Loading...
HomeMy WebLinkAboutWell New 00 Kelly Road (3) STATE OF CONNECTICUT WELL COMPLETION REPORT DO NOT FILL IN WATER COMMISSION _ 317STATE OFFICE BUILDING This report must be completed and submitted to STATE WELL NO, HARTFORD 15, CONN. State Water Commission no later than 30 days OTI-IER NO. after completion of well. 6� WELL / /ems OWNER f-F l� ' f/ 1(jr A03e,, r DRILLER / Ir WELL ams Street Address �^ City or�Town / `� �51 B/ 1.t7 f E,+ms. &AJA Name Street Address City or Town PROPOSED USE OR USES (check): jP/Domestic Ej-jrrigation ❑Stock El Municipal (] Industrial 0 Test Well CASING DETAILS PUMPING TEST WATER LEVEL SCREEN DETAILS (measure from land surface) LENGTH: FEET DURATION: _ -_ HOURS STATIC:-- FEET MAKE• A 6 t� SLOT IAMETER: �i INCHES PUMPING RATE: G.P.M. WHEN PUMPING: ��� FEET LENGTH: ( pT, SIZE [KIND: - — - DIAMETER:,1AJe4CIN. WELL LOG DEPTH FROM Give details of formations penetrated, such as: peat, slit, sand, gravel,clay, hardpan,shale,stone,rock. Include size of gravel [GROUND SURFACE (diameter)and sand (fine,medium,coarse),color of material, structure (loose, packed,cemented,soft, hard) s FT.to f 0 FT. ' (✓ 9' �7AJ T FT.to ..FT. AO FBeb FT,to FT. FT.to FT. FT.to FT. FT.to FT. �s-- - FT.to FT. T*4 FT.to FT. C� FT.to FT. r is 4 FT.to FT. - FT,to FT. --- Cn W —�— FT,to FT. FT.to FT. FT.to FT. FT.to FT. DATE WELL WAS COMPLETED:_ DATE OF REPORT WELL DRILLER (Signature) CERTIFICATE NO. _—.__--____,-------`--------------- LOCATION OF WELL: TOWN OF L)l6` tit AJL)Sb SKETCH SHOWING LOCATION OF PREMISES IN TOWN: DIAGRAM SHOWING LOCATION OF WELL ON PREMISES: ROUTE DIRECTIONS FOR REACHING WELL SITE FROM HARTFORD: