Loading...
HomeMy WebLinkAboutWell Correspondence 00 (20) STATE OF CONNECTICUT DEPARTMENT OF PUBLIC HEALTH yrN61. r NAME: George H. Sparks DATE: July 13, 2000 Chief Operating Officer ADDRESS : 555 Main Street P.O. Box 800 Hartford, CT 06142-0800 UTILITY: The Metropolitan District Commission TOWN: Hartford County SUBJECT: SANITARY SURVEY ( X ) For your information. ( X ) Please note special recommendations . ( ) Resampling requested. ( X ) For necessary action. ( X ) Remarks . Please distribute this report to your individual staff members that have responsibility for these facilities . Please respond to the points and questions raised in the Conclusions/Recommendations section by August 18, 2000 . A� Rtx� Paul Ritsick, P.E. Supervising Sanitary Engineer Water Supplies Section cc: DOHs-13 towns served by the MDC. Bob Kerkes-MDC Steve Pratt-MDC Phone: 18601 509-7333 Telephone Device for the Deaf (860) 509-7191 • 410 Capitol Avenue -MS# 51 WAT P.O. Box 340308 Hartford, CT 06134 An Equal Opportunity Employer July 13,2000 SUBJECT: HARTFORD, CT: INSPECTION OF THE METROPOLITAN DISTRICT'S (MDC)POTABLE WATER UNDERGROUND STORAGE BASINS,STORAGE TANKS/STANDPIPES AND HYDROPNEUMATIC TANK BOOSTER STATIONS. FROM: Clifford A. McClellan,Jr. Sanitary Engineer 3 ' Water Supplies Sectionc INSPECTED WITH: Joe Fresta-Sr.Journeyman Maintenance Mechanic-MDC Janis McCarroll-Engineer Intern-WSS INSPECTION DATES: June 14 & 16, 2000 INTRODUCTION: As part of its expansive distribution system, the MDC maintains many storage facilities to augment the daily potable water demands of its customers. The initial gravity system has 6 underground storage basins and 3 standpipes.As the MDC expanded its service to outlying sections in elevated areas of the towns served,it found that it had to use pump stations to boost system pressure to properly serve their customers. To meet these new demands, 16 pump stations have been constructed over the years. Some have their own hydropneumatic storage tanks and some pump directly to one of the 7 above ground tanks or a single below grade reservoir. It should be noted that all of the storage tank/basin sites,when not directly on MDC property,have security fences or access roads with lockable gates. As a check on the stored water quality, heterotrophic bacteria plate count(HPC) and physical samples were taken at each site visited. A free chlorine residual was also recorded at the time of sampling.All the results were quite satisfactory and are appended at the end of this report. Superscripted numbers (1), correspond to numbers in the Conclusions and Recommendations Section. I. Underground Storage Basins/Reservoirs A) Cedar Mountain Reservoirs-Hartford (south end) These 2 identical (191111 x 137'w x 271h) 5MG concrete basins were built in 1951. Their inspection hatches were not removed for lack of a key but it is suspect that, like the Wickham Basins listed below,these inspection ports may also lack tight 1 fitting 24mesh circular screens to keep out insects,debris and small mammals that would fall into the water the hatch is opened. (1)This in turn could increase the chlorine demand of the stored water and reduce the effectiveness of chlorine in eliminating pathogenic bacteria. The basin's floors are at elevation 264.50, a stored water height of 27 feet results in an overflow elevation of 291.0. The basin overflows are equipped with two weighted flapper valves that discharge through metal grates to a drainage channel. The basins each fill and discharge in parallel by means of 30-inch lines that join into a common 42-inch line that goes to distribution. The upper house contains the 30-inch gate valves and some instrumentation for the basins. The lower house still contains an old chlorinator,the new sampling compliance point and chlorine autoanalyzer. The basins were last drained,cleaned and inspected in 12/95. Water sample results: HPC count-less than 1 colony/ml,turbidity-less than 0.2NTU and free chlorine residual-0.24ppm. B) Wickham Hill Storage Basins-East Hartford These 2-2.25MG concrete basins are equal in size(11711 x 117'w x 23.251h) but are at different elevations. The lower basin floor is at elevation 236 with basin full at elevation 257. The upper basin bottom is at elevation 258 with overflow at elevation 280.A discharge out the upper basin vent is often experienced as a paved drainage swale has been constructed to carry water away from the vent pipe and minimize erosion. (2)The basins have a 24"influent line and discharge through a 16"line to distribution. Both tanks operate as one as the upper basin is the only one that feeds the distribution system. The lower basin has a 3HP- transfer pump that circulates water between the basins to keep the lower basin water fresh and transfers water to the upper basin when the water level begins to drop in response to a large system demand. The basins when constructed in 1950 were equipped with vents and inspection hatches on the basins' roof. The vents have been retrofitted with lockable disinfection ports that can receive sodium hypochlorite for periodic disinfection. The lockable heavy metal inspection hatches do not have screening but seem to rely on a light metal circular plate that fits in the hatch opening underneath the primary cover to keep out debris, insects and small mammals. This secondary cover had holes in it and when the cover was exposed,2 discarded snakeskins and large populations of insects were discovered. This cover does not appear to be adequate to keep debris and contaminants from falling into the basin. It is suspect that the upper basin is similarly vulnerable. (1)The basins were last cleaned and inspected in 1996. 2 Water sample results (lower basin): HPC count-less than 1,turbidity-less than 0.2NTU and free chlorine residual-0.38ppm; (upper basin)-HPC count-8, turbidity-less than 0.2NTU and free chlorine residual-0.44ppm. C) Cold Brook Basins/Pump Station-South Glastonbury These 2-0.25MG identical(541 x 81'w x 7.66'h) concrete basins were built in 1920. Base elevation is 240.55 with top, basin overflow at 248.75. The basins are gravity fed through a 1611' line. Pump station discharge is via a 12"line that serves the Bucks Corner section of south Glastonbury. Pumps transfer water from the basins to 4-400 gallon pressure tanks that supplies Bucks Corner with first stage pressurized water. The tanks are equipped with drains,pressure gauges,sight glasses and air relief blow-offs. One tank was off- line at the time of inspection.The pumps (2-15hp, @ 85gpm) operate on an alternating lead/lag basis to equalize pump usage. These run times were confirmed by viewing the pump totalizing hour meters for each pump. They were similar. It should be noted that it is standard practice by MDC to have all pump stations be equipped with hour meters for each pump on=site.The station's operating pressure range is 100-135psi. The station has an oil fired 125 kW diesel generator on-site for emergency power. It also has a electrical outside socket for an off-site generator.This dual emergency power capability is provided at all the MDC pump stations. The basins were last drained and cleaned in September of 1999. Water sample results: HPC count-20, turbidity-0.2NTU and free chlorine residual-0.03ppm. MDC may inactivate this station once the New London Turnpike main extension to South Glastonbury is complete. D) Eastbury Basin-Glastonbury This circular(75.5'D x 15'H)prestressed concrete 0.5MG tank was constructed in 1972. Its bottom elevation is 405' with overflow at elevation 420'. The overflow is hardpiped to a storm sewer catchbasin. It is unknown if this discharge is screened. (3)The basin is filled from the Orchard Street pump station via a common 12"fill/discharge line. The basin is equipped with a locked and screened mushroom access hatch located to the rear of the basin. A below grade vault to the front of the basin contains radio telemetry equipment, a sample tap and altitude valve. High and low level signals are radioed back to the central office. The last inspection date is unknown. (14) Water sample results: HPC count-1, turbidity-0.6NTU and free chlorine residual- 0.01ppm. 3 IL Storage Tanks/Standpipes All of the tanks in the distribution system"ride" on the daily pressure demands of the system.When system demand is down the tanks fill,usually at night, and when system demand increases, the tanks drain,usually in the daytime. The tanks rarely overflow. None of the tank overflows could be located,with the exception of the Canal Road tank and the Kilkenny Rocks tanks.Their overflows were found unscreened which is in violation of section 19-13-11102 (f)(3) of the CT Public Health Code that has been quoted previously in this report.(4) As is stated in section 7.0.18 of the Recommended Standards For Water Works "Appropriate sampling tap(s) shall be provided to facilitate collection of water samples for both bacteriologic and chemical analyses. Properly installed sample taps were not found at the Canal Road or Rocky Hill tanks. (5) A) Rocky Hill- 0.45MG Standpipe This riveted steel tank was built in 1932 with a diameter of 301and height of 851. Its floor elevation is 202' with overflow/top water at 287'. Its overflow is internal, its discharge point was not found. It was not determined if the overflow pipe was screened. It has a below grade vault that contains an altitude valve. It fills and discharges through a 10" line. According to MDC it was last painted inside in 1977 and outside in 1990. (14)It is due for an inside repainting this year. The tank is exhibiting evidence of rust around some exterior rivet heads and plate overlaps. Water sample results: HPC count-100 colonies/ml; turbidity-0.3NTU and free chlorine residual-0.04ppm. B) Newington- 0.31MG Standpipe This welded steel tank was built in 1948 and has a diameter of 27' with a height of 70'. The tank floor elevation is 224.50' with an overflow/top water elevation of 294.50'. The water level in the tank on the day of inspection was almost to the top of the 6th ring(approx. 52'AGL) around 11:30AM. The tank's internal overflow discharge was not found.And it was not determined if the pipe was screened. The tank fills & discharges by means of a single 10"line. The tank's perimeter fence has been broken down in spots and the area has evidence of trespass and vandalism. The tank's lower rings show excessive graffiti and rust spots due to rock throws (6) It was last painted both inside and out in 1981. A repainting of the inside is scheduled for this year. (14) Water sample results: HPC counts-1,turbidity-0.2NTU and free chlorine residual-0.11ppm. C) Windsor(Day Hill)-0.5MG Standpipe This welded steel tank was placed into service in 1950 and has a diameter of 32' 4 with a height of 80'. Its base elevation is 214.50' with an overflow/top water elevation of 294.50'. Its internal overflow discharge point is unknown. It was last painted inside in 1997,the outside was done in 1984. It was last drained & inspected in 11/94.(14)The tank fills and drains through a single 12"line. Both underground valve vaults were flooded with 2-3 feet of standing water,which is peculiar as the tank and security fencing is on a knoll highly elevated from the surrounding terrain.The gravity drains appear to be blocked. (7)The exterior paint is good condition. Some surficial spalling of the concrete pad was noted. Water sample results: HPC count 1; turbidity-less than 0.2NTU and free chlorine residual-0.27ppm. D) Canal Road (W. HFTD.)-0.5MG This prestressed concrete tank was put into service in 1961, has a diameter of 58' and height of 251.Its base elevation is 425' and has a top water/overflow elevation of 450'. The internal overflow pipe discharges down a hillside and is unscreened. The tank does not appear to have a sample tap.(4)�(5)It fills and discharges through a single 12"line. The large lateral crack noted in the last report has been repaired. It was last drained and inspected in 6/95. Water sample results: not taken. E) Kilkenny Rocks (W. HFTD.)-Standpipes(2)-ea.@0.5MG These 2 identical welded steel storage tanks were built in 1967. Each tank has a diameter of 45' and a height of 41'. Their floor elevations are 499' with an overflow/top water elevation of 540'. Their external overflows share a common line that discharges to an adjacent brook. It is unscreened. Each tank has a sample tap. There is an old air compressor on site that was used for a,now inactive, air bubbler system.($)The tanks were last painted in 1985. The tanks are in need of painting now and bids are being prepared for this project. They were last drained and inspected in 1990.(14)The tanks fill and discharge through a common 16"line. The tanks are filled from the Hawley Road pump station that is part of the Slow Sand Plant Administrative Building. The station contains 3 horizontal split-case 500GPM pumps that activate sequentially as water levels in the tanks drop. Pump #1 activates as levels drop to 36-411,pump#2 at 31-39' and pump#3 at 26-371. The pumps are powered by 1-60HP and 2-75HP electric motors.There are also 2- 60HP and 1-75HP electric motors on site as spares. 5 The pumps are alternated regularly but pump#1 has a far greater total run time than either#2 or 3. There is also a 40KW Detroit diesel powered 2200GPM pump on hand for standby power. The diesel is exercised on a monthly basis. This station is to be upgraded should MDC sell water to the Unionville Water Company in the future. Water sample results: HPC count-1 colony/ml; turbidity-less than 0.2NTU and free chlorine residual-0.10ppm. F) Vexation Hill(Rocky Hill) Storage Tank Farm(4)-Total 3.39MG All 4 tanks fill and discharge equally through a common 16"pipe. A distribution compliance sampling point has been created here by the installation of a common sampling hydrant by the access gate that will represent water from all four tanks. The first 2 identical welded steel 0.75MG tanks were constructed in 1964,with a diameter of 70' and a height of 261. Their floor elevations are at 384' with overflow/top water elevation at 4101. Both were painted inside in 1979 and outside in 1992. Both tanks are now experiencing defoliation of the finish coat with exposure of the primer coat to the weather.(9)The external overflows are piped directly into individual catch basins. The common overflow discharge point was not found and it was not determined if it was screened.There was extensive grass growth around the tank bases, making leaks/weeps at the base difficult to discover if occurring.(10)There is some spalling of the concrete pads in evidence. A third 0.89MG tank was constructed in 1984. It is a glass coated bolted steel tank, that does not require painting,with a diameter of 81' and height of 23'. Its base elevation is 385.20' with an overflow/top water elevation of 4081. Its double weired unscreened overflow discharges 24" above its catch basin.(I) It, along with #1&2,was last drained and inspected in 5/90.(14) The fourth last and largest tank was built in 1994.It is of the same design as Tank#3 and its diameter of 81' and height of 261 gives a total volume of 1.00MG. It base elevation is 384' with an overflow/top water elevation of 410'. It also discharges its overflow through a 24" air gap to a catch basin. The overflow outlet is unscreened. (1)It has not been drained or inspected since it was constructed. (14) These 4 tanks are supplied water from the Newington and Wethersfield pump stations. Water sample results: HPC count-less than 1 colony/ml; turbidity-0.2NTU and free chlorine residual-0.25ppm. 6 III. Hydropneumatic Tank Pump Stations It should be noted that all of the stations visited were alike in the following ways: • all the stations are well maintained, heated,lit and drained • each station had at least 2 means of emergency power, an on-site generator and an external receptacle for a portable unit,the generators are maintained and exercised regularly by MDC staff(11) • each station has a high (discharge) and low (suction)hydrants,for emergency station bypass • totalizing hour meters for all pumps are at each site • the stations use alternating lead/lag activation of the pumps, as proven by the above meters showing similar total pump run times • tank air relief valves, drain valves and pump volute air release pet cocks are all hard piped to the station drain, minimizing condensation within the station • all stations have automatic air compressors to replenish lost air in tanks • all pressure tanks are equipped with; a drain,pressure gauge,inspection manhole, sight tubes with marked operational pump on/off water levels and air relief valves • all stations have radio telemetry that send alarm signals (AC Power, generator activation, flooding,tank low/high pressure,pump activation) to the main office at the MDC sewage treatment plant in Hartford • all tanks are cleaned and inspected every five years and,painted when needed • pursuant to a letter of 11/23/99,MDC will thoroughly flush all pump station hydropneumatic tanks annually(12) The pressure tanks are utilized with about 40% of useable tank water volume that results in a large air/water interface area in the tank. This may lead to entrained air in the water exiting the station resulting in pump cavitation and milky water complaints. To preclude this from happening each tank discharge line is equipped with a specialized low pressure cut-off valve that prevents any air from exiting the tank during a very low water pressure event, e.g. a main break or fire emergency. A) Canal Road Pump Station (W. HFTD.) Year Built-1962 Tanks-2-7500g Pumps-2-50HP@500GPM 1-10,000g 1-Diesel@200GPM Emergency Power-125KW Operating Range(psi) 115-140 Water Quality-HPC count-Icolony/ml,turbidity-0.2NTU and free chlorine residual-0.49ppm. The diesel engine uses station water for cooling and the feed line is equipped with an RPD but it was not known when it was last tested.(13) 7 B) Farmstead Lane Pump Station (Glastonbury) Year Built-1963 Tanks-2-7500g Pumps-2-15HP@80GPM 1-25HP@200GPM Emergency Power-100KW Operating Range(psi) 118-135 Water Quality-HPC count-0,turbidity-0.3NTU and free chlorine residual-0.02ppm. This station does not have a proper sampling tap.(5) C) Highview Pump Station (E. HFTD) Year Built-1960 Tanks-1-7500g Pumps-2-20HP@250GPM Emergency Power-100KW Operating Range(psi)-65-85 Water Quality-HPC count-2 colonies/ml, turbidity-0.2NTU and free chlorine residual-0.45ppm. The sitzht tubes on the tank need cleaning. D) Simsbury Road Pump Station (Bloomfield) Year Built-1967 Tanks-2-7500g Pumps-2-20HP@100GPM Emergency Power-60KW Kohler Genset Operating Range(psi)-118-135 Water Quality-HPC count-2 colonies/ml,turbidity-0.4NTU and free chlorine residual-0.70ppm. This station also does not have a proper sample tap and has an RPD on the Genset's cooling line. (5)&(13) E) Uplands Way Pump Station (Glastonbury) Year Built-1988 Tanks-2-8500g Pumps-2-25HP@170GPM Emergency Power-100KW Operating Range (psi)-85-112 Water Quality-HPC count-2 colonies/ml,turbidity-0.3NTU and free chlorine residual-0.01ppm. 8 This station is to be upgraded to serve the new main extension down New London Turnpike to South Glastonbury. F) South Mill Pump Station (Glastonbury) Year Built-1988 Tanks-2-10,000g Pumps-2-40HP@334GPM Emergency Power-100KW Operating Range(psi)-128-138 Water Quality-HPC count-0,turbidity-0.2NTU and free chlorine residual- 0.02ppm. This station may be upgraded to serve the new Portland interconnection. CONCLUSIONS and RECOMMENDATIONS: 1) Sections 19-13-B102 (f)(3) of the CT Public Health Code states in part, "All water storage tanks connected to a public water distribution system shall be constructed and located so as to adequately protect the water from contamination.Tanks and basins must be covered and vents and overflow pipes screened. They shall not be directly connected to sanitary sewers or to storm drainage systems." Any and all inspection hatches for the Cedar Mountain,Wickham Hill,Eastbury and Cold Brook Basins should conform to this requirement. 2) This overflow condition was noted in the 1995 sanitary survey. A telemetered signal (high level/overflow) should be installed at the Wickham Hill upper basin to prevent or at least minimize this repetitious overflow. 3) While the CT Public Health Code prohibits direct connection of the overflow pipe to any sewer, see item#1,the differences in elevation between the Eastbury basin and storm sewer would preclude any backpressure into the basin and,the mushroom vent would preclude any backsiphonage into the basin. 4) In addition to above cited code requirement, section 7.0.8d of the"Recommended Standards For Water Works" also requires screening of the overflow pipes. Its purpose is twofold: first to prevent small mammals/insects from entering the tank and second,to catch any floatable material,e.g. leaves/bird feathers, in the overflow discharge that would be indicative of tank contamination. It must be verified by MDC that all storage tank and basin overflows are screened in accordance to Public Health Code requirements. 