floor). L 0 condenser water, chilled water, and domestic hot and cold water service; threaded ends for 2.2 WATER HAMMER ARRESTORS 3.1 INSTALLATION z N 0 B. Flexible Unicellular Piping Insulation (Type abil ASTM C 53m flexible, 4.5 lb/ft3. k value of heating hot water and low-pressure steam.0.27 at 75 degrees F., water vapor permeability = 0.1 perm, density 4.5 Ib/ft3. A. Make changes in direction for drainage and vent piping using appropriate 45 degree wyes, o C. BLBL=2 Ball Valves, 1-1/4-Inch to 2-Inch: Rated for 150 psi saturated steam pressure, 400 A Water hammer Arrestors shall have a stainless steel casing, flexible mechanical half- es or Ion sweep or drainage sixth eighth, or sixteenth bends. Install underground building 0 wy 9 p q 9 g g drains Lli . Jackets for Piping Insulation: ASTM C 921, Type I (vapor barrier) for piping with temperatures psi WOG pressure; with bronze body conforming to ASTM B 62, conventional port, chrome-plated bellows, pressurized inert gas chamber, and certification stamp as conforming to PDI WH-201. to conform with the plumbing code, and in accordance with the Cast Iron Soil Pipe Institute below ambient, Type II for piping with temperatures above ambient. Type I may be used for all piping at brass ball, replaceable 'Teflon" or 'TFE" seats and seals, blowout proof stem, and vinyl-covered Engineering Manual. I }. U Installers option. steel handle. Provide solder or threaded ends for condenser water, chilled water, and domestic 2.3 BACKFLOW PRMINTERS -•H hot and cold 1. Encase Pipefittings insulation with one-piece premolded PVC fitting covers, fastened as per water service; threaded ends for heating hot water and low-pressure steam. B. Install cleanout in above and below ground piping and building drain piping as indicated, and = � Q A Backflow preventers shall be the same size as the pipe on which it is installed unless as required by plumbing code, at each change in direction of piping greater than 45 degrees; at W � manufacturers recommendations. 2.5 GLOBE VALVES noted otherwise on the drawings. minimum intervals of 50' for piping 4" and smaller and 100' for larger piping; at base of each vertical C/ 2. Encase exterior piping insulation with aluminum jacket with weather-proof construction. soil or waste stack. Install floor and wall cleanout covers for concealed piping, types as indicated. � z �B. Backflow preventers shall be the Reduced Pressure Zone type with intermediate 0 D. Staples, Bands, Wires, Adhesives, Sealers and Protective Finishes : As recommended by A. Subject to compliance with the technical requirements, select manufacturer from the atmospheric vent, consisting of shutoff valves on the inlet and outlet and strainer on the inlet. Q following: Crone, Grinnell, Hammond, Nibco, or Stockham. Assemblies shall include test cocks and shall comply with the requirements of ASSE Standard C. Install hangers for above ground pipe at the following intervals: O L _ O 0 insulation manufacturer for applications indicated. Use stainless steel staples if required for piping below Q ambient temperature. 1013. Backflow preventers Y and smaller shall have bronze body with threaded ends.B. GL-1 Globe Valves, 2 inches and Smaller. Rated for wed steam, 300$ WOG. PIPE MATERIAL MAX HORIZ SPACING MAX VERT SPACING S Construction shall be per MSS SP-80; body and screwed bonnet of ASTM B 62 cast bronze; with 2.4 TRAP PRIMERS 2.3 DUCTWORK AND EQUIPMENT INSULATION MATERIALS threaded or solder ends, brass or replaceable composition disc, copper-silicon alloy stem, brass (FT) (FT) Z (n z packing gland, "Teflon" impregnated packing, and malleable iron handwheel. A. Mechanical trap primers shall be automatic type with cast bronze body, removable Cast-Iron Pipe - All Sizes 5 15 Ur A Rigid Fiberglass Ductwork Insulation (Type RFG): ASTM C 612; 'k' Value of 0.24 at 75 F, 3 Ib/ft3 2.6 BUTTERFLY VALVES valve mechanism, integral vacuum breaker, and %" diameter socket tube ends.minimum density, non-combustible, rigid, ASJ jacket. Copper Tubing - 1-1/4' & smaller 6 10 z B. Flexible Fiberglass Ductwork Insulation (Type FFG): ASTM C 553, Type I, Class B-4, 1.5 Ib/ft3, A. Subject to compliance with the technical requirements, select manufacturer from the PART 3 - EXECUTION Copper Tubing - 1-1/2" & larger 10 10 w -0L\L) V Value of 0.3 at 75 F, white vinyl jacket, non-combustible, flexible, following: Center Line, Crane, Grinnell, Keystone, Nibco, or Watts. For grooved connections, use 3.1 INSTALLA710N � Victaulic. C. Provide ASTM C 921 jackets for Ductwork Insulation: Type I for ductwork with temperatures A. Provide a union or flange at all piping connections to equipment. Pipe connections to 3.2 FIELD QUALITY CONTROL Ld below ambient; Type II for ductwork with temperatures above ambient. B. @J_t Butterfly Valves, 2-1/2-Inch and Larger. MSS SP-67; rated at 200 psi; cast-iron equipment shall be made so that no strain is placed on the equipment. Pipe shall be supported body conforming to ASTM A 126, Class B. Valves shall be rated for -40 to 250 of Provide valves A Test drainage and vent system in accordance with the procedures of the authority having 0 with field replaceable EPDM sleeve independent of the equipment. D. Ductwork Insulation Accessories: Provide staples, bands, wires, tape, anchors, comer angles , nickel-plated ductile iron disc (except aluminum bronze disc jurisdiction. � and similar accessories as recommended by insulation manufacturer for applications indicated. for valves installed in condenser water piping), stainless steel stem, and EPDM O-ring stem seals. B. Changes in pipe size shall be made with reducing fitting No bushings will be allowed Provide lever operators with locks for sizes 2 through 6 inches and gear operators with position s. g . O O 0 C) PART 3 - EXECUTION. indicator for sizes 8 through 24 inches. Provide lug type body, bubble-tight shut-off (without need C. Install water hammer arrestors within the chase on the cold-water branch lines as for downstream flange), suitable for dead end service. Body and stem shall be through stem indicated on the drawings. All water hammer arrestors shall have a wall access panel adjacent 0- 3.1 PIPE INSULATION APPLICATION SCHEDULE design. Stem shall extended a minimum of 2 inches beyond the flange outer diameter to allow for to the shock absorber for repair purposes. insulation of the valve. A. Insulate Plumbing and HVAC pipe according to the following schedule: 2.6 CHECK VALVES D. The atmospheric relief from backflow preventers shall be piped through a fixed air gap SECTION 15410 - PLUMBING FIXTURES (1)to a floor drain. RAMP INSUL PIPE INSUL RANGE SERVICE TYPE SIZE THICKNESS A. Subject to compliance with the technical requirements, select check valve manufacturer E. Underground piping from trap primer to floor drains shall be installed without fittings. PART 1 - GENERAL �-••- Cold -Potable Cold Water FG ALL 1• from the following: Crone, Grinnell, Hammond, Nibco, or Stockham. For grooved connections, -Interior above-ground roof drain heads and pans, and non- UC ALL 1/2" use Victaulic. F. Contractor shall be responsible for the fitting of materials and equipment, shall perform 1.1 DESCRIPTION OF WORK vertical storm water pipping. all dimensional layout of the work and shall establish lines and grades. Install pipe lines to -Plumbing vents within 6 n-ve feet a roof outlet. B. CKCK=1 Check Valves, through 2 inch: Rated for 150# steam, 300;( WOG. Construction conform to conditions, off-setting to clear structural members and ducts. Run piping parallel to A. This Section includes plumbing fixtures and trim, fittings, and accessories, appliances, -Interior above-ground non-vertical santay piping where the shall be cast-bronze body and cap conforming to ASTM B 62; bronze disc; and having threaded or or at right angles to building walls with each horizontal line at maximum. piping collects condensate from air conditioning equipment. solder ends. appurtenances, equipment and supports associated With plumbing fixtures. Hot -Potable Hot Water Piping FG 6' & less 1' G. Pipe found to be damaged by handling shall be removed from the job site to prevent mistaken us 1.2 QUALITY ASSURANCE 2.7 PLUG VALVES UC 2' & less 3/4' 3.2 HANGERS AND SUPPORTS A. Regulatory Requirements: Comply with requirements of ANSI Standard A117.1, "Buildings „a� l 0 - 39"F -Low Temperature Refrigerant. FG 1' & Tess 1' A. Subject to compliance with the technical requirements, select manufacturer from the and Facilities -- Providing Accessibility and Useability" for Physically Handicapped People; and ........... Public Law 90-480, 'Architectural Barriers Act, 1968, with respect to plumbing fixtures for the 3 , o�•. `' following, or approved equivalent: Lunkenheimer, Powell, Dezurick, Homestead, Mueller. A Install hangers for horizontal piping with the following maximum spacing and minimum rod sizes: handicapped. _ Over 1' 1-1/2' physically UC 2 & less 1" B. PL-1 Plug Valves, 2 inches and Smaller. Screwed end plug valve w/ resilient seats and bubble-tight shutoff. Valve, where applicable, shall carry a UL listing for shutoff service of natural NOM. PIPE STEEL PIPE MAX. COPPER TUBE PART 2 - PRODUCTS 40'F to -Air Conditioning Condensate Drains. FG 4" & less 1" gas and fuel oils. Valve shall be