Loading...
HomeMy WebLinkAbout199 Deming Street - Life Safety System T r S 7 ) ECURIrY *Quality DYNANA:RK MEMO CENTERS Alarm Systems Since 1985 P.O. Box 1170 "Nationally Known, Locally Chemed" Tolland, CT 06084-1170 LIC #18164.1 Tel. (860) 872-4050 Fax (860) 875-0493 Church of the Living God* ynamarkCT@comcast.net Deming Street Manchester, CT 06042-1731 Date: 3/11/2011 RE: ANNUAL FIRE ALARM TEST Attached is a copy of the "INSPECTION AND TESTING FORM". This form was completed upon testing the fire system in your building, as required annually. A copy must be kept in a file on the property for a minimum of three [3] years and available if asked for by a building official or fire marshal. SEE NOTES ON PAGE 72-115 Michael G Casieri CC: Fire Marshal WO# 1102 Messed 6e the Lord my rock my refuge and my fortress, my stronghold, my deliverer, my shield in whom I trust. PSALM 144 I . 72-111 INSPECTION TESTING AND MAINTENANCE INSPECTION AND TESTING FORM WO#: 1102 DATE: SERVICE ORGANIZATION PROPERTY NAME(USER) NAME: Dynamark Security NAME: Church ofthe Living God* ADDRESS: P.O. Box 1170 Tolland,CT 06084-1170 ADDRESS: 199 Deming Street REPRESENTATIVE: Michael G.Casieri Manchester,CT 06042-1731 LICENSE NO.: 181641 TELEPHONE: (860)648-0520 TELEPHONE: (860)872-4050 CONTACT: Jody Tiffany CHECK HERE IF MAILING ADDRESS IS DIFFERENT❑ MONITORING ENTITY APPROVING AGENCY CONTACT: CMS CONTACT: South Windsor Fire Marshal TELEPHONE: 1-800-432-1429 ADDRESS: 1540 Sullivan Avenue South Windsor,CT 06074 MONITORING ACCOUNT#: FL5001196 TELEPHONE: (860)644-2511 ext.217 TYPE TRANSMISSION SERVICE ❑-McCulloh ❑-Weekly ❑-Multiplex ❑-Monthly ®-Digital ❑-Quarterly ❑-Reverse Priority ❑-Semi-Annually ❑-R F ®-Annually ❑-Other(Specify) ❑-Other(Specify) PANEL MANUFACTURER: Silent Knight MODEL NO.: SK 5208 DATE INSTALLED: 8/14/08 CIRCUIT STYLES: B NO.OF CIRCUITS: 20 SOFTWARE REV.:N/A LAST DATE SYSTEM HAD ANY SERVICE PERFORMED: Fire Test 8/31/09 ALARM INITIATING DEVICES AND CIRCUIT INFORMATION TV CKT. STYLE 7 B MANUAL STATIONS ION DETECTORS I B PHOTO DETECTORS DUCT DETECTORS I B HEAT DETECTORS 2 B WATERFLOW SWITCHES 6 B SUPERVISORY SWITCHES OTHER:(SPECIFY) NATIONAL FIRE ALARM CODE 72-I12 ALARM INDICATING APPLIANCES AND CIRCUIT INFORMATION TY CKT.STYLE TYPE LOCATION I B Strobe/Horn Basement VISU FUNCTIONAL l B Strobe/Horn Basement l B Strobe/Horn Basement I B Strobe/Horn Basement I B Strobe/Li ht1 Basement I B Strobe/Li ht Basement I B Strobe/Li t Basement 1 B Strobe/Horn Main Level Lobb l B Strobe/Horn Main Level Church 1 B Strobe/Horn Main Level Church I B Strobe/Li ht Main Level Restroom l B Strobe/Li ht Main Level Restroom l B Strobe/Horn Office Level Hallway l B Strobe/Horn Office Level Hallwa l B Strobe/Li ht Office Level Bathroom l B Strobe/Li ht Office Level Bathroom 0 0 ❑ ❑ ❑° a ❑ o NO.OF ALARM INDICATING CIRCUITS:4 ❑ ARE CIRCUITS SUPERVISED? ®YES ❑NO SUPERVISORY SIGNAL INITIATING DEVICES AND CIRCUIT INFORMATION TY CKT.STYLE BUILDING TEMP. SITE WATER TEMP. SITE WATER LEVEL FIRE PUMP POWER FIRE PUMP RUNNING FIRE PUMP AUTO POSITION FIRE PUMP OR PUMP CONTROLLER TROUBLE