5) The finished water storage section 7.0.18 of the "Recommended Standard For Water Works" states, "Appropriate sampling tap(s) shall be provided to facilitate collection 9 of water samples for both bacteriologic and chemical analyses."All storage tanks and pumping stations should be so provided. 6) The security fence at the Newington standpipe should be repaired and the tank's exterior scheduled for repainting. 7) Submerged potable water piping/valves are considered a cross connection pursuant CT Public Health Code section 19-13-B37a and 19-13-1151c.The drains in the below grade pits at the Day Hill standpipe should be cleared and the pits maintained in a dry condition. 8) The unused air compressor at the Kilkenny Rocks tanks should be put to use elsewhere or sold as surplus. 9) Vexation Hill Tanks#1&2 should be scheduled for repainting in the near future. 10)Grass and shrub growth around storage tank bases should be kept to a minimum to facilitate tank leak inspections. 11)All-emergency generators and diesel engine powered pumps should be exercised pursuant to DPUC regulation sec. 16-11-99a(d),i.e. "at least once in every consecutive 30 day period, under load, for a minimum duration of 30 minutes". 12)As set forth in section 19-13-Bl02(f)(5) of the CT Public Health Code, "The distribution system shall be flushed as required to maintain it free from excessive accumulation of sediment, organic growths,products of corrosion and erosion, and other extraneous matter". It is recommended that MDC flush all of its hydropneumatic tanks on a semi-annual basis,preferably after the spring and fall hydrant flushing programs. 13)The CT Public Health Code requires, at a minimum, annual testing of all backflow devices, e.g. RPDs. MDC is now tagging all their RPDs at their various facilities. This tag would show the last test date and functioning status of the device. The devices in the pump stations should be included in this program. 14)According to AWWA Standard D-101-53 (Revised 1986), "..all water tanks (including storage basins) should be thoroughly inspected at intervals of not more than five years". According to this acknowledged schedule, many, if not all of MDC's storage facilities are overdue for inspection.This office would urge MDC to accelerate its storage tank/basin inspection program in order to conform to industry standards. 10 STATE OF CONNECTICUT DEPARTMENT OF PUBLIC HEALTH rNSI4/I r April 18, 1997 Mr. Robert Deptula, RS South Windsor Health Department 1540 Sullivan Avenue South Windsor, CT 06074 a Dear MrrPeVVula; Enclosed is the MDC/DPH flushing letter that I have previously discussed with you. It is less technical and more consumer friendly than the draft letter I had sent you. Both this office and the MDC have had input on this final version. It should go out this week. I have enclosed a few pages of information of a technical nature that your office can use should you receive any inquires. You may want to share this letter and information with other town officials. This mailing will go to all the condominium associations or their management companies in South Windsor that are be served by the MDC. If you have any questions please call me. Thank you. Sincerely, Clifford A. McClellan, Jr. Sanitary Engineer 3 Water Supplies Section Enclosures Phone: (860) 509-7333 �i Telephone Device for the Deaf (860) 509-7191 ■ 410 Capitol Avenue - MS# 51WAT P.O. Box 340308 Hartford, CT 06134 An Equal Opportunity Employer 34 Distribution System Performance Evaluation Aesthetic measures(discolored water,taste and odor,temperature) • Other measures(corrosion indices,lead and copper concentrations, disinfection by-products) Bacteriological Measures Monitoring and control of bacteriological measures in the distribution system are required by the SDWA,its amendments,and various rules associated with it.The Total Coliform Rule(TCR)requires measurements of total coliform bacteria, HPC, and disinfectant residual in a specific number of locations in a distribution system.Assessment of bacterial regrowth potential(with parameters like assimilable organic carbon,biodegradable organic carbon,and direct measures of biofilms)can be used to investigate the nature and causes of bacterial quality deterioration in the distribution system. The maximum contaminant level goal(MCLG)for total coliforms is zero. The maximum contaminant level(MCL)is based on the presence or absence of total colifonns.For utilities analyzing at least 40 samples per month, no more than 5.0 percent of the monthly samples may be positive for total coliforms. Three repeat samples must be collected within a 24-hour period for each positive sample.HPC testing is required by the TCR for samples with negative total coliforms to check for heterotrophic bacteria interference. HPC may also be used to assess bacterial regrowth in distribution systems.Residual chlorine at various locations in adistribution system is also an important parameter.Absence of residual chlorine in.'a distribution system is a violation of the TCR.The SWTR specifies contact time values in various locations in a distribution system. The terns bacterial regrowth and biofilm formation refer to the growth of bacteria in the distribution system after disinfection.Many water systems consider bacterial regrowth an existing or potential problem. Bacterial regrowth occurs generally at low water velocity,at relatively high water temperatures,and at places Where large surface areas are available for growth. In unlined old cast iron mains, where cast iron corrodes in water and is redeposited in the form of surface tubercles, the corrosion products that accumulate on the metal surface will provide greater surface area for bacterial attachment and growth-if the deposits are not removed by the.flowing water. Donlan et al. (n.d.), in their experiments at the Philadelphia Suburban Water Company's distribution system, found that the rate of biofrlm formation increased in warm water and decreased in cold water.They also found that the rate of growth is related to flow velocity;the higher the flow velocity the lower the growth,and vice versa.High velocity was found to shear attached cells from the metal surfaces and to increase exposure of attached bacteria to residual disinfectant. Another factor that affects bacterial regrowth in distribution systems is assimilable organic carbon(AOC)in waterin the distribution system.Increase of AOC can cause bacteria to increase over time throughout the distribution system.Removal of AOC at the treatment plant may reduce bacterial regrowth in the distribution system.The following conditions may lead to a high potential for bacterial regrowth in the distribution system: Tuberculation in unlined old cast iron mains with dead ends • Warm summer water temperatures • High levels of AOC in finished water • Absence of residual disinfection • Low velocity 64 AWWA DISTRIBUTION MANUAL PIPE SYSTEM 65 Disinfection of Mains the velocity of flow is not sufficient to keep them in suspension. A good Although precautions may have been taken during installation to keep flushing at high induced velocities once or twice a year usually removes the interior of pipe and appurtenances free from debris and contamination, the major part of such settlement. At times, however, if flushing has not flushing and disinfection of the main are carried out to insure that a safe, been carried out at sufficiently close intervals, more positive methods of potable water is delivered to customers. The best precaution is to swab cleaning become necessary. One means of accomplishing this is to force, out the pipe before installation. The use of bulkheads at the termination by water pressure and induced flow, a chain-covered, inflated rubber ball of days work prevents animals, insects, and surface drainage from enter through the pipeline. The rotation of. the ball and the scraping of the ing the pipe during the night hours.. In spite of precautions foreign sub- interior surface of the pipe by the chains stir up the more dense settled stances will usually get into the pipe so flushing and disinfection are material and it is flushed out. Another method of accomplishing this is required. to use a pipe-cleaning instrument having spring-loaded steel scrapers. The A good flushing of the line under pressure should be carried out to re- instrument is forced along the pipeline by water pressure and scrapes up move any dirt and debris which may have entered the line. the deposited material so that it can be carried out ahead by the flushing The AW WA standard for main*disinfection* permits the use of cal- action of the water. cium (or sodium) hypochlorite, chlorinated lime, chlorine gas, or-liquid Tuberculation and Scale chlorine for this purpose. - Calcium hypochlorite is particularly safe and easy to apply, but care should be taken that the chemical does not lose any Another type of cleaning, often required in older, unlined cast-iron pipe, of its potency through prolonged exposure to the atmosphere. The dry is the removal of tubercles and deposits produced by the,corrosive action hypochlorite is mixed with water in the proper proportion to provide a 1 of the water on the bare metal of the pipe. Over the years these-tubercles per cent chlorine solution. This is applied at the end of the main where may grow by accretion to such an extent that they nearly fill the pipeline. the flow of water can distribute it throughout its length. The chlorine There may be a combined buildup of tubereulation and coatings of chemical dose should be such as to produce•at least a 10-ppm residual at the extreme compounds present in the water, such as calcium carbonate and chlorites end of the main after standing 24 hr. This may be expected with an appli- or iron and manganese deposits. The elimination of such growths and cation of 25 ppm, although some conditions may require more. After dis- deposits requires mechanical cleaning with actual scrapers: infection is satisfactorily completed, the treated water should be thoroughly Slime Growths flushed from.the line. Also available for disinfection of pipelines is a portable injector for The third type of pipeline deposit that must be periodically eliminated chlorine gas. It.can, deliver large amounts of chlorine and is especially results from the growth of iron bacteria or slimes. Although sometimes useful in sterilizing larger mains. The rate of application can be controlled hardly noticeable, these growths nevertheless produce greatly increased and the length of time for the injection process reduced. Portable units friction losses in the mains. they are generally more common in raw- can be run by a gasoline engine where power is not available. water pipelines carrying unchlorinated water, as chlorination is frequently Still another method is the use of liquid chlorine cylinders. This effective in eliminating them. ' Iron and manganese deposits frequently method could be dangerous unless the injection is supervised by competent occur in cement-lined cast-iron, asbestos-cement, and concrete pipelines employees. After. a reduction in pressure the liquid chlorine is injected in distribution systems, however. The ball-and-chain cleaner or a similar into the main. A flow of water in the main is necessary to distribute the instrument is usually effective in removing most of these.deposits, although chlorine. Freezing of chlorine can occur if the rate of application is not the scraper must occasionally be used. properly controlled. The flushing of the main should be thorough to get Reasons for Main Cleaning rid of the heavily chlorinated water before the main is placed in service. Cleaning is resorted to in order to reduce friction losses. Unlined cast- Cleaning of Pipe iron pipe, when new, has a Hazen-Williams coefficient ranging from 120 Sediment Deposits to 130. In a period of years the roughening of the interior surface of the In most water distribution systems, it is necessary to clean out sand, pipeline and the reduction of the cross-sectional area produced by rusting, turbidity deposits, and similar substances that settle out in the pipes when tuberculation, and deposition reach such an extent that twice as much *AWWA C601—Standard for Disinfecting Water Mains. Am. Wtr.Wks. Assn., head may be required to send a given quantity of water through the line. ork (1968). Cleaning is a method of restoring the interior surface.to a condition ap- /199-7 1b:3b 8b02tJb1UUJ IUWN Ur W1NV5)UM r-Hur- FJ4 NPR 25-20 INSPECTION,TESTING,AND MAINTENANCE OF WATER-BASED FIRE PROTEC•IYON SYMNtS Table 4.3.2.5 rod fter operation, dry barrel and wall hydrants shall be rved for proper drain2ge from the barrel. Full drain- Condition Corrective Action shall take no longer than 60 min.When soil Conditions ther factors are such that the hydrant barrel will not -Accessibility •make accessible n within. fa0 limn.,.or when the groundwater level Is -leaks in outlets or at top •Repair or replace gaskets, e that of the hydrant drain,the hydrant drain shall be Of hydrant packing,or parts as necessaryged and the water in the barrel shall be pumped out. .Cracks in hydrant barrel -Repair or replace barrel hydrants in areas sub9ect to freering weatherightness of outlets •Lubricate if necessary:tighten that have plugged drains sltall be clearly identified asif necessary . din to be pumped out after operation. -Warn nozzle threads -Repair or replace g p p. P -Worn hydrant operating Repair or replace nut 4.4.3 Moultor Nozzles. Monitor nozzles that are A,valUbility of operating -Make sure wrench is available mounted on.hydrants-shall be tested according to 44.2. wrench Additionally, all monitor morales shall be oscillated and -- moved throughout their full range at least semiannually to ensure proper operability. Table 4-1.2.6 4.4.4 HomMydrant Houses. All fire hose shall be tested Condition Corrective Action In accordance with NFI?A 1952,Standard for the Care, Use, and Mnixtrnance of Fire Nose Including Couplings and Noules. -Leakage -Repair 4.5 Maintenance. -Physical damage -Repair or replace -Corrosion -Clean or replace,and lubricate or protect as 4.5.1 General. All equipment shell be maintained in proper necessary working condition,consistent with manufacturers recommen- dations. 4.5.2 Mainline Strainers. Mainline strainers shall be 4.3.2.7 Hose/Hydrant Houses. . Hose/hydrant houses cleaned at least annually and after each operation. shall be inspected monthly. Houses shall be inspected and 4.5.3 Hydrants. the necessary corrective actsin shall be taken as shown in Table 4-3.2.7. 4.5.3.1 Hydrants shall be lubricated at least annually to ensure that all stems, caps, plugs, and threads are in proper operating condition. Table 4-3.2.7 4-5.3.2* Hydrants shall be kept free of snow,ice,or other materials and protected against mechanical damage so that Condition Corrective Action free'access is ensured. •Accessibility -Make accessible 4.5.4 Monitor Nozzles. Monitor nozzles shall be lubri. •Physical damage -Repair or replace cated at least annually to ensure proper operating condition. •Missing equipment -Replace equipment 4.5.5 Hose/Hydrant Houses. Hose/hydrant houses shall be maintained annually in a condition to assure that all fire hose and required components are in usable condition. 4.4 Testhq. 4.6 Records, Records shall be maintained in accordance 4.4.1 Underground and Exposed Piping, with Chapter 1. 4.4.1.11 Flow Tests. Underground and exposed piping Chapter 5 Fire Pumps shall be flow tested to determine the internal condition of the piping at minimum five:,year intervals. Flow tests shall 5.1 General. be made at flows representative of those expected durin4 a fire,for the purpose of comparing friction loss charaetens- 3.1,1 This chapter provides the minimum requirements des of the pipe with that expected for the particular type of relative to the periodic inspection, testing,and maintenance I involved, with due consideration given to the age of of fire pump assemblies. See Table 5-1 for the minimum the pipe and to the results of previous flow tests.Any flog required frequencies for inspection, testing, and mainte• test results that indicate deterioration of available water nance. How and pressure shall be fully investigated to the satisfac Exceptiom. Valves shalt be inspected, tested, and maintained in Lion of the authority having jurisdiction to erasure that ade- accordance with Chapter 9. quate Row and pressure are available for fire protection. 5•1.2'" A, Are pump assembly provides waterf#uw and 4.4.2 Hydrants. Hydrants shall be tested at mittimum pressure for private fire protection.The assembly includes annually to ensure proper functioning. Each hydrant shall the water supply suction and discharge piping and valuing; be fully opened and water flowed until all foreign material pump;electric,diesel,or steam turbine driver and control: has cleared,but for a duration of not less than 1 min_ and auxiliary equipment appurtenant thereto, laaz edition FPF"P— February 5, 1997 William Aman,Mayor Town of South Windsor Sullivan Avenue South Windsor Ct, 06074 Dear Mayor Aman, The purpose of this letter is to gain your support in our petition to The Metropolitan District(MDC) for construction of a water main on Newberry Road to complete public water service to all properties on Newberry Road. We originally petitioned the MDC in 1987 shortly after drilling our well and determining the water quality to be less than satisfactory. Please refer to attached copy of our letter to the MDC. At the time of our original petition we were informed verbally by Luis Alvarado that additional construction of water services in South Windsor was unlikely since South .Windsor was not a member towri of the AMC.,We received no written response to our petition but were told that itf would-be considered in'the quarterly planning meetings held by the MDC. Recently, late in 1995 or early 1996,the MDC proceeded with construction on Main Street in South Windsor, Again verbally, we were advised that this construction project would benefit us in that the closing or joining of the two mains along Main Street was a prerequisite to bringing service to our home at 98 Newberry Road. Our letter of July 4, 1996 and MDC response of July 18, 1996 are enclosed. I have spoken several times with Bob Laneri of the MDC. Bob has reviewed the engineering for public water service on Newberry Road. He advises that extension of service is unlikely for the following reasons: 1- South Windsor is not a member town of the MDC 2 - only two residences are currently excluded from public water service. (There are residences with service available but not hooked up.) 3- Other land owners on Newberry Road will oppose our petition because of the financial impact to them, frontage fees. I l�st:spoke with:Bob on:December 5 `1996. 