rated for 175# WOG at temperatures up to 180 oF. Valve body SIZE - IN. SPAN - FT. MAX SPAN - FT. MIN ROD DIA. - IN. 2.1 MANUFACTURERS %,°'Gyp ••••• Ambient UC 1' & less 3/4' shall be cast iron ANSI or MSS rated, plug shall be bronze, resilient plug seal shall be Hycar or `S Over 1' 1' petroleum Hycar as required for service. Up To 3/4' 7 5 3/8 "nn,ii❑ina�° A. Subject to compliance with requirements, provide the products as scheduled, or approved B. Omit insulation on chrome-plated exposed piping (except for handicapped fixtures), air C. PLPL=2 Plug Valves, 2-1/2 inches and Larger. Flanged end plug valve w/ resilient seats and 1 7 6 3/8 equivalent. chambers, unions, strainers, check valves, balance cocks, flow regulators, drain lines from water coolers, bubble-tight shutoff. Valve, where applicable, shall carry a UL listing for shutoff service of natural gas and fuel oils. Valve shall be rated for 175# WOG at temperatures up to 180 oF. Valve body 1-1/4 7 7 3/8 PART 3 - EXECUTION drainage piping located in crawl spaces or tunnels, buried piping, fire protection piping, pre-insulated shall be cast iron ANSI or MSS rated plug shall be bronze, resilient plug seal shall be 1-1/2 9 8 3/8 equipment, hot piping within radiation enclosures or unit cabinets, and cold piping within unit cabinets P 9 p 9 Hycar or 3.1 INSTALLATION OF PLUMBING FIXTURES provided piping is located over drain pan. petroleum Hycar as required for service. 2 10 8 3/8 C. Install insulation products in accordance with manufacturers written instructions, and in D. EL-3_Plug Valves, screwed end lubricated plug cock for 1/2# or less natural gas: UL and A. Install plumbing fixtures level and plumb, in accordance with fixture manufacturers' written accordance with recognized industry practices. AGA approved for the service with 150# WOG brass body, brass plug with square head and 2-1/2 11 9 1/2 installation instructions, roughing-in drawings, and referenced standards. screwed ends. 3 12 10 1/2 3.2 DUCT AND EQUIPMENT INSULATION APPLICATION SCHEDULE B. Install escutcheons at each wall, floor, and ceiling penetration in exposed finished locations PART 3 - EXECUTION 4 14 12 5/8 (1/2 for copper) and within cabinets and millwork. Use deep pattern escutcheons where required to conceal A. Insulate concealed duct and equipment according to the following schedule: protruding pipe fittings. 3.1 VALVE ENDS SELECTION 3.3 INSTALLATION OF PIPING SPECIALTIES C. Seal fixtures to walls, floors, and counters using a sanitary-type, one-part, mildew-resistant, TEMP INSUL INSUL A. Select valves with the following ends or types of pipe/tube connections: A Install backflow reventers at each connection to mechanical silicone sealant in accordance with sealing requirements specified in Division 7 Section 'Joint RANGE SERVICE P equipment and systems Sealers.' Match sealant color to fixture color. TYPE THICKNESS 1. Copper Tube Size, 2-Inch and Smaller. Solder ends. in compliance with the plumbing code and authority having jurisdiction. Locate in same room Cold Duct -Outdoor air intake ductwork between air entrace and fan inlet or HVAC RFG 1-1/2' 2. Steel Pipe Sizes, 2-Inch and Smaller threaded ends. as equipment being connected. Install air gap fitting and pipe relief outlet drain without valves unit inlet. FFG 1-1/2' to nearest floor drain. 3.2 PLUMBING FIXTURES -HVAC supply ductwork between fan discharge, or HVAC unit discharge, or 3.2 VALVE APPLICATION SCHEDULE and room terminal outlet. B. Install pressure-regulating valves with inlet and outlet shutoff valves and balance cock A. Provide plumbing fixtures as scheduled on the drawings. -Neck and bells of supply diffusers. A. Select valves according to the following schedule: bypass. Install pressure gauge on valve outlet. Other products may be substituted with prior approval of the engineer and architect. I DON PENN, P.E. -HVAC return ductwork between room terminal inlet and return fan inlet (/��1) 635 Westport Parkway, Suite 300 or HVAC unit inlet B. Valves 2 inches and Smaller 3.4 ADJUSTING -HVAC plenums or unit housings not pre-insulated at factory or lined. Grapevine, TX 76051 A Adjust and balance all water systems to obtain operating flows at all fixtures and water using (817) 410-2858 fax 817-251-8411 SERVICE GATE GLOBE BALL CHECK PLUG equipment. Also adjust and balance the hot water circulation from all portons of the building. B. Install duct and equipment Thermal insulation products in accordance with manufacturers written instructions, and in compliance with recognized industry practices. Domestic Hot & Cold Water GA-1 GL-1 BL-1 CK-1 --- 3.5 FIELD QUALIFY CONTROL C. A Inspections: Arrange for inspection b the plumbing official to observe there cared SHEET NUMBER Maintain integrity of vapor-barrier and protect it to prevent puncture and other damage. Natural Gas GA-1 --- BL-1 --- PL-1 or tests and to ensure compliance with the re uirements of the plumbing code. Prepare N PL-3 inspection reports signed y the plumbing official. P g p B. Fill and sterilize the system as required by the local Water Utility and the local Code MEP SECIFICATIONS Authorities. MEP2 REFER TO THE EVERGREEN WALK TENANT CONSTRUCTION MANUAL. IF A CONFLICT EXISTS, LANDLORD GUIDELINES TAKE PRIORITY. SECTION 15485 - WATER HEATERS SECTION 15815 - METAL DUCTWORK C. Control Dampers: Provide dampers with parallel blades for 2-position control, or opposed blades SECTION 15855 - AIR OUTLETS AND INLETS, PART 1 - GENERAL PART 1 - GENERAL for modulating control. Construct blades of 16-ga steel, provide heavy-duty molded self-lubricating nylon DATE: 08/12/11 bearings, M" diameter steel axles spaced on 9" centers. Construct frame of minimum 5" x 1" x 16-guage PART 1 - GENERAL 1.1 DESCRIPTION OF WORK 1.1 DESCRIPTION OF WORK steel hat channel. Damper to be equipped with foam blade seals and metal 'compression type jamb seals. 1.1 DESCRIPTION OF WORK JOB NO: H1 - PHC - 11 Provide galvanized steel finish with aluminum touch-up. Maximum leakage allowed of 10 CFM/sq. ft. of 9 1 9 P 9 damper area at 1" w.c. differential pressure. Damper shall be Ruskin Model CD35, or equivalent. A. This Project shall include air outlets and inlets work as indicated by drawings and DRAWN: A This Project shall include electric domestic water heaters as indicated on drawings and A This Project shall include rectangular and round metal ducts and plenums for heating, schedules, and by requirements of this section. ventilating, and air conditioning systems in pressure classes from minus 1/2 inch to plus 2-inch D. Damper Actuator. The actuator furnished shall be the direct-coupled type, enabling it to be schedules, and by requirements of this Section. CHECKED: water gage. mounted directly to the damper shaft without the need for connecting linkage. Actuator shall be by Belimo, 1.2 QUALITY ASSURANCE B. Types of air outlets and inlets required for project include ceiling air diffusers, wall or equivalent. YP q � P J 9 1.2 QUALITY ASSURANCE registers and grilles, and louvers. A Codes and Standards: Construct water heaters in accordance with the applicable sections 2.2 FIRE AND SMOKE DAMPERS of UL, NEC, and ASHRAE standards. A. Comply with the requirements of NFPA 90A, "Standard for the Installation of Air 1.2 QUALITY ASSURANCE Conditioning and Ventilating Systems," except as indicated otherwise. Are Dampers: Provide fire dampers, of types and sizes indicated. Provide dire dampers rated PART 2 - PRODUCTS A. Fire dynamic conditions unless otherwise noted. Provide fusible link rated at 160 to 165 deg. F (71 to 74 A. Codes and Standards: Air outlets and inlets shall be tested and rated in conformance 2.1 COMMERCIAL ELECTRIC WATER HEATERS PART 2 - PRODUCTS deg. C), in accordance with UL 33, unless otherwise indicated. Fabricate in accordance with NFPA 90A with applicable sections of ARI 650, ASHRAE 70, AMCA 500 and NFPA 90A 2.1 SHEET METAL MATERIALS and UL 555, and as indicated. PART 2 - PRODUCTS A. General: Provide commercial electric water heaters of sizes, capacities, and electrical B. Motor-Driven Fire/Smoke Dampers: Provide motor-driven fire/smoke dampers in types and sizes C 0 R T LA N 0 characteristics as indicated on drawings. A. Galvanized Sheet Steel: Lack-forming quality, ASTM A 527, Coating Designation G 90. indicated, with casing constructed of 11-go galvanized steel, fusible link 160 to 165 deg. F, unless 2.1 DIFFUSERS AND GRILLES Provide mill phosphatized finish for exposed surfaces of ducts exposed to view. otherwise indicated, and curtain type stainless steel interlocking blades, with electric motor mounted M 0 R G A N B. Heater. Working pressure of 150 PSI, magnesium anode rod; glass lining on internal outside air steam equipped with instant closure clutch, stainless steel cable damper blade linkage, motor A. General: Except as otherwise indicated, provide manufacturers standard ceiling air surfaces exposed to water. B. Reinforcement Shapes and Plates: Unless otherwise indicated P 9 A R C H IT E C T p , provide galvanized steel diffusers and wall grilles where shown; of size, shape, capacity and type indicated; constructed of 9 mounting bracket, and with the following construction feature: materials and components as indicated, and as required for complete installation. reinforcing where installed on galvanized sheet metal ducts. For aluminum and stainless steel C. Heating Elements: Heavy-duty, medium watt density, with incoloy sheath, thermostat ducts provide reinforcing of compatible materials. 