GENERATOR IN AUTO POSITION GENERATOR OR CONTROLLER TROUBLE SWITCH TRANSFER GENERATOR ENGINE RUNNING OTHER: SIGNALING LINE CIRCUITS Quantity and style(See NFPA 72,Table 3-6.1)of signaling line circuits connected to system: Quantity Style(s) 72-113 INSPECTI E TING AND MAINTENAN E Prima (Main):Nominal Volta e 120v AC ,Am s: 15 Overcurrent Protection Ty e Breaker ,Am s:20 Location(Panel Number): Basement LP-2 Disconnecting Means Location: Circuit#39 b. Secondary(Standby): Storage Battery#1: Amp-Hr.Rating: 7.0 VDC: ' 2- 0j AH: '1 y- Installed: 8/08 Storage Batter #2: Amp-Hr.Rating: -7-O VDC: AH: Installed: Calculated capacity to operate system,in hours: 24 60 Engine-driven generator-dedicated to fire alarm system: TYPE BATTERY ❑Dry Cell ❑Nickel Cadmium ®Sealed Lead-Acid ❑Lead-Acid []Other(Specify) c. Emergency or standby system used as a backup to primary power supply,instead of using a secondary power supply: ❑Emergency system described in NFPA 70,Article 700 ❑Legally required standby described in NFPA 70,Article 701 ❑Optional standby system described in NFPA 70,Article 702,which also meets the performance requirements of Article 700 or 701. PRIOR TO ANY TESTING WHO TIMENOTIFICATIONS ARE MADE: j'ES MONITORING ENTITY ❑ BUILDING OCCUPANTS �� c� BUILDING MANAGEMENT ❑ ❑ OTHER(SPECIFY) AHJ(NOTIFIED)OF ANY IMPAIRMENTS ❑ ❑ SYSTEM TESTS AND INSPECTIONS TYPE VISU FUNCTIONAL COMMENTS CONTROLPANEL ❑ INTERFACE EQ. ❑ LAMPS/LEDS ❑ FUSES ❑ PRIMARY POWER SUPPLY ❑ TROUBLE SIGNALS ❑ ❑ DISCONNECT SWITCHES ❑ ❑ GROUND FAULT MONITORING ❑ SECONDARY POWER COMMENTS TYPE VISU FUNCTIONAL BATTERY CONDITION LOAD VOLTAGE ❑ DISCHARGE TEST ❑ CHARGER TEST SPECIFIC GRAVITY NATIONAL FIRE ALARM CODE 72-114 TYPE VISUAL FUNCTIONAL COMMENTS TRANSIENT SUPPRESSIONS Li REMOTE ANNUNCIATORS ❑ ❑ NOTIFICATION APPLIANCES AUDIBLE ❑ VISUAL ❑ SPEAKERS ❑ ❑ VOICE CLARITY ❑ INITIATING AND SUPERVISORY DEVICE TESTS AND INSPECTIONS LOCATION DEVICE VISUAL FUNCTION FACTORY TYPE CHEC TES MEAS. PASS FAIL Basement Electrical Room Smo SETTING SETTING ke Detector Basement Left Exit Door Pull Station Basement Exit Door Pull Station Ltd ❑ Basement Door to Stairwa Pull Station t Main Level Kitchen Heat Detector ❑ Main Level Front Door Pull Station ❑ Main Level Door to Stairwa Pull Station Office Level Rear Exit Pull Station ❑ Office Level Door to Stairwa Pull Station ❑ SPRINKLER SYSTEM: ❑ ❑ ❑ ❑ ❑ ❑ ❑ Zone I Flow Valve-Wet Zone 1 ❑ ❑ Zone 2 Pressure Switch-D Zone 2 © ❑ ❑ Tam er-Shut Off-Wet Zone 3 ❑ Tamper-Shut Off-Dry Zone 4 [� ❑ Trouble-Dry Low Pressure Zone 5 ❑ Tamper-Elevator Shaft-Attic Zone 6 ❑ Tarn er-Valve-Elec. Room Rear Zone 7 Tamper-Valve-Elec.Room Over 131 ❑ Panel Zone 8 COMMENTS: ❑ ❑ (] VISUAL DEVICE SIMULATED OPERATION INTERFACE EQUIPMENT OPERATION SPECIFY) El❑ ❑ ❑ SPECIE (SPECIFY) ❑ ❑ SPECIAL HAZARD SYSTEMS ❑ ❑ (SPECIFY) (SPECIFY) ❑ ❑ ❑ (SPECIFY) ❑ ❑ ❑ 72-115 INSPECTION.TESTING.AND MAINTENANCE SPECIAL PROCEDURES/COMMENTS: Note:8/14/08-Two main water shut-off valves are not supervised. There may be 2 more shut-off valves(1 on the main floor & 1 on the 2°d floor). Lto ld �>L�-rb f4C C c S