'He advised that although South Windsor was not a member,town of the MDC support'fromyouur office would still be influential in gaining public water service. Bob also advised that he would 1)canvas the neighboring PPPPPPP- landowners to identify who would want public water service on Newberry Road and 2) determine if construction could be completed for the benefit of the MDC either in "closing the loop" or replacing the "unconventional" service available to several residences to the east of us. I would be happy to meet with you to discuss our situation in more detail to offer clarity. In addition to your support of our petition to the MDC, I would like to know what other remedies the Town will support to provide quality water service to our home. Thank you. Sincerely, Judith Sutton For Judith and James Sutton 98 NewberryRoad South Windsor, Ct. 06074 cc: Bob Laneri qCobert Deptula, South Windsor.Sanitarian Anthony Milano,The Metropolitan-District ppppppp- James and Judith Sutton 98 Newberry Road South Windsor CT. 06074 July 4, 1996 Mr. Luis Alvarado Metropolitan District Corporation 555 Main Street P.O. Box 800 Hartford, CT 06142-800 Dear Mr. Alvarado My wife and I petitioned the MDC in 1987 to extend existing water lines on Newberry Road in South Windsor approximately 1,000 feet to service our home. This petition was submitted shortly after the house was constructed. MDC turned down the petition on the basis that South Windsor was not a "member town" but suggested that done properly,we could arrange to have the lines extended by a contractor. In this scenario the Suttons would be responsible for collecting any "frontage" fees from neighbors who would also benefit from the extended water line. The purpose of this letter is twofold. First, I would like to repetition MDC to extend the water line. Secondly, I want to inform MDC that through their actions they are harming me by unfairly increasing the cost to me of having the water lines extended. The water line can be extended either east from the end of the Newberry Road pipe or west from Main Street. Regarding the first purpose. I understand that our two adjacent neighbors,the Thibaults at 120 Newberry Road and the Andersons at Lot 1 would also like service form MDC. Additionally, MDC previously indicated that they would prefer to extend the Newberry Road pipe to Main Street to eliminate the "dead end" on Newberry Road. Regarding the second purpose, informing MDC that its actions are harming me, I would like MDC to consider the following. MDC is allowing several houses east of us on Newberry Road to have "non standard" connections to MDC. By this I mean that several houses that do not have water lines 'officially" piped to them are connected to a single house "up the Road" which is serviced by MDC. By allowing this to happen, water service is extended but the water lines are not. The homes involved have no reason to contribute financially to extending the water line properly. Had the lines been PPPPPP,- extended properly to service these customers an extension of only 300 feet westward would be required to provide service to us. MDC when it recently repiped its water lines on Main Street it did not extend its lines around the corner lot. Usually the owner of a corner lot must pay frontage on both Roads. By allowing the owner of the corner lots at the intersection of Newberry Road and Main Street to have MDC service but not have pipes on both frontages,MDC has made it effectively impossible to recover costs of extending the pipes past these properties. MDC was made aware via our petition and phone calls that we wanted water but appears to have ignored us in this construction project. If the water lines had been extended to the end of the corner lots only a small extension of 300 feet or so would have been required. In summary, I would very much like MDC to extend service to our home at 98 Newberry Road because of the poor quality of our well water. My wife and I would be pleased to pay the frontage charges. If that is impossible, we would like MDC to stop its actions that are harming us from contracting to have water lines extended. By this I mean that if MDC will not extend service it should stop service to the non standard houses and complete the construction work that should have been done at the intersection of Main and Newberry Road. I would like to thank you for your consideration in this matter. Sincerely James and Judith Sutton Homeowners 98 Newberry Road cc: Anthony V. Milano Kevin Rennie Robert Deptula, South Windsor Sanitarian politan District 55 Main Street Post Office Box 800 iii]Fr Water Supply Hartford,Connecticut06142 0800 Sewerage 203-278-7850 Hydroelectric Power Telecopier 203-724-2679 Resources Recovery July 18, 1996 File: Newberry Road South Windsor Mr. James Sutton 98 Newberry Road South Windsor, CT 06074 Dear Mr. Sutton: The purpose of this letter is to acknowledge the receipt of your request for public water service to serve your property located at 98 Newberry Road, South Windsor. Your petition will be reported to the Bureau of Public Works of the Metropolitan District at its next regularly scheduled meeting. Your request was referred to one of our staff engineers for study of feasibility and recommendations. The District will keep you informed of the status of your request upon completion of the study. Should you have any questions regarding this matter, please feel free to contact our Mr. Robert Laneri, project manager, at 278-7850, extension 3440. Sincerely, uis 4 . Alvarado, P.E. Manager of Engineering Services Engineering & Planning PC: Anthony-V. Milano LCA:RJL:sbt f:\word-d\sue\rjl\sutton James and Judith Sutton 98 Newberry Road South Windsor CT. 06074 July 4, 1996 Mr. Luis Alvarado Metropolitan District Corporation 555 Main Street P.O. Box 800 Hartford, CT 06142-800 Dear Mr. Alvarado My wife and I petitioned the MDC in 1987 to extend existing water lines on Newberry Road in South Windsor approximately 1,000 feet to service our home. This petition was submitted shortly after the house was constructed. MDC turned down the petition on the basis that South Windsor was not a "member town" but suggested that done properly,we could arrange to have the lines extended by a contractor. In this scenario the Suttons would be responsible for collecting any "frontage" fees from neighbors who would also benefit from the extended water line: The purpose of this letter is twofold. First, I would like to repetition MDC to extend the water line. Secondly, I want to inform MDC that through their actions they are harming me by unfairly increasing the cost to me of having the water lines extended. The water line can be extended either east from the end of the Newberry Road pipe or west from Main Street. Regarding the first purpose. I understand that our two adjacent neighbors,the Thibaults at 120 Newberry Road and the Andersons at Lot 1 would also like service form MDC. Additionally, MDC previously indicated that they would prefer to extend the Newberry Road pipe to Main Street to eliminate the "dead end" on Newberry Road. Regarding the second purpose, informing MDC that its actions are harming me, I would like MDC to consider the following. MDC is allowing several houses east of us on Newberry Road to have "non standard" connections to MDC. By this I mean that several houses that do not have water lines "officially" piped to them are connected to a single house "up the Road"which is serviced by MDC. By allowing this to happen, water service is extended but the water lines are not. The homes involved have no reason to contribute financially to extending the water line properly. Had the lines been extended properly to service these customers an extension of only 300 feet westward would be required to provide service to us. MDC when it recently repiped its water lines on Main Street it did not extend its lines around the corner lot. Usually the owner of a corner lot must pay frontage on both Roads. By allowing the owner of the corner lots at the intersection of Newberry Road and Main Street to have MDC service but not have pipes on both frontages,MDC has made it effectively impossible to recover costs of extending the pipes past these properties. MDC was made aware via our petition and phone calls that we wanted water but appears to have ignored us in this construction project. If the water lines had been extended to the end of the corner lots only a small extension of 300 feet or so would have been required. In summary, I would very much like MDC to extend service to our home at 98 Newberry Road because of the poor quality of our well water. My wife and I would be pleased to pay the frontage charges. If that is impossible, we would like MDC to stop its actions that are harming us from contracting to have water lines extended. By this I mean that if MDC will not extend service it should stop service to the non standard houses and complete the construction work that should have been done at the intersection of Main and Newberry Road. I would like to thank you for your consideration in this matter. Sincerely James and Judith Sutton Homeowners 98 Newberry Road cc: Anthony V. Milano Kevin Rennie Robert Deptula, South Windsor Sanitarian oPolitan District 555 Main Street Post Office Box 800 Hartford, Connecticut 06142_08p0 203-278-7850 1 1 Water Supply Sewerage July 8, 1992 Hydroelectric Power Resources Recovery I TO ALL PROPERTY 0 File: North gin OW, File: _ South g Street, Extension Windsor understand by Metropolitan D' by your letter District has received you agree to Pa the foota june 29' 1992 your petition for rn y front that a water ge assessment f are waivin main to serve your Attached for or this imp g Your rights to a public property j pro your information m rovement to your property. hearing at perties involved in and records g and that schedule of rates ado this project. is a list ad' , adopted Proi As stated in the of the assess dusted front foot, tuber 19 assessment list assessments to be levied 1991 and effective these assess against the January 1, se as In are based The terms of at$39.00 on the Distract, and are payment of per front foot or as follows: water main assess ws: ments are provided by ordinance o f T ono Approximately two he Metro . wners served b months after thepolitan 0 methods of Y the new mains completion payment: the are declared due °f installation of a District's installment meth and payable. An o main water pipe, ass �0 Under the install method, or wner may select either of assessments Percent installment method payment in full two per an the , an owner Pay his assess min sixteen (16 'fan ment in full ) equal install may pay his assessment owner fails to within sixty(60) days ments over a fifteen (1S) plus an interest char (IS%) interest fee make his payments ys of billing and thus a Year charge of six on or before avoid period, or the o Wo e d owner ei h a e Final date due i Payment of interest may Please , he is char charges. enclosed le acknowledge charged a fifteen percent 00 copy of this letter receipt ni this letter and returning and the accom g it to The Metro panying info 35.U0 politan District. rmation by signing the Sincerely, Robert A. Hagan (,{ Assistant to Director Of A dministrative Services z _ The Metropolitan District 555 Main Street Water Supply Post Office Box 800 Sewerage Hartford,Connecticut 06142-0800 Hydroelectric Power 203 278 7850iii]Fr Resources Recovery April 13, 1993 File: Main Street Closure, South Windsor - Public Hearing on Proposed Water Main Extension TO ALL PROPERTY OWNERS : The Water Bureau of The Metropolitan District will hold a public hearing in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue, South Windsor on Tuesday, April 27, 1993, at 7 : 00 P.M. for the purpose of considering an extension of a water main in a portion of MAIN STREET, South Windsor, from House No. 840 northerly about 1, 460 feet to Newberry Road. We would appreciate your attendance at the public hearing. Should you be unable to attend the hearing, we invite any written comments you may wish to make relative to the project, prior to the hearing, in order for the District to make a decision based on as much public input as possible. Enclosed for your information and records is a copy of the list showing the estimated assessment for your property. If the proposed project were approved, then approximately two months following the completion of construction of the water main, assessments on owners served by the new mains would be declared due and payable. At that time, an owner would have the option of selecting either of two methods of payment: the District' s installment method, or payment in full . Under the installment method, an owner may pay his or her assessment plus an interest charge of six percent per annum in sixteen (16) equal installments over a fifteen (15) year period, or the owner may pay his or her assessment in full within sixty (60) days of billing and thus avoid payment of interest charges . If an owner fails to make his or her payments on or before the final date due, he or she is charged a fifteen percent (150) interest fee. Should you have any questions concerning the proposed sewer project or the upcoming hearing, please feel free to contact the undersigned. Sincerely, 0000�bhn J. Bartize c, Jr. Director of Administrative Services See "Harford Courant" April 13 and 14, 1993 NOTICE OF PUBLIC HEARING ON PROPOSED WATER MAIN EXTENSION FOR MAIN STREET CLOSURE, SOUTH WINDSOR THE METROPOLITAN DISTRICT 555 Main Street, P.O. Box 800 Hartford, Connecticut April 13, 1993 A public hearing on the proposed extension of a water main in a portion of MAIN STREET, South Windsor, from House No. 840 northerly about 1, 460 feet to Newberry Road, will be held by The Metropolitan District in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue, South Windsor on Tuesday, April 27, 1993, at 7 : 00 P.M. All interested parties, both in favor or against said water main extension, may appear to be heard. J n J. Bartizek, Jr. District Clerk PRELIMINARY SCHEDULE OF ASSESSMENTS FOR WATER MAIN FOR MAIN STREET CLOSURE, SOUTH WINDSOR THE METROPOLITAN DISTRICT 555 Main Street, P.O. Box 800 Hartford, Connecticut ApriL 14, 1993 The following schedule of estimated assessments has been determined relative to the proposed layout and construction of a public water main in a portion of MAIN STREET from House No. 840 northerly about 1,460 feet to Newberry Road in South Windsor. Assessments are based on the schedule of flat rates adopted November 23, 1992 - effective January 1, 1993 at $41.00 per front foot. ESTIMATED DIRECT ASSESSMENTS Assessor's Property Now or Formerly of Lot No. Frontage Assessments MAIN STREET - EAST SIDE ANNA C. CAVANAUGH 4 (Previously assessed) 0.00 DAVID K. SAKHEIM & SUSAN E. DEVINE 5 109.50 4,489.50 THE J. E. SHEPARD COMPANY WEST PT OF 11 (Not being assessed) 0.00 ROBERT A. GUILMETTE WEST PT OF 6 168.85 6,922.85 MILDRED I.M. ALESHIN WEST PT OF 7 223.00+/-(SC.) 9,143.00 HAROLD M. NEWBERRY,JR. & FLORENCE M. NEWBERRY - LIFE USE TO HARRIET R. NEWBERRY WEST PT OF 9 165.00+/-(SC.) 6,765.00 ANNE SURBER WEST PT OF 8 180.00+/-(SC.) 7,380.00 VERNON 0. PETERSEN & SHIRLEY H. PETERSEN 28 111.90 4,587.90 STUART D. LELAND WEST PT OF 27 229.00 9,389.00 THOMAS G. TAYLOR & CAROLINE C. TAYLOR 26 147.00+/-(SC.) 6,027.00 GAIL M. ANDERSON 24 (Previously assessed) 0.00 MAIN STREET - WEST SIDE ALAN W. TROTMAN,TRUSTEE - LIFE USE TO MARJORIE TROTMAN 56 200.00 8,200.00 ROBERT H. BAINBRIDGE & MARY E. MURPHY EAST PT OF 1 218.00 8,938.00 DEBORAH DILLON LIGHTFOOT 2 115.00 4,715.00 PATRICIA S. DILLON - LIFE USE TO HELEN VERONICA DILLON 30 115.00 4,715.00 RUNO W. PALMQUIST & LOUISE PALMQUIST 31 121.68 4,988.88 ANDRE GIRARD & RITA GIRARD 32 122.00 5,002.00 WALTER J. KRYZAK,III, KENNETH L. KRYZAK & LAURIE F. BANCROFT & JULIE M. KARKOWSKI - LIFE USE TO DOROTHY M. KRYZAK EAST PT OF 34 218.00+/-(SC.) 8,938.00 WARREN L. TOMEK & CATHERINE G. TOMEK EAST PT OF 35 232.68 9,539.88 ANN JUNE ROMANOWSKI 36 164.84 6,758.44 LARRY W. COWLES & SONIA R. COWLES 37 (Previously assessed) 0.00 TOTAL DIRECT ASSESSMENTS $ 116,499.45 / R 57 53 L iNI�T of A33L5SM JT BA/NBR/DGE L/GNTFoor (o M E. ss 5 MURVNY 4 863 875 I� A.W. TROTM AI, lWn TRUSTEE B47 909 831 2 r s.oo' iiSoo' 8/9 82/ (OREV/OU61-YAS5E55E0) zoO.00' GND CND /�I A�N PRoPos cEX/ST/NG_ 121" v✓ATER N/AIN CrID CND 62.pd1Cs c. /lo$.SS' 223.00t(s c.) /0 9.so' rpREVI oUSL y 87O 88 ASSESSED) COT MIA16 BSZ ASSEZ60) 808 o z J3 o � vSAk' I41M THE GU%METTE ALESN, 3 4 S14EWD A.C. S.E. CO. CAVAA/AUGN DEVIAM _ /z 4 5 Boom- OF � /3 6 i i ,I �i II i I I i i i i i, I 1 1 30 3/ 3Z 94 3S 36 I 37 I W.J.M,� AIRYZAlC, L.F. I ,8A� R J.M T wT MEKG R.W. L. A.li'R. kARkOwSJ(1 L.W$S.R. RAL.ma vST G/RARD ROMAA.i. l COWLES R S. I LLD/Y 895 92� I 965 95/ I 887 905 935 I (PREU1Or/SLY ASSESSED o' iziGB oo' 2/B.GI�� <sc.) z32.G8 18¢' CND C yp „ CLASSSTREET ZL WATER MAIN ' v✓ArER "'A)N E�cl— S �z' GND [NO 1&5.00:t 92 /B0.00= (66.) 111501 ZZ9.oo' /47 DO'=` (SC.) (s� 894 (PREU/UUSLY 932 954 AssEssEL) 90G 9�Z0 9700 f.M., JR. G.M. F.M. ANQERSGYV NEW�ERRY A. Y.O S.N. S.D. T•G f c.c. SURBER. PE7E/tSEN LELA MD TAYLOf 24 L/M/T OF ASSFSSME/t�T ASSESSMENT Q Q 2B 27 �6 9 8 3 /o PRELIMINARY APR 12 1993 SOURCT TO CORRECTION AND ADDITION *-THIS AREA MAY BE SUBJECT TO FUTURE MONETARY CHARGES YHI= METROPOLITAN DISTRICT ENGitd *K NG AND PLANNING HARTFORD, CONNECTICUT ASSESSMENT PLAN FOR PROPOSED MSC WATER MAIN IN A PORTION OF MAI N STREET SOUTH WINDSOR SCALE' I"= 100' pgAwto IDATE MARCH S. 1993 SUBMITTED SERIAL NO, APPROVED EMi1►EERIN6 AND PlANNINC ACC. 6479 The Metropolitan District 555 Main Street Water Supply Post office Box 800 C Sewerage Hartford,Connecticut 06142-0800 r Hydroelectric Power 203-278-7850 Resources Recovery Telecopier 203-724.2679 11 July 2, 1991 File: North King Street, South Windsor - Public Hearing on Proposed Water Main Extension To All Property Owners: The Water Bureau of The Metropolitan District will hold a public hearing in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue, South Windsor, on Tuesday, July 16, 1991 at 7: OO P.M. for the purpose of considering considering an extension of a Water Main in North King Street, South Windsor, from Main Street easterly and southerly to Connecticut I-291. We would appreciate your attendance at the public hearing. Should you be unable to attend the hearing, we invite any written comments you may wish to make relative to the project, prior to the hearing, in order for the District to make a decision based on as much public input as possible. A copy of the list showing the estimated assessment for your property is enclosed for your information. If the proposed project were approved, then approximately two inonths following completion of construction of the water main, assessments on owners served by the new main would be declared due and payable. At that time, owners would have the option of selecting either of two methods of payment: the District' s installment method, or payment in full. Under the installment method, an owner may pay- his or her assessment plus an interest charge of six percent per annum in sixteen equal installments over a fifteen (15) year period, or the owner may pay his or her assessment in full within 60 days of billing and thus avoid payment of interest charges. If an owner fails to make his or her payments on the final date due, he or she is charged a 15 percent interest fee. Should you have any questions concerning the: proposed sewer project or the upcoming hearing, please feel free to contact the undersigned. John J. Bartizek, Jr. District Clerk MAIN PIPE ASSESSMENT PROJECT: NORTH KING STREET, SOUTH WINDSOR DESCRIPTION: IN NORTH KING STREET, from Main Street easterly and southerly to Connecticut I-291 Assessments are based on the schedule of rates adopted November 13 , 1990 and effective January 1, 1991 at $37. 00 per front or adjusted front foot. Adjusted frontage is indicated by figure in parentheses. Assessor' s _ . -- Property Now or Formerly of Parcel No. Frontage Assessment NORTH KING STREET - North & East Sides Main Street crosses Charles B. Shepard, Jean E Shepard, Mary Elizabeth West Shepard, Nancy S. Nation and part (Previously Anne S. King of 4 assessed) $0. 00 Charles B. Shepard, Jean E. Shepard, Mary Elizabeth East Shepard, Nancy S Nation and part Anne S. King of 4 152. 33 5, 636.21 Janet C. Murray 5 140. 00±(sc. ) (130. 00) 4,810.00 Ronald C. Freeto and Lois J. Freeto South part of 6 299. 00±(sc. ) 11,063 .00 Richard D. Nicholson 7 150. 00 5,550.00 Anna F. Nicholson South part of 9 248. 00±(sc. ) ( 285.00) 10,545. 00 Barbara C. Murray West part of 10 335. 00±(sc. ) ( 365.00) 13,505.00 .Connecticut I-291 crosses NORTH KING STREET - South & West Sides Main Street Crosses R. Georges Grundmann 31 (subject to Robert P. Marx and previous caveat) 0. 00 d'Auvergne E. Marx North part of 28 150. 00(160. 00) 5, 920. 00 Lawrence T. Hines and Anna Hines 27 100. 00 3,700. 00 J. Richard Dagesse, Jr. and Linda E. Dagesse 26 175. 00( 165. 00) 6,105. 00 J. Richard Dagesse, Jr. North part and Linda E. Dagesse of 25 286 . 61 10,604.57 Robert L. Murray, Jr. and Anne S. Murray 24 150.00 5,550. 00 Barbara C. Murray 23 360. 00±(sc. ) ( 215. 00) 7,955.00 State of Connecticut 22 (Not being assessed) 0. 00 Connecticut I-291 crosses TOTAL ASSESSMENTS $90,943.781 NOTICE OF PUBLIC HEARING ON PROPOSED WATER MAIN EXTENSION THE WATER BUREAU The Metropolitan District 555 Main Street, P. O. Box 800 Hartford, Connecticut July 2, 1991 A public hearing will be held in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue, South Windsor, = Connecticut, on Tuesday, July 16, 1991, at 7:00 p.m STREET: NORTH KING STREET TOWN• SOUTH WINDSOR LOCATION: IN NORTH KING STREET, FROM MAIN STREET EASTERLY AND SOUTHERLY TO CONNECTICUT I-291 All interested parties are invited to be present. THE WATER BUREAU OF THE METROPOLITAN DISTRICT B oh Bartizek, District Clerk METROPOLTTAN DT STRT CT 1991 SCHEDULE OF WATER ASSESSMENT , SERV2 CE TAPS AND HYDRANT CHARGES WATER MATN . ASSESSMENT CHARGE $ 3 "7 _ 0 O per f rorit foot SERVTCE P= PE 'T'APPTNG FEE S= ZE OF SERVT CE TAP COST 1 .. $ 1. 28 _ 00 ]L z .. 128 _ 00 2 " 1. 28 _ 00 4 T 260 _ 00 6 .. 260 _ 00. $ " 260 _ O0 WATER SUPPLY TELEPHONE SEWERAGE - 278�7850 THE METROPOLITAN DISTRICT 555 MAIN STREET-P.O.BOX 600 HARTFORD,CT 06142.08M March 30, 1988 Robert Deptula Director of Health Town of South Windsor 1540 Sullivan Ave. South Windsor, CT 06074 Dear Mr. -Deptula: Enclosed is a bill stuffer that will be sent to our customers regarding lead in their drinking water. The District as well as all other water companies is required by EPA to send the notice. Sinc , Paul E. McCarthy Admin/Review Officer PEM:h Enclosures: 2 The Metropolitan District ' 555 Main Street Water Supply Post Office Box 800 Sewerage Hartford,Connecticut 06142-0800 Hydroelectric Power 203-278-7850 Resources Recovery iii]Fr (- D December 12, 1988l2( C 141988 kMr. Michael GantickDirector of Public Workstarn of Sa Ml 1740 Sullivan Avenue South Windsor, CT 06074 f Dear Mr. Gantick: On January 1, 1989, the District will institute a new policy and procedure regarding the adjustment or relocation of its water or sewage facilities made necessary by town/city construction projects. The new procedure will involve the town/city entering into a written agreement with the District for each construction project it undertakes that will require adjustments to District facilities costing in excess of $5000. A copy of the standard agreement form is enclosed. The major change in policy is that the District will estimate the cost of the adjustment expense and state it in the Estimate of Cost (Part B) of the agreement. This estimate of cost will be considered an upset price. As long as the scope of the work. does not change significantly, the District's charges will not exceed the original estimate. Other things remain largely unchanged under the revised policy. The District will do the planning, engineering, (including preparation of plans and specifications), and inspecting for all adjustments or relocations of its facilities. In addition, it will determine which portion of the work will be installed by District forces and which portion will be installed by the town/city or its contractor. In general, work done by District forces will be limited to that which involves connecting to in-service water mains. The town/city shall, at its cost, have the remaining adjustment work as stated in Estimate of Cost (Part A) of the agreement, performed to District plans and specifications. I ri -2- Significant changes in the scope of adjustment work will be undertaken only after a written change order modifying the agreement has been executed. The town/city will be responsible for payment of the cost of such additional work. This policy is being instituted to provide better control of this type of work by both the District and the town. Moreover, we mean it to improve relations by avoiding misunderstandings and unanticipated costs. The town/city will know in advance the maximum amount to budget for District facility adjustments. In addition, the work, and responsibility therefore, will be clearly defined. Please contact Tip Garritt, Manager of Special Engineering Projects, at 278-7850 extension 438 if you have any questions concerning these changes. S' cerely yours, Peter M. Curry Assistant District Manager CAG/PMC:h Encl: 1 set PC: R.A. Kerkes, Director of Operations C.A. Garritt, Mgr. of Special Engr. Proj. C. Geldof, Chief of Engineering e Utility Adjustment Agreement Between The Metropolitan District and the Town/City of in relation to (Project) WHEREAS the (hereinafter "Town/City") intends to undertake the aforementioned project which will necessitate adjustment of certain pipes, water mains, sewers, laterals, services, or other facilities under the ownership or control of The Metropolitan District as specified herein, and WHEREAS The Metropolitan District (hereinafter "District") is willing and able to undertake such adjustments, provided its expenses resulting therefrom are guaranteed to be paid by Town/City. NOW, THEREFORE, the parties agree as follows: 1. District shall plan, engineer and/or inspect the work hereinafter described in Attachment 1. 2. District shall prepare a Cost Estimate of Adjustments which shall be made part of this agreement and be composed of Part A and Part B. Part A shall contain the costs of all adjustment work that will be performed by the Town/City or its contractor. Part B shall contain the costs of all. planning, engineering, inspection and construction adjustment work to be performed. by District personnel. -1- 3 . District shall charge Town/City for the costs of performing such work in accordance with standard District accounting methods and rates for service, provided the total of such charges shall not exceed $ 4. Town/City shall include in the plans and specifications for construction of said project, provisions for its contractor to adjust all District facilities indicated in Part A of the Cost Estimate of Adjustments. Town/City shall pay its contractor for all work stated in Part A. 5. District agrees to accomplish that work indicated in Part B of the Cost Estimate of Adjustments. Town/City, in turn, agrees to pay the District for all such work. 6. District may bill for services rendered on a monthly or quarterly basis depending on the nature of the project. Town/City promises to pay District within sixty (60) days of receipt of each invoice from District. If the Town/City fails to pay any amount as submitted on an invoice within such sixty (60) day period, then the amount due and owing to the District shall accrue interest at a rate equal to twelve percent (12%) per annum from the date such payment was due until it is paid in full. 7. All work identified in Part A, to be undertaken by Town/City or its contractor, shall be performed in conformance with plans and specifications expressly approved or prepared by District. 8. Significant changes in the scope of the work as set forth in Attachment 1 herein which result in additional work shall only be undertaken in accordance with written amendments to this agreement which shall be referred to as "Change Orders" and which shall be executed by authorized representatives of the parties. Town/City shall be responsible for payment of the cost of such additional work. If, in District's opinion, changes are sufficiently substantive to require a new agreement, District may require of Town/City -a replacement agreement and Town/City shall pay District's cost incurred to date under the agreement which has thereby been superseded. 9. Should the project which is the subject of this agreement be cancelled or abandoned for more than twelve (12) months, Town/City shall, upon being billed by District, pay the balance of District's costs incurred to date in accordance with paragraph 0 6 herein. -2- TOWN/CITY OF METROPOLITAN DISTRICT Signed and Sealed in Signed and Sealed in The Presence Of: The Presence Of: By: By: Its: Director of Engineering & Planning Date: Date: -3- UTILITY ADJUSTMENT AGREEMENT Sheet No. of C.E. FORM - PART A COST ESTIMATE OF ADJUSTMENTS PART A PROJECT DESCRIPTION TOWN TOWN NO. MDC PROJ. NO. WORK TO BE PERFORMED BY TOWN/CITY'S CONTRACTOR Item Item Description Unit Quantity Price Amount No. s UTILITY ADJUSTMENT AGREEMENT Sheet No. of C.E. FORM - PART B COST ESTIMATE OF ADJUSTMENTS PART B PROJECT DESCRIPTION TOWN TOWN NO. MDC PROJ. NO. WORK TO BE PERFORMED BY DISTRICT PERSONNEL - ENGINEERING (PART A &B) UNIT PRICE AMOUNT DESIGN INSPECTION STERILIZATION &TESTING Subtotal 55% Administrative cost +57.67 Payroll additive ENGINEERING TOTAL DEPRECIATION: DEPRECIATION RESERVE DEPRECIATION TOTAL COST ESTIMATE SUBTOTAL CONTINGENCY % COST ESTIMATE TOTAL PART B f UTILITY ADJUSTMENT AGREEMENT Sheet No. of C.E. FORM - PART B COST ESTIMATE OF ADJUSTMENTS PART B PROJECT DESCRIPTION TOWN TOWN NO. MDC PROD. NO. WORK TO BE PERFORMED BY DISTRICT PERSONNEL CONSTRUCTION: ITEM DESCRIPTION: MATERIALS: UNIT PRICE AMOUNT Subtotal 15% Handling Charge Material Total LABOR* Subtotal Indirect Costs(Overhead) Labor Total EQUIPMENT Subtotal ITEM TOTAL CONSTRUCTION TOTAL * Includes fringe benefit costs t ' UTILITY ADJUSTMENT AGREEMENT Sheet No. of C.E. FORM -PART B COST ESTIMATE OF ADJUSTMENTS PART B PROJECT DESCRIPTION TOWN TOWN NO. MDC PROJ. NO. WORK TO BE PERFORMED BY DISTRICT PERSONNEL CONSTRUCTION: ITEM DESCRIPTION: MATERIALS: UNIT PRICE AMOUNT Subtotal 15% Handling Charge Material Total LABOR* Subtotal Indirect_ Costs (Overhead) Labor Total EQUIPMENT Subtotal ITEM TOTAL CONSTRUCTION TOTAL * Includes fringe benefit costs x UTILITY ADJUSTMENT AGREEMENT ATTACHMENT 1 SW FORM SCOPE OF WORK WATER SUPPLY TELEPHONE SEWERAGE 278-7950 THE METROPOLITAN DISTRICT 555 MAIN STREET-P.O.BOX 800 HARTFORD,CT 06142.08M March 4, 1988 Robert Deptula Director of Health 1540 Sullivan Ave. South Windsor, CT 06074 Dear Deptula, Enclosed is the Cross Connection Report that was submitted to the State of Connecticut Department of Health Services as required by Section 19-13-B102 (f)(2)(A)(B), to comply with the Federal Safe Drinking Water Act and State of Connecticut Public Health Code. We ask your cooperation in assisting the District to correct any violation that are noted in the report. If I can be of any assistance. in this matter, please call 278-7850 extension 431 . Sincerely, Paul E. McCarthy Admin/Review Officer PEM:h Enclosure PRIVATE WELL REPORT SOUTH WINDSOR ADDRESS TOWN DATE COMMENTS 419 Main St South Windsor 5-27-81 No Cross Conn-Piping Severed and Pump Removed from House-Well Feeds Garden Hose Only 724 Pleasant Valley Rd South Windsor 10-15-81 No Cross Conn-Pump Removed 417 John Fitch Blvd South Windsor 10-20-81 No Cross Conn-Piping Severed Outlet Side Tank 1425 Main St South Windsor 11-13-81 No Cross Conn.-Well Feeds One Sill Cock and Toilet Only 1750 Ellington Rd South Windsor 11-16-81 No Cross Connection 1200 Ellington Rd South Windsor 12-1-81 No Cross Connection 673 Ellington Rd South Windsor 1-5-82 No Cross Connection-House Feeds Church 90 Belden Rd South Windsor 3-23-82 No Cross Connection 1281 Main St South Windsor 3-30-82 No Cross Conn Section-Well May Be Used for Outside Sill Cock 1738 Ellington Rd South Windsor 4-19-82 No Cross Connection-Plastic Pipe From Well Severed Underground 1305 Main St South Windsor 7-13-82 No Cross Connection-Pump and Tank Removed 588 Main St South Windsor 8-27-82 No Cross Connection 1349 Main St South Windsor 9-15-82 No Cross Connection 380 Burnham St South Windsor 9-30-82 No Cross Connection 1330 Main St South Windsor 12-9-82 No Cross Connection 77b Pleasant Valley Rd South Windsor 12-27-82 No Cross Connection-Pipe Severed 23 Pleasant Valley Rd South Windsor 3-23-83 No Cross Connection 41 Beldon St South Windsor 4-6-83 No Cross Connection-Tank and Pump Severed PRIVATE WELL REPORT SOUTH WINDSOR(Cont.) ADDRESS TOWN DATE COMMENTS 427 Strong Rd outside South Windsor 7-1-83 No Cross Connection-Well to Feed Rear Sill Cock 595 Main St South Windsor 7-29-83 No Cross Connection 772 Main St South Windsor 9-6-83 No Cross Connection 634 Main St South Windsor 10-19-83 No Cross Connection 1270 Main St South Windsor 1-5-84 No Cross Connection-Well Feeds Sill Cock, Rear Hatchway 328 Burnham St South Windsor 3-26-84 No Cross Connection-Well Alleged to be Contaminated with Bengine. 1331 Ellington Rd South Windsor 6-27-84 No Cross Connection 5 Oakland St South Windsor 1-14-85 No Cross Connection-Well Capped 389 Pleasant Valley Rd South Windsor 2-28-85 No Cross Connection 733 Governors Hwy South Windsor 3-19-85 No Cross Connection 871 Ellington Rd South Windsor 4-2-85 No Cross Connection 733 Governors Hwy South Windsor 6-2-85 No Cross Connection 725 Governors Hwy South Windsor 6-28-85 No Cross Connection 66 Pleasant Valley Rd South_ Windsor 8-30-85 No Cross Connection-Well to Feed Outside Spigot Only 253 Chapel Rd South Windsor 9-12-85 Well Only-No MDC 100 Long Hill Rd South Windsor 9-13-85 Well Only-No MDC 444 John Fitch Blvd South Windsor 9-17-85 Well Only-No MDC 516 Strong Rd South Windsor 10-1-85 No Cross Connection-Pump Removed 574 Strong Rd South Windsor 10-1-85 No Cross Connection-Pump Removed 478 Strong Rd South Windsor 10-1-85 No Cross Connection-Pump Removed 442 Strong Rd South Windsor 10-9-85 No Cross Connection PRIVATE WELL REPORT SOUTH WINDSOR (Cont.) ADDRESS TOWN DATE COMMENTS 432 Strong Rd South Windsor 10-10-85 No Cross Connection 434 Strong Rd South Windsor 10-10-85 No Cross Connection 1062 Pleasant Valley Rd South Windsor 10-10-85 No Cross Connection 500 Strong Rd South Windsor 1-30-86 No Cross Connection 379 Main St South Windsor 6-12-86 No Cross Connection-Formerly on Well 926 Ellington Rd South Windsor 10-2-86 No Cross Connection-Formerly on Well 1386 Main St South Windsor 1-19-87 No Cross Connection-Well Feeds One Faucet, Sink Only 237 Main St South Windsor 1-21-87 No Cross Connection-Formerly on Well 1091 Main St South Windsor 1-27-87 No Cross Connection-Formerly on Well 1788 Ellington Rd South Windsor 4-8-87 No Cross Connection-Formerly Fed From #1790 Still on Well, #1788 Capped 482 Main St South Windsor 7-20-87 No Cross Connection-Pump Cut-off 27 Ellington Rd South Windsor 8-12-87 No Cross Connection-Formerly on Well 1790 Ellington Rd South Windsor 8-17-87 No Cross Connection-Formerly on Well CROSS CONNECTION S UR VE YREPORT FOR 19 87 ONE- YEAR INSPECTIONS JTILITY: MDC CONTACT PERSON: Paul E. McCarthy PHONE: 278-7850 ext. S/3/ DATE SUBMITTED: March 1, 1988 MOST PREVIOUS VIOLATIONS BACKFLOW PREVENTER CONSUMER/ADDRESS RECENT INSPECTION COMMENTS (UNCORRECTED INSPECTION DATE VIOLATION STATUS) !l�o�Sof' DATE # FOUND #REMAINING TOTAL # #TESTED # FAILED D /lilaivz SZ`'. 3 -- 9- P(; 2 4 /Pd.r,�t a/P v C o 0/ 1- I/- ZS 9-/9- 7 o eaz5of f /fasc _ ey at r i�=�cf Ok sus u7` � /o-1p_/�; oe, 70 /� ct/ 3n0 REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER, PRESSURE VACUUM BREAKER OR DOUBLE CHECK VALVE USE ADDITIONAL SHEETS AS NECESSARY ** REPORT ON LAST PAGE CONTINUED ON NEXT PAGE CROSS CONNECTION SURVEY REP � 7 REPORT FOR 19_ FIVE- YEAR INSPECTIONS UTILITY: CONTACT PERSON: PHONE: DATE SUBMITTED: . MOST PREVIOUS VIOLATIONS BACKFLOW PREVENTER CONSUMER/ADDRESS RECENT INSPECTION COMMENTS (UNCORRECTED INSPECTION DATE VIOLATION STATUS) s �h�SQ� DATE # FOUND #REMAINING TOTAL # #TESTED # FAILED Tow `-a r -c /a-IF-ems /7-�'� 1:5- o //7s Z7111hl7 roll ..Z aae/ �. a.j S�S o c c - 9--10-re-- �O ,230 a Ste. 3-zo Ail S r,- - a REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER, PRESSURE VACUUM BREAKER Q OR DOUBLE CHECK VALVE USE ADDITIONAL SHEETS AS NECESSARY ** REPORT ON LAST PAGE �� 4 CONTINUED ON NEXT PAGE } CROSS CONNECTION SURVEY REPORT FOR 19 87 ' Y FIVE- YEAR INSPECTIONS JTILITY: CONTACT PERSON: PHONE: DATE SUBMITTED: MOST PREVIOUS VIOLATIONS BACKFLOW PREVENTER RECENT DATE COMMENTS (UNCORRECTED CONSUMER/ADDRESS INSPECTION INSPECTION �� VIOLATION STATUS). DATE ,�# FOUND #REMAINING TOTAL # #TESTED # FAILED /v4I• fe h Sc? 7-a4�)og ,e h CO.?7�_r /o-Zy 141 ,5'9.�r�-r etc Li �i/✓off G� o �-5 S,/�1 HLi �3/✓al. O o s�S��ti cif! ,�3/►%! o a REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER, PRESSURE VACUUM BREAKER' USE ADDITIONAL SHEETS AS NECESSARY OR DOUBLE CHECK VALVE c ** REPORT ON LAST PAGE a CONTINUED ON NEXT PAGE WATER SUPPLY TELEPHONE SEWERAGE / 278-7850 PEM/ref THE METROPOLITAN DISTRICT 555 MAIN STREET - P.O. -BOX 800 HARTFORD, CT 06101 October 3, 1985 Mr. Robert Deptula, R.S. Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Mr. Deptula: As part of the District's ongoing Cross-Connection Program, I am enclosing a report of the results of this survey. A copy of this report will be filed with the Department of Health Services in March 1986. This list does not represent all of the inspections we have made to date. As these reports become available, I will send them to you. Sincerely, Paul E. McCarthy Review Officer Enc. CC: Paul Ritsick, Department of Health Services PEM CROSS CONNECTION SURVEY REPORT NAME OF UTILITY /�,Q� TOWN OF UTILITY Su7-87 1 /JYI 4'SD r— DATE OF REPORT /, —/—�� . SUBMITTED BY NUMBER OF NAME ITEMS DATE OF NUMBER OF DATE OF VIOLATIONS aver STREET NO., TOWN USE CODE INSPECTION VIOLATIONS REINSPECTION CORRECTED C G.yt/tcr, n05 30 161/we// tea .. ,ojc C C/o f .in S9 .. 00" Al -ITEM CODE (See Section 9-13-B102(f) (2) of the State Public Health Code I. Private water source (it isPthe' policy of the Water Control Comm. to inspect manufacturing plants annually) 2. Toxic substance used 3. Elevated water pressure 4. Storage tank 5. Sprinkler system (fire or irrigation) - S _ 2P�o*N Be', lu� 0-le SoUL4 ?A�t� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soe•co� AREA CODE 203/644-2511 RICHARD J. SARTOR Town Manager October 23 , 1985 Mr. Harry Covey c/o Metropolitan District Commission 555 Main Street - P. 0. Box 800 Hartford, CT 06101 RE: PUBLIC WATER - CLARK STREET —SOUTH WINDSOR Dear Mr. Covey: The Town recently received the accompanying petition for the installation of waterlines in Clark Street. It is our understanding that the District will make arrangements for project consideration. Please keep us advised as to the status of this proposal. Very truly yours, own Man er RJS:bmr Enclosure cc: R. Arsenault, Director of Public Works R. Martel, Town Engineer R. Deptula, Environmental Health Officer 3 T ---------- -?Or J J • 1)17 ---------------- f � Tug ;�`lz �r A4 � ' r -- - - --��, STATE OF CONNECTICUT DEPARTMENT OF HEALTH SERVICES August 24, 1984 Mr. Bernard Batycki, Manager Metropolitan District Commission 555 Main Street, P. 0. Box 800 Hartford, CT 06101 RE: Notice of Violation Dear Mr. Batycki : Enclosed is a Notice of Violation (NV No. WS-064-002) regarding MDC's 1983 Cross Connection Report. Should you have any questions concern- ing this notice, please contact Paul Ritsick at 566-1253. Sincerely Raym d-Jarema, Chief Water Supplies Section RJ/pdp cc: Beth Weinstein, Assistant Director Preventable Diseases Division Elly Jacobson, Director Office of Policy, Management & Communications Paul Ritsick, Regional Engineer Directors of Health of: Hartford Wethersfield Glastonbury West Hartford Newington mouth Windsor Windsor Rocky Hill Farmington Bloomfield East Hartford Manchester Enc: Phone: 566-1253 150 Washington Street — Hartford, Connecticut 06106 An Equal Opportunity Employer NOTICE OF VIOLATION STATE OF CONNECTICUT WATER SUPPLIES SECTION DEPARTMENT OF HEALTH SERVICES 150 WASH I NGTON STREET, HARTFORD, CT 06106 TO: Bernard Batycki , Manager, Metropolitan District Commission NV NO. 555 Main St. , P.O. Box SOO, Hartford, CT 06101 k'S-64-064-002 You are hereby notified of violation(s) of the Administration Regulations and/or Statutes regarding water supplies (referenced below) . VIOLATION(S) Incomplete Cross Connection Report, 1993 Calendar Year. All of the 175 annual locations were not inspected. done of the 500-5 year frequency locations were inspected. No violation descriptions were reported relative to locations that may have been inspected. There were no inspection notes relative to interconnections with large private production wells and storage taders, and the P,PD devices were not tested. PERTINENT REGULATION(S3 AND OR STATUTES Section 1 -13-6102(f) and Section 19-13-6339(e) of the Public Health Code. Copies of these Regulations are available for your reference in our office. On or before October 1 , 1934, you are required to provide this department with a report on the status of your cross connection report for the 1934 calendar year which is due March 1 , 19CU5. Please be advised that intentional falsification of information is subject to criminal penalties under State and Federal laws. You are invited to confer with us about this Notice by October 1 , 1;34. If you do not initiate such a conference within that period, you shall be considered to have waived this opportunity. Please contact Paul Ritsick of the Water Supplies Section (566-12533) SUBMIT lil WR1 T i ;G TO: 4Jater Supplies Section Department of health Services 150 Washington Street Hartford, CT 06106 SIGNED (Regional Engineer) ADATEESIGNED , hie ATE Water Supplies Section RETURN OF SERVICE Copy of the foregoing Notice was submitted to the above-named as indicated below: QPersonally NAME OF RECIPIENT SIGNATURE OF RECIPIENT DATE delivered to: U Certified mail to the usual place REGISTRATION NO. RCD. of business or residence TOWN Hartford COPIES: 1 . Local Directorsof Health PD/SE-162 STATE OF CONNIECI~ICU - STATE -DEPARTMEN7' OF HEALT11 p r 79 ELM STREET HARTFORD, CONNFCTItUT 06115 �Nl its(•• OFFICE OF PUBLIC HEALTH Mr. Arthur W. Sweeton, District Mgr. Nane: MDC July 26, 1977 Date: Hartford Plaza _.dry ess: P.O. Box 000 Hartford Hartford, Ct 06101 Town Utility. Metropoliton District Comm. of Hartford County For YOU: :in2ormation. LM1 Resar±>7?wru requested. For necessary action. XX n-PIC'rys The water supply facilities were found to be in very good condition and were producing drinking water of excellent quality. . ne 0014es Scat To: Director of Health for: Bloomfield Wethersfield East Hartford Windsor Glastonbury South Windsor Hartford Farmington Newington Manchester Rocky Hill '""!rr„b West Hartford r CONNECTICUT STATE DEPARTMENT OF HEALTH July 22, 1977 ENVIRONMENTAL HEALTH SERVICES DIVISION cc: Mr. Arthur Sweeton, Dist. Mg) HARTFORD, CONIC, INSPECTION OF THE MDC, Hartford, Ct SUBJECT: PUBLIC WATER SUPPLY OF THE METROPO- LITAN DISTRICT COMM. OF HARTFORD Directors of Health for: COUNTY (MDC) ON JUNE 7, 1977 Bloomfield East Hartford To: David C. Wiggin, Director Glastonbury Environmental Health Services Division Hartford Newington From: William J. Buckley Rocky Hill West Hartford Sanitary Engineer Wethersfield Windsor INSPECTED WITH: Tom Marcello, Plant Engineer South Windsor West Hartford Plant Farmington Cliff Beaulieu, Plant Manager Manchester Reservoir #6 SURFACE WATER: SOURCES OF SUPPLY SOURCE SAFE YIELD USEFUL CAPACITY Nepaug (storage 27 MGD 9,494 MG Barkhamsted (storage) 55 MGD 30,324 MG West Hartford #2 & #3 (storage) - 1 277 MG West Hartford #5 & #6 (terminal) - ' - WATERSHED SURVEY: Last done in 1976 by Mr. Dan Savino, Sanitarian. PROTECTION AGAINST CHA14CE CONTAMINATION: (Reservoirs not observed). AIGAE CONTROL: Microscopic Analysis: Weekly Copper Sulfate Treatment: As necessary TREATMENT INSPECTION OF WATER FILTRATION ITRA ON PLANT: SOURCE OF SUPPLY: West Hartford Treatment Plant TEEAZMNT FACILITIES: Aeration, Slow Sand Filtration, Chlorination, Fluoridation, Lime (pH adjustment), Sodium Hexametaphosphat RATE OF FILTRATION A - Filters 1-10 - 19 MGD B - Filters 11-18 - 15 MGD - HOURS OPERATING/DAY: 24 hours C - Filters 19-22 10 MGD DESIGNED PLANT CAPACITY • MGD): 55 MGD RATE OF FLOW (MGD): 44 MGD CHEMICAL DOSAGE: Lime: A - 34 lb/MG; B - 72 lb/MG; C - 58 lb/MG METAPHOSPHATE: Feed @ 1 ppm OTHER: See Chlorination and Fluoridation Sheets Test Influent Filtered Effluent (Filters 1-18) (1-10) 11-18 19-22) (1-10)z11-18Z19-2 Color 4 4 0-0 0-0 0-0 0-0 0-0 0-0 PH Value 6.7 6.5 6.6 6.6 7.0 7.2 7.1 Odor none none none none none none # Distinct Chlorinous F .2 HARTFORD, CONN., INSPECTION OF T}? PUBLIC WATER SUPPLY OF THE METROP LITAN DISTRICT C04M. OF HARTFORD COUNTY (MDC) ON JUNE 7. 