2.3 TURNING VANES B. Performance: Provide diffusers and grilles that have, as minimum, temperature and 711 N. FIELDER RD. stepped through magnetic contactors. C. Tie Rods: Galvanized steel, 1/4-inch minimum diameter for 36-inch length or less; A. Fabricated Turning Vanes: Provide fabricated turning vanes and vane runners, constructed in velocity traverses, throw and drop, and noise criteria ratings for each size device as listed in ARLINGTON, TX 76012 D. Safety Controls: Double pole, manual reset, high limit; probe type electric low water cutoff; 3/8-inch minimum diameter for lengths longer than 36 inches. manufacturers current data. both factory wired. / 9 9 accordance with SMACNA "HVAC Duct Construction Standards". 2.2 SEALING MATERIALS C. Ceiling Compatibility: Provide diffusers with border styles that are compatible with PH: (817) 635-5696 E. Jacket: Equip with full size control compartments with front panel opening. Insulate tank B. Manufactured Turning Vanes: Provide turning vanes constructed oft 2 o. wide curved blades 9 il ty ty P q P P Pset at 3/4" o.c., supported with bars perpendicular to blades set at 2�o.c., and set into side strips suitable adjacent ceiling systems, and that are specifically manufactured to fit into ceiling module with FAX: (817) 635-5699 with vermin-proof glass fiber insulation. Provide outer steel jacket with bonderized undercoat A. Joint and Seam Tape: 2 inches wide, glass-fiber-fabric reinforced. for mounting in ductwork. accurate fit and adequate support. Refer to general construction drawings and specifications for and baked enamel finish. types of ceiling systems which will contain each type of ceiling air diffuser. B. Joint and Seam Sealant: One-port, nonsag, solvent-release-curing, polymerized butyl 2.4 DUCT HARDWARE AND ACCESS DOORS F. Accessories: Provide brass drain valve; 3/4" temperature and pressure relief valve; ASME sealant complying with FS TT-S-001657, Type I; formulated with a minimum of 75 percent solids. D. Provide mounting frames to adapt to construction type. Where installed in hard ceilings tank construction for 125 PSI working pressure; and 4" x 6° hand hole cleanmQ?out. A. Provide duct hardware, manufactured by one manufacturer for all items on project, including test or walls, provide surface mount frame below ceiling with perimeter flange and gasket to seal C. Flanged Joint Mastics: One-part, acid-curio silicone elastomeric joint sealants, against ceiling construction. 9 P 9. 1 holes and quadrant locks. G. Controls: Adjustable immersion thermostat; power circuit fusing; pilot light and switch complying with ASTM C 920, Type S, Grade NS, Class 25, Use 0.controlling control circuit; 3-stage time delay sequencer, and 7-day time clock. B. Access Doors: Construct of same or greater gage as ductwork served, provide insulated doors E. Where indicated, provide adjustable opposed blade damper assembly, key operated from 2.3 DUCT AND FITTING FABRICATION for insulated ductwork. Provide flush frames for uninsulated ductwork, extended frames for externally face of diffuser. H. Subject to compliance with requirements, provide commercial electric water heaters as insulated duct. Provide one side hinged, other side with one handle-type latch for doors 12" high and manufactured by Rheem Water Heater Div, Ruud Water Heater Div, Smith Corp (A.O.), State A. Except as otherwise indicated, fabricate ducts with galvanized sheet steel, in accordance smaller, 2 handle-type latches for larger doors. F. Provide, where required to protect fire rated ceiling penetrations, combination adjustable o Industries, Inc., or approved equivalent. with SMACNA "HVAC Duct Construction Standards; Tables 1-3 through 1-19, including their opposed blade damper and fusible link fire damper with UL approved link and assembly designed associated details (latest version). Conform to the requirements in the referenced standard for metal PART 3 - EXECUTION to meet requirements of NFPA 90A N d. PART 3 - EXECUTION thickness, reinforcing types and intervals, tie rod applications, and joint types and intervals. (1) Q0 3.1 INSTALLATION OF WATER HEATERS B. Static Pressure Class 3.1 INSTALLATION OF DUCTWORK ACCESSORIES G. Subject to compliance with requirements, provide equipment manufactured by Krueger w L_ ifications: Except where otherwise indicated, construct duct Mfg. Co.; Titus Products Co.; Tuttle & Bailey Corp.; or approved equivalent: , ` systems to the following pressure classifications: A Install ductwork accessories in accordance with manufacturers installation instructions, with V 0 w 0 A Install water heaters in accordance with manufacturer's installation instructions. Install applicable portions of details of construction as shown in SMACNA standards, and in accordance with PART 3 - EXECUTION 0 units plumb and level, firmly anchored in locations indicated, and maintain manufacturers 1. Supply Ducts: 1-inch water gage. recognized industry practices to ensure that products serve intended function. 3.1 INSTALLATION ; N recommended clearances. 2. Return Ducts: 1/2 inches water gage, negative pressure. 3. Exhaust Ducts: 1/2 inches water gage, negative pressure. B. Install access doors at all fire dampers fire/smoke dampers, control dampers, other duct mounted O W B. Connect hot and cold water piping to units with shutoff valves and unions. Extend relief equipment, and elsewhere as shown on drawings. Install to open against system air pressure, with A. General: Install air outlets and inlets in accordance with manufacturers written valve discharge to closest floor drain, or as indicated. C. Fabricate elbows, transitions, offsets, branch connections, and other duct construction in instructions and in accordance with recognized industry practices to insure that products serve U accordance with SMACNA "HVAC Metal Duct Construction Standard," 1985 Edition, Figures 2-1 latches operable from either side, except outside only where duct is too small for person to enter. intended functions. U C. Provide thermometers on inlet and outlet piping of water heaters. through 2-10. C. Coordinate with other work, including ductwork, as necessary to interface installation of ductwork = Q accessories properly with other work. B. Coordinate with other work, including ductwork and duct accessories, as necessary to D. Only with the Engineers written approval may contractor substitute interface installation of air outlets and inlets with other work. W round duct, with the some free area, for rectmgular duct as shown. D. Connect diffusers or troffer boots to ducts with 5 feet maximum length of insulated flexible duct. SECTION 15738 - DX AIR-CONDITIONING UNITS Hold in place with strap or clamp. If this length is exceeded on the plans, the extra footage required to C. Locate ceiling air diffusers, registers, and grilles, as indicated on general construction z w E. Fabricate round duct and round fittings including elbows, transitions, offsets, branch meet this minimum length will be installed as rigid round galvanized steel duct of the some size or larger. "Reflected Ceiling Plans". Unless otherwise indicated, locate units in center of acoustical ceiling _ Q O connections, and other duct construction in accordance with SMACNA "HVAC Metal Duct modules. Z PART' 1 - GENERAL Install flexible ductwork at inlet to all diffusers which are shown to be connected with flexible ductwork. ® L� r) Construction Standard," 1985 Edition. All round duct 12" diameter and greater shall be fabricated Support all flexible duct on minimum 4' centers. � 0 L� 0 of spiral-wound duct. W Z 1.1 DESCRIPTION OF WORK z A. This Project includes package, split-system air-conditioning heat pump units consisting of substituted, such as manufactured by Undab, or approved equivalent. F. In lieu of shop fabricated duct and fittings, factory fabricated duct and fittings may be evaporator, indoor fan, compressor and condenser components. . Units are designed for SECTION 15830 - FANS exposed or concealed mounting. System may contain gas or electric furnace. PART 3 - EXECUTION W Furnaces shall be as scheduled or approved equal by approved manufacturer. PART 1 - GENERAL ry 3.1 DUCT INSTALLATION SECTION 15990 - TESTING, ADJUSTING, AND BALANCING Q_ W 1.2 QUALITY ASSURANCE 1.1 DESCRIPTION OF WORK U > A. Use fabricated fittings for all changes in directions, changes in size and shape, and PART 1 - GENERAL W A. Drawings indicate size, profiles, and dimensional requirements of DX units and are connections. A This Project shall include the requirements of the scheduled fans including roof and wall mounted based on the specific system indicated. Other manufacturers systems with equal performance exhausters and in-line centrifugal fans. 1.1 DESCRIPTION OF WORK characteristics may be considered if approved as an equal manufacturer.. B. Locate ducts, except as otherwise indicated, vertically and horizontally, parallel and O ry perpendicular to building lines; avoid diagonal runs. Install duct systems in shortest route that 1.2 QUALITY ASSURANCE A This Project shall include