S T7-Or,- Pv e lr ON/OFF PREMISES MONITORING YES NO TIME COMMENTS ALARM SIGNAL ❑ A -3 v ALARM RESTORAL ❑ TROUBLE SIGNAL ❑ ❑ SUPERVISORY SIGNAL ❑ ❑ SUPERVISORY RESTORAL ❑ ❑ NOTIFICATION THAT THIS YES NO WHO TIME TESTING IS COMPLETE: BUILDING MANAGEMENT ❑ �� MONITORING AGENCY 12r ❑ BUILDING OCCUPANTS ❑ ❑ OTHER(SPECIFY) ❑ ❑ THE FOLLOWING DID NOT OPERATE CORRECTLY: SYSTEM RESTORED TO NORMAL OPERATION: DATE �, I 1'I TIME 2"3 T) THIS TESTING WAS PERFORMED IN ACCORDANCE WITH APPLICABLE NFPA STANDARDS. NAME OF INSPECTOR: DATE: , Ill f l 1 SIGNATURE: NAME OF OWNER OR REPRESENTATIVE: DATE: SIGNATURE: 3/11/201114.27:02 Mail Out Report Page 1 of 3 criticom Installer DYNAMARK SECURITY CENTERS Active Dates First to Last Dates 3/11/2011 to 3/11/2011 DYNAMARK SECURITY CENTERS 157 WILDWOOD RD TOLLAND CT 06084 CS# FL5001196 Site Name CHURCH OF THE LIVING GOD Site Address 199 DEMING ST MANCHESTER,CT 06040 Phone 860-648-0520 Vrt# Alt# Date Op Zone Event Location/Comment User Scheduled Disp 3/11/2011 12:52:10 PM DJM: 1999 Contact P/C Verified DAVID MCCARTWf 3/11/2011 12:52:27 PM DJM: ONTEST Placed On Test *Test DAVID MCCARTH'y Expires:03/11/2011 16:00:00 All Zones 3/11/2011 1:07:04 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:07:05 PM ET S1078 Trbl-Expansion Dev*Test Device#33 3/11/2011 1:07:05 PM ER S1079 Restore-Expan Modt*Test Device#33 3/11/2011 1:07:50 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:07:53 PM ET S1078 Trbl-Expansion Dev*Test Device#34 3/11/2011 1:07:53 PM ER S1079 Restore-Expan Modi*Test Device#34 3/11/2011 1:16:22 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:16:22 PM ST4 SUP013 Supry PR-CL *Test SPRINKLER SHUT OFF V, 3/11/2011 1:20:38 PM CALLID SG039 Caller ID *Test Called D:(860)644-1997 3/11/2011 1:20:39 PM ST5 SUP013 Supry PR-Cl- *Test SPRINKLER DRY LOW PF 3/11/2011 1:20:39 PM SJ5 RES499 Restore LOG *Test SPRINKLER DRY LOW PF 3/11/2011 1:22:59 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:23:00 PM ST3 SUP013 Supry PR-CL *Test SPRINKLER SHUNT OFF 3/11/2011 1:23:00 PM SJ3 RES499 Restore LOG *Test SPRINKLER SHUNT OFF 3/11/2011 1:23:00 PM ST3 SUP013 Supry PR-CL *Test SPRINKLER SHUNT OFF 3/11/2011 1:23:00 PM SJ3 RES499 Restore LOG *Test SPRINKLER SHUNT OFF 3/11/2011 1:25:06 PM CALLID SG039 Caller ID *Test Called D:(860)644-1997 3/11/2011 1:25:09 PM SJ4 RES499 Restore LOG *Test SPRINKLER SHUT OFF V, 3/11/2011 1:25:09 PM FA2 FIR667 Fire(C)FD-PR-CL-*Test SPRINKLER DRY ACTIVA 3/11/2011 1:25:49 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:25:50 PM FA2 FIR667 Fire(C)FD-PR-CL-*Test SPRINKLER DRY ACTIVA 3/11/2011 1:26:34 PM CALLID SG039 Caller ID *Test Called D:(860)644-1997 3/11/2011 1:26:34 PM FH2 RES499 Restore LOG *Test SPRINKLER DRY ACTIVA 3/11/2011 1:26:34 PM ST3 SUP013 Supry PR-CL *Test SPRINKLER SHUNT OFF 3/11/2011 1:26:34 PM SJ3 RES499 Restore LOG *Test SPRINKLER SHUNT OFF 3/11/2011 1:27:14 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:27:17 PM FH2 RES499 Restore LOG *Test SPRINKLER DRY ACTIVA 3/11/2011 1:32:20 PM CALLID SG039 Caller ID *Test Called D:(860)644-1997 3/11/2011 1:32:20 PM FA13 FIR667 Fire(C)FD-PR-CL-*Test OFFICE LEVEL PULL STA 3/11/2011 1:33:03 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:33:03 PM FA13 FIR667 Fire(C)FD-PR-CL-*Test OFFICE LEVEL PULL STA 3/11/2011 1:33:54 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:33:57 PM FH13 RES499 Restore LOG *Test OFFICE LEVEL PULL STA 3/11/2011 1:34:35 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:34:38 PM FH13 RES499 Restore LOG *Test OFFICE LEVEL PULL STA 3/11/2011 1:34:38 PM FA13 FIR667 Fire(C)FD-PR-CL-*Test OFFICE LEVEL PULL STA Page 1 of 3 3/11/201114:27:02 Mali Out Report Page 2 of 3 criticom Installer DYNAMARK SECURITY CENTERS Active Dates First to Last Dates 3/11/2011 to 3/11/2011 Date Op Zone Event Location/Comment User Scheduled Disp 3/11/2011 1:35:17 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:35:19 PM FA13 FIR667 Fire(C)FD-PR-CL-*Test OFFICE LEVEL PULL STA 3/11/2011 1:36:04 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:36:07 PM FH13 RES499 Restore LOG *Test OFFICE LEVEL PULL STA 3/11/2011 1:36:46 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:36:48 PM FH13 RES499 Restore LOG *Test OFFICE LEVEL PULL STA 3/11/2011 1:36:48 PM FA12 FIR667 Fire(C)FD-PR-CL-*Test MAIN FL HEAT/PULL ST, 3/11/2011 1:37:28 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:37:29 PM FA12 FIR667 Fire(C)FD-PR-CL-*Test MAIN FL HEAT/PULL ST, 3/11/2011 1:37:29 PM FH12 RES499 Restore LOG *Test MAIN FL HEAT/PULL ST) 3/11/2011 1:37:29 PM FA12 FIR667 Fire(C)FD-PR-CL-*Test MAIN FL HEAT/PULL STi 3/11/2011 1:38:11 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:38:11 PM FH12 RES499 Restore LOG *Test MAIN FL HEAT/PULL STi 3/11/2011 1:38:11 PM FA12 FIR667 Fire(C)FD-PR-CL-*Test MAIN FL HEAT/PULL STi 3/11/2011 1:38:11 PM FH12 RES499 Restore LOG *Test MAIN FL HEAT/PULL STj 3/11/2011 1:38:11 PM FA11 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 1:38:52 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:38:52 PM FA11 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 1:38:52 PM FHi 1 RES499 Restore LOG *Test BASEMENT SMOKE/PUL 3/11/2011 1:39:34 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:39:35 PM FH11 RES499 Restore LOG *Test BASEMENT SMOKE/PUL 3/11/2011 1:39:35 PM FA11 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 1:40:16 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:40:16 PM FA11 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 1:40:57 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:40:57 PM FH11 RES499 Restore LOG *Test BASEMENT SMOKE/PUL 3/11/2011 1:40:57 PM FA11 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 1:41:37 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:41:39 PM FHi 1 RES499 Restore LOG *Test BASEMENT SMOKE/PUL 3/11/2011 1:41:39 PM FAi 1 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 1:44:11 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:44:12 PM FH11 RES499 Restore LOG *Test BASEMENT SMOKE/PUL 3/11/2011 1:44:53 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:44:53 PM FH11 RES499 Restore LOG *Test BASEMENT SMOKE/PUL 3/11/2011 1:46:47 