Loading...
HomeMy WebLinkAboutWell Correspondence 00 Miller Road �towN +e' Town aloe s'otdA V&&44.0t m �~ 1540 SULLIVAN AVENUE•SOUTH WINDSOR,CT 06074-2786 R c0 AREA CODE 860/644-2511 FAX 860/644-3781 May 4, 2000 Mr. Arthur J. Rocque, Jr. Commission of the Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Dear Commissioner Rocque: The Town has become aware that it will not comply with the timetable set in item number 4A of Consent Order #SRD-122, This is due to a twelve (12) day medical leave of personnel and the fact that the pertinent staff member did not receive a copy of the Consent Order. We anticipate retaining a qualified consultant on or before May 26, 2000 and expediting this matter as quickly as possible to compensate for lost time so that we may return to the original compliance schedule. Thank you for your consideration. - Yours truly, , 144 / Robert Deptula, R.S. Environmental Health Officer RD/cm i cc: Mr. Michael P. Senyk DEP - Bureau of Water Management PERD 79 Elm Street Hartford, CT 06106-5127 '04/00 10:27 FAX � `F.j O11 (•-K— STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER& REMEDL SON DIYISIQN SUP, pERM1Ti'irIG, ENRORCEME FAX MESSAGE DATE: t Z-0 c)0 f u to, TELEPHONE TO: FAX FROM: TELEPHONE: PERMITTING, ENFORCEMENT & REI IWJATTON DIVISION BUREAU OF WATER MANAGEMENT- DEPARTNEWr OF ENVIRONMENTAL PROTECTION 79 ELM STREET HARTFORD, CT 06106-5127 FAX # ) 424-4057 SUBJECT: NUMBER OF PAGES INCLUDING TRANSMITTAL SHEET: COMMENTS: PLEASE CALL IF YOU DO NOT RECEIVE ALL PAGES CLEARLY Rev.4195 (ptlated an Reeroled Paper} 79 Sim Street • Hartj" GT 06106•$127 An Egetet OPPOPWetty Employer. 05/04/00 10:28 FAX Lfjvu2 ^" SOUTH WINDSOR PAGE 01/e2 0z/el/2000 08:26 ! 9606447280 r AP6011 <.� Oj 6 DST The Town.of South Windsor is seeking a statement of qualifications aztd proposal to address contamination of drinking water wells and the Icing term provisions of drinking water which meets the standards for drinking water established by the Commissioner of Public Health to the qffected properties. This task shall be conducted in accordance with the,requirements of consent order number SRD 122 Town of South Windsor, State of Connecticut vs. Town of South Windsor, attached as exhibit A and Deparrt tent of PInvironmental Protection,Bureau of Water Management application for potable water supplies assistanca document which is attached as exhibit B. xjujacrous well water samples P esults of which are available for review ditiomally, the DEP collected and analyzed numerous ground water samples fro znozutor ells and surface water, This report is also available. 05/04/00 10:28 FAX IM003 �^ 05f`�2r�2000 68:26 06064472$e SOUTH WINDSOR PAGE 02/02 J Public water is in the area. It would involve the installation of approximately 2,500 feet v of water main to provide potable water to the affected properties,if that is the chosen alternative. Engineering design of lime installation would be done under a.separate contract to the utility. Letters and qualification statements must be received by the Environmental Healtb Officer,Town Hall, 1540 Sullivan,,Avenue, South Windsor, CT 06074 by May 19, 2000. Please include your proposal for remediation. This quality based selection will be determe so e y y your submissions to this office. Please submit two copies,which should include: 1) General information about the Run. 2) Current Federal GSA forms 254 and 255. 3) Relevant experience with similar projects. 4) Resume of key personnel. 5)Pertinent references. 6)Any additional irnformation deemed necessary i Selection will be completed and you will be notified by May 26, 2000. Yt �� Y14armtit l-f aal z _CiL. 66`13 L 4_4 h _ �_ l 10 4- _ r6 fad.—.�v►C 05/04/00 10:20 FAX 1j@004 The chemical compound trichloro then was detected at concentrations exceeding the Connecticut Department of Public ealth drinking water action level in nineteen drinking water wells in the Barber Hill Road areal of South Windsor, Connecticut. The Connecticut Department of En onmental Protection (CTDEP) has provided a short- term water supply to fourteen of the affected residents in the forin of granular activated carbon filter systems. One resident has been provided bottled water due to plumbing constraints and the remaining four affected residents were connected to.the public water system available on Foster Street Extension. Despite the DEP's concerted effort, a responsible party has not been identified to date. As a result,the Connecticut Department of Environmental Protection has issued the Town of South Windsor an order to address the long-term drinking water issues. The scope of work should include the determination of the area and population affected by the ground water pollution,the evaluation of long-term potable drinking water supply alternatives, and the associated cost and design criteria for each alternativ As stated in the attached consent order number SRD 122 State of Connecticut vs. Town of South Windsor. Please note that the Connecticut Water Company will be providing the engineering design for the public water alternative under separate contract. In addition, the monitoring and maintenance of the granular activated carbon filter systems should be included in the proposal. Monitoring will consist of the quarterly �) collection and laboratory analysis of rain and treated water samples by EPA method l/ 524.2. The monitoring and maintenance of the filter systems will be continued until an alternative water supply is available. / , t $Nl r' ..�- 'urn= f-1-� c�sv V�✓�.J �,,d, Gt -+ 74' i i bon r --eplam. I-e Jk Jed r J�o.rrs i vw;I� c 13)b {;lam CAM G.� 3 DRAFT The Town of South Windsor is seeking a statement of qualifications and proposal to address contamination of drinking water wells and the long term provisions of drinking water which meets the standards for drinking water established by the Commissioner of Public Health to the effected properties. This task shall be conducted in accordance with the requirements of consent order number SRD 122 Town of South Windsor, State of Connecticut vs. Town of South Windsor, attached as exhibit A and Department of Environmental Protection, Bureau of Water Management application for potable water supplies assistance document which is attached as exhibit B. Please be aware that under item#3, short term drinking water has been provided. TCE was discovered in one drinking water well in this area. This led to the collection of numerous well water samples by the Town and DEP, Results of which are available for review. Additionally, the DEP collected and analyzed numerous ground water samples from monitor wells and surface water. This report is also available. D?4 rf Public water is in the area. It would involve the installation of approximately 2,500 feet of water main to provide potable water to the affected properties, if that is the chosen alternative. Engineering design of line installation would be done under a separate contract to the utility. Letters and qualification statements must be received by the Environmental Health Officer, Town Hall, 1540 Sullivan Avenue, South Windsor, CT 06074 by May 19, 2000. Please include your proposal for remediation. This quality based selection will be determined solely by your submissions to this office. Please submit two copies, which should include: 1) General information about the firm. 2) Current Federal GSA forms 254 and 255. 3)Relevant experience with similar projects. 4)Resume of key personnel. 5)Pertinent references. 6)Any additional information deemed necessary Selection will be completed and you will be notified by May 26, 2000. STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION R AOiNS *$�, ce STATE OF CONNECTICUT VS. TOWN OF SOUTH WINDSOR CONSENT ORDER The Commissioner of Environmental Protection has determined that the Town of South Windsor ("the Town") is a municipality in which pollution of the groundwaters has occurred or can reasonably be expected to occur; the Commissioner of Public Health has determined that the pollution creates or can reasonably be expected to create an unacceptable risk of injury to the health or safety of persons using such groundwaters as a public or private source of water for drinking or other personal or domestic uses; and the Commissioner of Environmental Protection has been unable to determine the person or municipality responsible for such pollution. Therefore, pursuant to Sections 22a-6, 22a-424 and 22a-471 of the Connecticut General Statutes, the Commissioner of Environmental Protection ("the Commissioner") hereby orders the Town to take the following actions: 1. Describe in detail the area and population affected by the pollution of groundwater on and in the vicinity of the intersection of Barber Hill and Miller Roads in the Town of South Windsor and determine which areas presently or potentially may not meet the State of Connecticut Department of Public Health requirements for potable drinking water. 2. Describe long-term potable drinking water supply alternatives, associated costs and design criteria for each alternative. 3. Provide a short-term and long-term potable drinking water supply which meets the standards for drinking water established by the Commissioner of Public Health to the following properties and the areas as described under paragraph 1 above. Sk° 19-1 41011a NAME ADDRESS 50 Mr. Brian Rivard 1042 Foster Street Ext. Mr. Michael Lanata 460 Miller Road Mr. Wayne Martel 461 Miller Road Ms. Paulette Farris 471 Miller Road Mr. Raymond Shearer 480 Miller Road Mr. Fred Schilke 488 Miller Road ( Printed on Recycled Paper) 79 Elm Street • Hartford, CT 06106- 5127 http://dep.state.ct.us An Equal Opportunity Employer �^atin/�Connecticut Coastal Resource Management:1980-2000 F 1 2 Mr. Edward Rodonis 496 Miller Road Mr. Richard Cyr 501 Miller Road Mr. Robert Kuehnal 10 Barber Hill Road Mr. Bradford Case 20 Barber Hill Road Mr. Thomas Dillion 34 Barber Hill Road Mr. Michael Pines 42 Barber Hill Road Mr. Walter Twardowski 76 Barber Hill Road Mr. Michael Dzen 204 Barber Hill Road Mr. Donald Dzen 244 Barber Hill Road 4. The Town is further ordered to accomplish the above described actions, except as may be revised by the recommendations of a detailed engineering investigation and agreed to in writing by the Commissioner and the Commissioner of Public Health, in accordance with the following schedule: A. On or before thirty (30) days following the date of issuance of this consent order, the Town shall retain one or more qualified consultants acceptable to the Commissioner or demonstrate to the satisfaction of the Commissioner that the Town has adequate in-house expertise to prepare the documents and oversee the actions required by this consent order and shall, by that date, notify the Commissioner in writing of the identity of such consultants or in-house expert. The Town shall retain one or more qualified consultants acceptable to the Commissioner or maintain such in-house expertise, until this consent order is fully complied with, and, within ten days after retaining any such consultant or in-house expert other than one originally identified under this paragraph, the Town shall notify the Commissioner in writing of the identity of such other consultant or in-house expert. The Town shall submit to the Commissioner a description of a consultant's or in-house expert's education, experience and training which is relevant to the work required by this consent order within ten days after a request for such a description. Nothing in this paragraph shall preclude the Commissioner from finding a previously acceptable consultant or in-house expert unacceptable. B. On or before sixty (60) days after issuance of this consent order, the Town shall submit for the review and written approval of the Commissioner, a scope of work, schedule and proposed engineering agreement for the investigation and study required by paragraphs 1 and 2 and a plan and schedule for the provision of a short-term supply of potable drinking water to the properties identified in paragraph 3 until a long-term supply of potable drinking water has been provided. C. On or before 14 days after the approval of the report required by paragraph 23, the Town shall submit for the review and written approval_of the 1 3 Commissioner a Request for State Grant in accordance with Section 22a- 471-1 of the Regulations of Connecticut State Agencies ("RCSA") for the short-tern and long term provision of potable drinking water and the investigation and study required by paragraphs 1 and 2 which includes the Resolution required by Section 22a-471-1(d)(1)(C). D. On or before 30 days after approval by the Commissioner of the scope of work required by paragraph 4.6, the Town shall submit for the review and written approval of the Commissioner and the Commissioner of Public Health, an engineering report which describes the problems, area and Population affected by the groundwater pollution, alternate solutions including cost of construction or installation, operation and maintenance, design criteria on all altematives, and a recommended alternative for water supply facilities. The report shall also contain a schedule for construction of the approved water supply alternative and for the submission of the following items to the Commissioner. 1) Contract plans and specifications for the water supply alternative approved by the Commissioner under this paragraph. 2) Verification that a contract for the installation and construction of the facilities approved by the Commissioner has been awarded. 3) Verification that said approved facilities have been placed in operation. E. On or before 14 days after the Commissioner's approval of the engineering report required by paragraph 4.1), the Town shall submit for the review and written approval of the Commissioner a Request for State Grant in accordance with RCSA Section 22a-471-1 for capital improvements for the long-tern provision of potable water, which includes the Resolution required by RCSA Section 22a-471-1(d)(1)(C). F. The Town shall carry out the actions specified in the approved engineering report in accordance with the approved schedule. 5. Standard for potable drinking water All potable drinking water which is provided pursuant to this consent order shall be of a quality which meets all standards specified in the Regulations of Connecticut State Agencies, including sections 19- 13-B101 and 19-13-13102, as amended and which the Commissioner of Public Health has not determined creates an unacceptable risk of injury to the health or safety of persons using such water as a public or private source of water for drinking or other personal and domestic uses. 4 6. Full compliance. The Town shall not be considered in full compliance with this consent order until all actions required by this consent order have been completed as approved and to the satisfaction of the Commissioner. 7. Approvals. The Town shall use best efforts to submit to the Commissioner all documents required by this consent order in a complete and approvable form. If the Commissioner notifies the Town that any document or other action is deficient, and does not approve it with conditions or modifications, it is deemed disapproved, and the Town shall correct the deficiencies and resubmit it within the time specified by the Commissioner or, if no time is specified by the Commissioner, within thirty days of the Commissioner's notice of deficiencies. In approving any document or other action under this consent order, the Commissioner may approve the document or other action as submitted or performed or with such conditions or modifications as the Commissioner deems necessary to carry out the purposes of this consent order. Nothing in this paragraph shall excuse noncompliance or delay. 8. Definitions. As used in this consent order, "Commissioner" means the Commissioner of Environmental Protection or an agent of the Commissioner of Environmental Protection. 9. Dates. The date of submission to the Commissioner of any document required by the consent order shall be the date such document is received by the Commissioner. The date of any notice by the Commissioner under this consent order, including but not limited to notice of approval or disapproval of any document or other action, shall be the date such notice is personally delivered or the date three days after it is mailed by the Commissioner, whichever is earlier. Except as otherwise specified in this consent order, the word "day" as used in this consent order means calendar day. Any document or action which is required by this consent order to be submitted or performed by a date which falls on a Saturday, Sunday or Connecticut or federal holiday shall be submitted or performed on or before the next day which is not a Saturday, Sunday, or Connecticut or federal holiday. 10. Notification of noncompliance. In the event that the Town becomes aware that it did not or may not comply, or did not or may not comply on time, with any requirement of this consent order or of any document required hereunder, the Town shall immediately notify the Commissioner and shall take all the reasonable steps to ensure that any noncompliance or delay is avoided or, if unavoidable, is minimized to the greatest extent possible. In so notifying the Commissioner, the Town shall state in writing the reasons for the noncompliance or delay and propose, for the review and written approval of the Commissioner, dates by which compliance will be achieved, and the Town shall comply with any dates which may be approved in writing by the commissioner. Notification by the Town shall not excuse noncompliance or delay, and the Commissioner's approval of any compliance dates 5 proposed shall not excuse noncompliance or delay unless specifically so stated by the Commissioner in writing. 11. Certification of documents. Any document, including but not limited by any notice, which is required to be submitted to the Commission under this consent order shall be signed by a responsible principal executive officer or a ranking elected official of the Town or a duly authorized representative of such officer or official, as those terms are defined in section 22a-430-3(b)(2) of the Regulations of Connecticut State Agencies and by the individual or individuals responsible for actually preparing such document, each of whom shall certify in writing as follows: "I have personally examined and am familiar with the information submitted in this document and all attachments and certify that based on reasonable investigation, including my inquiry of those individuals responsible for obtaining the information, the submitted information is true, accurate and complete to the best of my knowledge and belief, and I understand that any false statement made in this document or its attachments may be punishable as a criminal offense." 12. Noncompliance. Failure to comply with this consent order may subject the Town to an injunction and penalties under Chapters 439 and 446k of the Connecticut General Statutes. 13. False statements. Any false statement in any information submitted pursuant to this consent order may be punishable as a criminal offense under Section 22a-438 of the Connecticut General Statutes or, in accordance with Section 22a-6, under Section 53a-157b of the Connecticut General Statutes. 14. Liability of the Town and others. The Town's obligations under this consent order shall not be affected by the passage of title to any property to any other person or municipality. 