1277 Test . Influent Filtered Effluent (Filters 1-18) (1-10 11-18)(19-22) (1-10)(11-18)(19-22) Alkalinity (mg/1) 10 6 8 5 13 18 14 Turbidity 1 0 0 0 1 1 0 Hardness . 14 10 13 10 18 18 16 Residual Chlo.(mg/1) - .7 .7 .5 CONDITION OF TESTING EQUIPMENT: Excellent RECORDS: Excellent. METHOD OF WASHING FILTERS: Springtooth harrow; completely reconditioned every 6 years. DISPOSAL OF WASH WATER AND SLUDGE: Holding Reservoir #1 SAMPLES COLLECTED: Lab_. No. Color Alkalinity (Coliform Apt. True KmgL). organisms/100 ml) 17838(Raw) 4 4 10 17 17839(Trt.1-10) 0 0 13 0 17840(Trt.11-18) 0 0 18 0 17841(Trt.19-22) 0 0 14 0 INSPECTION OF GAS CHLORINATOR: SOURCE OF SUPPLY: West Hartford Filter Plant TYPE OF CHLORINATOR: W & T gas solution fed chlorinator proportional to flow. (Four identical units) (A = Filters 1-10; B = 11-18; C = 19-22) ALTERNATE CHLORINATOR: Yes STANDBY POWER: Diesel driven generator CONDITION: Checked periodically INJECTOR PRESSURE (#/sq.in.): 60 psi (all 3) MAIN PRESSURE (#sq.in.): 5 ft. head CHLORINE TANK PRESSURE (#/sq.in.): A - 50 psi; B - 42 psi; C - 40 psi RATE OF WATER FLOW: A - 19 MG; B - 15 MG; C - 10 MG RATE OF CHLORINE DOSAGE (lbs./24 hrs.): A - 130 lb.; B - 120 lb.; C - 55 lb. (lbs./MG): A-6.8 lb/MG; B-8.0 lb/MG; C-5.5 lb/MG ' POINT OF CHLORINE INJECTION: Prior to basins. RECORDS IN GOOD ORDER: Excellent FREQUENCY OF RESIDUAL CHLORINE TESTING: Continuous recorder. ARRANGEMENT OF CHLORINE CYLINDERS: 2 on a scale (1 ton each); both on line. . PLATFORM SCALES: Yes, 2 scales GAS MASK: Scott Air Pack SPARE PARTS AVAILABLE FOR CHLORINATOR: Yes RESIDUAL CHLORINE TESTING EQUIPMENT, CONDITION: Continuous recorder W & T; Amperometric Titration Method. INSPECTION OF FLUORIDATOR: SOURCE OF SUPPLY: West Hartford Filter Plant. TYPE OF FEEDER: Three Omega Machine Company dry chemical feeders, manually controlled. RATE OF WATER FLOW: 1-10 = 19 MG; 11-18 = 15 MG; 19-22 = 10 MG POINT OF FLUORIDE INJECTION: Just outside chew. building - 3 lines. TYPE OF CHEMICAL USED: Sodium•Silico fluoride RATE OF CHEMICAL FEED: A 43.1 lb/MG; B. - 52.0 lb/MG; C '- 51.0 lb/MG FLUORIDE DOSAGE RATE (mg/l as F): A - 1.02; B - 1.23; C - 1.21 FREQUENCY OF. TESTING: Continuous analyzer, Lab. - Daily FLUORIDE TEST (mg/1): analyzer . 0.9 -.3 - HARTFORD, CONN., -U4'TECTI0N OF TfiE PUBLIC WATER SUPPLY OF THE METROPO- LITAN DISTRICT C012,1. OF HARTFORD COUNTY (MDC) ON J[iNE 7 1977 TESTING PROCEDURE USED: Foxboro Fluoride Analyzer CONDITION OF TESTING EQUIPMENT:- Orion electrode RECORDS: Excellent SAMPLES COLLECTED: @ #6 Lab. No. Pt. of Collection Fluoride (mr/1, . 17839 Filters 1-10 1.0 17840 Filters 11-18 0.85 17841 Filters 19-22 0.90 INSPECTION OF WATER FILTRATION PLANT: SOURCE OF SUPPLY: AH)C - Reservoir ##6 TrEA Mq'T FACILITIES: Aeration, Alum, Post filtration, Sodium hydroxide, Fluoride, Phosphate, Chlorine, Sedimentation coagulation. . RATE OF FILTRATION (gpm/sf.): 2 gpm/sq.ft. HOURS OPERATING/DAY: 16 DESIMTED PLANT CAPACITY (MGD): 48 MGD RATE OF FLOUT (MGD): 26 1,G/16 hours CHEMICAL DOSAGE: Alum: 100 lb/MG METAPHOSPHATE: .7 ppm ACTIVATED CARBON: Not used regularly APPEARANCE OF FLOC: Pinpoint (fine) SETTLING TIME (Hrs.): 4 hours Test Influent Settled Effluent App. True. Color 12 12 0.0 � 0.0 pH Value 7.0 6.5 6.9 Odor Faint earthy Faint earthy Decided chlorinous Alkalinity (mg/1) 13 4.0 29 Turbidity 1 0 0 Hardness(mg/1 as CaCO3) 16 14 15 Residual. Chlori.ne(mg/1) - - 1.0 CONDITION OF TESTING EQUIPMENT: Excellent- RECORDS: Excellent LENGTH OF FILTER RUNS (hrs.): Sand: 4.6 MG between wash - 3 days. Dual: 12 MG between wash - 5 days. RATE OF WASH (GPM/sq.ft.): 6 - 8 minutes, 125,000 gallons/wash/filter. FLOW CONTROLLERS: Yes LOSS OF HEAD GAUGES: Yes DATE SEDIMENTATION BASIN LAST C LEANED: May, 1976 DISPOSAL OF WASH WATER AND SLUDGE: Drying beds. SAMPLES COLLECTED: Source Color Alkalinity (Coliform App. True m 1) organisms/100 ml) Raw tap 12 12 16 Plant effluent 0 0 15 30 Distrib. tap 0 0 0 INSPECTION OF GAS CHLORINATOR: SOURCE OF SUPPLY: MDC - Reservoir ##6 TYPE OF CHLORINATOR: Fischer & Porter gas solution fed manually controlled (one in operation). ALTERPdA-TE CHLORINATOR: 2 exactly the same. STANDBY POUdER: English Electric Diesel, KVA 625 CONDITION: Satisfactory, tested twice a month. i - 4 - HARTFORD, CONN., INSPECTION OF THE PUBLIC WATER SUPPLY OF THE METROPO- LITAN DISTRICT COa� % OF HARTFORD COUNTY (p.JDC) ON JUKE 7. 1977 INJECTOR' PRESSURE (##/sq.in.): 80 psi MAIN PRESSURE (##/sq.in.): 10 psi CHLORINE TANK PRESSURE (##/sq.in. ): 40 psi RATE OF WATER FLOW: 26 MGD RATE OF CHLORINE DOSAGE, (lbs./24 hrs.): 308 ##/24 hr. ; (lbs./MG) 11.8 lb/MG RECORDS IN GOOD ORDER: Excellent FREQUENCY OF RESIDUAL CHLORINE TESTING: Continuous analyzer. Lab test twice a day. PAST 24 HRS., AVERAGE CHLORINE DOSAGE RATE (##/MG): 14 ##/MG ARRANGEMENT OF CHLORINE CYLINDERS: 2 on a scale (can put 5 on a scale) PLATFORM SCALES: Yes, 3 GAS MASK: Scott Air Pack SPARE PARTS AVAILABLE FOR CHLORINATOR: Yes INSPECTION OF FLUORIDATOR: SOURCE OF SUPPLY: MDC - Reservoir ##6 TYPE OF FEEDER: BIF dual head chemical feed pump, manually controlled. RATE OF WATER FLOW: 26 MG/16 hr. POINT OF FLUORIDE INJECTION: Post filtration TYPE OF CHEMICAL USED: Hydrofluosilicic Acid RATE OF CHEMICAL FEED: 43 lb/MG FLUORIDE DOSAGE RATE (mg/1 as F): 1.03 FREQUENCY OF TESTING: Once a day FLUORIDE TEST (mg/1): 1.0 on post 0.85 dirt. TESTING PROCEDURE USED: Orion specific ion analyzer CONDITION OF TESTING EQUIPMENT: Excellent RECORDS: Excellent DISTRIBUTION ESTIMATED POPULATION SUPPLIED: 400,300 YEARLY AVERAGE DAILY CONSUIMPTION: 51.42 MG PER CAPITA: 128 ESTIMATED SAFE YIELD OF PRESENT SOURCES: 83 MG NO. OF SERVICES: 83,371 NO. OF METERS: 801870 % METERED: 97% STORAGE TANKS: NAME CA PA CITY 1. Rocky Hill Standpipe 0.45 MG 2. Newington Standpipe 0.31 MG 3. Wickham Hill Storage Basins (2) 4.5 MG 4. Cedar Mountain Storage Basins (2) 10.0 MG 5. Canal Street Storage Tank 0.5 MG 6. Vexation Hill Storage Tanks (2) 1.5 MG 7. Kilkenney Rocks Storage Tanks (2) 1.0 MG 8. Cold Brook Storage Basins (2) 0.5 MG 9. Windsor Standpipe 0.5 MG 10. Eastbury Storage Tank 0.5 MG BOOSTER STATIONS: NAME CAPACITY PUMPS STORAGE 1. Mountain Rd. 3.456 MGD (4 @ 400 .gpm + 1 @ 1,200 gpm Diesel) - 2. Canal Rd. 0.72 MGD (2 @ 250 gpm) ' 2 @ 7,5Q0 gal.Pressur( 3. Farmstead Lane 0.518 MGD (2 @ 80 gpm;l @ 200 gpm) 2 @ 7,500 gal.Pressur( 4. Highview St. 0.72 MGD (2 17)D 250 gpm) 1 @ 7,500 gal.Pressur; 5. Newington 4.12 MGD (2 @ 400 gpm 2 @ 700 gpm 1 @ 1,500. gpm Diesel) - 5 - HARTFORD, CONK., INSPECTION OF THE PUBLIC WATER SUPPLY OF THE METROPO- LITAN DISTRICT C(AKM. OF HARTFUItI} COUNTY (I1DC) ON JUKE 7, 1977 NAME CAPACITY PUMPS STORAGE 6. Simsbury Rd. 0.288 MGD (2- @ 100 gpm) 2 @ 7,500 gal.pressure 7. Hawley Rd. 4.32 MGD (2 @ 500 gpm; 1 @ 2,000 g m Diesel) - 8. Orchard St. 0.72 MGD (2 @ 250 gpm _ 9. Vexation Hill 0.72 MGD (2 @ 250 gpm) 10. Buckingham Pump - Station * 1 0.72 MGD (2 @ 250 gpm) - 11. Bear Ridge Pump Station 0.14 MGD (2'@ 50 gpm) 1 @ 21000 gal.pressure WATER QUALITY The results of the analyses are satisfactory and meet the requirements of a potable water. CONCLUSIONS AND RECO1-1IENDATIONS 1. There are six companies which take water from the Nepaug-Barkhamsted Aqueduct for daily or emergency use; they are: WATER ICO` STATUS OF CONNECTION A. New Britain Water Department Emergency B. Collinsville Water Company Main source C. Unionville Water Company Only source D. Farmington Water Company Active source E. Avon Water Company Emergency F. New Hartford Water Company Main Source 2. The following companies have connections to MDC filtered water: A. Berlin Water and Sewer Commission B. Connecticut Water Company, Windsor Locks., South Windsor 3. Attached are copies of a schematic layout. for the rapid sand filter plant at reservoir six and the slow sand filter plant at West Hartford and a copy of "West Hartford and Reservoir Six Water Purification System" publication of MDC. 4. The Cedar Mountain chlorine booster station was inspected on June 7, 1977 and the facilities and records there were found- to be satisfactory. The other booster stations will be inspected later this year. 5. On April 28, 1977 this inspector collected 13 split samples with an MDC representative. The results of the analyses were forwarded to Mr. Vincent Morkus on May 20, 1977. The results of all 13 distribution samples were satisfactory. 6. In general the facilities at the time of the inspection were receiving excellent maintenance and supervision-and were producing a high quality water for the system. WJB/ch i NEFAUG CONDUIT .«-t.q,Ele eat[ RESERM .EST ••Lco+r NO.g 4CAINTwIN c-o J 0/r re C cr[DYrLme :ANDiIrt , .NNE 'ONOu,r N�n t EIw MID I Q E W 798 9 Pa'n,( ,',�� CGCv.3222: •:tu.. :J ..•<D.< rEor PaM.G Ekv 290.0 It -: .p _— T- r'ss tCsa9�Nq mar«..[ D.•326e 70• 7 7 u� L('�j pD,nl,4'EIrv.19G.5 GATE U.v.3S'd lij < CNn48Ek PIPE LINES L'o 8�Z/•gNei AL..TOR ibDl Mvel ;•' � +-� Ell,MW3101[ •I +, (� yy b i'ACRE E ED5(o 53 wE PE,NWL ELEv 30400, L ` 4 1ACRE BEDS 20 1 19 I 8 6 4 2 •7 i( (Nac�taaJ , I 1 16 15 1 R (Ell, b- I 4-=ACRE BEDS ( � I � 7 5 I 3 I el.. � r.sSwEaE; 18 17 nwL ELEV 30700) - ACRE BEDS (0.73 w RE1 /. cN wLC LCv 303 DOs g 11 10 d ` \\ STOP PLANK J ,T Pi •!� �a'\, I1 I WELL I - �\. CMmrc'.dvi wn apd,tal,«,pd - 9Lso• ' E BE I 9(t,; Z _.• J�, '(D 53 wr REI 11 "�Eu'•. L —L ELEv 304 751 iNo � NG ' ss ! 9 MILLION GALLON 6MILLION I FILTERERED GALLON WATER FILTERED RESERVOIR WATER �i II tHWL ELEv 295.001 Ij RESERVOIR u' (Nw L.ELCv.29 S00 RII - - — LEGEND a 41a«am ai[,vDn DPC,40 L ^I NI =dam �I p,;.e,al.nd smaller tl r+`J• aEf � = C e 'e FP[.48�ond argtr q 1 �•I1 ro V. o � 4 r volve ce!3G• tltlN 1 1� ® tr-v<+... .vetorK•r+ • !)rc^• - Rpe n.rn,aly tnrry,ny raw«ni[r i — .-__. _�-� ... —114 4 nq—1 m m««altr ^I �y � _ ),7•tr w na-11'wr y gl,Ittred Wa[<[ •D -_.--�— 1L -- ,- ,p„J P Dn normally«dAOvr Itow [... - _��_-._ •: Z x• I� ?a1 _-... •w,se 3.te we•co«c _ oa NOTES ♦2, , Mal[r Svr,(,ly peq�Dniy,s mown L snort rvna o4 ovsmq p,D�y Pt gait nI,en are na[�I M'.ced THE 4ErFUOLRwN DrYPaLT Elerarlons ar<basal m Ot4 R[a.vP, t r[brygr TDpt,lsl p7 f[D 1959 KART.ORD Couwv.a>m. LaIYR N.Y, 19G0 GATL VALVE.1'G..ITION .4r"' '' WATER EAJREAU 8 �: FILTRATION PLANT SCHEMATIC LAYOUT •�DIIAVN ).J.R n M 94Y[ 419a e.fY t IOUIO ALUM CAPBON SODIUM NTONOMIOE CHLORINE cmol:HE DIOXWE BULf IIR DIOXIDE INO SPNAt! NYORO7 UIOSIt ICIt ACID 4 COMPRESSOR ji����{{y i SOOIUY CNl OP11E t _ r L 9 �LNIVRI«E oloK/a It Of IIERAl on 1 CL SD C 1N CL .CO • co NA C C C — c0 LA - - -LA _ WAIN WA1E11,STANDPI►( —NA EO NA 6t CL C TO PLANT p WATEP SUPPLY S 11. SN SD p. C IMAMS WORKS Cl - II Tt RED WATIR CL LA - SHp ASINS-- RF S.S - __- __�..__ COAOVl A710N BASINS Iltil RB AERATOR ---- CD n PLANT WATER !A«IN [[VTYok T.T IL t .4M.0 OAY � J 1LRSN MINERS 2 f.�66' /R.iLRfO VMIER COPDIIIT- .PAW WAtLR BT-PASS qAW WATER PAW WAIEA LINES TWO Sa'LIRES TOOISIRIBVIIONSYSIEM DlCANTSO WA'iEP RETURN TO RESERVOIR- N T CL SLOW-Off • CHLORINE - Q OECAMIIs WAI(R PUMPS LEGEND to u400E LOADER +-- c cAHbfw c0 CHE on-1 01011#OE - CL GNIOPINE DICAN/INO SASINS W NTOgO,&.osl10C ACID LA LIQUID PLUM SITING SEO DRAIN SUMP - ► PIN15p1IAlE �- i.• tw W MFUR DIOKIOE THE WAIER BUREAU Of SN SODIUM NTD110KIOEeTaC=J now TUBE ....-___._ _ CNECKEO BT q- 1 I tl.qsy IA � (� - TNARTI OAOD IOV«T T.CONMI __ SUPMIITED B � .p�3.A RAPID SAND _ ,.-,,. SLoocE tINE AppquVED BY Ld+ "��V FILTER PLANT M WIY lA 1w lWn.NA HNMIGA(WA SCNE4Attc tATE«II DRYING BEDS NO SCALE MOVEYOLR 4t0 ' - R SALLEN OWO NO 0•TO THE WEST HARTFORD AND RESERVOIR SIX WATER PURIFICATION SYSTEM of THE METROPOLITAN DISTRICT of HARTFORD, CONNECTI CUT This description of the purification works was written especially for the use of non-technical readers, but contains the same data that are available for profes- sional use. THE WATER PURIFICATION SYSTEM of THE METROPOLITAN DISTRICT of HARTFORD, CONNECTICUT NATURAL PURIFICATION The purity of rain water, which is the primary source of all public water supplies, is changed the moment raindrops touch the soil . The rain water starts ' immediately to dissolve chemicals present in the soil and at the same time picks up numerous bacteria. Fortunately, great numbers of these bacteria are harmless, _ but there is always the possibility that bacteria which may cause diseases, such as typhoid, dysentery and cholera, will be present. The type and the amount of chem- icals dissolved by the rain water generally have little direct effect on health, but they do cause nuisances such as tastes, odors and discolorations. Nature immediately lends a hand and starts to remove or change the char- acter of the contaminating materials. As the water flows along a rivulet, a brook, or a. river, it falls and splashes and comes into intimate contact with the oxygen of the air. The oxygen. kills large numbers of bacteria, but not all of them by any means. Some of the chemicals are changed in character, but very few are removed entirely. There is often heard the expression that f"l o,.-ring water purifies itself in some mystical distance. That is a very erroneous belief! True enough, nature assists in the purification process, but it does not always render water safe enough for human consumption. ALGAE CONTROL The storage of water in a reservoir for many months is another natural purification process. During the period that water rests in a reservoir a large portion of the particles suspended in the water settles to the bottom. Exposure to sunlight and air removes great numbers of bacteria and also reduces the mater- ials which discolor water. However, the very factors that aid in this purification -- sunlight and stillness -- also encourage the growth of algae, simple plants which impart tastes to the water and- turn it cloudy. To control this growth, the water in the reservoirs is tested frequently, and when the algae concentration becomes excessiVe the reservoirs are treated with copper sulfate. The dose of copper sulfate rarely exceeds 4 of one part in a million parts of water. Sad to say, man frequently finds it necessary to dump all sorts of waste products both human and industrial , into streams which eventually find their way into public water supply reservoirs. Steps are taken to prevent, or reduce the effect of such actions by inspection and close regulation of the habits of people residing on land which drains into a reservoir. However, these regulations cannot insure for certainty that dangerous contamination will not some day enter a public water supply, thus making it necessary to have water purification plants which will produce water of unquestioned purity at all times. 2. FILTRATION AT THE WEST HARTFORD PLANT One water purification system of The Metropolitan District of Hartford is located in West Hartford, Connecticut, west of Reservoir No. 19 off Farmington Avenue. Its main component parts are an aerator, sand filters, and machines for applying chlorine gas, fluorides and chemical compounds which reduce the tendency of the water to corrode metals. AERATION The aerator is the first device used in the purification process.. Water from Nepaug_ Reservoir, the Barkhamsted Reservoir, or the system of small reservoirs in West Hartford, can be made to flow directly by gravity to the aerator. Many people, unfamiliar with the word "aerator", call it a fountain, and that describes it very well . At the bottom of an open, circular, concrete chamber are some large pipes with holes drilled in the top of them. The pressure of the water flowing from any one of .the reservoirs, which are all higher than the aerator, causes the water to shoot upward through these holes in a-spraylike effect. From the rim- of the concrete basin, additional water is sprayed toward the center. . The water failing to the bottom of the basin flows through the open joints of brick walls into a cast iron pipe which delivers it to the sand filters. The capacity of the aerator is 27 million gallons of water in a 24-hour day. The purpose of the aerator is to cause oxygen from the air to enter the water. As the water is sprayed upward and later falls downward, it separates into . small particles, allowing the air to come into contact with a large portion of it. This induces the oxygen of the air to dissolve in the water. It is essential to have some oxygen in the water to improve' its taste. Water containing no oxygen is flat tasting, similar to water which has remained in a drinking glass for a long time. There is another purpose of the aerator. Sometimes the water in a reservoir picks up undesirable gases caused by the de.composition of the muds at the bottom of a reservoir. One of these -gases, hydrogen sulfide, imparts un- desirable tastes and odors to the water; another, carbon dioxide, forms rust in pipes. At other times, algae release droplets of oil having strong tastes or odors. By spraying water containing these gases or oils into the air_, they are removed from the water to a large extent, improving its taste. Aeration of water also affects its chemical content. Certain elements, such as iron and manganese, will remain dissolved in eater containing a large _amount of carbon dioxide and very little oxygen. By aeration, these elements are changed to an insoluble' form', which means that they can be removed from the water by filtering it through sand. SLOW-SAND FILTRATION The next step in the purification process is the filtration of the aerated water through fine sand. The West Hartford plant of the Hartford Metropolitan District is of the type known as a slow-sand filter. At present it is made up of 22 units, called filter beds, which can be operated separately to filter the water flowing from the aerator. If necessary, the aerator can be bypassed and the water • from the reservoirs applied directly to the filters. With all 22 filter beds in service, a total of 55 million gallons of water can be treated in 24 hours for long periods of time and somewhat larger quantities can be filtered to take care of peak .demands of short duration. Of the 22 filter beds, 16 are 2 acre each and 6 are 3/4 acres each for a combined total of 13 acres. Each bed has side walls 12 feet high. On the floor of the filter is a network of glazed tile or concrete pipes all terminating in a central conduit, which extends through one of the vertical concrete side walls, and is connected to a cast iron pipe fitted with control valves. The, p•ipes in the underdrainage network have small openings in their walls to allow the entry of water. Over the underdrainage system and the floor of the filter is a layer of stones 12 inches in depth. The stones, which are about 2 inches in size immediate- ly over the pipes are graded so that at the top of the layer, the "stones" are only 1/8 of an inch ' in diameter. Over the stones- is sand to a depth _of 27 inches. This sand is a special quartz sand with particles especially graded in size and averaging about 1/75th of an inch in diameter. On top of the sand is the water which has passed through, or bypassed, the aerator. The depth is 6 feet and it is kept constant by large copper floats which open and close valves that control the flow of water from the aerator to the top of the sand. The action of a filter is simple. The water over the sand gradually seeps down through it and the underlying stones, until it enters the underdrain- age system. From these pipes, it flows into the central conduit and then out of the filter by means of a cast iron outlet pipe. A half-acre filter is generally operated to deliver two million gallons of water in 24 hours. This is equivalent to only a half-pint of water per minute from each square foot of the filter, �•rhich explains the reason for the name of the process: slow-sand filtration. Slightly higher rates can be obtained when the filter is clean and much lower rates when it is dirty. The flow of the water is controlled by means of a valve in the cast iron outlet line. In the same line is a device known as a Venturi meter, which measures the amount of water flowing through the cast iron line, and records the value on a chart. The outlet line from each filter is joined to larger pipes into which all the other twenty-one filter units connect. These larger pipes, of which there are three at present, carry the filtered water to underground concrete storage basins .that have a capacity of 15 million gallons of water when full . Although the action of a filter unit is a simple process, the results are quite remarkable. The sand removes- particles of dirt, leaves, twigs and fishes, but what is more gratifying is the fact that bacteria, of which it takes about 25,000 laid end' to end to make an inch, are removed 'from the water as it passes through the sand. Moreover, some of the chemicals which impart color to water are also removed. The. iron and manganese compounds that were made to combine with oxygen at the aerator are likewise taken from the water. 