the requirements and procedures for total mechanical E B. Electrical Components, Devices, and Accessories shall be listed and labeled as defined in does not obstruct useable space or block access for servicing building and its equipment. systems testing, adjusting, and balancing. Requirements include measurement and O O N NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and A Fans shall be designed, manufactured, and tested in accordance with UL 705 "Power establishment of the fluid quantities of the mechanical systems as required to meet design marked for intended use. C. Seal duct seams and joints according to SMACNA "Duct Construction Standards'. Ventilators." specifications, and recording and reporting the results. Work includes testing, adjusting and L In balancing the supply air systems, return air systems, exhaust air systems, and verifying the PART 2 PRODUCTS D. Install rigid round and rectangular metal duct with support systems indicated in SMACNA B Motors and electrical accessories shall comply with NEMA standards. temperature control system operation. "HVAC Duct Construction Standards," Tables 4-1 through 4-3 and Figures 4-1 through 4-8. � 2.1 MANUFACTURERS NUFACTURERS B.PART 2 - PRODUCTS 1.2 QUALITY ASSURANCE E. Support horizontal ducts within 2 feet of each elbow and within 4 feet of each branch A. Subject to compliance with requirements, provide products as manufactured by Carrier intersection. 2.1 MANUFACTURERS A Agency Qualifications: Employ the services of an independent testing, adjusting, and Corp.; Lennox Industries Inc.; or Trane Co. (The). balancing agency meeting the qualifications specified below, to be the single source of F. Support vertical ducts at a maximum interval of 16 feet and at each floor. A Subject to compliance with requirements, provide products manufactured by Cook, Greenheck, responsibility to test, adjust, and balance the building mechanical systems identified above, to 2.2 EVAPORATOR-FAN COMPONENTS produce the design objectives. Services shall include checking installations for conformity to Penn Ventilator, or approved equivalent. P 9 J 9 � tY A. Galvanized steel chassis with flanged edges, removable panels for servicing, and faced, design, measurement and establishment of the fluid quantities of the mechanical systems as glass-fiber insulation on back of panels. Include insulated, galvanized steel drain pan with 3.2 CONNECTIONS 2.2 FANS, GENERAL required to meet design specifications, and recording and reporting the results. piping connection and 1" thick disposable filter in filter rack. A. General: Provide fans that are facto fabricated and assembled facto tested, and 1. Employ the services of an independent testing, adjusting, and balancing agency A. Equipment Connections: Connect equipment with flexible connectors per plans. All flexible factory factory meeting the qualifications specified below, to be the single source of responsibility to test v"""" " ""'%• B. Copper tube refrigerant coil with mechanically bonded aluminum fins, complying with ARI connectors and flexible air ducts ashall be tested per UL 181 and labeled as Class 0 or 1. factory finished, with indicated capacities and character stics. 9 q P 9 P ty : adjust, and balance the building mechanical systems identified above. The independent ,,.....,, 210/240, and with thermal-expansion valve. j B. Branch Connections: Comply with SMACNA "HVAC Duct Construction Standards; Figures 2-7 B. Fans and Shafts: Statically and dynamically balanced and designed for continuous testing, adjusting, and balancing agency shall be certified by the Associated Air Balance V,:° and 2-8. operation at the maximum rated fan speed and motor horsepower. Fans shall be factory balanced Council (AABC) or the National Environmental Balancing Bureau (NEBB) in those testing and C. Helical, nickel-chrome, resistance-wire heating elements with refractory ceramic support and checked for vibration. Maximum fan self-excited vibration velocity shall not exceed 0.157 balancing disciplines required for this project, and having at least one Professional Engineer bushings; automatic-reset thermal cutout; built-in magnetic contactors; manual-reset thermal C. Outlet and Inlet Connections: Comply with SMACNA "HVAC Duct Construction Standards," inch/second at bearing caps, measured with the fan fully assembled and operating at design registered in the State in which the services are to be performed, certified by AABC or NEBB _o nw Z v:i U conditions. Fan Shaft shall be turned, ground, and polished steel designed to operate at no more as a Test and Balance Engineer. . cutout; airflow proving device; and one-time fuses in terminal box for overcunent protection. Figures 2-16 through 2-18. than 70 percent of the first critical speed at the top of the speed range of the fan's class. D. Forward-curved, double-width fan wheel of galvanized steel; directly connected to D. Terminal Units Connections: Comply with SMACNA "HVAC Duct Construction Standards," B. Codes and Standards: %;;�1>>S°"'} mulUspeed, PSC type motor. Figure 2-19. C. Belt Drives: Factory mounted, with final alignment and belt adjustment made after installation, with 1.4 Service Factor. 1. NEBB: "Procedural Standards for Testing, Adjusting, and Balancing of 2.3 AIR-COOLED, COMPRESSOR-CONDENSER COMPONENTS Environmental Systems." D. Belts: Oil-resistant, non-sparking, and non-static. 2. AABC: 'National Standards For Total System Balance". A. Steel casing finished with baked enamel, with removable panels for access to controls, 3. ASHRAE: ASHRAE Handbook, 1984 Systems Volume, Chapter 37, Testing, weep holes for water drainage, and mounting holes in base. Provide brass service valves, SECTION 15820 - DUCTWORK ACCESSORIES E. Motors and Fan Wheel Pulleys: Adjustable pitch for use with motors through 15 HP; Adjusting, and Balancing. fittings, and gage ports on exterior of casing. fixed pitch for use with motors larger than 15 HP. Select pulley so that pitch adjustment is at the PART 1 - GENERAL middle of the adjustment range at fan design conditions. Provide steel belt guards for motors PART 2 - PRODUCTS B. Hermetically sealed reciprocating or scroll-type compressor with crankcase heater and mounted on the outside of the fan cabinet. Not Used mounted on vibration isolators. Compressor motor shall have thermal- and current-sensitive 1.1 DESCRIPTION OF WORK PART 3 - EXECUTION overload devices, start capacitor, relay, and contactor. Provide reversing valve and F. Shaft Bearings: Provide type indicated, having a median life "Rating Life" (AFBMA L low-temperature air cut-off thermostat on heatpump units. A This Project shall include ductwork accessories work as indicated on drawings and in schedules, (50)) of 200,000, calculated in accordance with AFBMA Standard 9 for ball bearings and AFBMA 3.1 PERFORMING TESTING, ADJUSTING, AND BALANCING and by requirements of this section, and includes dampers, damper actuators, fire and smoke dampers, Standard 11 for roller bearings. A Perform testing and balancing procedures on each system identified, in accordance C. Copper tube refrigerant coil with mechanically bonded aluminum fins, complying with ARI 210/240, and with liquid subcooler. turning vanes, duct hardware, and duct access doors. G. Factory Finish: The following finishes are required: with the detailed procedures outlined in the referenced standards. 1.2 QUALITY ASSURANCE B. Cut insulation, ductwork, and piping for installation of test probes to the minimum D. Aluminum-propeller type fan directly connected to a permanently lubricated motor with 1. Sheet Metal Parts: Prime coating prior to final assembly. extent necessary to allow adequate performance of procedures. Patch insulation, ductwork, integral thermal-overload protection. A. Comply with applicable sections of the following Codes and Standards: 2. Exterior Surfaces: Baked-enamel finish coat after assembly on all ferrous metal parts. and housings, using materials identical to those removed. Seal insulation to re-establish No finish on galvanized or aluminum parts. integrity of the vapor barrier. E. Provide low ambient kit for operation down to 30 deg F; low voltage thermostat with 1. SMACNA 'HVAC Duct Construction Standards, Metal and Flexible". C. Mark equipment settings, including damper control positions, valve indicators, fan subbase to control compressor and evaporator fan; automatic-reset timer to prevent rapid 2. ASHRAE recommendations pertaining to construction of ductwork accessories, except as PART 3 - EXECUTION speed control levers, and similar controls and devices, to show final settings. Mark with paint " cycling of compressor, soft-annealed copper suction and liquid refrigerant lines factory otherwise indicated. or other suitable, permanent identification materials. cleaned, dried, pressurized, and sealed with factory-insulated suction line with flared 3. UL Standard 55 Fire Dampers and Ceiling Dampers'. 3.1 INSTALLATION, GENERAL at both ends; and polyethylene mounting base. 4. NFPA 90A "Standard for the Installation of Air Conditioning and Ventilating Systems". 3.2 RECORD AND REPORT DATA DON PENN, P.E. A. Install fans level and plumb, in accordance with manufacturers written instructions. PART 3 - EXECUTION PART 2 - PRODUCTS Support units as described below, using the vibration control devices indicated. Accurately locate A Prepare Test and Balance report and submit one (1) copy to the Engineer and one (1) 635 Westport Parkway, Suite 300 roof curbs. Secure roof-mounted fans to roof curbs with cadmium-plated hardware. copy to the Owners Representative. Report shall be standard NEBB or AABC format. Grapevine, TX 76051 3.1 INSTAL1AT10N P A plumb,Install units level and s 2.1 DAMPERS AND ACTUATORS P � in accordance with the drawings and the manufacturers B. Arrange installation of units to provide access space around units for service and END OF SECTION P (817) 410-2858 fax 817-251-8411 instructions. A Low Pressure Manual Dampers: Provide dampers of single blade type or multi-blade type, maintenance. B. Install refrigerant and drain piping adjacent to unit to allow service and maintenance. constructed in accordance with SMACNA "HVAC Duct Construction Standards", or as manufactured by Connect piping with unions and shutoff valves to allow units to be disconnected without Ruskin model MD35, MD25 or MDRS25 as required, or equivalent. 3.2 CONNECTIONS SHEET NUMBER draining piping. C. After installation, charge system and test for leaks. Repair leaks and retest until no leaks B. Backdraft dampers: Heavy duty, minimum 0.125" wall thickness extruded aluminum frame, A. Duct installations and connections are specified in other Division 15 sections. Make final N minimum 0.070" thick extruded aluminum blades with vinyl edge seals, synthetic bearings, mill finish. duct connections with flexible connections. exist. Ruskin model BD6, or equivalent. y 9 9 MEP SECIFICATIONS D. Perform startup checks according to manufacturer's written instructions. REFER TO THE EVERGREEN WALK TENANT CONSTRUCTION MANUAL. IF A CONFLICT EXISTS, LANDLORD GUIDELINES TAKE PRIORITY. MEP3 DATE: 08/12/11 ELECTRICAL SPECIFICATIONS JOB NO: H1 - PHC - 11 DRAWN: CHECKED: I. General conditions D. Conductors H. Disconnect switches lii. Execution A. The scope of the work shall include the furnishing and installation 1. Conductors shall be 98% conductivity soft drawn annealed 1. As manufactured by square d, general electric, cutler-hammer A. Installation of building conduit Of the necessary material and labor to accomplish the work indicated Copper, 600 volt, thwn insulation, #10 and smaller - solid, #8 and Or siemens/ite. F. Equipment connections and control wiring By the drawings and herein specified. All work by this contractor Larger - stranded. Make all connections with solderless 1. All above grade raceways shall be rigid galvanized steel or Shall conform to all applicable federal, state and local building Insulated connectors equal to scotchlock for no. 8 awg and 2. Fusible/non-fusible switches Intermediate metal conduit where installed exposed in 1. All motors, motor starters, controls and control wiring will, Codes. Smaller. Conductors no. 6 awg and larger shall be spliced Equipment rooms, in damp or wet locations, in hazardous Unless otherwise specifically noted, be furnished and installed Utilizing copper bolt clamp-type connector or hydraulically A. All switches: heavy duty type; ul listed and meet latest Locations, or where trade size exceeds 2 inches. Under other divisions of the specifications. Except for items C 0 R T L A N 0 B. The contract documents do not propose to show all existing Crimped copper crimp connectors. Connectors shall be ul Nema standards ks-1; horsepower rated; quick-make, That are furnished with factory-installed, ,integral motors, an Systems, equipment or material. Contractor shall be responsible for Approved for the application in which they are used. Quick-break; visible blades in "off" position; removable Electric motor of required size and electrical characteristics M 0 R G A N Reviewing the existing conditions at the job site before submitting Arc suppressors; lugs front removable and ul listed for 2. Conduits shall be of such size and so installed that the Will be provided and installed under mechanical and/or kitchen A R C H I T E C T Proposals. Submission of proposals shall be taken as evidence that 2. Romex and "bx" cable shall not be permitted. "me" may be used as 75'c aluminum or copper wire; operating handle in Conductors may be drawn through without injury or excessive Equipment systems for each item of motor-driven equipment. Such inspection has taken place. The contractor shall become Permitted by landlord and city. Control of switch with door open and closed; handle Strain, shall be secured at cabinets and boxes with galvanized 2• Where disconnect switches or circuit breakers are not Familiar with the complete set of construction documents, and the Position clearly indicate "on" and "off' positions; Locknuts, both inside and outside, and shall have appropriate Lack of specific information on the drawings shall not relieve the "off" Provided integral with control equipment for motors and 711 N. FIELDER RD. P 9 3. No conductors shall be smaller than no. 12, except for signal Provisions for padlocking in off position; safety Bushings inside. Bushings shall be insulating type with bond Contractor of any responsibility. Or control circuits and for individual lighting fixture taps as Interlocks to prevent the enclosure door from being Ground clamps. Other electrical appurtenances, provide and install all ARLINGTON, TX 76012 Permitted b nec. Opened while the handle is in the "on" Disconnect switches required by the national electrical code y p position and to PH: 817 635-5696 C. Materials and equipment furnished under this contract shall be new And/or indicated. ( ) Prevent the handle from being turned to the "on" 3. Threaded conduits shall be reamed after threading, and shall And shall bear the u.L. Label where applicable, unless noted 4. For receptacle and motor branch circuits, conductors shall Position while the enclosure door is open; means to Be kept tightly closed at each end, and shall be kept in dry (817) 635-5699 Otherwise. All work shall be guaranteed against defective materials Be no. 12 awg, unless specified, noted or scheduled otherwise. Permit authorized personnel to release the safety Locations during construction° Conduits shall be swabbed out 3. Provide all power wiring complete for operation all items FAX:And workmanship for a period of not less than one (1) year after Interlocks for maintenance or inspection; auxiliary Before conductors are pulled. Heating, air conditioning, plumbing and all other electrical Completion and acceptance b the owner. Devices furnished by the owner or under other divisions of the P P Y 5. For home runs on 120-volt, 20-ampere branch circuits, where Poles, as required, to disconnect control voltage(s) Specifications. Refer to the owner and to the contractors for � Length of run from panelboard to first outlet exceeds 100 When power voltage is disconnected. 4. Conduits larger than 1 inch shall not be run horizontally The work under the other divisions for the scope contractors D. Contractor shall install electrical systems without interference Linear feet, use no. 10 awg conductors. Where length of run is 100 Within any floor slab. Where floor slab construction is not Connections to equipment furnished by them and for the exact of And in strict coordination with other trades. Linear feet or less, use no. 12 awg conductors. B. Enclosures: nema 1 or nema 3r, as indicated on drawings; More than 2-1/2 inches thick, no horizontal conduits shall be Clean steel, galvanized after forming, primed and grey Run. Where it is required for a large number of conduits Locations all connections to equipment furnished by them E. Materials and workmanship shall comply with the contract And for thea exact locations of all items. Documents and applicable codes and standards. In case of difference Baked enamel finished; nema 1 covers on pin type hinges; Routed horizontally within slab to be stubbed up at a single Between applicable codes and standards and the contract E. Wiring devices, cover plates and accessories Nema 3r covers securable in the open position. Location, conduits shall be separated by at least 4 inches. 4. Where possible, terminate conduits in conduit boxes on motors. o Interchangeable bolt-on threaded hubs on nema 3r Where motors are not provided with conduit boxes, terminate Documents, the contractor shall promptly notify the 1. Provide wiring devices and associated accessories of Switches thru 200 ampere. 