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:46:48 PM 8 BUR528 Burg(C)PR-PD-C*Test FRONT CHURCH EMERG 3/11/2011 1:46:48 PM 8 RES499 Restore LOG *Test FRONT CHURCH EMERG 3/11/2011 1:49:17 PM CALLID SG039 Caller ID *Test Called D:(860)644-1997 3/11/2011 1:49:18 PM ST7 SUP013 Supry PR-CL *Test SPRINKLER SHUT OFF B' 3/11/2011 1:49:18 PM SJ7 RES499 Restore LOG *Test SPRINKLER SHUT OFF B' 3/11/2011 1:54:38 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:54:40 PM FA1 FIR667 Fire(C)FD-PR-CL-*Test SPRINKLER WET ACTIVA 3/11/2011 1:55:19 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:55:21 PM FA1 FIR667 Fire(C)FD-PR-CL-*Test SPRINKLER WET ACTIVA 3/11/2011 1:55:21 PM FH1 RES499 Restore LOG *Test SPRINKLER WET ACTIVA 3/11/2011 1:59:47 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 1:59:48 PM FA11 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 1:59:48 PM FH11 RES499 Restore LOG *Test BASEMENT SMOKE/PUL 3/11/2011 1:59:48 PM FA11 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 2:00:29 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 2:00:29 PM FAi 1 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 2:00:29 PM FH11 RES499 Restore LOG *Test BASEMENT SMOKE/PUL 3/11/2011 2:00:29 PM FA11 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 2:00:29 PM FH11 RES499 Restore LOG *Test BASEMENT SMOKE/PUL Page 2 of 3 3/11/2011 14:27:02 Mali Out Report Page 3 of 3 criticom Installer DYNAMARK SECURITY CENTERS Active Dates First to Last Dates 3/11/2011 to 3/11/2011 Date Op Zone Event Location/Comment User Scheduled Disp 3/11/2011 2:00:32 PM FA11 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 2:01:12 PM CALLID SG039 Caller ID *Test Called D:(860)644-1997 3/11/2011 2:01:12 PM FAi 1 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 2:01:12 PM FH11 RES499 Restore LOG *Test BASEMENT SMOKE/PUL 3/11/2011 2:01:53 PM CALLID SG039 Caller ID *Test Called D:(860)644-1997 3/11/2011 2:01:54 PM FH11 RES499 Restore LOG *Test BASEMENT SMOKE/PUL 3/11/2011 2:07:59 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 2:08:01 PM ET S1078 Trbl-Expansion Dev*Test Device#32 3/11/2011 2:08:01 PM ER S1079 Restore-Expan Modi*Test Device#32 3/11/2011 2:13:27 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 2:13:28 PM FAi 1 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 2:14:08 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 2:14:09 PM FA11 FIR667 Fire(C)FD-PR-CL-*Test BASEMENT SMOKE/PUL 3/11/2011 2:16:51 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 2:16:51 PM FH11 RES499 Restore LOG *Test BASEMENT SMOKE/PUL 3/11/2011 2:17:31 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 2:17:32 PM FH11 RES499 Restore LOG *Test BASEMENT SMOKE/PUL 3/11/2011 2:20:32 PM CALLID SG039 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 2:20:34 PM ST6 SUP013 Supry PR-CL *Test SPRINKLER SHUT OFF B' 3/11/2011 2:22:22 PM CALLID SGO39 Caller ID *Test CallerlD:(860)644-1997 3/11/2011 2:22:22 PM SJ6 RES499 Restore LOG *Test SPRINKLER SHUT OFF B' 3/11/2011 2:25:22 PM DMF( 1999 Contact P/C Verified DAVID MCCARTHI Page 3 of 3