15. Commissioner's powers Nothing in this consent order shall affect the Commissioner's Authority to institute any proceeding to prevent or abate violations of law, prevent or abate pollution, recover costs and natural resource damages, and to impose penalties for violations of law, including but not limited to violations of any permit issued by the Commissioner. If at any time the Commissioner determines that the actions taken by the Town pursuant to this consent order have not successfully provided potable drinking water to all persons affected, the Commissioner may institute any proceeding to require the Town to undertake further investigation or further action to provide potable drinking water. 16. The Town's obligations under law. Nothing in this consent order shall relieve the Town of other obligations under applicable federal, state and, to the extent local law is consistent with this consent order, local law. 6 IT No assurance by Commissioner. No provision of this consent order and no action or inaction by the Commissioner shall be construed to constitute assurance by the Commissioner that the actions taken by the Town pursuant to this consent order will successfully provide potable drinking water to all persons affected. 18. No effect on Li hts of other persons This consent order shall neither create nor affect any rights of persons who or municipalities which are not parties to this consent order. 19. Notice to Commissioner of changes. Within fifteen days of the date the Town becomes aware of a change in any information submitted to the Commissioner under this consent order, or that any such information was inaccurate or misleading or that any relevant information was omitted, the Town shall submit the correct or omitted information to the Commissioner. 20. Submission of documents to DER Any document required to be submitted to the Commissioner under this consent order shall, unless otherwise specified in writing by the Commissioner, be directed to: Mr. Michael P. Senyk Department of Environmental Protection Bureau of Water Management Permitting, Enforcement and Remediation Division 79 Elm Street Hartford, Connecticut 06106-5127 21. Submission of documents to DPH. Any document required to be submitted to the Commissioner of Public Health under this consent order shall, unless otherwise specified in writing by the Commissioner of Public Health, be directed to: Mr. Paul Ritsick Department of Public Health Water Supplies Section 450 Capitol Ave., MS#51WAT P.O. Box 340308 Hartford, Connecticut 06134-0308 7 The Town consents to the issuance of this consent order without further notice. The undersigned certifies that (he/she) is fully authorized to enter into the consent order and to legally.bind the Town to the terms and conditions of the consent order. v / � Da Matthew B. Galligan Town Manager Issued as a final order of the Commissionejur FJr Environmental Protection. Date CONSENT ORDER NO. SRD- 1 2 2 TOWN OF SOUTH WINDSOR CERTIFIED TO BE A TRUE C01=Y CONNEC=n DEPARTMENT o ENMOAMENTk PROTECTiG.,\- NAA�IE� /00 I?Fl? 00 �.0 Jn)(/y/�nJ/ja/nN ��- S/'fi'Y Y = t• / ` '�y t ji ili _ 1{, i,,-..- f j`w- sic-J`/14 �l �----� 7� c ' F!Q � T MIC'ATIONS .. - REQUEST eT A TF�.FNTS OF OUA The Town of South Windsor is seeking statements of qualifications from qualified engineering firms for the preparation of a report that will evaluate the extent to which the existing wastewater Facility processes and equipment may be modified through cost-effective means to 4 treatment Fac ty p control odor emissions. The Town will select a firm using a qualification—based selection process. All interested firms must obtain a project summary available from the Office of the Director of Public Works. Proposals must be submitted to the Office of the Director of Public z Works,Town Hall, 1540 Sullivan Avenue, South Windsor, Connecticut 06074 by June 18, 1999 4:30 P.M. ,/� Matthew B. Galligan Town Manager ,y t d �?-7' 7 s �0 WASTEWATER TREATMENT FA n TTY ODOR CONTROL PLAN OF STUDY PRO ECT SUMMARY PJIrnose To obtain statements of qualification for selection of firms for subsequent interviews for engineering and special services for the preparation of a report that will evaluate the extent to which the existing Treatment Facility processes and equipment maybe modified through cost- effective means to control odor emissions. &Qkd D=d)2&n The Treatment Plant is a secondary treatment waste activated sludge facility with a design capacity of 3.75 MGD.Final effluent discharge is to the Connecticut River. The Plant serves the Town of South Windsor, and portions of Manchester and East Windsor. The Plant is located near to a residential area. The treatment process includes a headworks building(aerated grit removal and screenings), three primary clarifiers,four aeration tanks(two surface mechanical aeration units and two fine bubble membrane disc aeration-systems), surface grease removal systems,two secondary clarifiers, two gravity sludge thickeners, a sludge dewatering belt filter press,and sludge tranport. RP on rt_R_Quirement� I. Engineering Report: a. A specific study to evaluate the sources of Plant odors(from hydrogen sulfide, mercaptans, indoles, skatoles,volatile organic compounds, ammonia, oil and grease) and the opportunities for the control of odors. Specific areas of study shall include but not be limited to the following: grit and bar screening,primary clarifiers, side- stream returns, sludge thickening/holding, sludge dewatering,sludge storage, and liquid polymer storage. The study is not intended to be a full facility plan but a process based evaluation of the wastewater treatment facility. H. Study Considerations: a. Evaluate existing process, equipment, and operating conditions. i. Review existing records of all Plant operational processes. ii. Review existing laboratory test records. iii. Review records of problems and complaints. b. Evaluate Source Control i. Improvement of operating conditions. I Eliminate conditions of low dissolved oxygen or low pH. iii. Reduce turbulence. M r c. Evaluate sidestreams d. Evaluate chemical treatment i. Chlorine ii. Hydrogen peroxide iii. Nitrates iv. Metallic salts V. Lime e. Evaluate pre-aeration f. Evaluate containment, collection and control where source control, chemical treatment or pre-aeration have been found to be insufficient or unpractical. i. Evaluate performance of systems to contain and collect gases which are further treated by odor removal equipment such as chemical scrubbers, activated carbon filters, and/or bio-filters. g. Detailed evaluation of screened potential alternatives. h. Economic evaluation including capital,operation and maintenance costs of ternatives. i. Recommendation and report conclusions. j. A complete description of selected alternatives. k. Cost estimate for design and construction. 1. A time schedule for project implementation. m. Provide presentations and technical criteria to local and state governmental authorities as have jurisdiction to approve this study. Schedrde and R auir m ntc a. Letters and qualification statements must be received in the Office of the Director of Public Works,Town Hall, 1540 Sullivan Avenue, South Windsor, Connecticut 06074 by 4:30 P.M.June 15, 1999. b. Three copies of qualification statements must be submitted. c. Information pertaining to qualifications must include: i. General_information about the firm. ii. Current Federal GSA Forms 254 and 255. iii. Relevant experience of the firm with similar projects. iv. Resume of key personnel to be assigned to this project. V. Pertinent reference contact information. A. Additional information not included above,which may be useful and applicable to this project. d. ,Potential schedule costs. e. nor efore July 8, a Town will complete interviews with selected short listed firms. f. On or before July 15, 1999, the Town will select a qualified Consultant to prepare this report. FAX TRANSMITTAL STATE OF CONNECTICUT N DEPARTMENT OF ENYIItONMENTAL PROTECTION 0 79 ELM STREET HARTFORD, CT 06106 TO: Bob Deptala FROM: Hank 01szews1d cr C FAX NO. 860-644-3781 PHONE NO. 860-424-3708 � COMPANY: Town of South Windsor SUBJECT: Potable Water Project Events c cc CITY: South Windsor DATE: February 28,2000 STATE: CT PAGES: Three(including cover) PHONENO. 860-644-2511 FAXNO_ 860-424-4067 East.248 COtvIIv1E1�P15 m x Bob, Here is a basic outline that highlights the ma}or events the Town faces when applying for potable water funding. Hopefully,it should give you an idea of the flow of events.At least you will be aware of what will happen next Any questions,Please call me_ Sincerely, Hank LE' c c WATER.SUPPLY PROJECT SCHEDULE OF EVENTS N C h DEP POTABLE WATER PROGRAM n C C PIANNNG PHASE r �a ■ DEP meets with Town officials to discuss: -extent of groundwater pollution, -the water supply order(required for State assistance)and, 0C -potable water program requirements. Q • DEP prepares and issues a water supply order to Town. ■ The Town procures an engineering consultant and meets with DEP to discuss requirements of the n engineering report. ■ DEP reviews plant of study that includes scope of services,proposed public participation plan,level c a of effort and 5700 forms. ■ Town adopts a resolution authorizing a representative to enter into contract with the State. ■ Town completes application for grant and submits to DEP for approval. ■ DEP approves plan of study and engineering agreement drafted by Town's consultant. a DEP prepares request to State Bond Commission for funding. ■ State Bond Commission approves DEP funding request. C ■ Town enters into agreement with the State for project funding. ■ Upon full approval of agreement,Town away submit reimbursement requests. ■ Engineering report is completed and submitted to the State for approval. y ■ DEP prepares FONSI for induced growth issues. ■ Engineering report is approved ■ Letter from DEP to Town regarding preliminary eligibility determination of construction costs. DESIGN/CONSTRUCMIN PRASE ■ Town procures a consultant to design the water supply system and to provide contract administration and inspection during the construction phase of the project. ■ Town adopts a resolution authorizing a representative to enter into contract with the State. ■ Statement of certification that local shave has been legally authorized for design and construction activities(as required by the Town). ■ Town prepares application and submits to DEP for project funding: Eligible project costs include consulting engineering services,construction costs for water main extension,service connections,well-abandonment,street restoration (repaving width of trench),etc. --AIE agreement,cost estimate summary form,cash flow projection,schedule including completion date,CHRO forms. ■ DEP approves A/E agreement ■ DEP prepares funding request and submits to State Bond Commission. n ■ Upon approval of funding,Town enters into agreement with the State. ■ Upon full approval of agreement,Town may submit reimbursement requests. A ■ Consultant prepares design of Plans&Specifications_ C ■ DEP and State Health Department review completed Plans&Specs. ■ DEP and State Health Department approve Plans&Specs. ■ DEP prepares an eligibility determination for project costs. C --ineligible items are:fire hydrants,water mains larger than 8 easement/r-o-w, C cost for preparation of grant application,etc. a c ■ Town now may advertise for and open bids. ■ After bid opening,the Town submits to DEP a letter of intent to award the construction contract with: --consultant's recommendation to award. —revised project cost summary form i —legal notice of bid advertisement C ,a —summary of bids. --bid proposal from lowest bidder. --State wage rates used in bid. C —legal opinion from Town attorney that all necessary easements and/or r-o-w's relating to construction are in place. ■ DEP forwards letter to Town authorizing award of the construction contract. ■ Construction begins. C tr 'S c c I G s ' tow f�c y` 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 4 w� AREA CODE 860/644-2511 g.COt, December 8, 1999 7671 Date pages Post-it®Fax Note From To Co. Co./Dept. phone# Mr. Bob Bristol Phone# Fax# Marin Environmental Fax# 7 Island Dock Road Haddam, CT 06438 Dear Mr. Bristol: Enclosed is the requested information so that Marin Environmental may give the Town a ballpark estimate to perform the referenced work. For further clarification, as per our discussion on December 7, 1999, you will not be paid for these efforts. We are merely,seeking a rough estimate if you choose to provide one. This project will most likely be put out to the competitive bidding process. We can provide you with additional information if needed. If you have any questions please call me at 644-2511 extension 248. Yours truly, Robert Deptu a, R.S. Environmental Health Officer RD/cm Enclosures: 3 2 Mr. Edward Rodonis 496 Miller Road Mr. Richard Cyr 501 Miller Road Mr. Robert Kuehnal 10 Barber Hill Road Mr. Bradford Case 20 Barber Hill Road Mr. Thomas Dillion 34 Barber Hill Road Mr. Michael Pines 42 Barber Hill Road Mr. Walter Twardowski 76 Barber Hill Road Mr. Michael Dzen 204 Barber'Hill Road Mr. Donald Dzen 244 Barber Hill Road 4. The Town is further ordered to accomplish the above described actions, except as may be revised by the recommendations of a detailed engineering investigation and agreed to in writing by the Commissioner and thp Comm isp io er of Public Health, in accordance with the following schedule: w' `f "'0"v4 of •IL,-_ V,,Vv5*- A. On or before thirty (§PLd"/�trate ing the date of issuance of this consent order, the Town shall retain more qualified consultants acceptable to the Commissioner or demoto the a its ac ion of the Commissioner that the Town has adequate in-house expertise to prepare the documents and oversee the ac ions required by this consent order and shall, by that date, notify the Commissioner in writing of the identi; of such consultants or in-house expert. The Town shall retain one or more qualified consultants acceptable to the Commissioner or maintain such in-house expertise, until this consent order is fully complied with, and, within ten days after retaining any such consultant or in-house expert other than one originally identified under this paragraph, the Town shall notify the Commissioner in writing of the identity of such other consultant or in-house expert. The Town shall submit to the Commissioner a descrigtion of a consultant's or in-house expert's education, experience and training which is re avant to the work re wired b this consen _ t for such a/ descnntion. Nothing in this paragraph shall preclu e e ommissioner from finding a previously acceptable consultant or in-house expert unacceptable. B. On or before sixty (60) days after issuance of this consent order, the Town shall submit for the review and written approval of the Commissioner, a ���scope of work, schedule and proposed engineering agreement for the investigation and study required by paragraphs 1 and 2 and a plan and schedule for the provision of a sho_ rt-te=supply of potable drinking water to the properties identified in paragrapl\3 until a long-term supply of potable drinking water has been provided. \ 0 nnc C. On or before 14 days after the approval of the report required by paragraph r,,�. the Town shall submit for the review and written approval of the ' 3 Commissioner a Request for State Grant in accordance with Section 22a- 471-1 of the Regulations of Connecticut State Agencies ("RCSA") for the short-term and long term provision of potable drinking water and the investigation and study required by paragraphs 1 and 2 which includes the Resolution required by Section 22a-471-1(d)(1)(C). D. On or before 30 days after approval by the Commissioner of the scope of work required by paragraph 4.13, the Town shall submit for the review and written approval of the Commissioner and the. Commissioner of Public Health, an engineering report which describes the problems, area and population affected by the groundwater pollution, alternate solutions including cost of construction or installation, operation and maintenance, design criteria on all alternatives, and a recommended alternative for water supply facilities. The report shall also contain a schedule for construction of the approved water supply alternative and for the submission_ of the following items to the Commissioner: 1) Contract plans and specifications for the water supply alternative approved by the Commissioner under this paragraph. 2) Verification that a contract for the installation and construction of the facilities approved by the Commissioner has been awarded. 3) Verification that said approved facilities have been placed in operation. E. On or before 14 days after the Commissioner's approval of the engineering report required by paragraph 4.D, the Town shall submit for the review and written approval of the Commissioner a Request for State Grant in accordance with RCSA Section 22a-471-1 for capital improvements for the long-term provision of potable water, which includes the Resolution required by RCSA Section 22a-471-1(d)(1)(C). F. The Town shall carry out the actions specified in the approved engineering report in accordance with the approved schedule. 5. Standard for potable drinking water. All potable drinking water which is provided pursuant to this consent order shall be of a quality which meets all standards specified in the Regulations of Connecticut State Agencies, including sections 19- 13-B101 and 19-13-13102, as amended and which the Commissioner of Public Health has not determined creates an unacceptable risk of injury to the health or safety of persons using such water as a public or private source of water for drinking or other personal and domestic uses. 4 6. Full compliance. The Town shall not be considered in full compliance with this consent order until all actions required by this consent order have been completed as approved and to the satisfaction of the Commissioner. 7. Approvals. The Town shall use best efforts to submit to the Commissioner all documents required by this consent order in a complete and approvable form. If the Commissioner notifies the Town that any document or other action is deficient, and does not approve it with conditions or modifications, it is deemed disapproved, and the Town shall correct the deficiencies and resubmit it within the time specified by. the Commissioner or, if no time is specified by the Commissioner, within thirty days of the Commissioner's notice of deficiencies. In approving any document or other action under this consent order, the Commissioner may approve the document or other action as submitted or performed or with such conditions or modifications as the Commissioner deems necessary to carry out the purposes of this consent order. Nothing in this paragraph shall excuse noncompliance or delay. 8. Definitions. As used in this consent order, "Commissioner" means the Commissioner or an agent of the Commissioner. 