HomeMy WebLinkAboutWell New 614 Foster Street STATE OF CONNECTICUT WELL COMPLETION REPORT DO NOT FILL IN
WATER COMMISSION
317 STATE OFFICE BUILDING This report must be completed and submitted to STATE WELL NO. .:>
HARTFORD 15, CONN. State Water Commission no later than 30 days OTHER NO.
after completion of well.
- WELL f
OWNER J'Oh reEfe .!? F.D FoS per d.
aO i `'I nAdsUr Vo_nLi
WELL F.
Name �
DRILLER E. li . Calne5 R.D.ii
Street Address City or Townn «
Rock Y illv v V.tlil.
Name Street Address City or Town
PROPOSED USE OR USES (check):
0 Domestic �Irrigation ❑Stock ❑Municipal [) Industrial E]Test Well
CASING DETAILS PUMPING TEST WATER LEVEL SCREEN DETAILS
t (measure from Iona surface)
LENGTH: 17 FEET DURATION: HOURS STATIC: 13 --_ FEET MAKE: hTone
4t SLOT
LKIND.-B-1k.
ETER: 6? INCHES PUMPING RATE: 9 _ G.P.M. WHEN PUMPING 40 FEET LENGTH: FT. SIZE
Steel l � i rt
9..�5.'
DIAMETER: IN.
WELL LOG
DEPTH FROM Give details of formations penetrated, such as: at silt sand ravel clay,hardpan,shale stone rock. Include size of grovel
pe � Pe r � . 9 . Y.
GROUND SURFACE {diameter)and sand (fine,medium, coarse),color of material,structure (loose, packed,cemented, soft, hard)
0 FT.to 17r T. Sand ?P. g aVel fllli.xed
17FT.to 105FT. Tea:=d sandstone
FT.to FT. r2otal depth 105 t
FT.to FT.
FT.to FT.
FT.to FT.
FT.to FT.
FT.to FT.
FT.to FT.
FT.to FT.
FT.to FT.
FT.to FT.
-- ----- -- as - rI 7' ..�—_--
FT.to FT.
FT.to FT. STATE WAIU,
FT.to FT.
ATE WELL WAS COMPLETED: 15 July 55 DATE OF REPORT- e . C
t^'
WELL DRILLER 'fl_�_ `r-. __ C'
(S ignature)
CERTIFICATE NO. --
LOCATION OF WELL: TOWN OF
So. Windsor
SKETCH SHOWING LOCATION=OF PREMISES IN TOWN:
Ali
6-s r
DIAGRAM SHOWING LOCATION OF WEL,L'ON PREMISES:
3
Jl Y s 3 [p
' ,/yiIl fir 4 tom-, !c—
r. t
�j
',7 h
J f
3
f
f
1
ROUTE DIRECTIONS FOR REACHING WELL SITE FROM HARTFORD:
r-- "