5. Use lengths of flexible metal conduit minimum 12 inches, maximum The conduits in conduit fittings at the motors. Q) N Architect/engineer in writing of such difference. Should the 9 9 Contractor perform any work that does not comply with the Specification grade. Device of leviton, hubbell or pass & 6 feet long at final connections to all motors, boilers, generators, W Requirements of applicable codes and standards, he shall bear all Seymour are acceptable, but submit for review a complete list I. Contactors Transformers and similar devices subject to movement because metal flexi ble U t t d l i adjustment. Use exe mea h ti ibraon or mechanical Costs arising in correcting such defects. Applicable codes and Of any substitutes offered for those specified. Of v G. Contractor shall keep a clean set of drawings on the job, noting U � Standards shall include all ordinances, utilitycompany regulations, 1. UI listed. Voltage, amperes and number of poles indicated on Conduits to effect final connections to recessed lighting IJ P Y 9 2. Color of wall switches, receptacles and face lutes: as Daily all changes made in these drawings in connection with the final L. P P The drawings. Continuously rated for the rated amperes per Fixtures. Use liquid tight flexible metal conduit, with I- And applicable requirements of nationally accepted codes and Specified or selected b architect. Installation including exact dimensioned locations of all new and � � P Y Pole for all types of ballast and tungsten lighting, resistive Appropriate connections, in damp or wet locations, in p Standards. Should the contractor supply equipment differing from Uncovered existing utilities and shall, with his request for final ® > (� The specified items in the contract documents without notification to 3. Where lighting circuits are shown to be line voltage switched, Heating and motor loads. Mechanical equipment rooms, in motor or equipment locations, O p Payment, turn over a clean, neatly marked set of 2 mil reproducible The engineer, he shall bear all costs to upgrade deficiencies arising Provide with specification grade, horsepower rated, ul listed, At or near pumps, and when installed outdoors. " " W g pg g P 9 P Myiars showing as installed work to the architect for subsequent f , � �-- From such. Back- and side-wired, toggle switches rated 20-amp, 120 volts or 2• The contactor shall be mounted t a general purpose Review and transmittal to the owner. Contractor shall note all U Enclosure unless otherwise indicated on the drawings. 6. Ground metallic conduits as required by nec. " " }- (, 277 volts. Switches shall be spst, dpst, 3-way or 4-way, with or g Construction changes, date each sheet and label as-builts in the ��- F. Install equipment with working clearances complying with nec 110-16 Without pilot light, as indicated on the drawings equivalent to Revision block on the drawings. Contractor shall also furnish one And 110-34. 7. Install raceways continuous from outlet to outlet box, or 9 • LJ.J Pass & seymour 20ac1-i series. (1) set of blueline prints from the "as-builts" mylars. J. Grounding Cabinet, with a maximum of 100 feet between pulls. _ li. Products 4. Receptacles 9 Z H. In addition to the above, contractor shall accumulate during the N ryO A. Conduit 1. Grounding conductors shall be annealed copper cables of the 8. Wherever raceways pass through floors, walls, penetrations, Job's progress, the following data, in triplicate, prepared in a neat A. Standard wall receptacles shall be specification grade, Or other partitions, careful) fill an space between the Brochure or packet folder and turned over to the architect for Z Rated 20-amp, 120-volt, 2 pole, 3-wire, grounding type, Sizes indicated or required. P Y Y P p ® Q N 1. Rigid steel conduit: constructed of mild steel piping, Side-wired, nema 5-20r. Outside of the raceway and the building material to prevent Review and subsequent delivery to the owner. Galvanized inside and outside, conforming with fed. Spec. Ww-c-581c, 2. A "green wire" equipment grounding conductor shall be Passage of air, water, smoke, and fumes. Filling material shall N w z Ansi c80.1 and applicable ul standards. B. Special purpose receptacles shall be specification grade Installed within each feeder and branch circuit raceway, Be a ul listed, intumescent sealing having fire/smoke resistive Devices for the nema configurations scheduled or Whether metallic or non-metallic, to form a complete and Rating equal to the building material penetrated. 1. All warranties and guarantees and manufacturers directions z 2. Intermediate metal conduit (imc): constructed of zinc coated On equipment and material covered by the contract including (' Steel tubingmanufactured in accordance with ul-1242 and Indicated on the drawings. Continuous grounding path. Connect grounding conductors The names, addresses and telephone numbers of the < Q To ground terminals at each end of the run. B. Installation of pull and junction boxes z ry Meeting the requirements of the nec. Manufacturers representative. 0 C. Ground fault circuit interrupter receptacles shall be 20 W Amp, 120 volt, 2 pole, 3-wire, nema 5-20r. 1. Fasten all boxes securely to the building construction, - w 3. Electric metallic tubing (emt): of high grade steel 3. Ground the electrical service system neutral at service entrance Independent of conduit systems. 2. Approved fixture brochures, wiring diagrams and control Manufactured specifically to standards assuring maximum Equipment neutral bus terminal to all available grounding electrodes Diagrams (original data, no copies). �J Welding characteristics and ductility, and shall conform to D. Isolated ground receptacles shall be orange in color, 20 amps, Including metal water piping, building structural steel and ground rods 2. On concealed conduit systems where boxes are not otherwise �/ a) D P Fed. Spec. Ww-t-806b. 120 volt, 2 pole, 3-wire, nema 5-20r. Q As described in nec art. 250-50 and 250-52. Accessible, set boxes flush with finished surfaces for access, 3. Copies of approved shop drawings. < T_And provide overlapping covers. 4. Flexible metal conduit: manufactured of mild steel strip 4. Operating instructions for all electrical system equipment. O Material havinga hot-di galvanized coating and meeting 5. Maintain grounding continuity between devices and metallic P 9 9 9 Raceway system in addition to green equipment grounding C. Installation of outlet boxes Operating instructions shall also include recommended L_Requirements of fed. Spec. Ww-c-566b. K.K Lighting fixtures Maintenance procedures. Conductor run with circuit conductors as indicated by n Contract documents, except care shall be taken when 1. Terminate conduits at a metal outlet box at each outlet or 5. Liquidtight flexible conduit: flexible metal conduit as specified P 1. Insure each lighting fixture has an operating set of lamps Device. All boxes shall conform to the nec. 5. Test reports required by these specifications. Herein with a copper grounding strand and factory-applied Installing receptacles having isolated ground pole so as to Equal to existing or of the types shown on the drawings and/or tight flexible conduit shall be ul ti Liquid jacket. Neoprene Li Not bond the isolated equipment ground conductor to the p j q g Specified herein. Lamps shall be manufactured by general 2. Except for outlet boxes supported by two or more rigid 6. Any and all other data and/or drawings required during Listed, equivalent to anaconda "sealtite", type ua. Conduit system. Electric, hilli s, or s vania, except where scheduled Construction. P P YI P Conduits or imc in threaded hubs, outlet boxes shall be Otherwise. Supported independent of the conduit system per nec. B. Couplings and terminators 7. Repair parts lists of all major items of equipment including 2. Fluorescent lamps: in general, 48" length, t-8, medium bi-pin, D. Installation of conduit hangers and supports Name, address and telephone numbers of local supplier or 1. For rigid steel or intermediate metal conduit: factory-made F. Overcurrent protective devices Rapid start, energy-saving lamps, lamp color as indicated, for Threaded couplings of some material as the conduit. Special purpose fluorescent lamps, color and illumination 1. Furnish and install all hangers and supports required by 1. Molded case circuit breakers Output as scheduled on the drawings. Lamps shall be compatible Raceway systems. I. All of the above data shall be submitted to the engineer for his 2. For electrical metallic tubing: t&b 5030 series steel setscrew With ballasts. Review at such time as the contractor submits his last estimate prior Couplings; t&b 5031 series steel setscrew box connectors with A. One, two or three pole with ratings indicated on the 2. Support all above-ground electrical conduits from the To his final payment, but in no case, less than two weeks before final �`. Nylon insulated throat and locknuts at all boxes and cabinet Drawings; standard or (high interrupting) construction Building construction. Support conduits running vertical) or "' +® Terminations or t&b 5051 series non-insulated box connector, g ( ) ( g P 9) 9 PF g Y °'•` As required by the short circuit ratings indicated on the 3. Provide o lighting fixture complete with lamps, ballasts, and Horizontally along walls with galvanized malleable iron one-hold Locknut and 3870 series nylon-insulated grounding bushing on )t 9 9 9 Drawings. Other required appurtenances for each lighting outlet shown Clamps. Carry individually supported horizontal conduits = o E'- �`i�.a,'�' •�' !' � t All tubing where grounding bushings are required. On the drawings. Light fixtures shall be as described in the = fl z B. Quick-make, quick-break, calibrated for operation in an » 1-1/4 inch and larger on kindorf no. 150 or steel city no. C-149 J. Provide labeling and indentification of equipment includin but not limited q P li htin fixture schedule . Each unit shall be furnished with 99 0 °•, 3. For flexible metal conduit: t&b 503 series couplings at Ambient temperature of 40 deg. C. Trip indication b handle "lighting Hangers. To: raceways, unction boxes, pull boxes, outlet cove lutes, panelboards, >,%% '°• .. "� Y All mounting and trim accessories to suit the specific services Ys� 1 rP � is°° _� Qr Connections between flexible conduit and emt, and t&b 3112 Position, trip-free. Two and three pole breakers: common Applied. Finishes shall be factory-standard, except where Etc., furnished and installed under division 16. ; Series nylon insulated throat, steel connectors at box or Trip with single operating handle without handle ties, yl Scheduled otherwise. 