9. Dates. The date of submission to the Commissioner of any document required by the consent order shall be the date such document is received by the Commissioner. The date of any notice by the Commissioner under this consent order, including but not limited to notice of approval or disapproval of any document or other action, shall be the date such notice is personally delivered or the date three days after it is mailed by the Commissioner, whichever is earlier. Except as otherwise specified in this consent order, the word "day" as used in this consent order means calendar day. Any document or action which is required by this consent order to be submitted or performed by a date which falls on a Saturday, Sunday or Connecticut or federal holiday shall be submitted or performed on or before the next day which is not a Saturday, Sunday, or Connecticut or federal holiday. 10. Notification of noncompliance. In the event that the Town becomes aware that it did not or may not comply, or did not or may not comply on time, with any requirement of this consent order or of any document required hereunder, the Town shall immediately notify the Commissioner and shall take all the reasonable steps to ensure that any noncompliance or delay is avoided or, if unavoidable, is minimized to the greatest extent possible. In so notifying the Commissioner, the Town shall state in writing the reasons for the noncompliance or delay and propose, for the review and written approval of the Commissioner, dates by which compliance will be achieved, and the Town shall comply with any dates which may be approved in writing by the commissioner. Notification by the Town shall not excuse noncompliance or delay, and the Commissioner's approval of any compliance dates Y w. .• _ • • .... ..VIE'.• 5 proposed shall not excuse noncompliance or delay unless specifically so stated by the Commissioner in writing. 11. Certification of documents. Any document, including but not limited by any notice, which is required to be submitted to the Commission under this consent order shall be signed by a responsible principal executive officer or a ranking elected official of the Town or a duly authorized representative of such officer or official, as those terms are defined in section 22a-430-3(b)(2) of the Regulations of Connecticut State Agencies and by the individual or individuals responsible for actually preparing such document, each of whom shall certify in writing as follows: "I have personally 2 examined and am familiar with the information submitted in this document and all attachments and certify that based on reasonable investigation, including my inquiry of those individuals responsible for obtaining the information, the submitted information is true, accurate and complete to the best of my knowledge and belief, and I understand that any false statement made in this document or its attachments may be punishable as a criminal offense." 12. Noncompliance. Failure to comply with this consent order may subject the Town to an injunction and penalties under Chapters 439 and 446k of the Connecticut General Statutes. 13. False statements. Any false statement in any information submitted pursuant to this consent order may be punishable as a criminal offense under Section 22a-438 of the Connecticut General Statutes or, in accordance with Section 22a-6, under Section 53a-157b of the Connecticut General Statutes. 14. Liability of the Town and others. The Town's obligations under this consent order shall not be affected by the passage of title to any property to any other person or municipality. 15. Commissioner's powers. Nothing in this consent order shall affect the Commissioner's Authority to institute any proceeding to prevent or abate violations of law, prevent or abate pollution, recover costs and natural resource damages, and to impose penalties for violations of law, including but not limited to violations of any permit issued by the Commissioner. If at any time the Commissioner determines that the actions taken by the Town pursuant to this consent order have not successfully provided potable drinking water to all persons affected, the Commissioner may institute any proceeding to require the Town to undertake further investigation or further action to provide potable drinking water. 16. The Town's obligations under law. Nothing in this consent order shall relieve the Town of other obligations under.applicable federal, state and, to the extent local law is consistent with this consent order, local law. 17. No assurance by Commissioner. No provision of this consent order and no action or inaction by the Commissioner shall be construed to constitute assurance by the Commissioner that the actions taken by the Town pursuant to this consent order will successfully provide potable drinking water to all persons affected. 18. No effect on rights of other persons. This consent order shall neither create nor affect any rights of persons who or municipalities which are not parties to this consent order. 19. Notice to Commissioner of changes. Within fifteen days of the date the Town becomes aware of a change in any information submitted to the Commissioner under this consent order, or that any such information was inaccurate or misleading or that any relevant information was omitted, the Town shall submit the correct or omitted information to the Commissioner. 20. Submission of documents to DER Any document required to be submitted to the Commissioner under this consent order shall, unless otherwise specified in writing by the Commissioner, be directed to: Mr. Michael P. Senyk Department of Environmental Protection Bureau of Water Management Permitting, Enforcement and Remediation Division 79 Elm Street Hartford, Connecticut 06106-5127 21. Submission of documents to DPH. Any document required to be submitted to the Commissioner of Public Health under this consent order shall, unless otherwise specified in writing by the Commissioner of Public Health, be directed to: Mr. Paul Ritsick Department of Public Health Water Supplies Section 450 Capitol Ave., MS#51 WAT P.O. Box 340308 Hartford, Connecticut 06134-0308 DFWT q 7 The Town consents to the issuance of this consent order without further notice. The undersigned certifies that (he/she) is fully authorized to enter into the consent order and to legally bind the Town to the terms and conditions of the consent order. Date Matthew B. Galligan Town Manager Issued as a final order of the Commissioner of the Department of Environmental Protection. Date Arthur J. Rocque Jr. Commissioner CONSENT ORDER NO. SRD- TOWN OF SOUTH WINDSOR STATE OF CONNECTICUT p DEPARTMENT OF ENVIRONMENTAL PROTECTION TO: Michael Senyk, Environmental Analyst II DEP/Water Bureau, Potable Water Program. PERD Division 79 Elm Street, Hartford, CT 06106 rRO�L =rank Bartolomeo. Environmental Anaivst III DEP'Waste Bureau. LUST Program _9 Elm Street, Hartford. CT 06106 DATE: September RE: DEP Subsurface Investigation: Barber Hill Road Vicinity, South Windsor, Connecticut. Solvent Contamination Detected In Residential Potable Wells. Backaround: During the spring of 1999, the solvent trichloroethene (TCE) and 1,2, dichloropropane (commonly found in Vorlex) was detected in several residential potable wells in the Barber Hill vicinity of South Windsor. Connecticut. Since a source of pollution was not immediately realized, the DEP's Potable Water Program requested technical assistance from the DEP's Leaking Underground Storage Tank (LUST) Program to find the source of the solvent pollution. Surficial and Bedrock Lithologv- The South Windsor area under investigation is located in the Manchester quadrangle. The area is mostly overlain by till consisting of a reddish brown nonsorted mixture (sand, clay, silt, pebbles and cobbles). Depth to bedrock is generally greater than 20 feet. The sedimentary bedrock is Portland Arkose which dips to the east at approximately 15 degrees. The bedrock r groundwater flow was assumed to be in a southerly direction under normal conditions. Sam link Methodology• The samples collected during the South Windsor investigation were normally analyzed under the following procedures (see "Standard Operating Procedures" after Appendix B): 1. Groundwater samples from the Geoprobe micro-wells were collected in two (2) 40 milliliter hydrochloric acid preserved voa vials and submitted to the DEP's mobile laboratory for further analysis. ?. Remaining groundwater collected from Geoprobe micro-wells was field screened inside the headspace of the collection flask with a Thermo-environmental (Printed on Recycled Paper) 79 Elm Street • Hartford, CT 06106-5127 http://dep-state.ct-us An Equal Opportunity Employer Photoionization Detector(PID) for volatiles. This reading was given to the mobile lab personnel. 3. The sample at the mobile lab was initially analyzed with a Photovac 1 OS50 gas chromatograph because of it's higher sensitivity to volatiles. If any peaks were detected, further quantification was done with the Viking Mass Spectrometer. DEP Investigation: Chronology Barber Hill Road& Miller Road March 9, 1999: Personnel from the DEP's LUST Program arrived at the intersection of Barber Hill and Miller Roads in South Windsor to commence the subsurface investigation. The DEP's Geoprobe units and mobile laboratory were on-site to collect and analyze subsurface samples,respectively. Because the highest TCE levels were detected in the Farris residence potable well at 91 ppb(near the intersection of Barber Hill and Miller Roads),the Geoprobe units worked independently along each road to install temporary micro-monitoring wells. This strategy was used to determine if the source of solvent pollution was localized(see site sketch for boring locations). See Appendix A for complete sample locations and corresponding lab#. See Appendix B for PID field screening data. The following data table represents field observations during well installation and analytical results of collected groundwater samples(sample results listed in ppb): Well# Screen Interval Smple TCE Leve Comments GP-1 9.7- 14.7' GW ND %Z"micro-well GP-2 5.0- 10.0' NA 3/4" micro-well GP-3 3.8 - 8.8' GW ND %Z"micro-well GP-4 5.5 - 10.5' GW ND 3/4" micro-well GP-5 3.0- 8.0' GW ND %"micro-well GP-6 6.0-.11.0' GW ND 3/4" micro-well GP-7 5.2- 10.2' GW ND %2"micro-well GP-8 5.5 - 10.5' GW ND 3/4" micro-well GP-9 5.0 - 10.0' GW ND %"micro-well GP-10 2.0 -7.0' GW ND 3/4" micro-well GP-11 5.7 - 10.7' GW ND %"micro-well GP-12 3.0 - 8.0' GW ND 3/4" micro-well GP-14 4.5 -9.5' GW ND 3/4" micro-well GP-16 4.0-9.0' GW ND 3/4"micro-well GP-18 4.0 - 9.0' GW NA 3/4" micro-well In addition to the above groundwater samples, two surface soil samples were collected at the Davis residence(#504 Miller Road)where three drums were discovered. While two drums were manifolded together with piping and a spigot, the other empty drum was labeled Vorlex. Laboratory analyses of these soils indicated no detectable levels of TCE. GP-7, GP-9, and GP- 11 were drilled in assumed downgradient locations of these three drums on the Rodonis property (#496 Miller Road). Miller Road &Foster Street March 10, 1999: Although analytical results could not be located for the groundwater sample collected at GP-18, additional groundwater samples were collected at greater depths adjacent to GP-18. The following data table represents our field and analytical observations(results in ppb): Well# Screen Interval Sg=le TCE Level Comments GP-18a 17.5 - 18.0' GW 4 no well; exp. pt GP-18b 12.0 - 13.0' GW 2 '/2"micro-well The DEP then focused on the residence at#1042 Foster Street because of possible solvent use here in the past(see site sketch). The following data table represents our field and analytical observations (results in ppb): Well# Screen Interval Sample TCE Level Comments GP-13 8.0 - 13.0' GW ND in former septic area GP-15 10.0 - 15.0' GW ND at rear of barn GP-17 8.0- 13.0' GW ND at rear of barn DEP personnel attempted to collect a groundwater sample at the rear of#20 Barber Hill Road,however,no groundwater was observed in the temporary micro-well. An unidentified 55-gallon drum was discovered in an adjacent stream/pond area; sediment was collected from under the drum and an ND result was recorded for TCE. Sediment was also collected from two storm drains along Miller Road; no WE was detected in either location. In addition,two potable well samples were collected from#244 and#204 Barber Hill Road. WE was detected at 117 ppb and 124 ppb,respectively. Wen Farm: #244 Barber Hill Road March 29, 1999: Due to the elevated TCE level detected in the Dzen Farm potable well (117 ppb), and the commercial operations on-site, DEP staff performs a limited investigation to determine subsurface groundwater quality. The following data table represents our field and analytical observations (results in ppb): Well # Screen Interval Sg=le TCE Level Comments GP-1 13.0 - 18.0' GW 10 soils 04: TCE=ND GP-2 9.5 - 14.5' GW ND MTBE=42 ppb GP-3 5.0- 10.0' GW ND septic leach field area GP-4 8.0 - 13.0' GW ND soils 04: TCE=ND GP-5 8.2 - 13.2' NA NA no GW in micro-well GP-6 8.5 - 13.5' NA NA PID=50 units on GW Additional samples were collected from the on-site septic tank, floor drains, and parts cleaner. The following data table represents the significant analytical results from these locations (see results for additional contaminants not listed): Location Component and Concentration Septic Tank TCE= 13 ppb; Toluene=6,514 ppb; P-Isopropyltoluene= 1,866 ppb Floor Drain East P-Isopropyltoluene=35,739 ppb(no other components detected) Floor Drain West P-Isopropyltoluene=95,907 ppb(no other components detected) Parts Cleaner sludge PCE=39,700,363 ppb; xylenes=22,496 ppb Floor Drain West TCE=50 ppb;PCE=66 ppb;xylenes=20,389 ppb; P-Isopropyltoluene Sludge =56,366 ppb; 1,3,5-Trimethylbenzene=32,726 ppb... Dzen Farm: #244 Barber Hill Road March 30, 1999: DEP staff on-site to gauge groundwater elevations from previously installed micro-wells (3-29-99), collect groundwater samples from GP-5 and GP-6, and tape dimensions for site map. While GP-5 remained dry, groundwater was collected at GP-6 for lab analyses; TCE= 13 ppb. Dzen Farm: #244 Barber Hill Road April 7, 1999: DEP staff returns to site to enhance subsurface investigation by installing additional micro-wells and collecting groundwater samples. The following data table represents our field and analytical observations(results in ppb): Well # Screen Interval Sample TCE Level Comments GP-7 9.0 - 19.0' GW ND 3/4" micro-well GP-8 4.0 - 14.0' GW ND %2"micro-well GP-9 10.0 - 15.0' GW ND %2"micro-well GP-10 5.0- 10.0' GW ND %2"micro-well GP-11 2.9 - 7.9' GW ND %2"micro-well GP-12 2.0- 7.0' GW ND '/2"micro-well GP-13 0.5 - 5.5' GW ND %2"micro-well Dzen Farm: barn southwest of#244 Barber Hill Road April 7, 1999: Well# Screen Interval Sample TCE Level Comments GP-14 18.6 -23.6' GW ND 3/4" micro-well GP-15 12.4- 17.4' GW ND 3/4" micro-well GP-16 13.5 - 18.5' NA NA well was"dry" Dzen Farm: ramp to potato barn (#244 Barber Hill Rd.) April 7, 1999: Well Screen Interval Sample TCE Level Comments GP-17 17.5 -22.5' GW ND 3/4" micro-well DEP staff collects a water sample from a stream to the west of the Dzen barn; analytical results for TCE=ND. Mike Dzen Property: #204 Barber Hill Road April 8, 1999: DEP staff returns to the Barber Hill Road area to continue the TCE investigation. An air sample was collected from GP-15 and analyzed; TCE=ND. Additional micro-wells are installed so that groundwater/air samples can be collected. Surface water bodies(ponds)are sampled to determine solvent impact. The following data table represents our field and analytical observations(results in ppb): Well# Screen Interval S=le TCE Level Comments GP-18 14.5 - 19.5' GW ND near septic GP-19 13.8 - 18.8' soil gas ND well was"dry" Surficial Water Body: Southwest of Dzen Farm April 8, 1999: Well# Screen Interval Sample TCE Level Comments GP-20 3.2 - 8.2' GW ND shallow well GP-20a 16.0 - 17.0' GW ND expendable tip DEP staff collects samples from"pond south water", "pond north water", "pond water", "swamp-1 water", and"pond 2 water"; TCE was not detected in any of these samples. DEP staff returns to Dzen Farm(#244 Barber Hill Road) to collect groundwater samples for analyses from the State of Connecticut Department of Health Services. Groundwater was collected from GP-I, GP-2, GP-3, GP-4, GP-5, GP-7, GP-8, GP-9, GP-10, and GP-11. The following data table represents TCE levels detected in the groundwater samples (see results as additional contaminants may be present): Well# TCE Level Well # TCE Level GP-1 11 ppb GP-7 ND GP-2 ND GP-8 ND GP-3 ND GP-9 <0.5 ppb GP-4 1.1 ppb GP-10 ND GP-5 8.9 ppb GP-11 <0.5 ppb Northeast Utilities (NU) Substation: Barber Hill Road April 21, 1999: DEP staff meet on-site with town and NU representatives regarding continued subsurface investigation activities at the NU Substation. This substation has existed for over 50 years servicing north central Connecticut. This facility represents a potential source area for the residential well pollution since NU has acknowledged the historic use of TCE for parts cleaning. NU personnel declared, however, that no significant quantity of TCE was ever used to perform routine maintenance. Safety issues were also discussed as significant volts exist on-site. NU Substation: Barber Hill Road April 29, 1999: DEP staff(with Geoprobe &mobile laboratory)meet on-site to perform limited subsurface assessment at NU facility. The following data table represents our field and analytical observations. See attached results as additional contaminants may be present(results in ppb): Well# Screen Interval Sample TCE Level Comments UP-1 13.5 - 18.5' GW ND PCE= 1 ppb GP-2 7.0 - 12.0' NA NA 3/4" micro-well GP-3 3.0 - 13.0' GW ND PCE=3 ppb GP-4 3.2 - 13.2' NA NA 3/4" micro-well GP-5 4.5 - 14.5' GW ND MTBE=4 ppb; PCE =2 ppb GP-6 1.0 - 11.0' GW ND PCE=7 ppb GP-7 3.5 - 13.5' GW ND PCE=6 ppb NU Substation: Barber Hill Road May 18, 1999: DEP staff returns to facility to continue subsurface investigation. The following data table represents our field and analytical observations. See results from mobile laboratory and the Department of Health Services as additional contaminants may be present(results in ppb): Well # Screen Interval Sample TCE Level Comments GP-8 4.0- 9.0' GW ND PCE<0.5 ppb, GP-9 3.5 - 8.5' GW ND GP-10 3.5 - 8.5' GW ND GP-11 4.0- 9.0' GW ND GP-12 3.5 - 8.5' GW ND GP-13d 10.3 - 15.3' GW ND GP-13s 3.0 - 8.0' GW ND DEP staff collects additional samples from previously installed micro-wells for analyses. See results as additional contaminants may be present(results in ppb): Well# Screen Interval Sample WE Level Comments GP-2 see above GW <0.5 PCE=0.6 ppb GP-3 see above GW <0.5 PCE=3.2 ppb GP-4 see above GW ND PCE<0.5 ppb GP-6 see above GW <0.5 PCE=0.9 ppb GP-7 see above GW ND PCE=3.8 ppb Straugh Barn: west from#244 Barber Hill Road June 1, 1999: DEP staffreturns to the former pesticide storage barn west of Dzen Farm at#244 Barber Hill Road. Additional borings/micro-wells were installed to collect subsurface data. It should be noted that two boring/micro-well locations were identified by numbers previously used during this investigation(GP-18 & GP-19). Since samples were collected and analyzed by these numbers, they will not be changed. The following data table represents our field and analytical observations. See results as additional contaminants may be present(results in ppb): Soil cores were collected at GP-18 (just west of loading dock) from 0-8'below grade; a sample was collected at 8'with no solvents detected. A micro-well was installed at an adjacent boring (GP-18a). Soil cores were collected at GP-20 from 0-12'below grade; soil samples were collected at 6'and 12'with no