HomeMy WebLinkAbout264 Evergreen Way - Life Safety System T May 02 12 02:49p Tri-City Fire Protection 8608723473 p,1
TRI-CITY FIRE PROTECTION, LLC
67 MEADOWOOD RD
TOLLAND, CT. 06084
F-A-X C-O-V-E-R L-E-T-T-F R
Date: 5/2/12 Time: 2:00 P.M.
Number Of Pages Including Cover Sheet: 3
To: WALTER SUMMERS-FIRE MARSHAL-SOUTH WINDSOR
Fax Number: (860) 644-7280
From: David J.Fusco
Message: ENCLOSED,PLEASE FIND 200LB TEST REPORT FOR
SEPHORA AT EVERGREEN WALK.
THANK YOU
DAVID FUSCO—860-836-8194/CELL
860-872-3473/OFFICE/FAX
860-870-5183 P.M./EMERGENCY 860-871-4983
If There Are Any Problems With This Transmission,Please Call Sender At 860-
836-8194—Cell 860-872-3473-Office. Thank You,
Tri-City Fire Protection,LLC
F1-40324
May 02 12 02:49p Tri-City Fire Protection 8608723473 p,3
ydrostatic:Hydrostatic tests shall be made at not less than 200 psi(13.6 bar)above static pressure in excess of
50 psi(10.2 bar)for 2 hours.Differential dry-pipe valve clappers shall be left open during the test to prevent
amage.All aboveground piping leakage shall be stopped.
[de7sc:riptionneumatic.Establish 40 psi(2.7 bar)air pressure and measure drop,which shall not exceed 1'h psi (0.1 bar)i
4 hours.Test pressure tanks at normal water level and air pressure and measure air pressure drop,which shall
not exceed 1Y:psi(0.1 bar)in 24 hours.
All piping hydrostatically tested at 200 psi 1�bar)for 2 hours If no;state reason
Dry piping pneumatically tested N/A Yes No
Equipment operates properly Yes X No
Do you certify as the sprinkler contractor that additives and corrosive chemicals,sodium silicate or derivatives of
sodium silicate,brine,or other corrosive chemicals were not used for testing systems or stopping leaks?
Yes X No
Tests Reading of gauge located near water supply test Residual pressure with valve in test
Drain test connection:_psi bar) N/A connection open wide:_psi C_
bar)
Underground mains and lead in connections to system risers flushed before Other,explain
connection made to sprinkler piping N/A
Verified by the copy of the U Form No.85B Yes No
Flushed by installer of underground sprinkler piping Yes No
If powder driven fasteners are used In concrete,has representative sample testing If no,explain
been satisfactorily completed? Yes X No
Blank testing Number used N/A Locations N/A Number removed NIA
gaskets
Welding piping Yes No X If yes...
Do you certify as the sprinkler contractofthat welding procedures comply with the Yes No
requirements of at least AWS 82.17
Do you certify that the welding was performed by welders qualified in compliance with
Welding the requirements of at least AWS B2.1? Yes No
Do you certify that the welding was carried out in compliance with a documented
quality control procedure to ensure that aft discs are retrieved,that openings in piping Yes No
are smooth,that slag and other welding residue are removed, and that the internal
diameters of piping are not penetrated?
cutouts Do you certify that you have a control feature to ensure that all cutouts(discs)are Yes X No
(discs) retrieved?
Hydraulic Nameplate provided If no,explain
data Yes X No
nameplate
Remarks Date left in service with all control valves open:
Name of sprinkler contractor
TRI-CITY FIRE PROTECTION, LLC
Tests witnessed by
For property owner(signed) Title Date
Signatures
For sprinkler contractor(signed) Title Date
MEMBER 5/1/2012
dditional explanations and notes:
May 02 12 02:49p Tri-City Fire Protection 8608723473 p2
Contractor's Material and Test Certificate for Aboveground Piping
TRI-CITY FIRE PROTECTION, LLG F4-40324 860-836-8194
Upon completeion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owners
representative.All defects shall be correcledand system left in service before contractors personnel finatly leave the job.
A certificate shall be filled out and signed by both representatives.Copies shall be prepared for approving authorities,owners,
and contractor. It is understood the owners representative's signature in no way prejudices any claim against contractor for
faulty material,poor workmanship,or failure to comply with approving authority's requirements or local ordinances.
Property name:SEPHORA-EVERGREEN WALK DATE:5/1/2012
Property address:601 EVERGREEN WAY,SOUTH WINDSOR,CT.05074
Accepted by approving authorities(names):TOWN OF SOUTH WINDSOR-FIRE MARSHAL'S OFFICE
Address: 1540 SULUVAN AVE,SOUTH WINDSOR,CT 06074
Plans
Installation conforms to accepted plans Yes X No
Equipment used is approved
If no,explain deviations Yes X No
Has person in charge of fire equipment been instructed as to location of control Yes X No
valves and cane and maintenance of this new equipment?
If no,explain?
instructions Have copies of the following been left on the premises? Yes X No
1.System components Instructions Yes X No
2.Care and maintenance instructions Yes X No
3. NFPA 25 Yes X No
Location of Supplies buildings SEPHORA
system
Make Model Yr.of manufacture Orifice size Quantity Temp.rating
VICTAULIC concealed 1650 2010 '/", 5.6 1550
Sprinklers
Pipe and Type of pipe BLACK STEEL
fittings Type of fittings CAST IRON
Maximum time to operate through test
Alarm valve Alarm device connection
or flow Type Make Model Minutes Seconds
indicator
Dry valve Q.O.D.
Make Model Serial no. Make Serial no.
Dry pipe
operating Time totnp
ed
test through test Water-Pressure Air pressure Trip pressure
e air Time water reach@d test outlet Alarm opera!
properly
connection
Without Q.O.D. min. sea
With Q.O.D. mn. sea
If no,explain