4. STORAGE BASINS There are two concrete basins for storing the filtered water before it .flows to the city. One basin holds 6 million gallons of water and -the other, 9 million gallons. The people of the Hartford Metropolitan District now use on the average almost 55 million gallons of water in one day, and sometimes as much as 80 million, so there is usually less than one-third days' supply of filtered water on hand. The rate at which.water -is used in The Metropolitan District is, however, constantly changing during the course of the day. Since it is better to operate the filter beds at a constant rate, the storage basins serve the very useful pur- pose of making up the difference. DISTRIBUTION SYSTEM The water from the storage basins is carried to the cities .and towns of The Metropolitan District by two cast iron pipe lines, 42 inches in diameter and a concrete pipe 54 inches in diameter. A short distance below the West Hartford' Filtration Plant, these large pipe lines branch out into other large pipe lines and then into many smaller pipes that supply the individual streets of The Metro- politan District. At various strategic points in the District are located several tanks and storage basins which help to maintain the supply and pressure of the water in the distribution system. Their combined storage capacity, when full , is 19.9 millions of gallons. CHLORINATION At points just downstream from the filters and immediately ahead of the basins,, a solution of chlorine gas in a small amount of water is injected contin- uously into the large volume of water flowing through the pipes. Chlorine is a chemical that destroys bacteria very readily. There are some bacteria that manage to get through the sand of the filters, and since it is possible that some of these might be disease-producing organisms, all precautions must be. taken to insure that the water delivered to a population of 390,000 is absolutely safe, and chlorine is the element that furnishes this safeguard. The amount of chlorine added to the water is minute; about ten pounds to a million gallons of water, which weigh 8,340,000 pounds. Yet this small con- centration of chlorine is very effective in destroying bacteria, as is known from laboratory tests made every day. Four special machines are employed to pump the chlorine solution into the water, three of them are in constant use and the fourth is an emergency reserve unit. The machines are so constructed that they will inject chlorine in direct proportion to the flow of water through the pipes. A constant check is kept on the chlorine content of the water by three automatic analyzers which measure the concentrAt-ion of the chlorine as the water .enters the storage basins, record the results on a chart, and transmit the instan- taneous readings to the control room. _ r SAND WASHING This completes the purification process as such, but a large amount of work is necessary to keep the-process going. In the course of time, the top of the sand in the filter beds becomes entirely clogged with the materials removed from the water. When this happens, very little water can be passed through the filter, even though the valve on the outlet pipe is opened wide. Gauges known as "Loss of Hbad Gauges" indicate when this condition is being approached. The remedy is to wash away the film of "dirt" on top of the sand and thereby allow the water to ` pass through the sand again. To do this, the water over the sand is drawn down to a depth of 8 to 10 inches and a spring tooth harrow, such as a farmer might use, is dragged over the 2 acre or 3/4 acre of sand by means of a tractor. At the same time, the water over the sand surface is made to flow horizontally. The tractor and the harrow stir up the sand and dislodge the dirt particles from the sand grains and this dirt remains in suspension in the water. The horizontal flow of water, created by letting in clear water at one side of the filter and drawing it off on the opposite side of the filter, . carries away the suspended dirt to a sewer. The sand is cleaned sufficiently well by this washing process so that a filter .can be returned to service and again filter approximately 90 millions of gallons before it needs to be washed once more. The volume filtered varies with the amount of contamination in the water and the rate at which it is filtered. Generally any one filter will last six to eight weeks between washings. This washing process has its limitations, it washes only the top foot of sand. The lower layers of sand gradually become coated with the same type of "dirt"• as covered the top before washing, and the sand is now densely packed and offers considerable resistance to the flow of water. After approximately 3 billions of gallons of water have passed through a filter in the course of about 6 years, it is necessary to wash all of the sand, from top to bottom. This is done by a method known at this plant as "reconditioning." Washing and replacing the sand is considerably cheaper than removing the dirty sand and replacing it with new clean sand. The reconditioning process is carried on by shoveling all the sand overlying the surface of the stone into hoppers, erhere a stream of water flowing at high velocity picks. it up and carries it along lines of three-inch rubber hose to. another type of sand washing machine known as - a separator. The separator is a closed steel tank, three feet in diameter and six feet high, the lower half being cone shaped. Near the top of the separator is a connection for the end of the three-inch rubber hose line, which brings the.mixture of dirty sand and water from the hoppers. A battery of six hoppers and six separators is used at one time. The sand and water mixture enters a separator with a high velocity and strikes a steel plate inside the separator. The impact knocks the dirt from the sand grains, the heavy sand sinks into the cone shaped part of the machine, and the dirt flows out of the separator through a pipe at its top. The clean sand is drawn from the cone and replaced over the stone to a depth of 27 inches. (GHIACTION DATA AND ANALYSIS REPORT ppL$C WATER SUPPLY SAMPLE For State Use sm.1 ENT OF PHYSICALMPLETE nATE4`6t(U6 - DATE REC'D t.- OL-8 I A(4-74)15M INVOrif ANALYSIS �*A - . ICE (X) COLLECTION SECTION(field data to be filled in by Sample Collector) NAME Of 6i11111Y RE WELL,OR SPRING NAME LOCATION AND/OR ADDRESS OF SAMPLE COLLECTION POINT TOWN OF UTILITY TOWN NO. r 4-' 0, TYPE OF WATER(At Sample C.11-ti—Point) Ei 1. Row or untreated —A 2. Treated water at 3. Water fr&rn distribution Ei 4. Water from distribution water at source Lr_y station on ❑ (One source only) ❑ (Mixture of 2 or more sources) TREATMENT Of WATER REPRESENTED BY THIS SAMPLE E] Chlor'l Poly- PH adjust- r-Vf Filtra- Soften- Iron-manganese Fl Taste & odor ❑ None notion" Elpohosphate Q Met LL%L tion 0 Ing ❑ removal ❑ lotion u0 ri 1:1 Strainers 1:1 control NAME AND ADDRESS OF PERSON TO RECEIVE Send Collection Data and sample to:ANALYSIS REPORT CONNECTICUT STATE DEPARTMENT OF HEALTH Laboratory Division NO.AND STREET BOX 1689, HARTFORD,CONN.06101 CITY AND STATE t (Zip Cod.) -Street Address: 10 CLINTON STREET, HARTFORD, CONN. LTELEPHONE: 566-5626 CHLORINE RESIDUAL(Field test) test) pH(Field test) COMPLAINTS(it any) Sedi- rn! rng./l, E] Color [:] Odor. E] Taste Elment [:1 ! "m_inog ❑ Other ADDITIONAL INFORMATION(Special tests required, k.) EXPLANATION OF COMPLAIN15 Far NAME OF UTILITY SOURCS TYPE I DATE 01 COLLECTION State Use 1 2 1 3 1 4 1 5 6 17 8 9 1 10 i 11 1 32 13 ! 14 COLLECTOR'S COLLECTOR'S NAME COLLECTOR' TITLE �DATE OF COLLECTION TIME OF COLLECTION SAMPLE NO. a LABORATORY SECTION (Analysis results to be filled in by State Laboratory Division) -A-F.COI. TRUE COL. ODOR M.—ijoli..) (Deg.) I 16 1 20 1 21 5 I , 1� - L * __—, 19-- i ' I`-Mi NITRATE fos N1 AMMONIA(.s N) ALBUMINOID(.,N) CHLORIDE(0, v I .6 1'27 1 26 29 t6 1 37 1 �8 39 1 40 41 42 2 30 31 1 �2 (,14.) ALKALINITY(CoCo3b BICARBONATE ALKALINITY(C-C 3)CARBONATE TOTAL HARDNESSoCo3) IRON(Pe) Vz ! 44 47 48 -ffb !45_2 56 57 2 43 1 45 46 53 i 54 55 J ­4 MANGANESE(M,) FLUORIDE(F) DETERGENT(ABS) SULPHATE(SO,) 58 59 60 61 62 1 62 64 65 1 66 67 1 68 1 69 MEMBRANE FILTER 6- standard arithmetic mean of all staard samples examined per month using the membrane filter technique shall not ex- TEST (ONC. 1 C.M-4 ­ uj S� ceed one colony per 100 mi. Coliform colonies per standard sample shall not exceed 4/100 mi. in: (a) two consecutive Cofi/o Co;,nies,'100 mi. I .. U 0 samples; (b) more than one standard sample when less than 20 are examined per m.-ath;or(c) more than five per rn cent of the samples when 20 or more are examined per month. I I'� 74—70 1 71 1 72 1 73 ❑ 1. The results of the analysis of this sample are satisfactory and meet requirements for a potable water. ❑2. The results of the analysis of this sample are satisfactory for a potable water but certain of the chemical or physical constituents are high. These are as follows: z to El 3. This sample is not satisfactory since it does not meet the bacterial requirements for a potable water.The presence of organisms of the coliform n group in a sample of potable water is undesirable and,while not necessarily indicating the presence of any disease-producing organisms,does indi- cote that such contamination might survive to the some extent.The presence of organisms of the coliform group may also indicate that the treat. V z rnent was not adequate at the time the sample was collected. VO 04. This sample is unsatisfactory as a potable water because certain chemical or physical constituents are above acceptable limits. These are as follows: 0 The coliform content for this raw surface water is 0 5. Low El 6.Moderate El 7. High 11 This fluoridated sample was analyzed for fluoride. The fluoride concentration was 0 8. High El 9. Low 11 0. Satisfactory LA us an 0 V (Yes, I;No, 2) EXTRA COPY r7. 1, (OIIfCTi(Jti DATA AND ANALYSIS REPORT _ _ LAD NO. T)vWN _�,—�-- PI,BLIC WATER SuvnLY SAMPLE tE EXTFNT OF PHYSICAL SE+rr" JCOAtPISTE FLUORIDE DATE RETORTED DATE REC-D.' '4 74 AN Att s15 INVOKE IX! f CO LECTION SECTION(Field data to be filled in by Sample Collector) ' NAME OF UTILITY WELL,OR SPRING NAME LOCATION ANO:OR ADDRESS OF SAMPLE COLLECTION POINT TOWN OF UTILITY TOWN NO. - Jl�,f•.�`•L,.+ -'`;L'. l � ` F: ��' �i G,i rfr ?-�',// j' ♦�I'' t:-T" /t � .��..�, /����� •j /:f•/ ,.. -�—_ TYPE OF WATER,A-Scmple Co lector-P,,t, t 1. Raw or untreated 2. Treated water at 3. Water from distribution 4. Water from distribution water at source treatment station ❑ (One source only) ❑ (Mixture of 2 or more sources' TiEATM.ENT,OF WATER REPRESENTED BY THIS SAMPLE CMcri- ((' � Poly- pH adjust- {�� Fifty Soften- Iron-manganese Fluori- Taste & odor None ❑ nation 0 phosphate ❑ meat -S tion ❑ ing ❑ removal ❑ dation ❑ Strainers ❑ control NAME AND ADDRESS OF PERSON TO RECEIVE ANALYSIS REPORT - Send Collection Data and sample to. CONNECTICUT STATE DEPARTMENT OF HEALTH Laboratory Division NO.AND STREET _ BOX 1689, HARTFORD, CONN. 06101 CITY AND STATE - - (Zip Code) Street Address: 10 CLINTON STREET, HARTFORD,CONN. LTELEPHONE: 566-5626 CHLORINE RESIDUAL(Fie1C t.,,) FLUORIDE iField test) pH(Field test) COMPLAINTS(if any) 9/ 9/ [:1 ❑ ❑ ❑ Sedi- ❑ Foam ❑m �1. m 1. Color Odor Taste ment in Other. ADDITIONAL INFORMATION!Special tests recr—ed,etc.) EXPLANATION OF COMPLAINTS For NAME OF UTILITY SOURCE I TYPE DATE OF COLLECTION SUsee 1 -� 2 3 1 4 15 6 1 7 8 9 � 10 17 12 13 14 COLLECTOR'S COUECTOR'S NAME COILEGTOR'S TITLE DATE OF COLLECTION TIME OF COLLECTION SAMPLE NO. Z� LABORATORY SECTION (Analysis results to be filled in by State Laboratory Division) APP.COL.. TRUE COL- ODOR;Jescr7pfion (De9.) TURBID. pH: f iO 15 I 16 17 1 18 r • 5- I t I 20 1 21 22 i`23 �24 a r25 NITRITE•cs N;. NITRATE(os N) '--• AMMONIA(as N) - ALBUMINOlD(os N) _ CHLORIDE(CI) a r 1; I Y { m - 26 -/27 1 28 ; 29 1 30 a -31 1 32 -.`33 1 3A 35 $6 1 37.I 38 39 I 40 '�"rt1 . `•11+�� E SODIUM ALKALINITY tC f)?3t B15ARSONATE ALKALINITY fCnCo3)CAR80NATE TOTAL HARDNF�S fC-Co3) IRON(Fe) t Q 43 I 44 I 45 46 47 I 48 1 49 50 51 32 I 53 1 54 1 55 G MANGANESE!Mn: 'FLUORIDE ff) DETERGENT(ABS) SULPHATE(SOs) Z O� w 58 a 59 60 1 bl 62 1 63 64 c 65 I 66 67 I 68 I 69 3 MEMBRANE FILTER 5P. 6- I The arithmetic mean of all standard samples examined per month using the membrane filter technique shall not ex- TEST Osc. w V teed one colony per 100 mi. Coliforn.colonies per standard sample shall not exceed 4,1100 mi. in: (a) two consecutive CoWor,n Colonies,100: �GAt' ai samples; (bi more than one standard sample when less than 20 are examined per month;or(c) more than five per ca j cent of the samples when 20 or more-are examined per month. I 1 If 70 1 71 1 72 1 73 74 75k ❑ 1. The results of the analysis of this sample are satisfactory and meet requirements for a potable water. `❑2. The results of the analysis of this sample are satisfactory for a potable water but certain of the chemical or physical constituents are 'igh. These are as follows: 2 O 1. w 3. This sample is not satisfactory since it does not meet the bacterial requirements for a potable water.The presence of organisms of the coliform group in a sample of potable water is undesirable and,while not necessarily indicating the presence of any disease-producing organisms,does ;ndi- UI cote thot such contamination might survive to the some extent.The presence of organisms of the coliform group may also indicate that t'r:e treat- Z ` ment was not adequate at the time the sample was collected. 4. This sample is unsotisfactory as a potable water because certain chemical or physical constituents are above acceptable limits. These are as follows: ❑ The coliform content for this raw surface water is ❑ 5. Low ❑ 6. Moderate ❑ 7. High ! Tha fluoridated sclrnic was analyzed for fluoride. The fluoride concentration was ❑ 8. High El 9. Low ❑ 0. Satisfactory Q W i I is.S �9 O U (Ye:, 1;No, 2) EXTRA COPY COLLECTION DATA AND ANALYSIS REPORT � J;':`tf� LAB NO. TOWN PUBLIC WATER SUPPLY SAMPLE For State Use SAMPLE EXTENT OF PHYSICAL COMVLIIE FLUORIUE DATE REPORTED DATE REC'D. OL-B 1 A(4.74)15M ANALYSIS / o INVOKE r COLLECTION SECTION(Field data to be filled in by Sample Collector) NAME Of UTILITY RE .,WELL,OR SPRING NAME LOCATION AND/OR ADDRESS OF SAMPLE COLLECTION POINT TOWN OF UTILITY TOWN TYPE OF WATER(At Sample Collection Pomp f - . Raw or untreated 2. Treated water at ❑ 3. Water from distribution 4. Water from distribution IT water at source In treatment station (One source only) ❑ (Mixture of 2 or more sources) TREATMENT OF WATER REPRESENTED BY THIS SAMPLE - - Chlori- Poly- pH adjust- } Filtra- Soften- Iron-manganese Fluori- Taste & odor El None ❑ nation ❑ phosphate El ment { Lion ❑ ing ❑ removal ❑ dation ❑ Strainers ❑ control NAME AND ADDRESS OF PERSON TO RECEIVE ANALYSIS REPORT Send Collection Data and sample to: CONNECTICUT STATE DEPARTMENT OF HEALTH Laboratory Division NO.AND STREET _ BOX 1689, HARTFORD, CONN.06101 CITY AND STATE (Zip Code) Street Address: 10 CLINTON STREET, HARTFORD,CONN. TELEPHONE: 566-5626 CHLORINE RESIDUAL(Field Jest) FIUORIDE IField test) pH(Field test COMPLAINTS(it any) -- Sedi- Foam- mg./1. mg./7. ❑ Color ❑ Odor El Taste ❑ ment [:1ing ❑ Other ADDITIONAL INFORMATION(Special tests required,etc.) EXPLANATION OF COMPLAINTS - _ - For NAME OF UTILITY - SOURCE TYPE I DATE OF COLLECTION State Use 1 2 3 1 4 1. 5- b 1. 7 8 9 i10 I Ili 12 ! 13 i 14 - COLLEC70R'S COILECTOR'S NAME COLLECTOR'S TITLE LE OF COLLECTION TIM E OF COLLECTION SAMPLE NO:1 ,_yY - - ..^Ts... ` iu LABORATORY SECTION (Analysis results to be filled in by State Laboratory Division) APP.COL. TRUE COL. ODOR(Description) (Deg) TURBID._ pHI,. o. 15 16 17 18 19 20 1 21 22 ( 23 24 - 25 NITRITE(as N) =1 NITRATE(as N)_ - AMMONIA(as N) ALBUMINOID(ae N). CHLORIDE J J EN 1 26 �7 f8 29 I 30e 31 1 32 ar33 I 34I 35 e61 3; I t38 39 11 40 1 41a 42 SODIUM(No) ALKALINITY(CoCo3)BICARBONATE ALKALINITY(C.Co31 CARBONATE TOTAL HA.RDNE5,4(CaCo3) IRON(Fe) 43 1 44 145 46 47 148 1 49 50 `41 52 53 1 54 1 55 56 57 _< MANGANESE(Mr, FLUORIDE(F) DETERGENT(ABS- ) T SULPHATE(SQa) Jr - Z VW I I I I I I , 58 59 1 60 61 62 1 63 64 65 1 66 67 1 68 1 69 M MEMBRANE-FILTER SP p Q The arithmetic mean of all standard samples examined per month using the membrane filter technique shall not ex- TEST toot. uJ U teed one colony per 100 mi. Coliform colonies per standard sample shall not exceed-4/100 mi. in: (a) two consecutive Calif—Colon,esr100 mt. ! coM. Q0 samples;(b) more than one standard sample when less than 20 are examined per month;or(c) more than five per to cent of the samples when 20 or more are examined per month. 70 j 71 j 72 i 73 74 75\� ❑ 1. The results of the analysis of this sample are satisfactory and meet requirements for a potable water. ❑2. The results of the analysis of this sample are satisfactory for a potable water but certain of the chemical or physical constituents are high. These are as follows: Z O w ❑ 3, This sample is not satisfactory since it does not meet the bacterial requirements for a potable water.The presence of organisms of the coliform, group in a sample of potable water is undesirable and,while not necessarily indicating the presence of any disease-producing organisms,does indi-cate that such contamination might survive to the some extent.The presence of organisms of the coliform group may also indicate that the treat- Z meet was not adequate at the time the sample was collected. O V ❑4. This sample is unsatisfactory as a potable water because certain chemical or physical constituents are above acceptable limits. These are as follows: r❑ The coliform content for this raw surface water is ❑ 5. Low ❑ 6.Moderate ❑ 7. High ❑ This fluoridated sample was analyzed for fluoride. The fluoride concentration was ❑ 8. High E19. Low ❑ 0. Satisfactory w - Vf V (Yes, 7;No,21 EXTRA COPY COLLiCTION DATA AND 'ANALYSIS REPORT 7 S PUBLIC WATER SUPPSY SAMPLE For State Use EANALYSOF PHYSICAL COMPLETE FLUORIDE DATE REPORTED DATE REC D OL-?l A(4-74)15M SAMPLE --fib etc INVOICE (x) COLLECTION SECTION(Field data to be filled in by Sample Collector) NAME OF UTILITY ES., ELL,OR SPRING NAME LOCATION AND/OR ADDRESS OF SAMPLE COLLECTION POINT TOWN OF UTILITY TOWN NO. � T Ex f TYPE Of WATER(AI Sample Collection Point)❑ - l. Raw or untreated Treated water at 3. Water from distribution f'�A Water from distribution water at source treatment station ❑ (One source only) LZ . (Mixture of 2 or more sources) TREATMENT OF WATER REPRESENTED BY THIS SAMPLE Chlori- oly- ((--��,pH adjust- (��Fiftra- Soften-- Iron-manganese [Xluori- Taste & odor ❑ None nation hosphate L1.1'�ment t—� Eton ❑ ing ❑ removal (,d4lwill ❑ Strainers El control NAME AND ADDRESS OF PERSON TO RECEIVE ANALYSIS REPORT Send Collection Data andsample to: CONNECTICUT STATE DEPARTMENT OF HEALTH - S D Laboratory Division NO.AND STREET BOX 1689, HARTFORD, CONN.06101 CITY AND STATE (Zip Code) Street Address: 10 CLINTON STREET, HARTFORD,CONN. TELEPHONE: 566-5626 CHLORINE RESIDUAL(Field test) FLUORIDE(Field le}I/ pH(Field test) COMPLAINTS(if ant) } Sedi- Foam- L' �mg.17. r i mg.11. ❑ Color ❑ Odor ❑ Taste 1-1ment ❑ ing ❑ Other ADDITIONAL INFORMATION(Special tests required,eta) EXPLANATION OF COMPLAINTS 4 � 1 Ul it r t � Fo+ NAME OF UTILITY SOURCE I TYPE I DATE OF COLLECTION State Use 1 2 3 1 4 1 5 6 1 7 B 9 10 I 11 12 13. 