solvents detected at either depth. No micro-well was installed at this location. Soil cores were also collected at GP-21 from 0-7.5'below grade; soil samples were collected at 4'and 7.5' with no solvents detected at either depth. No micro-well was installed at this location. Well # Screen Interval Sa=le TCE Level Comments GP-18 15.0 -20.0' Soil ND no PCE detected GP-18a 22.0 -27.0' GW ND no PCE detected GP-19 22.5 -27.5' GW ND no PCE detected Four aqueous samples were collected from an on-site potable well at various periods of purging; all results were non-detect per EPA 624 method. Conclusions/Recommendations Analytical results from samples collected during the DEP's subsurface investigation indicate a few areas of concern. Intersection of Miller& Barber Hill Roads: Low levels of TCE were detected in the overburden groundwater at GP18a and GP-18b near the intersection of Miller and Barber Hill Roads (see March 10, 1999). The higher level of WE contamination(4 ppb)was found in the deeper well, GP-18a. It was believed that this contamination could be discharging from the bedrock aquifer into the shallow aquifer. At this property,the untreated well water had levels around 85 ppb TCE which could have also served as a source for the contamination found in these two micro-wells. Although these levels (4 ppb and 2 ppb,respectively) are beneath the WE action level of 5 ppb for a GA/GAA groundwater classification, it's presence may require additional sampling and/or further investigation. Dzen Farms: TCE levels were detected at higher concentrations at the Dzen Farm located at#244 Barber Hill Road(see March 29, 1999). While sample results from GP-1 indicate TCE at 10 ppb on the groundwater, GP-6 possessed a TCE concentration of 13 ppb (both exceed the 5 ppb action level). TCE was also detected at 50 ppb in the washwater and"sludge"collected in the west floor drain and dt 13 ppb from the septic tank. Please note that other contaminants were found in samples collected at the Dzen Farm(see results). . Throughout the course of the DEP investigation, the highest levels of TCE contamination detected in the overburden groundwater was at the Dzen Farm. In addition, the potable well water sample collected from#244 Barber Hill Road had a WE level at 117 ppb. It can be argued that the TCE contamination detected on the overburden groundwater table at GP-1 and GP-6 (located near garage ramp at 10 ppb and 13 ppb, respectively) could be attributed to the TCE contamination in the potable well. As the well water was used to maintain/clean vehicles, the runoff could have infiltrated the ground surface and migrated vertically to the groundwater table. N.U. Substation: Low levels of TCE and PCE(Perchlorethylene)solvent contamination in the shallow aquifer were observed in groundwater samples collected at the N.U. Substation indicating the possibility of being near a historic source area(see May 18, 1999). Although all levels detected were beneath the action levels for both contaminants,it's mere presence signifies past usage. The size of the PCE and TCE plume was found to be over 120'long and still not fully delineated, indicating a large source discharge that needs further vertical and horizontal delineation. Because of the size of this facility,a limited subsurface investigation was performed. There was evidence found that the N.U. Substation is a recharge area with diverging shallow groundwater flow. Since the N.U. Substation does not have a potable well which could transport pollutants to the surface,any contaminants encountered may be attributed to the acknowledged historic uses of the solvents.on-site. In view of the DEP's findings, it is recommended that Northeast Utilities conduct a subsurface investigation at the Northeast Utilities Substation located on Barber Hill Road in South Windsor. The investigation should be coordinated with Michael Senyk of the DEP's Potable Water Program(860-424-3782). f j 1'` ••: ,...• ter.. .r• ♦w�i,Y1 .•r. Y' • / 1 \hr•• :♦VM. •PtZWv Y. •V' R K �i. :fix ,•�' .M Y.. 4. :yv;• �•� •�Wwvr:• 'A• .1 :v. :h �. •.l T• mow.'.• � '♦ W w ti• t :.• x. r .. . .s '.^ r. •M• «•' .: •fit.. /` `,� i r, ow41 r.. f' nr. .. �� ?:,.,.x.Y.♦.:..,,,Y,ji/� .I� 74 f,• •f�;?' � 1�riG...:R• � .ICY f,�yrw. ve vI.Y..•,:••.•j•" '•••O.V! ��:♦.ram lF •�ir:W.•' .. .w• WM Yh•••,♦ t°i. ,i •A '• Z vI�;Y.�p,•..•InYJI►.rrJw/R• QF T.•.rr. w• , rgV.••y..IK, }; r ••ti' :y 1� �r. ���y 1;•s'• Nr q .-RY s 'h. •N\ .f. t•• Y Y' VM•• •:r f w f• .1•: �¢ r:: •A• :• •rc• .J4:•• i i• •1. * ♦( .Y :•y Sti'' .• { •1..1. •.Y• �� ••1S;�• ••��jj,, :ice J.1•. { i ;i.:,� :i A i�' .I Y•: :Y .1•. :::' ': �i is �:: ffi". :is•I• i. 11• ;•;:✓ ;,,. •>•SA y .r . : DEP WST/PM IWASTICKTIoNj MARCH 9-10/ 1999 N N. 0 x 8 34 W, GAR[3ER III>,L ROOD VICINITY r- 1.06 Ac. N 69. SouT41 w%N05aR I CT to oo' kiYi•... - - -._.---- a .. _ 20000 0 OW MICRO-WLLL5 (APP'ox. Locj: dlw5) °• m 27 '" `" 4.00Ac. N 25 N g 33 3 o y 19.00Ac. $ 0.69Ac. _ o N A V 200 95' N 2 m W Q� _ N � N 0 32 m m a 0.72 AC. m 00, r 0 a93-37 0' 223.88' 1.o0'- 190'S N U Q 0 81 c 0.92 Ac. - PARCEL-a '$ � N aoPE 320.59, a 31 0' GP4 o g ^' 0.90Ac. V A 28 - S 0.92 Ac. e��° a �Ja"9�, GPb O PARCEL-A z a 323.73' 1 30 a 29 $ w 0.99Ac a` v io18 0.8OAc. �•N `" 24 O.98AC. a 327.42 223 4' ro 6 G2'Io 550.62' D a 0 51 r4�01 1.70 Ac. u `' a WATER, w 52 tS0' 1.20Ac. "' o S ry u 207.51' 557.4 LIPS, •. 105.98' 105.99 ._ 105 wd' !- wA r E R 3 4 S 6 IDGP7 m Lv �6P9 7 o 53 0.74AC. GP'1 � _ � 54 � 55 M O GP15 U /p6/ o.g% ^' 0.67Ac. 0.75Ac. ; 56 0.82Ac.• 60 ��'7 h u 2.3OAc. TV (UGPI$A m H O M 57 �. 0.87Ac. N 59 A / / N LIOAc. �y J°oa °0"0' fie, a J /00,°, �49s RO4D 58 F� 0.86 Ac. mq v2J'ssO,ssOo u 0• 61 �9. 2.20Ac. . . /• /Jos ' b / 1 0 5/y?' ro 2 Qy .GM APp.K.«ek b .1�..� 1wyFroU �H M (N01 TO _ • OA Sw T.MC DZEN FARM 1 Cst•. n11e(G¢a s.�t t.yp'�.( b.�:.S l.t,l.t;> rAa((%%29 1, '99 \ l \ ,SiS� ham o, ce,y o se.soac. Co\ ♦\ 7 0cr�. . W 2 e \ 0.55Ac. \ cn+ Of \ \ o o \ it. nto st•99 \ M \\\ C c \\\ 1109.6II' le- 111.19' 225.0f 770.49 m c,Cl Q Co NU o SUBSTATION �� ytc nv.;I9'9p 00 (stt Ap�.1 Z9( May { aNw CW I tt —ts o cva 4 24.00 G 20 cv9 p 0 4 2A —... Me 0 'I S 8 � o cvu 0GN +( (,tic- (1 DEP LUST/PERD INVESTIGATION 326.4' MARCH 29-JUNE 1, 1999 BARBER HILL ROAD VICINITY $ g 0. °_: 26 O SOUTH WINDSOR,CT 1.50Ac. °' 0 DEP MICRO-WELLS sxa.II' e54.e2' STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION a STATE OF CONNECTICUT VS. TOWN OF SOUTH WINDSOR CONSENT ORDER The Commissioner of Environmental Protection has determined that the Town of South Windsor("the Town") is a municipality in which pollution of the groundwaters has occurred or can reasonably be expected to occur; the Commissioner of Public Health has determined that the pollution creates or can reasonably be expected to create an unacceptable risk of injury to the health or safety of persons using'such groundwaters as a public or private source of water for drinking or other personal or domestic uses; and the Commissioner of Environmental Protection has been unable to determine the person or municipality responsible for such pollution. Therefore, pursuant to Sections 22a-6, 22a-424 and 22a-471 of the Connecticut General Statutes, the Commissioner of Environmental Protection ("the Commissioner") hereby consent orders the Town to take the following actions: 1. Describe in detail the area and population affected by the pollution of groundwater on and in the vicinity of the intersection of Barber Hill and Miller Roads in the Town of South Windsor and determine which areas presently or potentially may not meet the State of Connecticut Department of Public Health requirements for potable drinking water. 2. Describe long-term potable drinking water supply alternatives, associated costs and design criteria for each alternative. 3. Provide a short-term and long-term potable drinking water supply which meets the standards for drinking water established by the Commissioner of Public Health to the following properties and the areas as described under paragraph 1 above. NAME ADDRESS Mr. Brian Rivard 1042 Foster Street Ext. Mr. Michael Lanata 460 Miller Road Mr. Wayne Martel 461 Miller Road Ms. Paulette Farris 471 Miller Road Mr. Raymond Shearer 480 Miller Road Mr. Fred Schilke 488 Miller Road (Printed on Recycled Paper) 79 Elm Street • Hartford, CT 06106-5127 http://dep.state.ct.us An Equal Opportunity Employer 2 Mr. Edward Rodonis 496 Miller Road Mr. Richard Cyr 501 Miller Road Mr. Robert Kuehnal 10 Barber Hill Road Mr. Bradford Case 20 Barber Hill Road Mr. Thomas Dillion 34 Barber Hill Road Mr. Michael Pines 42 Barber Hill Road Mr. Walter Twardowski 76 Barber Hill Road Mr. Michael Dzen 204 Barber Hill Road Mr. Donald Dzen 244 Barber Hill Road 4. The Town is further ordered to accomplish the above described actions, except as may be revised by the recommendations of a detailed engineering investigation and agreed to in writing by the Commissioner and the Commissioner of Public Health, in accordance with the following schedule: A. On or before thirty (30) days following the date of issuance of this consent order, the Town shall retain one or more qualified consultants acceptable to the Commissioner or demonstrate to the satisfaction of the Commissioner that the Town has adequate in-house expertise to prepare the documents and oversee the actions required by this consent order and shall, by that date, notify the Commissioner in writing of the identity of such consultants or in-house expert. The Town shall retain one or more qualified consultants acceptable to the Commissioner or maintain such in-house expertise, until this consent order is fully complied with, and, within ten days after retaining any such consultant or in-house expert other than one originally identified under this paragraph, the Town shall notify the Commissioner in writing of the identity of such other consultant or in-house expert. The Town shall submit to the Commissioner a description of a consultant's or in-house expert's education, experience and training which is relevant to the work required by this consent order within ten days after a request for such a description. Nothing in this paragraph shall preclude the Commissioner from finding a previously acceptable consultant or in-house expert unacceptable. B. On or before sixty (60) days after issuance of this consent order, the Town shall submit for the review and written approval of the Commissioner, a scope of work, schedule and proposed engineering agreement for the investigation and study required by paragraphs 1 and 2 and a plan and schedule for the provision of a short-term supply of potable drinking water to the properties identified in paragraph 3 until a long-term supply of potable drinking water has been provided. C. On or before 14 days after the approval of the report required by paragraph 23, the Town shall submit for the review and written approval of the 3 Commissioner a Request for State Grant in accordance with Section 22a- 471-1 of the Regulations of Connecticut State Agencies ("RCSA") for the short-term and long term provision of potable drinking water and the investigation and study required by paragraphs 1 and 2 which includes the Resolution required by Section 22a-471-1(d)(1)(C). D. On or before 30 days after approval by the Commissioner of the scope of work required by paragraph 4.13, the Town shall submit for the review and written approval of the Commissioner and the Commissioner of Public Health, an engineering report which describes the problems, area and population affected by the groundwater pollution, alternate solutions including cost of construction or installation, operation and maintenance, design criteria on all alternatives, and a recommended alternative for water supply facilities. The report shall also contain a schedule for construction of the approved water supply alternative and for the submission of the following items to the Commissioner: 1) Contract plans and specifications for the water supply alternative approved by the Commissioner under this paragraph. 2) Verification that a contract for the installation and construction of the facilities approved by the Commissioner has been awarded. 3) Verification that said approved facilities have been placed in operation. E. On or before 14 days after the Commissioner's approval of the engineering report required by paragraph 4.D, the Town shall submit for the review and written approval of the Commissioner a Request for State Grant in accordance with RCSA Section 22a-471-1 for capital improvements for the long-term provision of potable water, which includes the Resolution required by RCSA Section 22a-471-1(d)(1)(C). F. The Town shall carry out the actions specified in the approved engineering report in accordance with the approved schedule. 5. Standard for potable drinking water. All potable drinking water which is provided pursuant to this consent order shall be of a quality which meets all standards specified in the Regulations of Connecticut State Agencies, including sections 19- 13-B101 and 19-13-13102, as amended and which the Commissioner of Public Health has not determined creates an unacceptable risk of injury to the health or safety of persons using such water as a public or private source of water for drinking or other personal and domestic uses. 4 6. Full compliance. The Town shall not be considered in full compliance with this consent order until all actions required by this consent order have been completed as approved and to the satisfaction of the Commissioner. 7. Approvals. The Town shall use best efforts to submit to the Commissioner all documents required by this consent order in a complete and approvable form. If the Commissioner notifies the Town that any document or other action is deficient, and does not approve it with conditions or modifications, it is deemed disapproved, and the Town shall correct the deficiencies and resubmit it within the time specified by the Commissioner or, if no time is specified by the Commissioner, within thirty days of the Commissioner's notice of deficiencies. In approving any document or other action under this consent order, the Commissioner may approve the document or other action as submitted or performed or with such conditions or modifications as the Commissioner deems necessary to cant'out the purposes of this consent order. Nothing in this paragraph shall excuse noncompliance or delay. 8. Definitions. As used in this consent order, "Commissioner" means the Commissioner or an agent of the Commissioner. 9. Dates. The date of submission to the Commissioner of any document required by the consent order shall be the date such document is received by the Commissioner. The date of any notice by the Commissioner under this consent order, including but not limited to notice of approval or disapproval of any document or other action, shall be the date such notice is personally delivered or the date three days after it is mailed by the Commissioner, whichever is earlier. Except as otherwise specified in this consent order, the word "day" as used in this consent order means calendar day. Any document or action which is required by this consent order to be submitted or performed by a date which falls on a Saturday, Sunday or Connecticut or federal holiday shall be submitted or performed on or before the next day which is not a Saturday, Sunday, or Connecticut or federal holiday. 10. Notification of noncompliance. In the event that the Town becomes aware that it did not or may not comply, or did not or may not comply on time, with any requirement of this consent order or of any document required hereunder, the Town shall immediately notify the Commissioner and shall take all the reasonable steps to ensure that any noncompliance or delay is avoided or, if unavoidable, is minimized to the greatest extent possible. In so notifying the Commissioner, the Town shall state in writing the reasons for the noncompliance or delay and propose, for the review and written approval of the Commissioner, dates by which compliance will be achieved, and the Town shall comply with any dates which may be approved in writing by the commissioner. Notification by the Town shall not excuse noncompliance or delay, and the Commissioner's approval of any compliance dates I ' 5 proposed shall not excuse noncompliance or delay unless specifically so stated by the Commissioner in writing. 11. Certification of documents. Any document, including but not limited by any notice, which is required to be submitted to the Commission under this consent order shall be signed by a responsible principal executive officer or a ranking elected official of the Town or a duly authorized representative of such officer or official, as those terms are defined in section 22a-430-3(b)(2) of the Regulations of Connecticut State Agencies and by the individual or individuals responsible for actually preparing such document, each of whom shall certify in writing as follows: "I have;personally examined and am familiar with the information submitted in this document and all attachments and certify that based on reasonable investigation, including my inquiry of those individuals responsible for obtaining the information, the submitted information is true, accurate and complete to the best of my knowledge and belief, and I understand that any false statement made in this document or its attachments may be punishable as a criminal offense." 12. Noncompliance. Failure to comply with this consent order may subject the Town to an injunction and penalties under Chapters 439 and 446k of the Connecticut General Statutes. 13. False statements. Any false statement in any information submitted pursuant to this consent order may be punishable as a criminal offense under Section 22a-438 of the Connecticut General Statutes or, in accordance with Section 22a-6, under Section 53a-157b of the Connecticut General Statutes. 14. Liability of the Town and others. The Town's obligations under this consent order shall not be affected by the passage of title to any property to any other person or municipality. 15. Commissioner's powers.. Nothing in this consent order shall affect the Commissioner's Authority to institute any proceeding to prevent or abate violations of law, prevent or abate pollution, recover costs and natural resource damages, and to impose penalties for violations of law, including but not limited to violations of any permit issued by the Commissioner. If at any time the Commissioner determines that the actions taken by the Town pursuant to this consent order have not successfully provided potable drinking water to all persons affected, the Commissioner may institute any proceeding to require the Town to undertake further investigation or further action to provide potable drinking water. 16. The Town's obligations under law. Nothing in this consent order shall relieve the Town of other obligations under applicable federal, state and, to the extent local law is consistent with this consent order, local law. 17. No assurance by Commissioner. No provision of this consent order and no action or inaction by the Commissioner shall be construed to constitute assurance by the Commissioner that the actions taken by the Town pursuant to this consent order will successfully provide potable drinking water to all persons affected. 