3. Locate hangers and trapezes to support horizontal raceways Cabinet terminations. Permanent trip unit containing individual thermal and Without appreciable sagging. Hanger spacing shall not exceed K. Provide new type written circuit directories for new panelboards. Magnetic trip elements in each pole. Frame sizes greater 4. Provide lighting fixtures in accordance with the designations Nee requirements, or recommendations of the neca "standard C. Outlet box, junction and pull boxes Than 100 amperes: variable magnetic trip elements which And descriptions on the drawings. Where a single Of installation". Are set by a single adjustment. Manufacturer and associated catalog number is scheduled, it L. Coordinate all work with owner specifications before any rough-in. 1. Junction and pull boxes 100 cubic inches in volume and smaller: Standard outlet boxes. Larger junction and pull boxes: code C. Removable lugs, ul listed for copper and aluminum Is to establish a desired type and standard of quality. 4. Where conduits smaller than 1-1/4 inch are installed above Gauge sheet steel with overlapped riveted or welded corners Conductors. Listed for installation of mechanical or Removable type dry ceilings, support them on suitable hanger And with edges turned to receive trim. Covers some gauge as Compression type lugs. 5. Lighting fixtures shall be ul labeled. Rods with metal clip or secure them to ceiling hanger rods on Box and screw fastened. Boxes over 864 square inches shall be Clips at a distance above the ceiling sufficient to permit Removal of ceiling panels Y 9 anels and lay-in light fixtures. Locate such Sectionalized.' Boxes factory fabricated from galvanized steel G. Panelboards Conduits so as not to hinder access to mechanical equipment To prevent corrosion. Nema os1. L Ballasts Through ceiling panels. 1. Distribution, lighting and appliance panelboards 2. Cast outlet boxes: nema fb1, type fd cast feralloy. Provide gasketed 1. Fluorescent ballasts: rapid start, electronic, energy saving, class 'p' Cover by box manufacturer. Provide threaded hubs. A. Panelboard bus structure and main lugs or main circuit With thermal protection, high power factor, ul listed and etl certified Breaker shall have current ratings as indicated on the And so labeled, having an a' sound rating and design for use E. Installation of conductors Drawings. Bus bars shall accept bolt-on circuit For use with one or two energy saving lamps. 1. Pull no conductors into conduits until all work of a nature Breakers. All current carrying parts of the bus Structure shall be plated. UI labeled. Which may cause injury to conductors is completed. Before any Wire is pulled into any conduit, swab the conduit to remove all B. The panelboard bus assembly shall be enclosed in a Foreign material. DON PENN, P.E. Surface or flush mounted steel cabinet as indicated on 635 Westport Parkway, Suite 300 The drawings. 2. Run feeders in continuous pieces, without joints or splices, Grapevine, TX 76051 Insofar as practicable. dp (817) 410-2858 fax 817-251-8411 C. Each panelboard shall have a short circuit current Rating equal to or greater than the fault current 3. Type me metal clad cables may be installed in walls and ceilings Indicated on the drawings. Panelboards shall be marked In conformance with the requirements of nec 334, local code and With their maximum short circuit rating at the supply Landlord standard and shall be installed in a workmanlike manner. SHEET NUMBER Voltage. Type me cable shall be used only for branch circuit terminations N To lighting, receptacles, and vibrating equipment. The me cable shall Not be utilized within electrical equipment rooms. Cable shall be Limited to six feet in length. MEP SECIFICATIONS RE ER TO THE EVERGREEN WALK TENANT CONSTRUCTION MANUAL. IF A CONFLICT EXISTS, LANDLORD GUIDELI ES TAKE PRIORITY. MEP4 J Exception:Gravity dampers acceptable in systems with outside or exhaust air flow rates less than 300 cfm where dampers are interlocked with fan DATE: 08�12�11 18.Automatic controls for freeze protection systems present COMcheckSoftware• Version 3.8.2 COMcfleck Software Version 3.8.2 J 19.Exhaustairheatrecoveryincludedforsystems5.000cfmorgreaterwithmorethan70%outsideairfractionorspecificallyexempted JOB NO: H1 - PHC - 11 Interior Lighting Compliance � - iVlechanical Compliance Certificate Exception:Hazardous useofene systems,commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code prohibits the use of energy recovery systems. DRAWN: J Exception:Systems serving spaces that are heated and not cooled to less than 60`F. Certificate D Exception:Wnere more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. CHECKED: 2009 IECC 2009 iECC J Exception:Heating systems in climates with less than 3600 HOD. J Exception:Cooling systems in climates with a 1 percent cooling design wet-bulb temperature less than 64"F. Exception:Systems requiring dehumidification that employ energy recovery In series with the cooling coil. Section 1: Project information Section '1: Project Information J;Lj Exception:Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and Project Type:Alteration Project Type:Alteration makeup air volume to 50 percent or less of design values or,a separate make up air supply meeting the following makeup air requirements:a)at least 75 percent of exhaust Row rate,b)heated to no more than 2'F below room setpoint temperature,0)cooled Project Title:Parmida Home Concepts-Evergreen Walk Project Title Parmida Home Concepts-Evergreen Walk to no lower than 3°F above room setpoint temperature,d)no humidification added,e)no simultaneous heating and cooling. Construction Site: Owner/Agent:raigHntDesigner/Contractor:PEN ontractor. Construction Site: Owner/Agent: Designer/Contractor: C 0 R T I A N 0 Suite Evergreen Way Craig Hebert DON PENN 501 Evergreen Way Craig Hebert DON PENN Section 5: Compliance Statement Suite o20 12 Project Management SUI E 300 RT PKVYY Suite 520 H-t Project Management 635 WESTPORT PKWY M R G A N South Nlndsor,CT 06074 t2820.Hillcrest Rd. SUITE VI South Windsor,CT 06074 12820 Hillcrest Rd, SUITE 300 Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, #CZ03 GRAPEVINE,TX 76051 Dallas,TX 75230 817-410.2850 If 0203 = GRAPEVINE,TX 76051 specifications and other calculations submitted with this permit application.The proposed mechanical alteration project has been designed A R C H IT E C T 972-516-1007 Dallas,TX 75230 617.410-2850 INFO�DOMPENN.COM 972-515-1007 INFO�Ie DONPEtJN.COM to meet the 2009 IECD, Chapter 8,reyulrements in COMcheek Version 3.8�and to comply with the mandatary requirements in the Requirements Checklist. Section 2: Interior Lighting and Power Calculation Section 2: General information iuml palftt't, Pr4--L SEPA... 711 N. FIELDER RD. C D s Date ZO'� ARLINGTON, TX 76012 A B mTitl e- e Si nature Building Location(for weather data): South Windsor,Connecticut Na Area Category Floor Area Allowed Allowed Watts Climate Zone:Retail 5a PH: (817) 635-5696 (ft2j Watts f ft2 (B x C) 9671 1.5 14507 FAX: (817) 635-5699 Total Alloyed Watts= 14507 Section 3: Mechanical Systems List Quantity syste..m Type A.A.pescriptio)l,Section 3: Interior Lighting Fixture Schedule 1 Rru-1 (single zone): Heating:1 each-Duct Furnace,Gas,Capacity =130 kBtufh,Efficiency=80.00%Ec A B C D E Cooling: i each-Rooftop Package Unit,Capacity=62 kBtuih,Efficiency=13.00 SEER,Air-Cooled Condenser. Fixture ID:Description I Lamp/Wattage Per Lamp I Ballast Lamps/ #of Fixture (C X D) Air Economizer Fixture Fixtures Watt. 2 RTU-2 8 3(Single Zone) Retail(9671 sq.R,) ; } Heating:2 each-Duct Furnace,Gas,Capacity=200 kBtuih,Efficiency=80.004E Ec Linear Fluorescent 1:A:Tx4 Fluorescent 148"T8 32W i Electronic 3 28 96 2688 Cooling:2 each-Rooftop Package Unit,Capacity=89 IrBtuirr.Efficiency=11.20 EER.Air-Cooled Condenser, Compact Fluorescent 1:B:Downlight%Triple 4-pin 42!W;Electronic 1 91 42 3822 Air Economizer Incandescent 1: B3: Dounlighl i Incandescent 5011V 1 RTU.4(Single Zone): 1 6 O 50 300 Heating:1 each-Duct Furnace.Gas,Capacity=130 k8tuih,Efficiency=$0.00%£c Linear Fluorescent 2:C:Fluorescent Strip 148"T8 32W%Electronic 4 6 128 768 Cooling:1 each-Rooftop Package Unit,Capacity=62 k8tuih,Efficiency=11.20 SEER,Air-Cooled Condenser, ^, N Track lighting 1:D:Track/Heads Wattage based an total luminaires 0 0 0 3300 Air EconomizerVJ Total Proposed Watts= 10878 1 Water Heater 1:Electric Storage'Waler Heater,Capacity:15 gallons vr, Heat Trace Tape Installed a_ r/\ LJ Section 4: Requirements Checklist Section 4: Requirements Checklist (,, W O Lighting Wattage: Requirements Specific To: RTU-1 : �.