1 14 COLLECTOR'S COLLECTOR'S NAME COCLECTOR'S TITLE - DATE OF COLLECTION TIME OF COLLECTION SAMPLE NO. i rt' L4 + LABORATORY SECTION (Analysis results to be filled in by State Laboratory Division) APP.COL. TRUE COL. ODOR(Description) (Deg.) TURBID, pH a IS 16 17 18 "'""R^ "'" 19 23 i 2 22 ) 23 24f 25- NITRITE(as N) f NITRATE(as N) AMMONIA(as N) ALBUMINOID(as N) CHLORIDE(CI) -- -a, 2 -2`7 i 28/1 29 I 30' 1 3 33 I 4 I 35 a 4 77 13 39 1 40_ I 41"`e 42 E SODIUM(No) - ALKALINITY(CaCo3)BICARBONATE ALKALINITY(Ca Co•,:CARBONATE TOTAL HARDNESS(C-0O3) - IRON(Fe) V N Z ,p O 43 44 45 a 46 47 : 4d 11 4�- 50 51 52 53 1 5 _< MANGANESE(Mn) FLUORIDE(F) DETERGENT(ABS) SULPHATE(SOa) Z r11. O 58 a 59 60 I 61 62!l 6r3 64 a 65 I 66 67 I 68 69 e o "J - ^ -+ The arithmetic mean of all standard samples examined per month using the membrane filter technique shall not ex- MEMBRANE FILTER SP. O P p 9 9 TEST cONC w U teed one colony per 100 ml. Coiiform colonies per standard sample shall not exceed 4 j 100 mi. in: (a) two consecutive coliform Colonies/100 mi. cOt4. <00 samples; (b) more than one standard sample when less than 20 are examined per mouth;or(c) more than five per m cent of the samples when 20 or more are examined per month. 70 1 n 1 72 1 73 75/ 1 I I 1. The results of the analysis of this sample are satisfactory and meet requirements for a potable water. 2. The results of the analysis of this sample are satisfactory fora potable water but certain of the chemical or physical constituents are high. These - are as follows: Z O N ❑ 3. This sample is not satisfactory since it does not meet the bacterial requirements for a potable water.The presence of organisms of the coliform group in a sample of potable water is undesirable and,while not necessarily indicating the presence of any disease-producing organisms,does indi- '' cote that such contamination might survive to the same extent.The presence of organisms of the coliform group may also indicate that the treat- u Z ment was not adequate at the time the sample was collected. O ' V E14. This sample is unsatisfactory as a potable water because certain chemical or physical constituents are above acceptable limits. These are as follows: ❑ The coliform content for this raw surface water is ❑ 5.Low ❑ 6.Moderate ❑ 7.High This fluoridated sample was analyzed for fluoride.The fluoride concentration was ❑ 8. High ❑ 9. Low Wo. Satisfactory Lu QL N OV (Yes, 1,No,2) EXTRA COPY COLLECTION DATA AND ANALYSIS REPORT PUBLIC WATER SUPPLY SAMPLE For State Use -} SAMPLE EXTENT OF PHYSICAL COMPEETE FLUORIDE DATE REPORTED DATE REC'M,i;f'f �5 �t OL-81A(4-74)1-"A ANALYSIS RIVOEtf (X) - C CTION SECTION(Field data to be filled in by Sample Collector) NAME OF UTILITY S., ELL,OR.SPRING NAME IOCATIO_N AND/OR ADDRESS OF SAMPLE COLLECTION POINT TOWN OF UTILITY ITOWN - h,'o TYPE OF WATER(At Sample Cot td Point) - �qr 1. Raw or untreated 2. Treated water at 3. Water from distribution 4. Water from distribution 2. water at source ❑ treatment station ❑ (One source only ) (Mixture of 2 or more sources) TREATMENT OF WATER REPRESENTED BY THIS SAMPLE - Chlori- Poly- pH adjust- Filtra- Soften- Iron-manganese Fluori- Taste & odor None' ❑ notion phosphate ❑ meat ❑ lion ❑ ing ❑ removal ❑ dation ❑ Strainers ❑ control NAME AND ADDRESS OF PERSON TO RECEIVE ANALYSIS REPORT Send Collection Data and sample to; CONNECTICUT.STATE DEPARTMENT OF HEALTH Laboratory Division NO.AND STREET ) BOX 1689, HARTFORD, CONN.06101 CITY AND STATE - !L - (Zip Cede) Street Address: _ 10 CLINTON STREET, HARTFORD,CONN. TELEPHONE: 566-5626 MOMNE RESIDUAI'Field test) FLUORIDE(Field test) pH(Field test) COMPLAINTS(if any) . Sedi- Foam- mg./1. mg./7. ❑ Color [I Odor ❑ Taste ❑ ment [:1ing . ❑ Other. ADDITIO AL INFORMATION(Special tests required,etc.) EXPLANATION OF COMPLAINTS • i �� ��l For NAME Of UTILITY SOURCE TYPE DATE OF CO, U State Use 1 2 3 1 4 1 5 6 1 7 8 9 10 I I 12 13 i 14 COtIEtTOR'S ���/ COLLECTOR'S Nk - -COLLECTOR'S TITLE- f - - - - DATE OF COLLECT17ON'/7 TIME OF COLLECTION SAMPLE k0. 1° �J LABORATORY SECTION (Analysis results to be filled in by State Laboratory Division) w J APP.COI. TRUE COL. �ODOR/(De.,;pfion) j (Deg.) TURBID, pH - iO Is 1 I 17 Y 18 "'"R-1 r) '� 770 {t 19 Id 2tlf 21� 22 1 2a NITRITE(os v% NITRATE(os N) AMMONIA(os N) ALBUMINOID(as N) CHLORIDE(CI) o; 2 27 I 2r£ 29 130 3T-'1 3�2'- a 33.1 3 I 3 36 37 I 38 39 I 40 I 42- E SODIUM(Nc ,ALKALINITY/CaC BICARBONATE ALKALINITY(C00O3)CARBONATE TOTAL HARDNESS(C.Co3) IRON(Fe) _ N ill Z j �p-,-jy i Q 43 M i 45'� 47 1 48 I 4� 50 .52�` 53 5d I 5 56 57`-"'"3 =G MANGANESE(Nn/ FLUORIDE tF) DETERGENT(ABS) SULPHATE(SOa) ui I m • 59 63 6a 65 1 66 / 671 68I 6958 I W O "�j MEMBRANE FILTER p- The arithmetic mean of all standard samples examined per month using the membrane filter technique shall not ex- TEST CONC. w U teed one colony per 100 mi. Coliform colonies per standard sample shall not exceed 4/100 mi. in: (a) two consecutive colifor.n Colonfes�700 nd: COM. aO samples; (b) more than one standard sample when less than 20 are examined per month;or(c)more than five per I I a aT cent of the samples when 20 or more are examined per month. 70 1 ``71_I 72 1 73t 74 J ❑ 1: The results of the analysis of this sample are satisfactory and meet requirements for a potable water. ❑2. The results of the analysis of this sample are satisfactory for a potable water but certain of the chemical or physical constituents are high.These are as follows: z O w ❑ 3. This sample is not satisfactory since it does not meet the bacterial requirements for a potable water.The presence of organisms of the coliform group in a sample of potable water is undesirable and,while not necessarily indicating the presence of any disease-producing organisms,does indi- cate that such contamination might survive to the same extent.The presence of organisms of the coliform group may also indicate that the treat- U z ment was not adequate at the time the sample was collected. O V ❑4. This sample is unsatisfactory as a potable water because certain chemical or physical constituents are above acceptable limits. These are as follows: The catiform content for this raw surface water is 7r`5. Low ❑ 6.Moderate ❑ 7.High ❑ This fluoridated sample was analyzed for fluoride. The fluoride concentration was ❑ 8. High ❑ 9. Low ❑ 0.Satisfactory La a. Ple r^! { !!r-1 Pc't e (Yes. 1;No,2) EXTRA COPY CIDUKTIOv D.�TA Alin AtIAILYSIS REPORT LAB No TOWN PUBLIC WATER SUPPtX SAMPLE For State Use / 013 i A(4 74j 1 SM SAPtPLE 0.NALIYS6 PHYSICAI COMPLETE FLUORIDE DATE REPORTED DATE RLL D INVOKE ix) ri.., - - -- - -- . , , - - --� -777 _ - -- -- - - - —"` ---- —_----------_"COLLECTION SEC 1[ON(Field data to be filled in by Sample Collector),-- —__---- --- -- i- - - --_-- NAME OF UTILITY �! ELS WELL,OR SPRING NAME LOCATION AND'OR ADDRESS OF SAMPLE CO tCTI POINT TOWN OF UTILITY ,TOWN` ` �` ) NO. -------------------- TYPE Of.WATER;A,Sample Co11e0600 Pomq - ❑ 1. Raw or untreated Treated water at 3. Water from distribution 4. Water from distribution water at source treatment station ❑ (One source only) ❑ (Mixture of 2 or more sources) TREATMENT OF WATER REPRESENTED BY THIS SAMPLE - Chlori- poly, H adjust- Filtra- Soften- Iron-manganese Fluori- Taste & odor ❑-1Vone ❑ nation ❑ phosphate ❑ ment I ❑ tion ❑ ing ❑ removal g ❑ dation ❑ Strainers ❑ control NAME AND ADDRESS QF PERSON TO RECEIVE ANALYSIS REPORT Send Collection Data and sample to: CONNECTICUT STATE DEPARTMENT OF HEALTH Laboratory Division NO.AND STREET BOX 1689, HARTFORD, CONN. 06101 CITY AND STATE � � - (Zip Code) Street Address: - 10 CLINTON STREET, HARTFORD,CONN. TELEPHONE: 566-5626 CHLORINE RESIDUAL(Field test) FLUORIDE(Field test) pH(Field test) COMPLAINTS(if any) Sedi- mg./1. mg./7. ❑ Color ❑ Odor ❑ Taste ❑ ment ❑ ingm ❑ Other ADDITIONAL INFORMATION(Special tests required,etc.) EXPLANATION OF COMPLAINTS ror I NAME OF UTILITY SOURCE TYPE DATE OF COLLECTION State I I 1 I I I 1 I ) I Use 1 1 2 1 3 4 5 6 7 8 9 1 10 11 112 1 13 14 COLLECTOR'S COLLEC70R'5 N COIIECTOR'S TITLE DATE OF COLT CTIO TIME OF COLLECTION SAMPLE NO. LABORATORY SECTION (Analysis results to be filled in by State Laboratory Division) APP.COI. TRUE COL ODOR.(Descriplion) r - (Deg.) TURBID, pH jj =u 1 r 1 J !. I +tl 14 I !4 a_ 15 16 17 18 -"t"t T;l l'"fit p!.t 19 20/1 21422 1 23� - 24 4 NITRITE(as N) NITRATE(as N) ` AMMONIA(as N) ALBUMINOID(as N) CHLORIDE(CI) _ Yrl ` .� 26 2 129 29 1 30 11 Y111 'ill . 33�1 34 1 35 3 1 37 Y 38r 39 1 40 i 4 4 E SODIUM IN.) - ALKALINITY(C-0O3)BICARBONATE ALKALINITY(CaCO3)CARBONATE TOTAL HARDNESS(CnCo3) IRON(Fe) N yo' �` O 43 44 45 a 46 47 ; 48 j 49/ 51-;.10 - 53 i 54"�1/ 1 55 10 5) 1d< MANGANESE(Mn) FLUORIDE(F) .. DETERGENT(ABS) SULPHATE(SO4) Z Of I I I I I W 58 59 1 60 61 62 1 63 64 65 1 66 67 1 68 1 69 W MEMBRANE FILTER SP. p The arithmetic mean of all standard samples examined per month using the membrane filter technique shall not ex- TEST CONC. Lu v teed one colony per 100 mi. Coliform colonies per standard sample shall not exceed 4/100 mi. in: (a) two consecutive Corfor,n Colonies/100 mi. COM' 00 samples;(b) more than one standard sample when less than 20 are examined per month;or(c) more than five per I I m cent of the samples when 20 or more are examined per month. I I I )' 70 1 71 1 72 1 73 ly 74, 7S ❑ 1. The results of the analysis of this sample are satisfactory and meet requirements for a potable water. ❑2. The results of the analysis of this sample are satisfactory for a potable water but certain of the chemical or physical constituents are high. These are as follows: z 0 6- El3. This sample is not satisfactory since it does not meet the bacterial requirements for a potable water.The presence of organisms of the Coliform n group in a sample of potable water is undesirable and,while not necessarily indicating the presence of any disease-producing organisms,does indi- Vcote that such contamination might survive to the some extent.The presence of organisms of the Coliform group may also indicate that the treat- z ment was not adequate at the time the sample was collected. O ' V ❑ 4. This sample is unsatisfactory as a potable water because certain chemical or physical constituents are above acceptable limits. These are as follows: (❑ The Coliform content for this raw surface water is ❑ 5. Low ❑ 6. Moderate ❑ 7.High ❑ This fluoridated sample was analyzed for fluoride. The fluoride concentration was ❑ 8. High ❑ 9.Low ❑ In. Satisfactory (Q(�W - a.X 4A U (Yes, 1;No,2) EXTRA COPY COLLECI.DN DATA AND ANALYSIS REPORT t G LAB No. SOWN ;"UBUC WATER SUPPLY SAMPLE v For State Use s SAMPLE EXTENT OF PHYSICAL COMPLETE FLUORIDE DATE REPORTED DATE REC'D. OL-81A(4-74)15M ANALYSIS f INVOICE Ixl f f 7 CC 4JCTION SECTION(Field data to be filled in by Sample Collector) NAME OF UTILITY ES.,WELL,OR SPRING NAME LOCATION AND/OR ADDRESS OF SAMP COLLECTION IN TOWN OF UTILITY TOWN .11 TYPE OF WATER(At Sample Collection Point) I ❑ 1. Raw or untreated ((--'AjJJ22 Treated water at 3. Water fro distribution 4. Water from distribution water at source (�"' treatment station El (One source only) ❑ (Mixture of 2 or more sources) TREATMENT OF WATER REPRESENTED BY THIS SAMPLE (�y Chlori- Poly- pH adjust- y Filtra- Soften- Iron-manganese +Fluori- Taste & odor ❑ None L-+^h nation �pho�hate [Xment l;'LT`tion ❑ ing ❑ removal JAI dation ❑ Strainers ❑ control NAME AND ADDRESS OF PERSON TO RECEIVE ANALYSIS REPORT Send Collection Data and sample to: CONNECTICUT STATE DEPARTMENT OF HEALTH Laboratory Division NO.AND STREET st - BOX 1689,HARTFORD, CONN.06101 CITY AND STATE - (zip Code) Street Address: 10 CLINTON STREET, HARTFORD,CONN. TELEPHONE: 566-5626 CHLORINE RESIDUAL(field test) FLUORIDE(Field lest) d lest) COMPLAINTS(tl any) Sedi- Foam- mg./7. AjpH ❑ Color ❑ Odor ❑ Taste ❑ ment ❑ ing . ❑ Other ADDITIONAL II/Np{FORMATION(Special tests required,etc.) - EXPLANATION OF COMPLAINTS For NAME OF UTILITY SOURCE TYPE DATE OF COLLECTION State Use 1 2 i 3 I 4 1 5 6 1 7 B 9 1 10 I 11 i 12 13 1 14 COLEE ETOR'R'S COLLECTOR'� E COLLKTOR'S TITLE � DATE OF COLLECTION TIME OF COLLECTION 2, LABORATORY SECTION (Analysis results to be filled in by State Laboratory Division) J APP.COL. TRUE COL. ODOR(Description) (Deg.) TURBI 18D. pN i U I I f I+r<79 Ilp-- 20 2r 22 I n 15 I tb 1T °� C-C•�'t��+•e`f{':.�a•t++t:� 'NITRITE(as N) /° NITRATE(as N) } {�j� AMMONIA(as N) ALBUMINOID(as N) CHLORIDE(CI) tw` 0I 1 I 6-' T` `) �I �I ->I I I 2 1_ ( 28 29 1 3 3 1 32 3 1 3 1.35 3 ( 3 1 3 39 1 40 I 4 SODIUM(Na) ALKALINITY(C Co BICARBONATE ALKALINITY(CnCo3)CARBONATE TOTAL HARDNESS(CaCo3) IRON(Fe) u2 ii • i r - `9T • S3 j 54"I SrJ"� i. 5 V S.) 43 $$ 46 47 48`- 49 so MANGANESE(Mn) FLUORIDE(F) ETERGENT(A85/ SULPHATE(SO<) 2 u W I 6 d!2' 4— I I 58 59 , • ( 60 r4 62`1 6-3- I` 64 • 65 1 66 67 1 68 1 69 r W - C1 1). 4r AJ MEMBRANE FILTER SP. p B The arithmetic mean of all standard samples examined per month using the membrane filter technique shall not ex- TEST CONC. w u teed one colony per 100 mi. Coliform colonies per standard sample shall not exceed 4/100 ml. in: (a) two consecutive Cofdonn Colonies/100 ml: COM. samples; (b) more than one standard sample when less than 20 are examined per month;or(c) more than five per m cent of the samples when 20 or more are examined per month. I 70 1 71 I 72 I 73 7 75I 1. The results of the analysis of this sample are satisfactory and meet requirements for a potable water. ❑2. The results of the analysis of this samt:le are satisfactory for a potable water but certain of the chemical or physical constituents are high. These are as follows: Z O ❑3. This sample is not satisfactory since it does not meet the bacterial requirements for a potable water.The presence of organisms of the coliform group in a sample of potable water is undesirable and,while not necessarily indicating the presence of any disease-producing organisms;does indi- V cote that such contamination might survive to the same extent.The presence of organisms of the coliform group may also indicate that the treat- Z ment was not adequate at the time the sample was collected. O U ❑4. This sample is unsatisfactory as a potable water because certain chemical or physical constituents are above acceptable limits. These are as follows: ❑ The coliform content for this raw surface water is ❑ 5.Low ❑ 6.Moderate ❑ 7.High This fluoridated sample was analyzed for fluoride.The fluoride concentration was ❑ S. High ❑ 9. Low .Satisfactory - a ty N u (Yes, 1;No, 2) EXTRA COPY - tUlletT1G7i DATA AND l�NALY5i� R PORT � LAB NO. ^ TOWN — f— _``t H%UC WATER SUPPt t=54MPtE For State Use EXTENT OF HY PSICAL- COMPLETE rLUORIDE DATE REPORTED DATE REC'D. '--L-81A •4-74115M SAMPLEANntYSIS INVOICE fX! L C9tlLCTION SECTION(Field data to be filled in by Sarnple C llector) — a .�`r ---��►--+ ----- NAME OF UTILITY Rf?S.,WELL,OR SPRING NAME LOCATION AND iOR ADDRESS OF SA COLLECTION POINT YOWL OF UTILITY v_x H'jr1N X PA T+PE OF WATER,A!:cmp:<Cc ec Gan Pmml - 'J 1. Raw or untreated 2. Treated water at Water from distribution 4. Water from distribution water at source ❑ treatment station Lg�, (One source only) ❑ (Mixture of 2 or mote sources) 'FEATMENT OF WATER PEPRESENTED BY THIS SAMPLE Chlori- r'Poly- ���ye pH adjust- Itra- Soften- Iron-manganese (� Fluor)- Taste & odor None nation a; sphate I_/]gent flan ❑ ing ❑ removal yi d elation ❑ Strainers ❑ control j NAME AND ADDRESS OF PERSON TO RECEIVE ANALYSIS REPORT Send Collection Data and sample to: 17 CONNECTICUT STATE DEPARTMENT OF HEALTH Laboratory Division e NO.AND STREET BOX 1689, HARTFORD, CONN.06101 CITY AND STATE (zip Code) - Street Address: 10 CLINTON STREET, HARTFORD,CONN. TELEPHONE: 566-5626 CHLORINE RESIDUAL'Field teV, FLUORIDE fFiel��f) pH(Field test) COMPLAINTS(if any), Sedi- Foam- � ? mg,ji. 4 mg./1. ❑ Color [:1 Odor ❑ Taste ❑ ment ❑ ing ' ❑ Other ADDITIONAL INFORMATION(Speciat tests required,etc.) EXPLANATION OF COMPLAINTS i tr C� ForNAME OF UTILITY SOURCE I TYPE I DATE OF COLLECTION State Use 1 2 3 I 4 I 5 6 7 8 9 i 10 111 i 12 13 i 14 CCtLECTORRS COUECTOR'$�E - COLLECTOR'S TITLE DATE OF COLLECTIO, - TIME OF COLLECTION _ SAMPLE.NO.. �t rF 3' CAS' _e '-- 1'. /.1 7/ 1,2 <-•.e.% LABORATORY SECTION (Analysis results to be filled in by State Laboratory Division) APP.COL. TRUE CO l ODOR iDescdpeon) (Deg.) TURBID. pH £ r Tf I �I 1I I f_ e. TS 16e 17 1 s'r rt1 S' •rt f I, 7 II 19 2 1 2 r 22 1 23 247 2; NTT RITE(as Ni NITRATE(as N) f AMMONIA(as N) ALBUMINOID,.N) CHLORIDE(CI)- - - m • 26 1 27 1 28 29 1 30 a 31 1 32 • 33 1 34 1 35 • 36 1 37 1 38 39 i -40 141 • 42 SODIUM(No, ALKALINITY(C-Co3)BICARBONATE ALKALINITY(CoCo3)CARBONATE TOTAL HARDNESS(CoCo3) IRON(Fe) z 1 f— O 43 44 45 • 46 47 i 48 49 a 50 51 a 52 - 53 i 54 j 55 • 56 • 57 z Q MANGANESE IMn. FLUORIDE(F) DETERGENT(ABS) SULPHATE(SOA) z_ V0' I 1 I I I 0' 58 • 59 1 60 61 62r 1 if3 64• 65 1 66 67 I 68 69 a MEMBRANE FILTER Sp. p- The arithmetic mean of all standard samples examined per month using the membrane filter technique shall not ex- TEST CONc. vteed one colony per 100 Mi. Coliform colonies per standard sample shall not exceed 4/100 mi. in: (a) two consecutive Coldo—Colon-100 mi. COM. CO samples; (b) more than one standard sample when less than 20 are examined per month;or(c) more than five per Co cent of the samples when 20 or more are examined per month. 70 j 71 j n 1 73 7 75' mil', The results of the analysis of this sample are satisfactory and meet requirements for a potable water. ❑2. The results of the analysis of this sample are satisfactory for a potable water but certain of the chemical or physical constituents are high. These are as follows: z 0 w ❑ 3. This sample is not satisfactory since it does not meet the bacterial requirements for a potable water.The presence of organisms of the colifornl group in a sample of potable water is undesirable and,while not necessarily indicating the presence of any disease-producing organisms,does indi- urate that such contamination might survive to the some extent.The presence of organisms of the coliform group may also indicate that the treat- z ment was not adequate at the time the sample was collected. O u ❑4. This sample is unsatisfactory as a potable water because certain chemical or physical constituents are above acceptable limits. These are as follows: ❑ The coiiform content for this raw surface water is ❑ 5.Low ❑ 6:Moderate ❑ 7. High Q(This fluoridated sample was analyzed for fluoride. The fluoride concentration was ❑ 8.High E19. Low �Ld. Satisfactory V1 j / LU V a� 0 (Yes, 1;No,2) V EXTRA COPY FLUORIDATION In 1960 The Metropolitan District began the practice of adding one part per million of fluoride to the water in order to provide the benefits that children's teeth derive from drinking water which contains this small amount of the fluorine element. The fluoride is applied to the water in the form of a pow- der known as sodium silicof.luoride. The application is by three machines which automatically and continuously weigh the required amount, put it into a small amount of water, stir it until dissolved, then discharge it into the main stream of water flowing in three large pipes, just after filtration and before storage in the two concrete basins. A constant check is kept on the concentration of fluoride in the water as it enters the storage basins with another automatic analyzer which tests for fluorides continuously and records the results on a chart. Fluoride compounds in large -conceritrations are poisonous so the oper- ators 'are required to wear respirators and rubber clothing arhen they load the hoppers of the machines. - Dust collectors are provided on all the machines to reduce the hazards. CORROSION CONTROL The people of The Metropolitan District enjoy a very -soft and pure water, but because it is so soft it also tends to be corrosive. That .means it will dissolve minute quantities of copper from brass or cooper pipes and iron from pipes that have that element in their composition. If the piping system is made up of a mixture of metals, or if the temperature of the water is too high, the rate of solution is greatly accelerated. The corrosion products are a nuisance in that they discolor the water and plumbing fixtures and in that they weaken the pipe walls, roughen the interior surface, and impede the flow of water. These undesirable effects can be eliminated by adding a small amount of other harmless chemicals which neutralize the corrosive nature of the water. At this plant lime is used to protect the pipes which have a copper composition and a complex compound known as sodium hexa-meta-phosphate is used to protect pipes with an iron composition. The lime is added to the water by automatic weighing machines in very much the same manner as the fluorides. The application of the sodium hexa-meta- phosphate is slightly different in that a solution of known strength is made up by the operator and .then small diaphragm p unps force the solution into the three large pipes which carry filtered water to the 6- and 9-million gallon storage basins. The lime dose is approximately 6 parts per million which is equivalent to 50 pounds per million gallons , and the sodium hexa-meta-phosphate is at the rate of one part per million, or 8-1/3 pounds per million gallons. These dosage rates are varied when laboratory tests indicate the need for a change. Automatic recording analyzers indicate the effect of the lime on the water. It is between filtration and storage that the chlorine, fluoride, phosphate and caustic soda are added. The last mentioned chemicals, phosphate and caustic soda are used for the prevention of metal .corrosion. Water, which is now conditioned for drinking, i's conveyed to the consumers by means of two 54-inch diameter mains. The depth of the 10 million gallon storage basin fluctuates according to demand under the watchful eye of the plant operator who is ever ready to replenish the sparkling supply. SLUDGE DECANTING AND DRYING Material which has settled in the coagulation basin, together with the dirty wash water, is directed to the decanting basin. Here the heavy particles are again settled and concentrated on the bottom. The clear water above is chlorinated and pumped back into Reservoir 6 after which the sludge is drained onto one of two drying beds. Following a four or five day period the material is removed as a cake to be disposed of as land fill . • LABORATORY CONTROL Two well-equipped laboratories, licensed by the Connecticut State Health Department, are maintained, one at each filter plant. Daily bacterio- logical tests are made on the water flowing to the treatment plants , at .various points in the plant; after chlorination, and on water collected from n�uurcrous points throughout the distribution system. Microscopic examinations to deter- mine the kind and ntanber of algae present in the reservoirs are made acckly. Various chemical and physical tests are made on samples from the reservoirs , the treatment plants and the distribution system. These bacteriological tests show that the water produced at the treatment plants. of The Hartford Metropolit-an District is of excellent character, meeting the rigid requirements of the United States and the Connecticut State Health Department. COLLECT'40N DATA AND ANALYSIS REPORT _ / / '' 11 f PUBLIC WATER SUMY SAMPLE For State USe SAMPIf EXTENT OF PHYSICAL COMPl E FLUORIDE DATE SPORTED t * DATE REC'Oc.';';i ++ e J : 18 OL-81 A(4.74}15M ANALYSIS (// ! INVOICE (X) s --- --- — _ ,,GQLLECTION SECTION(Field data to be filled in by Sample Collector) NAME OF UTILITY RES.