18. No effect on rights of other persons. This consent order shall neither create nor affect any rights of persons who or municipalities which are not parties to this consent order. 19. Notice to Commissioner of changes. Within fifteen days of the date the Town becomes aware of a change in any information submitted to the Commissioner under this consent order, or that any such information was inaccurate or misleading or that any relevant information was omitted, the Town shall submit the correct or omitted information to the Commissioner. 20. Submission of documents to DER Any document required to be submitted to the Commissioner under this consent order shall, unless otherwise specified in writing by the Commissioner, be directed to: Mr. Michael P. Senyk Department of Environmental Protection Bureau of Water Management Permitting, Enforcement and Remediation Division 79 Elm Street Hartford, Connecticut 06106-5127 21. Submission of documents to DPH. Any document required to be submitted to the Commissioner of Public Health under this consent order shall, unless otherwise specified in writing by the Commissioner of Public Health, be directed to: Mr. Paul Ritsick Department of'Public Health Water Supplies Section 450 Capitol Ave., MS#51 WAT P.O. Box 340308 Hartford, Connecticut 06134-0308 AFT -DR The Town consents to the issuance of this consent order without further notice. The undersigned certifies that (he/she) is fully authorized to enter into the consent order and to legally bind the Town to the terms and conditions of the consent order. Date Matthew B. Galligan Town Manager Issued as a final order of the Commissioner of the Department of Environmental Protection. Date Arthur J. Rocque Jr. Commissioner CONSENT ORDER NO. SRD- TOWN OF SOUTH WINDSOR i t t� e 7/6 7,7 CJL p" �w p I STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION November 17, 1999 Robert Deptula,Sanitarian Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074-2786 RE: Consent Order Dear Mr. Deptula: Enclosed please find a draft cony of the consent order addressing the water supply issues in the Barber Hill Road area of South Windsor. Please review and comment by November 29, 1999. If you have any questions,please call me tit(860)-424-3782. Sincerely, Michael P. Senyk Environmental Analyst Permitting,Enforcement and Remediation Division Sp � i`'�t✓N� (printed on Recycled Paper) 79 Elm Street • Hartford, CT 06106.5127 http:l/dep.atate.ct.ua An Equal Opportunity Employer STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION n November 17, 1999 Robert Deptula, Sanitarian Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074-2786 RE: Consent Order Dear Mr. Deptula: Enclosed please find a draft copy of the consent order addressing the water supply issues in the Barber Hill Road area of South Windsor. Please review and comment by November 29, 1999. If you have any questions,please call me at(860)-424-3782. Sincerely, Michael P. Senyk Environmental Analyst Permitting, Enforcement and Remediation Division (Printed on Recycled Paper) 79 Elm Street • Hartford, CT 06106-5127 http://dep.state.ct.us An Equal Opportunity Employer STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION ►s.wrw M STATE OF CONNECTICUT vs. M_ .- . TOWN OF SOUTH WINDSOR CONSENT ORDER The Commissioner of Environmental Protection has determined that the Town of South Windsor ("the Town") is a municipality in which pollution of the groundwaters has occurred or can reasonably be expected to occur; the Commissioner of Public Health has determined that the pollution creates or can reasonably be expected to create an unacceptable risk of injury to the health or safety of persons using such groundwaters as a public or private source of water for drinking or other personal or domestic uses; and the Commissioner of Environmental Protection has been unable to determine the person or municipality responsible for such pollution. Therefore, pursuant to Sections 22a-6, 22a-424 and 22a-471 of the Connecticut General Statutes, the Commissioner of Environmental Protection ("the Commissioner") hereby consent orders the Town to take the following actions: 1. Describe in detail the area and population affected by the pollution of groundwater on and in the vicinity of the intersection of Barber Hill and Miller Roads in the Town of South Windsor and determine which areas presently or potentially may not meet the State of Connecticut Department of Public Health requirements for potable drinking water. 2. Describe long-term potable drinking water supply alternatives, associated costs and design criteria for each alternative. 3. Provide a short-term and long-term potable drinking water supply which meets the standards for drinking water established by the Commissioner of Public Health to the following properties and the areas as described under paragraph 1 above. NAME ADDRESS Mr. Brian Rivard 1042 Foster Street Ext. Mr. Michael Lanata 460 Miller Road Mr. Wayne Martel 461 Miler Road Ms. Paulette Farris 471 Miller Road Mr. Raymond Shearer 480 Miller Road Mr. Fred Schilke 488 Miller Road (Printed on Recycled Paper) 79 Elm Street 0 Hartford, CT 06106-5127 http://dep.state.ct.us An Equal Opportunity Employer 2 Mr. Edward Rodonis 496 Miller Road Mr. Richard Cyr 501 Miller Road Mr. Robert Kuehnal 10 Barber Hill Road Mr. Bradford Case 20 Barber Hill Road Mr. Thomas Dillion 34 Barber Hill Road Mr. Michael Pines 42 Barber Hill Road Mr. Walter Twardowski 76 Barber Hill Road Mr. Michael Dzen 204 Barber Hill Road Mr. Donald Dzen 244 Barber Hill Road 4. The Town is further ordered to accomplish the above described actions, except as may be revised by the recommendations of a detailed engineering investigation and agreed to in writing by the Commissioner and the Commissioner of Public Health, in accordance with the following schedule: A. On or before thirty (30) days following the date of issuance of this consent order, the Town shall retain one or more qualified consultants acceptable to the Commissioner or demonstrate to the satisfaction of the Commissioner that the Town has adequate in-house expertise to prepare the documents and oversee the actions required by this consent order and shall, by that date, notify the Commissioner in writing of the identity of such consultants or in-house expert. The Town shall retain one or more qualified consultants acceptable to the Commissioner or maintain such in-house expertise, until this consent order is fully complied with, and, within ten days after retaining any such consultant or in-house expert other than one originally identified under this paragraph, the Town shall notify the Commissioner in writing of the identity of such other consultant or in-house expert. The Town shall submit to the Commissioner a description of a consultant's or in-house expert's education, experience and training which is relevant to the work required by this consent order within ten days after a request for such a description. Nothing in this paragraph shall preclude the Commissioner from finding a previously acceptable consultant or in-house expert unacceptable. B. On or before sixty (60) days after issuance of this consent order, the Town shall submit for the review and written approval of the Commissioner, a scope of work, schedule and proposed engineering agreement for the investigation and study required by paragraphs 1 and 2 and a plan and schedule for the provision of a short-term supply of potable drinking water to the properties identified in paragraph 3 until a long-term supply of potable drinking water has been provided. C. On or before 14 days after the approval of the report required by paragraph 2.B, the Town shall submit for the review and written approval of the D -A,F, Commissioner a Request for State Grant in accordance with Section 22a- 471-1 of the Regulations of Connecticut State Agencies ("RCSA") for the short-term and long term provision of potable drinking water and the investigation and study required by paragraphs 1 and 2 which includes the Resolution required by Section 22a-471-1(d)(1)(C). D. On or before 30 days after approval by the Commissioner of the scope of work required by paragraph 4.13, the Town shall submit for the review and written approval of the Commissioner and the Commissioner of Public Health, an engineering report which describes the problems, area and population affected by the groundwater pollution, alternate solutions including cost of construction or installation, operation and maintenance, design criteria on all alternatives, and a recommended alternative for water supply facilities. The report shall also contain a schedule for construction of the approved water supply alternative and for the submission of the following items to the Commissioner: 1) Contract plans and specifications for the water supply alternative approved by the Commissioner under this paragraph. 2) Verification that a contract for the installation and construction of the facilities approved by the Commissioner has been awarded. 3) Verification that said approved facilities have been placed in operation. E. On or before 14 days after the Commissioner's approval of the engineering report required by paragraph 4.D, the Town shall submit for the review and written approval of the Commissioner a Request for State Grant in accordance with RCSA Section 22a-471-1 for capital improvements for the long-term provision of potable water, which includes the Resolution required by RCSA Section 22a-471-1(d)(1)(C). F. The Town shall carry out the actions specified in the approved engineering report in accordance with the approved schedule. 5. Standard for potable drinking water. All potable drinking water which is provided pursuant to this consent order shall be of a quality which meets all standards specified in the Regulations of Connecticut State Agencies, including sections 19- 13-B101 and 19-13-13102, as amended and which the Commissioner of Public Health has not determined creates an unacceptable risk of injury to the health or safety of persons using such water as a public or private source of water for drinking or other personal and domestic uses. 4 6. Full compliance. The Town shall not be considered in full compliance with this consent order until all actions required by this consent order have been completed as approved and to the satisfaction of the Commissioner. 7. Approvals. The Town shall use best efforts to submit to the Commissioner all documents required by this consent order in a complete and approvable form. If the Commissioner notifies the Town that any document or other action is deficient, and does not approve it with conditions or modifications, it is deemed disapproved, and the Town shall correct the deficiencies and resubmit it within the time specified by the Commissioner or, if no time is specified by the Commissioner, within thirty days of the Commissioner's notice of deficiencies. In approving any document or other action under this consent order, the Commissioner may approve the document or other action as submitted or performed or with such conditions or modifications as the Commissioner deems necessary to carry out the purposes of this consent order. Nothing in this paragraph shall excuse noncompliance or delay. 8. Definitions. As used in this consent order, "Commissioner" means the Commissioner or an agent of the Commissioner. 9. Dates. The date of submission to the Commissioner of any document required by the consent order shall be the date such document is received by the Commissioner. The date of any notice by the Commissioner under this consent order, including but not limited to notice of approval or disapproval of any document or other action, shall be the date such notice is personally delivered or the date three days after it is mailed by the Commissioner, whichever is earlier. Except as otherwise specified in this consent order, the word "day" as used in this consent order means calendar day. Any document or action which is required by this consent order to be submitted or performed by a date which falls on a Saturday, Sunday or Connecticut or federal holiday shall be submitted or performed on or before the next day which is not a Saturday, Sunday, or Connecticut or federal holiday. 10. Notification of noncompliance. In the event that the Town becomes aware that it did not or may not comply, or did not or may not comply on time, with any requirement of this consent order or of any document required hereunder, the Town shall immediately notify the Commissioner and shall take all the reasonable steps to ensure that any noncompliance or delay is avoided or, if unavoidable, is minimized to the greatest extent possible. In so notifying the Commissioner, the Town shall state in writing the reasons for the noncompliance or delay and propose, for the review and written approval of the Commissioner, dates by which compliance will be achieved, and the Town shall comply with any dates which may be approved in writing by the commissioner. Notification by the Town shall not excuse noncompliance or delay, and the Commissioner's approval of any compliance dates 5 proposed shall not excuse noncompliance or delay unless specifically so stated by the Commissioner in writing. 11. Certification of documents. Any document, including but not limited by any notice, which is required to be submitted to the Commission under this consent order shall be signed by a responsible principal executive officer or a ranking elected official of the Town or a duly authorized representative of such officer or official, as those terms are defined in section 22a-430-3(b)(2) of the Regulations of Connecticut State Agencies and by the individual or individuals responsible for actually preparing such document, each of whom shall certify in writing as follows: "I have personally examined and am familiar with the information submitted in this document and all attachments and certify that based on reasonable investigation, including my inquiry of those individuals responsible for obtaining the information, the submitted information is true, accurate and complete to the best of my knowledge and belief, and I understand that any false statement made in this document or its attachments may be punishable as a criminal offense." 12. Noncompliance. Failure to comply with this consent order may subject the Town to an injunction and penalties under Chapters 439 and 446k of the Connecticut General Statutes. 13. False statements. Any false statement in any information submitted pursuant to this consent order may be punishable as a criminal offense under Section 22a-438 of the Connecticut General Statutes or, in accordance with Section 22a-6, under Section 53a-157b of the Connecticut General Statutes. 14. Liability of the Town and others. The Town's obligations under this consent order shall not be affected by the passage of title to any property to any other person or municipality. 15. Commissioner's powers. Nothing in this consent order shall affect the Commissioner's Authority to institute any proceeding to prevent or abate violations of law, prevent or abate pollution, recover costs and natural resource damages, and to impose penalties for violations of law, including but not limited to violations of any permit issued by the Commissioner. If at any time the Commissioner determines that the actions taken by the Town pursuant to this consent order have not successfully provided potable drinking water to all persons affected, the Commissioner may institute any proceeding to require the Town to undertake further investigation or further action to provide potable drinking water. 16. The Town's obligations under law. Nothing in this consent order shall relieve the Town of other obligations under applicable federal, state and, to the extent local law is consistent with this consent order, local law. 6 17. No assurance by Commissioner. No provision of this consent order and no action or inaction by the Commissioner shall be construed to constitute assurance by the Commissioner that the actions taken by the Town pursuant to this consent order will successfully provide potable drinking water to all persons affected. 18. No effect on rights of other persons. This consent order shall neither create nor affect any rights of persons who or municipalities which are not parties to this consent order. 19. Notice to Commissioner of changes. Within fifteen days of the date the Town becomes aware of a change in any information submitted to the Commissioner under this consent order, or that any such information was inaccurate or misleading or that any relevant information was omitted, the Town shall submit the correct or omitted information to the Commissioner. 20. Submission of documents to DER Any document required to be submitted to the Commissioner under this consent order shall, unless otherwise specified in writing by the Commissioner, be directed to: Mr. Michael P. Senyk Department of Environmental Protection Bureau of Water Management Permitting, Enforcement and Remediation Division 79 Elm Street Hartford, Connecticut 06106-5127 21. Submission of documents to DPH. Any document required to be submitted to the Commissioner of Public Health under this consent order shall, unless otherwise specified in writing by the Commissioner of Public Health, be directed to: Mr. Paul Ritsick Department of Public Health Water Supplies Section 450 Capitol Ave., MS#51 WAT P.O. Box 340308 Hartford, Connecticut 06134-0308 7 The Town consents to the issuance of this consent order without further notice. The undersigned certifies that (he/she) is fully authorized to enter into the consent order and to legally bind the Town to the terms and conditions of the consent order. Date Matthew B. Galligan Town Manager Issued as a final order _of the Commissioner of the Department of Environmental Protection. Date Arthur J. Rocque Jr. Commissioner CONSENT ORDER NO. SRD- TOWN OF SOUTH WINDSOR VTAL PROTECTION Title 2 Ch. 446k WATER POLLUTION CONTROL 785 'B by public service companies. An i-1,planning to incinerate in the state any publ Sec. 22a-471. Pollution of groundwaters.Orders to provide potable drinking I PCB,as defined in section 22a-463,is pre for water. Grants to municipalities. Hearing on order to abate. Appeal. Injunction. ;r million, shall notify the municipality re Forfeiture for violations.Orders to persons engaged in agriculture for contamina- n days before transporting the substance itit tion of groundwater by pesticides.