- O J 1. Total proposed watts must be less than or equal to total allowed watts. ( 1. Equipment minimum efficiency: Duct Furnace(Gas): 80.0%Ec ® C):D :J 2. Equipment minimum efficiency: Rooftop Package Unit: 13.0 SEER Allowed Watts Proposed Watts Complies J 3. Cooling system provides a means to relieve excess outdoor air during economizer operation. ( W ling fo878 Passes J 4. Integrated air economizer required Controls, Switching,and Wiring: j S. Hot gas bypass vim@eel l0 50`:G of fatal cooling capacity ;J 2, Daylvertical zones cinder skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to Requirements Specific To: RTU-2&3 : if vertical fenestration. J 1. Equipment minimum efficiency: Duct Furnace(Gas): 80.0%Ec `<J 3. Daylight zones have individual lighting controls independent from that of the general area lighting. LJJ� 5 J 2. Equipment minimum efficiency: Rooftop Package Unit: 11.0 EER Exceptions: J Z N 3. Coaling system provides a means to relieve excess outdoor air during economizer operation. ^ O J Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device J 4. Integrated air economizer required ® O iJ 0 Daylight spaces enclosed by walls or calling height partitions and containing two or fewer light fixtures are not required to have a J 5. Mat gas bypass limited to 50%of total cooling capacity separate switch for general area lighting. Requirements Specific To: RTU-4 : /r'� Ld 7Q ...,......._........................................_........,,... ...,,,.„.,...._M. ,,,....___.. _,,,,,,.,.........,,•.,........,,...........,•,,,_.___.....____�...,.,,___..... ,,,, ........................................... ro)ect Tine: Parmida Home Concepts-Evergreen Walk Report dale: 09/14/N Project Title, Parmida Home Concepts- Evergreen Walk Report date:09,14M 1 Project Title: Parmida Home Concepts- Evergreen Walk Report date: 09114111 Data filename: E!jobs4Pannida Evergreen Walk,CT1PM S1uIRCOM Check'.cumcheck 9.11-11':Parmida-Evergreen-SouthwindsorCT Dafa filename:E:ljobslParmida Evergreen Walk,CP.PM Slufbcom check'Comcheck 9-1 L11iParmitla-Evergreen-SouthwindsorCT Data filename:E:'�obstParmida Evergreen Walk,CTtPM Stufficom checMComcheck 9-11-11)Parmfda-Evergreen-SouthwindsorCT (9-11-11).cok Page 1 of 5 (9-11-11).cek Page 3 of 5 (9-1 i-1 i),cck Page 5 of 5 ® � -0 a'1/ J 4. Independent controls for each space(switch(occupancy sensor). J 1. Equipment minimum efficiency: Duct Furnace(Gas): 80.0% Ec J 2. Equipment minimum efficiency: Rooftop Package Unit: 13.0 SEER ( O Exceptions: €J 3. Cooling system provides a means to relieve excess outdoor air during economizer operation. �� J Areas designated as security or emergency areas that must be continuously illuminated. J 4. integrated air economizer required O O 0 J Lighting in stairways or Corridors that are elements of the means of egress. ❑ 5. Hot gas bypass limited to 50%of total cooling capacity J 5. Master switch at entry s sepaholerately guest room, Requirements Specific To:Water Heater 1 J 6, IndivMedical t dwelling units separately metered. j 1. No efficiency requirements for water heater with storage capacity less than 20 gallons. j 7. Medical task met lighting, or arUhistory display fighting dalmed to be exempt from compliance has a control device Independent at the control �,,.,.. �,,.,Y•_,� of the nonexempt lighting. J 2- First 8 It of outlet piping is insulated J insulated pip ing heated ppg ^'J 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either 3. All heat traced or externally � .-.i V/ controlling all luminaires,dual switching of alternate rows of lumnafres,alternate luminaires.or alternate lamps.switching the middle ] 4. Hot water storage temperature adjustable down to 120°F or lower lamp luminaires independently of other lamps,or switching each iuminaire or each Tamp. J 5. Automatic time control of heat tapes and recirculating systems present •'^`� ,- Exceptions., J 6. Heat traps provided on inlet and outlet of storage tanks �:>a Generic Requirements: Must be met by all systems to which the requirement is applicable:Only one luminaire in space. - J An occupant-sensing device controls the area. J 1. Plant equipment and system capacity no greater than needed to meet loads ;] Exception:Standby equipment automatically off when primary system is operating J The area is a corridor,storeroom,restroom,public lobby or sleeping unit ai'Ex i�. J J Exception:Multiple units controlled to sequence operation as a function of load Areasthat use less than 0.6 Wattsfsq.ft. J 2. Minimum one temperature control device per system tsaar#Fs"E:-v \xppiiw ekxxil6�rtt J 9. Automatic lighting shutoff control in buildings larger ihan 5,Do0 sq.ft. rJ 3. Minimum one humidity control device per installed humidifipltonldehumidffication system J 4. Load calculations per ASHRAElACCA Standard 183 Exceptions: J S. Automatic Controls:Setback to 55°F(heat)and 85T(cool):7-day clock,2-hour occupant override,10-hour backup s,� tN A J Steeping units.patient.care areas:and spaces where automatic shuiofr would endanger safety or securely. J Exception Continuously operating zones e • -.;;,. ;> ,� -.7 10.Photocell%astronomical time switch on exterior lights � � L �ic'�a F � -, J Exception:2 kW demand or less,submit calculations Exceptions oJ 6. Outside-air source for ventilation:system capable of reducing OSA to required minimum ; J 7. R-5 supply and return air duct insulation in unconditioned spaces _J Lighting intended for 24 hour use. q /y _J 11.Tandem wired one-lamp and three-lamp ballasted luminaires(No single-lamp ballasts). R-8 supply and return air duct insulation outside the building hw Q R-8 insulation between ducts and the building exterior when ducts are part of a building assembly v9rrv(uOninU xcepbons: J Exception: Ducts located within equipment _ J Electronic high-frequency ballasts;Luminaires on emergency circuits or v:ith no available pair. J Exception: Ducts with interior and exterior temperature difference not exceeding 15°F. e e ������������� 8. Mechanical fasteners and sealants used to connect ducts and air distribution equipment J/� g. Due -s sealed longiludinal seams on rigid ducts;transverse seams on all ducts;UL 181 A or 181 B tapos and mastics J 10.Ho1 water pipe insulation: 1.5 in.for pipes<=1.5 in.and 21n.for pipes>1.5 in. Section 5: Compliance Statement Chilled waterlrefrigerant%brine pipe insulation: 1.5 in.for pipes<=1.5 in.and 1.5 in. for pipes>1.5 in. Steam pipe insulation: 1.5 in.for pipes<=1.5 in.and 3 in.for pipes -1.5 in. , u Compffance Statement: The proposed lighting alteration project represented In this document is consistent with the building plans, :_,J Exception:Piping within HVAC equipment. specifications and other calculations submitted prilhihis permit application.The proposed lighting alteration project has been designed to meet ;] Exception:Fluid temperatures between 55 and 105°F. <_ the 2009 IECC,Chapter 6,requirements in CUMcheck Version 3.8.2 and to comply with the mandatory requirements in the Requirements Checklist. J Exception:Fluid not heated or cooled with renewable energy. 6"Penn. AIE SEP 15 20it J Exception:Piping within room fan-coil(with AHRI440 rating)and unit ventilators(with AHRI840 rating). J Exception; Runauls<q R In length. ................................................................................... Name-Title - Signature pate J 1 t.Operation and maintenance manual provided to building owner J 12.Piping,insulated to 112 in.if nominal diameter of pipe is 41.5 in; Project Notes: Larger pipe insulated to 1 in.thickness J 13.Lavatory faucet outlet temperatures in public restrooms limited to 1104F(431C) Project is Tenant Improvement of existing shall space. J 14.Thermostatic controls have 5'F deadband J Exception:Thermostats requiring manual changeover between heating and cooling J Exception:Special occupancy or special applications where wide temperature ranges are not acceptable and are approved by the authority having jurisdiction. J 15.Balancing devices provided in accordance with IMC(2006)60117 DON PENN, P.E. J 16.Demand control ventilation(DCV)present for high design occupancy areas(>40 person11000112 in spaces>500 R2)and served by 635 Westport Parkway, Suite 300 systems with any one or I)an air-side economizer,2)automatic modulating control of the outdoor air damper,or 3)a design outdoor a irflow greater than 3000 Cron. Grapevine, TX 76051 J Exception:Systems with heat recovery. (817) 410-2858 fax 817-251-8411 J Exception:Multiple-zone systems without DOC of individual zones communicating with a central control panel. J Exception:Systems with a design outdoor airflow less than 1200 cim. J Exception:Spaces where the supply airflow,rate minus any makeup or outgoing transfer air requirement Is less than 1200 cfm.J 17.Motorized,automatic shutoff dampers required on exhaust and outdoor air supply openings SHEET NUMBER J Exception:Gravity dampers acceptable in buildings<3 stories N MEP COMCHECK ProjecTina; Parmida Home Concepts-Evergreen Walk Report data: 09114l11 Project Tithe: Parmida Hama Concepts- Evergreen Walk Report date:09/14111 MEP 5 Dataata filename:E:ljobsiParmida Evergreen Walk,CT,PM Stufftcom check?comcheck 9-11-11;Parmida-Evergreen-SouthwindsorCT Data fiename:E:gobs\Parmitla Evergreen Walk, CTPM StutRcom check'xcomcheck 9-11-11',Parmida-Evergreen-SouthwintlsorCT (9-i1.11).cck Page 2 of 5 (9-11-1 1).cck Page 4 of 5