`WELL,OR SPRING NAME LOCATION AND!OR ADDRESS OF SAMPLE COLLECTION POINT TOWN OF UTILITY TOWN /) it i 1 (..` + �/=tlil .�'.•sF.t /�L� t.s�r1 !:.' ZZ TYPE OF WATER(At Sample Collechon Pomt) - ❑ 1. Raw or untreated ( 2. Treated water at 3. Water frorr>rdistribution 4. Water from distribution water at source L__J treatment slat ion ❑ (One source only) ❑ (Mixture of 2 or more sources) TREATMENT OF WATER REPRESENTED BY THIS SAMPLE - Chlori- ,^�, ;'� Poly- (� pH adjust- Filtra- Soften- Iron-manganese Fluori Taste& odor ❑ None nation .{�J phosphate ,❑ ment 1�1tion ❑ ing ❑ removal dation ❑ Strainers ❑ control NAME AND ADDRESS OF PERSON TO RECEIVE ANALYSIS REPORT �: Send Collection Data and sample to: CONNECTICUT STATE DEPARTMENT OF HEALTH Laboratory Division NO.AND STREET _ i `- BOX 1689, HARTFORD, CONN.06101 CITY AND STATE (Zip Code) Street Address: 10 CLINTON STREET, HARTFORD,CONN. TELEPHONE: 566-5626 CHLORINE RESIDUAL(Field test) FLUORIDE(Field test) pH(Field test) COMPLAINTS(it any) z Sedi- Foam- r mg./7. ❑ Color ❑ Odor ❑ Taste ❑ ment ❑ ing ❑ Other ADDITIONAL INFORMATION(Special tests required,etc.) EXPLANATION OF COMPLAINTS. �• j f -`."� - For NAMEOF UTILITY SOURCE TYPE I DATE OF COLLECTION r — State Use 1 2 3 1 4 5 6 1 7 8 9 i 10 1 11 ! 12 13 i 14 COLLECTOR'S COLLECTOR'$.NAME _ COLLECTOR'SITITLE DATE OF COLLECTION TIME OF COLLECTION SAMPLE NO. ,' ,-/:� I .j "/i; '•'� .��j' <.:. - `_ LABORATORY SECTION (Analysis results to be filled in by State Laboratory Division) APP.COLT. TRUE COL. ODOR(Description) (Deg.)_ TURBID.. r1 15 16 17 t 18 1 19 1 20 1 21 22 NITRITE(as N) NITRATE/os N) d �.' AMMONIA(as N) ALBUMINOID(as N CHLORIDE'CI) 10 � I •r .1 -f 1 I i I ,� I I f e 76 1 27 1 28 29 1 30 31 1 32 ."33 1 34 1 35 36 1 37 1 38 39 1 40 1 4I 42 5 SODIUM(Na) ALKALINITY!CaC.93)BICARBONATE ALKALINITY(C.Co3)CARBONATE TOTAL HAJ;DNE•SS,'CoCo3) IRON(fe) �• � s,s. uz I I 11 •fc f��� 1 1 fk 1S'. j i O 43 1 44 1 45 46 47 1 48 1 49 a 50 1 53 1 54 1 55 — Sb 57 _ MANGANESE(Mr) FLUORIDE(F) DETERGENT(A85) SULPHATE(SOa) ;" if� t �' I�• I � I I t W 58 59 1 60 61 62 1 63 1 64 65 1 66 ) 67 1 68 I 69 MEMBRANE FILTER sP 6- The arithmetic mean of all standard samples examined per month using the membrane filter technique shall not ex- TEST colic. W U teed one colony per 100 ml. Coiiform colonies per standard sample shall not exceed 4/100 mi. in: (a) two consecutive calda,m ealaaie:/lao mt. Cant u 00 samples;(b) more than one standard sample when less than 20 are examined per month;or(c) more than five per co-' y cent of the samples when 20 or more are examined per month. 70 71 72 73 7a 75 1. The results of the analysis of this sample are satisfactory and meet requirements for a potable water. ❑2. The results of the analysis of this sample are satisfactory for a potable water but certain of the chemical or physical constituents are high. These are as follows: Z 0. ❑ 3. This sample is not satisfactory since it does not meet the bacterial requirements for a potable water.The presence of organisms of the coliform D group in a sample of potable water is undesirable and,while not necessarily indicating the presence of any disease-producing organisms,does indi- Ucote that such contamination might survive to the some extent.The presence of organisms of the coliform group may also indicate that the treat- ' Z ment was not adequate at the time the sample was collected. O V ❑4. This sample is unsatisfactory as a potable water because certain chemical or physical constituents are above acceptable limits. These are as follows: ❑ The coliform content for this raw surface water is ❑ 5,Low ❑ 6. Moderate ❑ 7.High ❑ This fluoridated sample was analyzed for fluoride.The fluoride concentration was ❑ 8.High ❑ 9.Low /LJ 47. Satisfactory Q Lu CL g tn O U (Yes, 1;No, 2 EXTRA COPY COLLTf Ti6N DATA AND' ANALYSIS REPORT c �- IAB No. TCFvta PUBLIC WATER SUPPLY SAMPLE b /s or State' Use r SAMPLE EXTENT OF PHYSICAL COMPLf TE FLUORIDE DATE REPORTED DALE RECD — 01-81 (4-7d)15M ANALY51S } --7 iHYOI(F x) ---�-1 --� �— COLpLECTION SECTION(Field data to be filled in by Sample Collector) NAME OF UTILITY ( -Rt5 WELL,OR SPRING NAME LOCATION AND�OR ADDRESS OFtAMPLE COLLECTION POINT TOWN OF UTILITY TOWN t NO, TYPE OF WATER(At Sample Cotlection P-1) - ❑ 1. Raw or untreated 1 2. Treated water at 3. Water from distribution 4. Water from distribution water at source treatment station ❑ (One source only) ❑ (Mixture of 2 or more sources) TREATMENT OF WATER REPRESENTED BY THIS SAMPLE _ Chia" {� Po - H adjust- Nitro- Soften- Iron-mon anese Flvori- Taste & odor ❑ None .S nation ❑,_phosphate r❑ ment I tion ❑ ing ❑ removal g dation ❑ Strainers ❑ control NAME AND ADDRESS OF PIERSON TO RECEIVE ANALYSIS REPORT Send Collection Data and sample to: CONNECTICUT STATE DEPARTMENT OF HEALTH Laboratory Division NO.AND STREET - BOX 1689, HARTFORD, CONN.06101 CITY AND STATE (Zip Code) Street Address: 10 CLINTON STREET, HARTFORD,CONN, LTELEPHONE: 566-5626 CHLORINE RESIDUAL(field test) FLUORIDE(Field test) pH(field test) COMPLAINTS(if any) Sedi- Foam- j (' mg./1.' '` '' mg./1. _ ❑ Color ❑ Odor' ❑ Taste ❑ ment ❑ ing ❑ Other - ADDITIONAL INFORMATION(Special tests required,etc.) EXPLANATION OF COMPLAINTS For NAME OF UTILITY SOURCE TYPE DATE OF COLLECTION _ -- Slate Use 1 2 3 1_ 4 1 5 b I 7 8 9 i- 10 1.-11 12 13 14 COLLECTOR'S COLLECTOR'S NAME - COLLECTOR'S TITLE DATE OF COLLECTION TIME Of COLLECTION SAMPLE NO.;' r t..-:_ �- - . \ LABORATORY SECTION (Analysis results to be filled in by State Laboratory Division) APP.COL. TRUE COL. ODOR(Desalption) (Deg.) TURBID. pH O 15 1 116 17 Ir 18 -` 1.9 '20 21 22 11123 24 25 ^ NITRITE(as N) - �._ ,.� NITRATE(as N) -_- AMMONIA(os N) ALBUMINOiDIos N)- - CHLORIDE(Cp¢ s"�sy" t•,...1 t,—xJ I 1-*" F I I'll i - 1 1 1 1 ��J m 26 1 27 1 28 29 1 30 3T 1 32 33 1 34 1 35 36 1 37 1 38 39 1 40 t 41 42 E SODIUM(No) ALKALINITY(CaCo3)BICARBONATE ALKALINITY(C.Cg�i CARBONATE TOTAL HARDNE5S!CaCo31- IRON(Fe) ` — N / 1 va I 1 IP I {s°l. 1 { { ; l� _ 43 1 44 1 45 46 47 1 48 49 50 51 52 53 1-54 1 55 �56 57 p1< MANGANESE(Mal FLUORIDE(F) DETERGENT(ABS) SULPHATE ISO,) - Y Z j u I 1' 1 t 1 I 58 59 I 60 6162 1 63 64 65 1 66 ? 67 I 68 I 69 i- The arithmetic mean of all standard samples examined per month using the membrane filter technique shall not ex- MEMBRANE FILTER SP. O P P 9 9 TEST cDRc. w U seed one colony per 100 mi. Coliform colonies per standard sample shall not exceed 4/1 G7 mi. in: (a) two consecutive cacfann Cahn es.loo mi. coM. O• sampies;(b) more than one standard sample when less than 20 are examined per month;or(c) more than five per m cent of the samples when 20 or more are examined per month. I I I JjJ 70 1 71 1 72 1 73 `74 75 1, The results of the analysis of this sample are satisfactory and meet requirements for a potable water. ❑2. The results of-the analysis of this sample are satisfactory for a potable water but certain of the chemical or-physical constituents are high. These are as follows: Z O N ❑ 3. This sample is not satisfactory since it does not meet the bacterial requirements for a potable water.The presence of organisms of the co!iform group in a sample of potable water is undesirable and,while not necessarily indicating the presence of any disease-producing organisms,does indi- cate that such contamination might survive to the same extent.The presence of organisms of the coliform group may also indicate that the treat- Z ment was not adequate at the-time the sample was collected. O V ❑4. This sample is unsatisfactory as a potable water because certain chemical or physical constituents are above acceptable limits. These are as fellows: (❑ The coliform content for this raw surface water'is ❑ 5. Low ❑ 6. Moderate ❑ 7. High L—� This fluoridated sample was analyzed for fluoride. The fluoride c9ncentration was .❑ 8. High ❑ 9. Low ❑ 0. Satisfactory az sn (Yes, 1;No, 2) EXTRA COPY , COLLECTION D,tM AND ANALYSIS REPORT _ - -- r - _� iAB NO. TOWN PUFtIC 4VA7ER SUPPLY SAMPLE For State Use -_--__-_ ._._.__. J...-.._._._ J u rEXT�NT O} PHYSICAL CO/ fTE FLUORIDE JDATE REPORTED DATE REC D, - t i 1£ t.7 ;r PtE I -- A td ALYMS 1 -• X) COLLECTION SECTION(Field data to be filled in by Sample Collector) ' --- _ _ NAME Ci UYtLiTY / REJWEIt.OR SPRING NAME LOCATION AND OR ADDRESS OF SAMPLE COLLECTION POINT TOWN OF UTILITY 7 1, ..•{ e f/ { NO- } --�— TYPE 6 WATER A.Sa-:OceI. Raw or untreated 2. Treated water at 3. Water from distribution 4. Water from distribution ED`, water at source .I— treatment station ❑ (One source only) ❑ (Mixture of 2 or more sources) TREAT/NENT,OF WATER L:E=.ESENTED BY;isl5 SAMPLE -------- - - - - —_ t I Chlori- r--; Poly- r---i pH adjust- Filtra- Soften- Iron-manganese ( Fluori- ( Taste & odor ❑ None L' !j nation L-_y phosphate }�-menl lion ❑ ing ❑ removal { dation ❑ Strainers L-7 control NAME AN-'ADDRESS OF PERSON TO RECEIVE ANALYSIS REPORT Send Collection Data and sample to: CONNECTICUT STATE DEPARTMENT OF HEALTH Laboratory Division NO.AND STREET .. - BOX 1689, HARTFORD, CONN. 06101 CITY AND STATE - - (Zip Code) Street Address: 10 CLINTON STREET, HARTFORD, CONN. h TELEPHONE: 566-5626 CHLORINE RESIDUAL(F,.;d tesv; FLUORIDE rFi.id test) _ pH(Field test).i COMPLAINTS(if any) Sedi- Foam- mg./1. �' •. mg./1. r ❑ Color ElOdor ❑ Taste ❑ merit ❑ ing ❑ Other• ADDITIONAL INFORMATION-Special tests regv ed,etc.) EXPLANATION OF COMPLAINTS For NAME OF UTILITY SOURCE I TYPE I DATE OF COLLECTION State I I I I.3 4 5 6 I I I I I I Use 1 1 2 1 l 7 8. 1 9 10 11 1 12 1 13 1 14 COLLECTOR'S _ COLLECTOR'S NAME COLLECTOR'S TITLE - DATE OF COLLECTION TIME OF COLLECTION SAMPLE LABORATORY SECTION (Analysis results to be filled in by State Laboratory Division) APP.COL. TRUE COI. ODOR Cesu�pFon; _ (Deg.) TURBID. pH.- i e O� 75 16 t7 � 18 -- - - j 19 �'20 i 21 22 23 -24 e`25 NITRITE' f as Nr• - NITRATE(as N7 t AMMONIA(as N) ALBUMINOlD(Os N) CHLORIDE(CI) ; _ 26 ,I17 28 ! 29 1 s0 31 ( 32 33 1 34 1 35 36 1 '37 I 38 39 1 40 1 41 42 -^�— c SODIUM wa; (ALKALINITY,C.C., BICARBONATE ALKALINITY iCOC 3)CARBONATE TOTAL HARDNESS(CoCo3) IRON(Fe, M 1 u 2 �' 4..•*L I r r J s 43 1 a4 1 45 46 j 47 1 48 1 49 50 `S1 52 53 1 54 1 55 56 •`571 MANGANESE M, 1 FLUORIDE tF DETERGENT(AB5) SULPHATE(SO4) of I .s 58 59 60 ' '61 •62 I 63 64 65 1 66 + 67 1 68 I 69 - W ' MEMBRANE FILTER sp 6- The arithmetic mean of all standard samples examined per month using the membrane filter technique shall not ex- TEST ', c LU V teed one colony per 100 ml. Coliform Colonies per standard sample shall not exceed 4/100 ml. in: (a) two consecutive Cafirar,::C.;­­ To^ j coM. CO samples; (b) more than one standard sample when less than 20 are examined per month;or(c) more than five per m cent of the scmples when 20 or more'are examined per month. 70 j 71 j 72 ' Y3 74 75 t 1. The results of the analysis of this sample are satisfactory and meet requirements for a potable water. 2. The results of the analysis of this sample are satisfactory for a potable water but certain of the chemical or physical constituents.are ',igh. These are as follows: Z O N ❑ 3, This sample is not satisfactory since it does not meet the bacterial requirements for a potable water.The presence of organisms of the.coliform group in a sample of potable water is undesirable and,while not necessarily indicating the presence of any disease-producing organisms,, does indi- u cafe thct such contamination might survive to the same extent.The presence of organisms of the coliform group may also indicate that t;ne treat- Z nlent was not adequate at the time the sample was collected. O --1 L„ 4. This so nple is unsatisfactory as a potable water because certain chemical or physical constituents are above acceptable limits. These areas follows: 1 ❑ The coliform content for this raw surface water is ❑ 5. Low ❑ 6. Moderate ❑ T. High c_J TKs fiuoric.led samp'e was analyzed for fluoride. The fluoride concentration was C1 8. High r.,I 9, low - ❑ 0. Satisf:utory vi Vim . sa / 0 I Yes, l;No,2) EX1`RA COPY COLLECTION DATA AND ANALYSIS REPORT _ ! ? AB NO. TOWN '� _ PUBLICWATt?R SUPPLY.SAM% For State Use E .`s - -- . PHYSICAL COMP ET_6 FLUORIDE SATE REPORTED DATE REC'U.,, y E OL-81A'4-7d 15M SAMPLE Ext(X) of �� vJ• s i ( ) ANALYSIS // / YJ.- INVOICE (x) f•� ' ��'rT� t . COLLECTION SECTION(Field data to be filled in by Sample Collector) 1^ NAME OF UTILITY - 5., ELL,OR SPRING NAME LOCA'LjON AND/OR/ADORE F SAMPLE COLLECTION POINT TOWN_OF UTILITY TOWN !� i,P� l,..ct,� R TYPE OF WATER rAl S—ple Colleclion Point)— - f 1. Raw or untreated 2. Treated water at 3. Water from distribution 4. Water from distribution water at source ❑ treatment station ❑ (One source only) ❑ (Mixture of 2 or more sources) JREA ENT OF WATER REPRESENTED BY THIS SAMPLE Chic,ri- Poly- pH adjust- Filtra- Soften- fron-manganese Fluari- Taste & odor None ❑. nation ❑ phosphate ❑ meat ❑ tian ❑ ing ❑ removal ❑ dation ❑ Strainers ❑ control r NAME AND ADDRESS OF PERSON TO RECEIVE ANALYSIS REPORT Send Collection Data and sample to: CONNECTICUT STATE DEPARTMENT OF HEALTH Laboratory Division NO.AND STREET BOX 1689,HARTFORD, CONN.06101 -- CITY AND STATE - (Zip Code) Street Address: 10 CLINTON STREET, HARTFORD, CONN. TELEPHONE: 566-5626 CHLORINE RESIDUAL(field test) FLUORIDE(Field test) pH(field test) COMPLAINTS(if any) g./ g•/ ❑ ❑ ❑ ❑ Se nt ❑ Fo9m- ❑ m 1. m 1. Color Odor Taste meat in Other ADDITIONAL INFORMATION(Spe<'oI tests required,etc.) - -- -- EXPLANATION OF COMPLAINTS L � -"�3 S`� j A,. Fyr NAME OF UTILITY SOURCE I TYPE I DATE OF COLLECTION �r State - Use 1 � 2 �- 3 I 4 1 5 b l 7 8 9 1 10 I 71 1 12 1 13 � 14 - COLLECTOR'S COLLECTOR'S NAME COLLEGTOR'S TITLE DATE OF COLLECTION TIME OF COLLECTION SAMPLE NO. V ' Z-2 LABORATORY SECTION (Analysis results to be filled in by State Laboratory Division) &M.COL. TRUE COL. ODOR(Description) - D q.) TURBID. pH i a t j jt i O 15 I 16• 17 I 18 //F' `� 1 19 120 ti 21- 22 2'i 24 25 -- NITRITE(as N) NITRATE(as N) AMMONIA(os N) ALBUMINOID(as N) CHLORIDE(C)t 1 m e 260 28 29 i 30 , 31 1 32 a 33 1 34 � 35 a 36� 371 38 39 1 40 1 42 SODIUM(No) - ALKALINITY /(`CaCoS)BICARBONATE ALKALINITY(CaCo3)CARBONATE - TOTAL HARDNESS(CaCO3) IRON ife) - - - F Q 43 44.1 4;� 47 48"1 4 .50 51.. 5 53 1 54/I 55 A 57 1p a MANGANESE(Mn) FLUORIDE(F) DETERGENT(ABS) SULPHATE(SOe) 2 Y V W 51 5401 b"6 6 63 64e 65 1 66 67 1 68 1 69 e s 6— The arithmetic mean of all standard samples examined per month using the membrane filter technique shall not ex- MEMBRANE FILTER SPTEST <oR<. W V teed one colony per 100 mi. Coliform colonies per standard sample shall not exceed 4/100 mi. in: (a) two consecutive Colifor,n Colonies/100-0 COM. aOO - samples; (b) more than one standard sample when less than 20 are examined per month;or.(c) more than five per m cent of the samples when 20 or more are examined per month. 70 1 71 1- 72 I 7 74, 75� ❑ 1. The results of the analysis of this sample are satisfactory and meet requirements for a potable water. p}-- _-'srri-.�• ❑2. The results of the analysis of this sample are satisfactory for a potable water but certain of the chemical or physical constituents are high. These are as follows: z- O E13. This sample is not satisfactory since it does not meet the bacterial requirements-for a potable water.The presence of organisms of the.coliform group in a sample of potable water is undesirable and,while not necessarily indicating The presence of any disease-producing organisms,does indi- cate that such contamination might survive to the some extent.The presence of organisms of the coliform group may also indicate that the treat- y . z ment was not adequate at the time the sample was collected. O V ❑4. This sample is unsatisfactory as a potable water because certain chemical or physical,constituents are above acceptable limits. These are as follows: The coliform content for this raw surface water is �5. low ❑ 6.Moderate ❑ 7.High ❑ This fluoridated sample was analyzed for fluoride. The fluoride concentration was ❑ 8.High ❑ 9. Low ❑ 0. Satisfactory 4A / _w kA V (Yes, l;No,-2) (p, EXTRA COPY The'6tropolitan District F Y-�' F. "eft 555 Main Street Water Supply Post Office Box 800 Sewerage Hartford,Connecticut 06142-0800 Hydroelectric Power 203-278-7850 ill rr Resources Recovery July 8, 1992 File: North King Street, Extension South Windsor TO ALL PROPERTY OWNERS: The Metropolitan District has received your petition for a water main to serve your property. I understand by your letter of June 29, 1992 that you are waiving your rights to a public hearing and that you agree to pay the front footage assessment for this improvement to your property. Attached for your information and records is a list of the assessments to be levied against the properties involved in this project. As stated in the assessment list, these assessments are based on the schedule of rates adopted November 19, 1991 and effective January 1, 1992 at $39.00 per front foot or adjusted front foot. The terms of payment of water main assessments are provided by ordinance of The Metropolitan District, and are as follows: Approximately two months after the completion of installation of a main water pipe, assessments on owners served by the new mains are declared due and payable. An owner may select either of two methods of payment: the District's installment method, or payment in full. Under the installment method, an owner may pay his assessment plus an interest charge of six percent per annum in sixteen (16) equal installments over a fifteen (15) year period, or the owner may pay his assessment in full within sixty (60) days of billing and thus avoid payment of interest charges. If an owner fails to make his payments on or before the final date due, he is charged a fifteen percent (15%) interest fee. Please acknowledge receipt of this letter and the accompanying information by signing the enclosed copy of this letter and returning it to The Metropolitan District. Sincerely, 3 4 Robert A. Hagan `y Assistant to Director of Administrative Services 1 RECEIVED y JUn 4 3i 1002j z lira of So.w:'nft w Ruft works rr Dem. � �t z MAIN PIPE ASSESSMENT PROJECT: North King Street, Extension, South Windsor DATE: July 8, 1992 DESCRIPTION: In NORTH KING STREET from opposite House #739 easterly and southerly about 450'± to opposite House #712 Assessments are based on the schedule of rates adopted November 19, 1991 and effective January 1, 1992 at $39.00 per front foot or adjusted front foot. Adjusted frontage is indicated by figure in parentheses. Assessor's Property Now or Formerly of Parcel No. Frontage Assessment NORTH KING STREET-North & East Sides Richard D. Nicholson 7 (previously assessed) $ 0.00 Anna F. Nicholson South part of 9 248.00±(sc.)(285.00) 11,115.00 Barbara C. Murray West part of 10 335.00±(sc.)(365.00) 14,235.00 NORTH KING STREET- South & West Sides Robert L. Murray, Jr. and Anne S. Murray 24 (previously assessed) 0.00 Barbara C. Murray 23 360.00±(sc.)(215.00) 8,385.00 TOTAL ASSESSMENTS $33,735.00 s