(a)(1)If the commissioner determines that pollution i which the substance will the transported,(2 of the groundwaters has occurred or can reasonably be expected to occur and the Com- municipality,(3)the quantity of the transported, missioner of Public Health determines that the extent of pollution creates or can reason- ably, be expected to create an unacceptable risk of injury to the health or safety of persons t that will be incinerated and (4) the meth o using such groundwaters as a public or private source of water for drinking or other personal or domestic uses, the Commissioner of Environmental Protection shall, as funds from the emergency spill response account established by section 22a-451 allow, arrange for the short-term provision of potable drinking water to those residential build- yy).Relocation or removal of public servic ings and elementary and secondary schools affected by such pollution until either he )f municipal sewer or pollution abatement. issues an order pursuant to this section requiring the provision of such short-term supply is a grant under this chapter for the construe- )f sewers or other Pollution abatement facili- and the recipient complies with such order or a long-term supply of potable drinking truction,rebuilding,expansion oracquisition water has been provided, whichever is earlier. In determining if pollution creates an lj ruction t, relocation or removal of a public unacceptable risk of injury,the Commissioner of Public Health shall balance all relevant liustment, r the municipality shall issue an and substantive facts and inferences and shall not be limited to a consideration of avail- or operating such facility and such company able statistical analysis but shall consider all of the evidence presented and any factor P y related to human health risks. The commissioner may issue an order to the person or relocate or remove such facility promptly in ad municipality responsible for such pollution requiring that potable drinking water be litab]eshareofthecostofsuchrejustmenf ice facility, including the cost a stment provided to all persons affected by such pollution.If the commissioner finds that more g than one person or municipality is responsible for such pollution, he shall attempt to ty in a new location, shall be borne by the one hundred per cent of such cost after the'_ apportion responsibility if he determines that apportionment is appropriate. If he does fishing the equitable share the cost to be` not apportion responsibility,all persons and municipalities responsible for the pollution of thegroundwaters shall be jointly and severally responsible forthe providing of potable ducted from the cost of the readjusted,relo- drinking water to persons affected by such pollution. If the commissioner determines n a consideration of the value of materials' that the state or an agency or department of the state is responsible in whole or in part >t of the original installation, the life expec ed term of such useful life.For the purposes forthe pollution of the groundwaters,such agency or department shall prepare or arrange ost of such readjustment, relocation or re- for the preparation of an engineering report and shall provide or arrange forthe provision my shall be available for the inspection of of a long-term potable drinking water supply.LfS co_ mmiscioner is unabl .rn�PrP, ,,;nP oved from a street or public right-of-way the person or municipality responsible or if ho determines that the responsible persons shall not pay for such right-of-way. If the have no assets other than land,buildings,business machinery or livestock and are unable erating such facility cannot agree upon the to secure a loan at a reasonable rate of interest to provide potable drinking water, he dity,either may apply to the superior court may prepare or arrange for the preparation of an engineering report and provide or it public right-of-way is situated or, if the _ arrange for the provision of a long-term potable drinking water supply or he may issue for a determination of the cost to be borne an orb r=rhP .,,,alitY wherein groundwaters unusable for potable rinking water e after causing notice of the pendency of are located requiring that short-term provision of potable drinking water be made to irty, shall appoint a state referee to make those existing residential buildings and elementary and secondary schools affected by ven at least ten days' notice to the parties such pollution and that long-term provision of potable drinking water be made to all fig, shall hear both parties, shall take such persons affected by such pollution.For purposes of this section, residential building" and shall thereupon determine the amount means any house,apartment,trailer,mobile manufactured home or other structure occu- i forthwith report to the court.If the report pied by individuals as a dwelling, except a non-owner-occupied hotel or motel or a shall, subject to right of appeal as in civil correctional institution. sed in this section,"public service facility" �. wire,tower,Lion, n" or apublic s i service appliance (2) Any order issued pursuant to this section may require the provision of potable ►e,telegraph,water building ildin rcommunita antenna drinking water in,such quantities as the commissioner determines are necessary for drinking and other personal and domestic uses and may require the maintenance and monitoring of potable water supply facilities for any period which the commissioner determines is necessary. In making such determinations, the commissioner shall con- Sider the short-term and long-term needs for potable drinking water and the health and safety of those persons whose water supply is unusable. Any order may require the 786 ENVIRONMENTAL PROTECTION Title 22, Ch. 446k WATER POL submission of an engineering report which shall be subject to the approval of the com- of this section may apply to the commiss missioner and the Commissioner of Public Health and include, but not be limited to,a Except as provided in subparagraph (C description in detail of the problem, area and population affected by pollution of the V. subdivision (2) of this subsection, the c groundwaters; the expected duration of and extent of the pollution; alternate solutions termprovision of potable drinking water includingrelativecostof construction orinstallation,operation and maintenance;desig wells or individual water treatment systei criteria on all alternate solutions; and any other information which the commissioner tion filters and shall make grants for othe deems necessary.Upon review of such report,the commissioner and the Commissioner sion of potable drinking water from the of Public Health shall consider the nature of the pollution, the expected,duration and by section 22a-451 or from any bond at extent of the pollution, the health and safety of the persons affected, the initial and ongoing cost-effectiveness and reliability of each alternative and any otherfactors which (B) The amount distributed to a mu they deem relevant,and shall approve a system or method to provide potable drinking °� dred per cent of the cost of short-term pr pursuant to the order.Each order shall include a time schedule for the accomplish- water per cent of the cost of the engineering r, ment of the steps leading to the provision of potable drinking water. Notwithstanding cent of the cost of capital improvement; the fact that a responsible party has been or may be identified or a request for a hearing of providing potable drinking water as c on or a pending appeal from an order issued pursuant to this section,when pollution of missioner of Public Health upon conside the groundwaters has occurred or may reasonably be expected to occur, the commis- dred per cent of the cost during the fir sioner may prepare or arrange for the preparation of an engineering report as described maintaining individual water treatment in this subdivision and may provide or arrange for the provision of a long-term potable located in an area where the commission drinking water supply. In any case where the state or an agency or department of the is reasonably likely to occur. No state i state is responsible in whole or in part for the pollution of the groundwaters,such agency the cost of operating or maintaining an or department shall prepare or arrange for the preparation of an engineering report and specified in this subsection. shall provide or arrange for the provision of a long-term potable drinking water supply, (C) Notwithstanding any provision and if the state is not the sole responsible party,the commissioner shall seek reimburse- sinner may advance to a municipality,fr ment under subdivision(4)of subsection(b)of this section for the costs of such report lio ed m section advance 22a- a 1 or from the,fr and for the provision of potable water.The cost of the report and of the provision of a of potable drinking water,any percentaz long-term potable drinking water supply,as funds allow, shall be paid from the emer- Sion of potable drinking water which he gency spill response account pursuant to the provisions of subdivision(6)of subsection (d) of section 22a-451 or from the proceeds of any bonds authorized for the provision (2) (A) If the commissioner is una of potable drinking water. sponsible for rendering the groundwate (3) The provisions of this section shall not affect the rights of any municipality to --, determines that the responsible persons institute suit to recover all damages, expenses and costs incurred by the municipality ; ness machinery or livestock and are unat from any responsible party including,but not limited to,the costs specified in subpara- to provide potable drinking water, a w, graph(B)(i)and(ii)of subdivision(4)of subsection(b)and in the case of any municipal- customers and which owns,maintains,i ity which is not responsible for the pollution of the groundwaters,the additional amounts supply well which is rendered unusabi specified in subparagraph (B)(iii) and (iv) of subdivision (4)of subsection (b) of this ''commissioner for a grant from funds e section. the proceeds of any bonds authorized 1 upon review of the engineering report r (4) No provision of this section shall limit the liability of any person who or munici- an application for such a grant, the co pality which renders the groundwaters unusable for potable drinking water from a suit company from the emergency spill resp for damages by a person who or municipality which relied on said groundwaters for from the proceeds of any bonds authori potable drinking water prior to the determination by the commissioner that the ground- is appropriate, he may make such a gr waters are polluted. him pursuant to subsection (e)of this s, (5) The commissioner may issue any order pursuant to this section if the pollution _ (B) The total amount distributed t+ of the groundwaters occurred before or after July 1, 1982. shall,as funds allow,equal fifty per cei (6) The commissioner may at anytime require further action by any person to whom by this subsection and fifty per cent o or municipality to which an order is issued pursuant to this section if he determines that method of rendering the water supply ii such action is necessary to protect the health and safety of those persons whose water isk determined by the commissioner and the supply was rendered unusable. ation of the required engineering repor (b) (1) (A)Any municipality not responsible for the pollution of the groundwaters t (C) For purposes of this section, which is ordered to provide potable drinking water in accordance with subsection(a) same meaning as specified in section 2 PROTECTION Title 22a `= Ch. 446k WATER POLLUTION CONTROL 787 call be subject to the approval of the com- - of this section may apply to the commissioner for a grant as provided by this subsection. :ealth and include, but not be limited to,a' Except as provided in subparagraph (C) of subdivision (1) of this subsection and in d population affected by pollution of the "` subdivision (2) of this subsection, the commissioner shall make grants for the short- went of the pollution; alternate solutions termprovision of potable drinking water and the construction or installation of individual Ration,operation and maintenance;design'; wells or individual watertreatment systems,including,but not limited to,carbon absorp- her information which the commissioner tion filters and shall make grants for othercapital improvements for the long-term provi- the commissioner and the Commissioner sion of potable drinking water from the emergency spill response account established the pollution, the expected duration and by section 22a-451 or from any bond authorization established for that purpose. y of the persons affected, the initial and tch alternative and any otherfactors which ' (B) The amount distributed to a.municipality shall,as funds allow,equal one hun- :m or method to provide potable drinking dred per cent of the cost of short-term provision of potable drinking water,one hundred per cent of the cost of the engineering report required by this section,one hundred per iclude a time schedule for the accomplish- cent of the cost of capital improvements for the most cost-effective long-term method potable drinking water. Notwithstanding -71 ay be identified or a request for a hearing of providing potable drinking water as determined by the commissioner and the Com- iursuant to this section,when pollution of missioner of Public Health upon consideration of such engineering report,and one hun- nably be expected to occur, the commis- dred per cent of the cost during the first five years of installation of monitoring and Lion of an engineering report as described maintaining individual water treatment systems and monitoring drinking water wells e for the provision of a long-term potable _ located in an area where the commissioner determines that pollution of the groundwater state or an agency or department of the is reasonably likely to occur. No state funds shall be distributed to a municipality for ollution of the groundwaters,such agency the cost of operating or maintaining any potable water supply facilities other than as preparation of an engineering report and specified in this subsection. long-term potable drinking water supply, ' (C) Notwithstanding any provision of this subsection to the contrary,the commis- the commissioner shall seek reimburse- )f this section for the costs of such report ' sioner may advance to a municipality,from the emergency spill response account estab- )st of the report and of the provision of a lished by section 22a-451 or from the proceeds of any bonds authorized for the provision 'unds allow, shall be paid from the emer- of potable drinking water,any percentage of the cost of short-term and long-term provi- rovisions of subdivision(6)of subsection sion of potable drinking water which he deems necessary. if any bonds authorized for the provision (2) (A) If the commissioner is unable to determine the person or municipality re- sponsible for rendering the groundwaters unusable for potable drinking water or if he )t affect the rights of any municipality to determines that the responsible persons have no assets other than land,buildings,busi- s and costs incurred by the municipality ness machinery or livestock and are unable to secure a loan at a reasonable rate of interest limited to,the costs specified in subpara- to provide potable drinking water, a water company which has less than ten thousand ction(b)and in the case of any municipal- customers and which owns, maintains,operates,manages,controls or employs a water the groundwaters,the additional amounts supply well which is rendered unusable for potable drinking water, may apply to the subdivision (4) of subsection (b) of this commissioner for a grant from funds established pursuant to section 22a-451 or from the proceeds of any bonds authorized for the provision of potable drinking water. If, upon review of the engineering report required by this subsection to be submitted with the liability of any person who or munici- an application for such a grant, the commissioner determines that a grant to a water )le for potable drinking water from a suit company from the emergency spill response account established by section 22a-451 or y which relied on said groundwaters for from the proceeds of any bonds authorized for the provision of potable drinking water on by the commissioner that the ground- is appropriate, he may make such a grant in accordance with regulations adopted by him pursuant to subsection (e)of this section. ;r pursuant to this section if the pollution (B) The total amount distributed to a water company pursuant to this subsection my 1, 1982. shall,as >unds allow,equal fifty per cent of the cost of the engineering report required wire further action by any person to whom by this subsection and fifty per cent of the cost of the most cost-effective long-term 'suant to this section if he determines that method of rendering the water supply in question usable for potable drinking water,as and safety of those persons whose water determined by the commissioner and the Commissioner of Public Health upon consider- ation of the required engineering report. ble for the pollution of the groundwaters (C) For purposes of this section, "water company" and "customer" shall have the water in accordance with subsection (a) same meaning as specified in section 25-32a. 788 ENVIRONMENTAL PROTECTION Title 22a Ch•446k (D) Any water company applying for a grant pursuant to this section shall prepare :apply to the W -' ss3 or have prepared an engineering report which shall be subject to the approval of the = total amoun:o. commissioner and the Commissioner of Public Health and include, but not be limited °not exceedto,a description in detail of the problem,area and population affected by pollution of the (b)of this section. groundwaters;alternate solutions including relative cost of construction or installation, (5) Forpurposti=cam operation and maintenance;design criteria on all alternate solutions and any other infor- ; graph(B)(ii)of su: n o_ - mation the commissioner deems necessary. the commissioner a (3) (A) If a municipality or water company receives funding from a private source, the cost of plan an_ � o a federal grant or another state grant for any cost for which a from may be awarded pursuant to this section,the grant under this section shall equal the specified percentage (6) If am a an= ; �,�nor. of the costs specified in this subsection minus the amount of the other funding. [bey ccordancewith ta:s(B) If a municipality or water company receives a grant under this section and is accordance wiih��s:noz compensated by a person who or municipality which is responsible for rendering the groundwaters unusable for potable drinking water,the municipality or water company (7) AnypersoPwn0 muni_shall reimburse the account from which the funds were made available for the grant as this section mad_�follows: If the compensation from the responsible party equals or exceeds the costs ond the areasi^toward which the grant was to be applied, the municipality or water company shall hich are determinesreimburse the total amount of the grant;if the compensation is less than the cost towardeimbursement shi Yii rtitr=i jwhich the grant was to be applied,the municipality or water company shall reimburse (c) And oroe- unat-- a percentage of the compensation equal to the percentage of such costs paid by the grant. rights of any aggnei'.�:x;o:ZF7 (4) (A) Notwithstanding any request for a hearing or a pending appeal therefrom, provided in se.no- _ 6-�►= if a person or municipality responsible for pollution of the groundwaters fails to comply stoner to the Su�ri� zzV.ti,,a::Um r with an order of the commissioner issued pursuant to this section, the municipality :orpendinsaprzali-= ^> =-n_ wherein such pollution is located may, after giving written notice of its intent to the sioner from reoue•�_m—'a"- = commissioner and the responsible person ormunicipality,undertake the actions required 435,or a ci%il actin 1,1 mco%"y= i( by the order and seek reimbursement for the cost of such actions from the responsible be initiated by the' zney G'r i person ormunicipality.If at any time after receipt of such a notice,the responsible party recipient of the or5�_ io take r lf intends to comply with a step of the order which the municipality has not yet completed, drin�_r the responsible party may do so with the written approval of the commissioner and oftheorder was arr z.. municipality,provided the actions which the responsible party takes are consistent with shall not grant a strzv�m and those taken by the municipality. an administrative a- ?is nr-tst^_ as the result of an z unde7 L_-_ I' (B) The commissioner may order any person or municipality responsible for pollu- `acted arbitrarily,u- zSonably trzu !i tion of the groundwaters to reimburse the state,a water company,and any municipality to comply with an ord`:the:,an=- which is not responsible for pollution but received an order pursuant to this section or for the total costs which have n--: s` which did not-receive such an order but voluntarily provided potable drinking water, 22a-446. for (i) the expenses each incurred in providing potable drinking water to any person affected by such pollution,provided the required reimbursement for such expenses shall (d) The coma s_&, 'r shaL n-=: ' not exceed the actual cost of short-term provision of potable drinking water and an if the sole basis fo-::e order F'I amount equal to the reasonable cost of planning and implementing the most cost-effec- the source of pollu2on or pot:nti= tivelong-termmethodofprovidingpotabledrinking water as determined by the commis - sioner and the Commissioner of Public Health;(ii)costs for recovering such reimburse-' (e) The comet--Y t per may- = ment; (iii) interest on the expenses specified in (i) at a rate of ten per cent a year from as he deems neces -z m cam o'er the date such expenses were paid;and(iv)reasonable attorney's fees.The commissioner tions for the pro%isilm of Aran=a= i may request the Attorney General to bring a civil action to recover any costs or expenses ,eligibility for funs incurred by the commissioner pursuant to this subsection provided no such action may ( (1) Nonni-_,,,aingin_zr j be brought later than ten years after the date of discover of the pollution of public or y P P mines that a persoE whose action_ i I I private sources of water for drinking or other personal or domestic use. pollution of the gdwaters rx t (C) If a municipality fails to recover all expenses specified in subparagraph(B)(i) the pesticide or arrant for ate=. as engaged in a=�iailture at of subdivision(4)of this subsection from the responsible party,the municipality may w inru i 3l p iF 7 TECTION Title 22a Ch. 446k WATER POLLUTION CONTROL 789 D l 1 )ursuant to this section shall prepare apply to the commissioner for a grant in accordance with this subsection,provided the ; all be subject to the approval of the total amount of funds received from the commissioner and the responsible party shall ,alth and include,but not be limited not exceed the amounts specified in subparagraph(B)of subdivision(1)of subsection opulation affected by pollution of the :;: (b)of this section. e cost of construction or installation, (5) For purposes of this section except subdivision(3)of subsection(a)and subpara- temate solutions and any other infor graph(B)(ii)of subdivision(4)of this subsection, cost,>includes only those costs which the commissioner determines are necessary and reasonable,including,but not limited to, -eives funding from a private source, the cost of plans and specifications,construction or installation and supervision thereof. j : for which a grant may be awarded i shall equal the specified percentage (6) If any grant application is pending on June 7, 1994, and is approved by the amount of the other funding. commissioner, the percentage of costs to be paid by the grant shall be determined in I accordance with this section.Any order pending on May 31, 1985, shall be construed ves a grant under this section and is in accordance with this section. hich is responsible for rendering the . the municipality or water company (7) Any person who or municipality which provides potable drinking water pursuant were made available for the grant as to this section may,with the approval of the commissioner,construct or install facilities le party equals or exceeds the costs beyond the areas included in the order or facilities which are more costly than those iunicipality or water company shall _- which are determined to be most cost-effective, provided any request for a grant or by pensation is less than the cost toward reimbursement shall be limited to the amounts specified in this section. ty or water company shall reimburse (c) Any order issued under the provisions of this section shall be subject to the -ntage of such costs paid by the grant. rights of any aggrieved person or municipality to a hearing before the commissioner as aring or a pending appeal therefrom,_ "_ _ _ provided in section 22a-436, and appeal from the final determination of the commis- n of the groundwaters fails to comply sioner to the Superior Court as provided in section 22a-437.The request for a hearing ant to this section, the municipality orpending appeal therefrom shall not constitute acondition which shall stay the commis- ng written notice of its intent to the w sioner from requesting that an injunction under the provisions of section 22a-6 or 22a- i pality,undertake the actions required 435, or a civil action to recover a forfeiture under the provisions of section 22a-438, of such actions from the responsible be initiated by the Attorney General. The court shall issue an injunction requiring the of such a notice,the responsible party recipient of the order to take the steps required by the order for short-term and long- e municipality has not yet completed, term provision of potable drinking water unless such court determines that the issuance i approval of the commissioner and of the order was arbitrary.Notwithstanding any provision of the general statutes,a court )nsible party takes are consistent with shall not grant a stay from any order issued pursuant to this section on the grounds that an administrative appeal is pending.If it is thereafter determined by the Superior Court )r municipality responsible for pollu- as the result of an appeal under the provisions of section 22a-437 that the commissioner water company,and any municipality acted arbitrarily,unreasonably or contrary to law in requiring a person or municipality d an order pursuant to this section or to comply with an order the commissioner shall reimburse the person or municipality fly provided potable drinking water, for the total costs which have been incurred from the funds established under section vable drinking water to any person 22a-446. -imbursement for such expenses shall _= (d) The commissioner shall not issue an order to any person pursuant to this section )n of potable drinking water and an if the sole basis for the order is that such person is the owner of the land from which �d implementing the most cost-effec- J the source of pollution or potential source of pollution emanates. ig water as determined by the commis- costs for recovering such reimburse- a (e) The commissioner may,in accordance with chapter 54,adopt such regulations at a rate of ten per cent a year from as he deems necessary to carry out the provisions of this section,and shall adopt regula- )le attorney's fees.The commissioner J tions for the provision of grants pursuant to this section which shall include criteria for ction to recover any costs or expenses eligibility for funds. )section provided no such action may iscovery of the pollution of public or ( (1) Notwithstanding the provisions of subsection(a),if the commissioner deter- sonal or domestic use. mines that a person whose actions have caused or can reasonably be expected to cause Pollution of the groundwaters by the application of a pesticide(A)has properly applied nses specified in subparagraph(B)(i) the pesticide or arranged for a pesticide application which was properly performed,(B) ponsible party, the municipality may was engaged in agriculture at the time the pesticide was applied and used the pesticide 790 ENVIRONMENTAL PROTECTION Title 22a Ch. 446k WATER P solely in the production of agricultural commodities, (C) has agreed to implement the secondary schools,by authorizing the commissione and to require submission of an engineering report:in plans specified in subdivision(2)of this subsection,and(D)maintained the records of and relettering the existing provisions as Subsec.;c the application of the pesticide as required by section 22a-58 and the records and plan action for injunction,shall require the recipient of ai Subsets.(d)and(e);P.A.86-364 amended Subsec.( identified in section 22a-471 a,the commissioner shall not issue an order under Subsec- or arrange for preparation of engineering reports wh tion(a)to the person engaged in agriculture,but may issue an order under said subsection that report shall include information re expected du (a to another responsible person,including but not limited to the producer Of the pesti- of subset.(b l to make advances from the emerged ) p P g provide potable drinking water;P.A.87-261 amend cide,requiring the short-term and long-term provision of potable drinking water in ac- subset.(f)exempting persons engaged in agricultu, cordance with said subsection(a).The commissioner shall not issue an order under said water orders if Subparas.(A)to(D),inclusive,of S subsection a engaged in a agriculture who did not maintain the records health services with commissioner of public health ( ) to a personS Subsec.(a)to specify a time limit for certain orders to identified under section 22a-471 a if said commissioner finds such records are not rele- potable water in certain cases and to allow the use c vant to a determination of the party responsible for pollution of the groundwaters.If the Subsec.(b)to allow the use of the emergency spill commissioner is unable to determine the responsible person,he may issue such order to increase the percentages of costs of provision fund., pc p p y municipalities reimburse the state for certain fund: the municipality wherein groundwaters unusable for potable drinking water are located. general to bring an action for recovery of costs undej replaced editorially by the Revisors with"account" (2) If the commissioner determines that a person engaged in agriculture has caused with Sec.22a-451,as amended by P.A.94-130;P.A c e action for reimbursement of expenses under thatsub< or can reasonably be expected to cause pollution of the groundwaters by pesticides, tern to ten years from the date of discovery of poll he may cause such person to submit to the commissioner and, upon approval by the or domestic use; P.A.95-257 replaced Commissic commissioner,implement a plan to minimize the potential for groundwater contamina- Commissioner and Department of Public Health,of tion from the storage, handling and disposal of pesticides at the locations where such person engaged in agriculture. Sec. 22a-471a. Exemption frog gaged in agriculture.(a)The provisii (3) For the purposes of this subsection,a pesticide is properly applied if at the time to any person engaged in agriculture of the application the pesticide was licensed by or registered with the state and federal arranges for the application of a gen government and was applied in a manner consistent with(A)the labeling of the pesticide, or horticultural products or to the]an as defined in section 22a-47,(B)applicable state and federal statutes and regulations at specified in subsection(d)and (2) d( the time of the application,(C)any approvals or recommendations of the federal,state specified in subsection (e). or local government,including any limitations,warnings orconditions of such approvals or recommendations,and(D)generally accepted agricultural management practices at (b) On and after July 1, 1989, th the time of application,considering any special geological,hydrological or soil condi- shall not apply to any person engaged tions of which the farmer was aware or reasonably should have been aware. specified in subsection(d)or(2)has I in subsection (e)when such records (4) Any municipality which receives an order pursuant to subdivision (1) of this subsection shall be eligible for a grant from the state in accordance with subparagraph (c) The provisions of subsection (1)of subsection(b)of this section. 1 beginning agricultural activities on c arranges for the application of a gen (5) The provisions of this subsection shall apply to pollution of the groundwaters r or horticultural products or to the lar by pesticides discovered on or after May 26, 1988. All orders issued pursuant to this specified in subsection(d)and(2)dev section by the commissioner prior to May 26, 1988, shall remain in effect unless the tion(e). orders are otherwise revoked, amended or modified by said commissioner. (d) The records required under sL (6) Nothing in this subsection,section 22a-471 a or section 22a-471 b shall affect or � information for each application of a; limit any right of action of an individual against any person engaged in agriculture for or horticultural product to the land: injury to person or property resulting from the use of a pesticide. amount of the pesticide used; (3) th For purposes of this subsection, "pesticide" shall have the same meaning as amount of acreage treated;(5)the nar (7) p rti number assigned by the United State specified in section 22a-47. " cide and(6)the invoice or purchase r (P.A.82-240,S.1,3;June Sp.Sess.P.A.83-3,S.1;P.A.84-81,S.3;P.A.85407,S.2,9;P.A.86-364,S.6;P.A.87- tained by the person engaged in agri( 191,S.1,2;87-261,S.9;P.A.88-211,S.1,4;P.A.93-381,S.9,39;P.A.94-198,S.1,13;P.A.95-169,S.1;95-257,S. of application. 12,21,58.) History:June Sp.Sess.P.A.83-3 changed term"mobile home"to"mobile manufactured home"in Subset.(a)(1);P.A. (e) Any plan prepared under sub 84-81 amended Subsec.(a)by adding provision that the order may require the supply of water in quantities necessary for domestic and personal use and authorized grants if the responsible party has no liquid assets or is unable to secure a loan; activities conducted on the land and P.A.85-407 amended Subsec.(a)by organizing the section into subdivisions and requiring the commissioner of health tarrllnatlon from pesticides.SUCK pla services to determine that pollution creates an unacceptable risk of injury as a prerequisite to the arrangement for provision a ement,if available,proper amount of potable drinking water by the commissioner of environmental protection for residential buildings and elementary and g h p i , ',CTION Title 22a Ch. 446k WATER POLLUTION CONTROL 791 i (C) has agreed to implement the secondary schools,by authorizing the commissioner to require maintenance and monitoring of drinking water facilities j t and to require submission of an engineering report;inserted new Subsec.(b)re grants to municipalities and watercompanies and(D)maintained the records of and relettering the existing provisions as Subsec.(c);amended relettered Subsec.(c)by specifying that the courts,in an I n 22a-58 and the records and plan action for injunction,shall require the recipient of an order to implement the order unless the order is arbitrary and added 11 not issue an order under Subsec- Subsecs.(d)and(e);P.A.86-364 amended Subsec.(a)(2)to authorize environmental protection commissioner to prepare 1 or arrange for preparation of engineering reports where there is actual or suspected groundwater pollution and to specify ssue an order under said subsection that report shall include information re expected duration and extent of pollution:P.A.87-191 amended Subdiv.(1)(C) mited to the produces:of the pesti- of Subsec.(b)to make advances from the emergency spill response fund or from the proceeds of bonds authorized to )n of potable drinking Water In aC- provide potable drinking water;P.A.87-261 amended Subsec.(c)by adding reference to Sec.22a-6:P.A.88-211 added Subsea(f)exempting persons engaged in agriculture who contaminate groundwater by pesticides from potable drinking '. shall not issue an order under said water orders if Subparas.(A)to(D),inclusive,of Subdiv.(1)are complied with;P.A.93-381 replaced commissioner of vho did not maintain the records health services with commissioner of public health and addiction services,effective July 1,1993;P.A.94-198 amended Subsec.(a)to specify atime limit forcertain orders to provide potable water,to require responsible state agencies to provide ter finds such records are not rele- potable water in certain cases and to allow the use of certain bond funds for the provision of potable water and amended I )llution of the groundwaters.If the Subsea(b)to allow the use of the emergency spill response fund for the provision of potable water in certain cases,to increase the percentages of costs of provision of potable water allowable to municipalities,to delete a requirement that person,he may issue such order to municipalities reimburse the state for certain funds disbursed to them under this section and to authorize the attorney )otable drinking water are located. general to bring an action for recovery of costs under that subsection,effective June 7,1994;in 1995 the word"fund"was replaced editorially by the Revisors with"account"in references to the emergency spill response fund to conform section engaged in agriculture has caused with Sec.22a-451,as amended by P.A.94-130;P.A.95-169 amended Subsec.(b)to change the limitation on bringing an F the groundwaters b eStiCldeS, actionforreimbursementofexpensesunderthatsubsectionfromsixyearsafterthediscoveryofpollutionofthegroundwa- Y P ters to ten years from the date of discovery of pollution of public or private sources of water for drinking or personal sioner and, upon approval by the or domestic use; P.A.95-257 replaced Commissioner and Department of Public Health and Addiction Services with ;ntial for groundwater contamina- Commissioner and Department of Public Health,effective July 1,1995. cides at the locations where such Sec. 22a-471a. Exemption from potable drinking water orders for persons en- gaged in agriculture.(a)The provisions of subsection ;t (f)of section 22a-471 shall apply ;l e is properly applied if at the time to any person engaged in agriculture on May 26, 1988, who makes an application or ;istered with the state and federal arranges for the application of a general use or restricted use pesticide to agricultural th(A)the labeling of the pesticide, or horticultural products or to the land provided such person (1) maintains the records federal statutes and regulations at specified in subsection (d) and(2) develops and implements by July 1, 1989, the plan mmendations of the federal,state specified in subsection (e). gs orconditions of such approvals cultural management practices at (b) On and after July 1, 1989, the provisions of subsection (f) of section 22a-471 wical,hydrological or soil condi- shall not apply to any person engaged in agriculture who(1)fails to maintain the records Could have been aware. specified in subsection(d)or(2)has not developed and implemented the plan specified .lrsuant to subdivision (1) of this in subsection (e) when such records have been maintained for less than three years. ' in accordance with subparagraph (c) The provisions of subsection (f) of section 22a-471 shall apply to any person beginning agricultural activities on or after July 1, 1989, who makes an application or arranges for the application of a general use or restricted use pesticide to agricultural to pollution of the groundwaters or horticultural products or to the land provided such person(1) maintains the records kll orders issued pursuant to this specified in subsection(d)and(2)develops and implements the plan specified in Subsec- shall remain in effect unless the tion (e). i ly said commissioner. =�>< ir section 22a-471 b shall affect or (d) The records required under subsection(a)shall include a record of the following information for each application of a general or restricted use pesticide to an agricultural person engaged in agriculture.for or horticultural product to the land: (1) The name of the applicator; (2) the kind and a pesticide. amount of the pesticide used; (3) the date and place of application; (4) the crop and F shall have the same meaning as amount of acreage treated;(5)the name of the manufacturer and the product registration cide and(6)the invoice or purchase receipt of the pesticide.Such records shall be main number assigned by the United States Environmental Protection Agency of each pesti- - ± A.85-407,S.2,9;P.A.86-364,S.6;P.A.87 tamed b the person engaged in a agriculture Y Y )4-198,S.1,13;P.A.95-169,S.1;95-257,S. Y Pg ' ulture for not less than twenty ears after the date of application. le manufactured home"in Subsec.(a)(1);P.A. the supply of water in quantities necessary for (e) Any plan prepared under subsection(a)shall be appropriate for the agricultural s no liquid assets or is unable to secure a loan; activities conducted on the land and shall minimize the potential for groundwater con- ms and requiring the commissioner of health talTilnatlOn from p a prerequisite to the arrangement for provision o pesticides.Such plan shall include provisions for integrated pest man- t for residential buildings and elementary and aoement,if available,proper amounts and rates of pesticide applications,calibration of t 1 ?ROTECTION Tine - Ch.446k WATER POLLUTION CONTROL 729 t, Cited.Id.,737,747.Cited.237 C.135,162.cited. _ pollution abatement facilities,disposal wells and other systems;"federal Water , Poljution Control Act"means the federal Water Pollution Control Act,33 USC Section Definitions. As used in this chap 166 et.seq seq.:including amendments thereto and regulations thereunder;"order to abate Environmental Protection his dent6pollutioni prevent antici ncludes an order to abate existing pollution or to preven re - tarbors,estuaries, rivers,brooks,W aced sources of pollution; "federal Safe Drinking Water Act" means the federal Safe at Drinking Water Act,42 USC,Section 300f et seq.,including amendments thereto and 1 rids, marshes, drainage systems and regulations thereunder;"monitoring system"means a system or method for measuring or accumulations of water, natural quality or quantity of a discharge or its impact on the waters of the state.Such system .-d within, flow through or border u theq ns sewage or any substance,liquid, or method shall provide for any means the commissioner reasonably deems necessary or tend to pollute any of the ware to assure the security of the system and the accuracy of monitoring results, including, 1 excretions and all domestic and waters but not limited to, automatic monitoring, "effluent limitation" means any restriction, mental to the public health; "pollution established by the commissioner by regulations adopted in accordance with the provi- ation or rendering unclean or impure sions of chapter 54,on quantities,rates or concentrations of chemical,physical,biologi- e state by reason of any wastes or oe cal and other constituents which are discharged into-the waters of the state and estab- lished by permit, schedule of compliance or administrative order; "economic benefit" « includes the amount of any savings resulting from avoided or delayed expenditures as y waters; rendering unclean or impure l or biological properties of any oft a result of noncompliance with the effluent limitations of a permit to discharge into change o odor,color,turbidity y of. a the waters of the state, and includes capital or one-time expenditures,operating costs, change in the temperature turbidity Ovate maintenance costs and any other benefits resulting from noncompliance; "persistent de of which temperature change does o violator"means any person or municipality which holds a permit to discharge into the de o waters of the state and which has exceeded any e val or injurious to public health,safe effluent limitation by a factor of one trial, agricultural, recreational or othe and one-half or more for four out of six consecutive reporting periods. (1967,P.A.57.S.2;1971,P.A.872,S.79:P.A.73-555,S.4.10;P.A.77-416;P.A.80-15;P.A.81-176,S.4,7;P.A. animals,birds,fish or other aquatic life' 8_240,S.2,3;P.A.84-81,S.2;P.A.85-407,S.3,9;P.A.86-82.S.1,5;86-420.S.10,12:P.A.88-118,S.2,3;P.A.90- )ciation,firm,limited liability compan 222,S.1;P.A.93-381,S.9,39;P.A.95-79,S. 101, 189:95-257,S.12,21,58.) overnment Cy,and includes the federal g , History:1971 act replaced definition of-commission",i.e.water resources commission,with definition of"commis- i any officer or governing or managing sioner",i.e.commissioner of environmental protection and redefined"pollution"to specifically include that which is rpOratlon Or any member Or manageC Of "prejudicial to public health";P.A.73-555 extended applicability of definitions to include part ll of chapter474 and defined "sewage";P.A.77-416 included subsurface sewage systems in definition of"pollution abatement facility";P.A.80-15 ition problem" means the existence l)f redefined"person"to include the federal government,the state and instrumentalities of the state:P.A.81-176 defined the �mmissioner, can best be abated by the Federal Safe Drinking Water Act;P.A.82-240 defined"potable drinking water";Sec.25-54b transferred to Sec.22a-423 any metropolitan district town,COnSOli- in 1983;P.A.84-81 revised the definition of potable drinking water by eliminating requirement that alternative supply be > provided at the boundary line of the affected property:P.A.85-407 redefined"potable drinking water"to eliminate the )rough, City, borough, village, fire and reference to drinking water standards established by the commissioner of health services and to add provision re determina- )l organization having authority to levy tionby said commissioner that waterdoes not create an unacceptable risk of injury to users:P.A.86-82defined"monitoring c >1 system";P.A.86-420redefined"pollution abatement facility";P.A.88-118 added an agent designated by the commissioner )rized function; discharge means the to the definition of commissioner;P.A.90-222defined"effluentlimitation","economic benefit"and"persistent violator": :o the waters of the state,whether or not P.A.93-381 replaced commissioner of health services with commissioner of public health and addiction services,effective July I,1993;P.A.95-79 redefined"person"to include a limited liability company and any member or manager of a limited ltement facility"means any equipment, liability company,effective May 31. 1995:P.A.95-257 replaced Commissioner and Department of Public Health and apparatus or land, or any Combination Addiction Services with Commissioner and Department of Public Health,effective July 1. 1995. d for the storage, collection, reduction',... : Annotations to former section 25-54b: treatment of water or wastes,or for the Former statute cited.148 C.586.Cited.170 C.31. Annotations to present section: tment of water or wastes,including,but Cited.226 C.358,360,363. ns, facilities, plants and works; outfall rs; and other real or personal property Sec. 22a-424. (Formerly Sec.25-54c).Powers and duties of commissiolper.The •ation; "potable drinking water" means commissioner shall have the following powers and duties: for which treatment is provided or an 'ublic Health determines does not create (a) To exercise general supervision of the administration and enforcement of this afety of those persons using such water chapter; ing or other personal or domestic uses. mer of Public Health shall balance all. (b) To develop comprehensive programs for the prevention,control and abatement d shall not be limited to a consideration of new or existing pollution of the waters of the state; ier all the evidence presented and any (c) To advise, consult and cooperate with other agencies of.the state, the federal system"means a system for disposing government,other states and interstate agencies and with affected groups,political sub- ,rground methods,and includes sewage divisions and industries in furtherance of the purposes of this chapter.Such powers and 730 ENVIRONMENTAL PROTECTION Title 22a Ch. 446k WATER POL duties shall include receiving information provided by the United States Environmental or reasonably may be expected to cause t Protection Agency,which if subject to a claim of confidentiality pursuant to the federal or potential waste discharges which mad Freedom of Information Act of 1976(5 USC 552)and regulations adopted thereunder, waters of the state. shall be kept confidential by the commissioner notwithstanding any of the provisions (1967,P.A.57,S.3;1971,P.A.872,s.80;P.A.73-: of section 1-210 to the contrary; 86-239,S.6,14;P.A.93-381.S.9,39;P.A.94-205,S. History: 1971 act replaced references to water resc (d) To submit plans for the prevention and control of water pollution and to render commissioner;P.A.73-38 replaced references to U.S.Sec reports and accounts to the Administrator of the Environmental Protection Agency and ' [ration with references to administrator of the control Act;& "' 474a and to the Federal Water Pollution Con[rol Act;S to any other federal officer or agency on such forms containing such information as the part II of chapter 474a deleted reflecting incorporation said Administrator or any other federal officer or agency, may reasonably require, in (c)by authorizing the commissioner to keep conf[denti order to olkialify the state and its municipalities for grants from the United States gov- Environmental Protection Agency if such information is, b b state law;P.A.84-219 added Subdiv.(1)authorizing the emment; (i)by authorizing the commissioner to consider prior vi section;P.A.86-239 added Subdiv.(m)concerning inve (e) To encourage, participate in or conduct studies, investigations, research and with commissioner of public health and addiction servi delete a provision re review of permit applicant's compl demonstrations,and collect and disseminate information,relating to water pollution and commissioner to transfer permits;P.A.95-257 replaced the causes,prevention,control and abatement thereof; Services with Commissioner and Department of Public 1 See Sec.22a-6m re review of permit applicant's corn (f) To issue,modify or revoke orders prohibiting or abat ng pollution of the waters of Annotation to former section 25-54c: the state,or requiring the construction,modification,extension or alteration of pollution Cited. 170 C.31, abatement facilities or monitoring systems,or any parts thereof,or adopting Such other Annotations to present section: Cited.226 C.358,373.Cited.Id.,737,748.Cited.Id remedial measures as are necessary to prevent,control or abate pollution; Cited.21 CA 91,98. Subdiv.(b): (g) To hold such hearings as may be required under the provisions of this chapter Cited.21 CA 91,106. and the federal Water Pollution Control Act or other applicable federal law,for which CiteSubd.21 C PP Cited.21 CA 91,97. he shall have the power to issue notices by certified mail, administer oaths,take testi- Subdiv.(1): mony and subpoena witnesses and evidence; Cited.206 C.65,77. (h) To require the submission of plans,specifications and other necessary data for, Sec. 22a-425. (Formerly Sec.25-5 and inspect the construction of,pollution abatement facilities and monitoring or disposal any person or municipality to maintain su systems in connection with the issuance of such permits or approvals as may be required tion or the operation of pollution abaten by this chapter and the federal Water Pollution Control Act; out the provisions of this chapter and the f or his authorized representative shall have (i) To issue,continue in effect,revoke,transfer,modify or deny permits,under such copy any such records or memoranda per conditions as he may prescribe, for the discharge of any water, substance or material such records on request. into the waters of the state,or orders for or approval of the installation,modification or (1967,P.A.57,S.4;1971,P.A.872,S.81;P.A.73-3 operation of pollution abatement facilities or monitoring systems; History: 1971 act replaced references to water reso[ commissioner and deleted provisions authorizing comrr (j) To require proper maintenance and operation of monitoring and disposal securing information and protecting confidentiality of inf systems; Paz[II of chapter 474a and Federal Water Pollution Cot y reference to part II of chapter 474 deleted reflecting inco, (k) To exercise all incidental powers necessary to carry out the purposes of this Annotation to former section 25-54d.: chapter and the federal Water Pollution Control Act; Cited.170 C.31. (1) To adopt regulations in accordance with the provisions of chapter 54 to imple- '.Sec..22a-426. (Formerly Sec.25-54 ment this chapter and to comply with the federal Water Pollution Control Act and the missionerof Environmental Protection sh federal Safe Drinking Water Act; of Water quality applicable to the various vided in this section.Such standards shall (m) Either on his own initiative or upon complaint,to investigate or order the person Control Act and shall be for the purpose who caused or reasonably may be expected to cause the pollution to investigate all for available federal grants and for the pt points of existing or potential waste discharge which may directly or indirectly result policy statements of a general program in pollution of the waters of the state provided upon written complaint by the Commis- rovided no standard of water quality ad sioner of Public Health,the chief executive officer of a municipality,the warden or any `astes to be discharged into any of the w of the burgesses of a borough, a committeeman of a fire district or a local or district t11e treatment available and necessary for director of health, the commissioner shall investigate or order the person who caused of quality shall: (1)Apply to interstate v i t IE 4 )TECTION Title-ch.446k WATER POLLUTION CONTROL 731 I d b the United States Environ Y men or reasonably may be expected to cause the pollution to investigate all points of existing 1 ;onfidentiality pursuant to the fede- or potential waste discharges which may directly or indirectly result in pollution of the I and regulations adopted thereund waters of the state. Xwithstanding any of the provisio (1967,P.A.57,S.3;1971,P.A.872,S.80;P.A.73-38,S.1,8;P.A.83-133;P.A.84-219,S.1,4;P.A.86-82,S.2,5; 36-239,S.6,14;P.A.93-381,S.9,39;P.A.94-205,S.4;P.A.95-218,S.11,24;95-257,S.12,21,58.) History: 1971 act replaced references to water resources commission with references to environmental protection ItrOl of water pollution and to re ii ;Ivironmental Protection A rend commissioner;P.A.73-38replacedreferencestoU.S.SecretaryofthelnteriorandFederalWaterPollutionControladminis- l l; Agency a nation with references to administrator of the Environmental Protection Agency and added references to part II of chapter s containing such information as 474a and to the Federal Water Pollution Control Act;Sec.25-54c transferred to Sec.22a-424 in 1983 and references to part II of chapter 474a deleted reflecting incorporation of those sections in this chapter;P.A.83-133 amended Subsec. l (c)by authorizing the commissioner to keep con agency, may reasonably require, confidential water pollution information received from the United States 'grants from the United States goy Environmental Protection Agency ifsuch information is confidential under federal law,even if it would be available under state law;P.A.84-219 added Subdiv.(1)authorizing the commissioner to adopt regulations;P.A.86-82 amended Subdiv. (i)by authorizing the commissioner to consider prior violations and added references to monitoring systems throughout ' :udies, investigations, research ap section;P.A.86-239 added Subdiv.(in)concerning investigations;P.A.93-381 replaced commissioner of health services } d with commissioner of public health and addiction services,effective July 1, 1993;P.A.94-205 amended Subsea(i)to to waterpollution an delete a provision re review of permit applicant's compliance history;P.A.95-218 amended Subsea(i)to authorize the ation,relating 1 ;Of' commissioner to transfer permits;P.A.95-257 replaced Commissioner and Department of Public Health and Addiction j ' Services with Commissioner and Department of Public Health,effective July I,1995. See Sec.22a-6m re review of permit applicant's compliance history. ! � or abating pollution of the waters o extension oralteration ofpollution L+�. Annotation to former section 25-54c: Cited.170 C.31. arts thereof,or adopting such other Annotations to present section: i trol Or abate Pollution; Cited.226 C.358,373.Cited.Id.,737,748.Cited.Id.,792,804,805.Cited.241 C.466. Cited.21 CA 91,98. rider the provisions of this chapter Subdiv.1 C Cited.21 CA 91,106. r applicable federal law, for which Subdiv.(k): mail, administer oaths, take testi- s�bdiv(1): 91,97. Cited.206 C.65,77. tions and other necessary data for, Sec. 22a-425. (Formerly Sec.25-54d).Records.The commissioner may require Icilities and monitoring or disposal _ any person or municipality to maintain such records relating to pollution,possible pollu- its or approvals as maybe required ' tion or the operation of pollution abatement facilities as he deems necessary to carry rol Act; out the provisions of this chapter and the federal Water Pollution Act.The commissioner lodif den or his authorized representative shall have access to such records,and may examine and Y or y permits,under such copy any such records or memoranda pertaining thereto,or shall be furnished copies of any water, substance or material such records on request. of the installation,modification or '1ng systems; (1967,P.A.57.S.-t: 1971,P.A.872,S.81:P.A.73-38,S.2,8.) History: 1971 act replaced references to water resources commission with references to environmental protection g and dISpOSaI ._ commissioner and deleted provisions authorizing commissioner's representatives to enter property for the purpose of On of monitorin securing information and protecting confidentiality of information relating to trade secrets;P.A.73-38 added reference to part II of chapter 474a and Federal Water Pollution Control Act;Sec.25-54d transferred to Sec.22a-425 in 1983 and reference to part II of chapter 474 deleted reflecting incorporation of those sections in this chapter. -.o carry Out the purposes of this Annotation to former section 25-54d.: Cited. 170 C.31. 'ovisions of chapter 54 to imple- Sec. 22a-426. (Formerly Sec.25-54e).Standards of water quality.(a)The Com- ,r Pollution Control Act and the missioner of Environmental Protection shall adopt,and may thereafter amend,standards of water quality applicable to the various waters of the state or portions thereof as pro- ,�i�j vided in this section.Such standards shall be consistent with the federal Water Pollution I to investigate ororder the person .y Control Act and shall be for the purpose of qualifying the state and its municipalities the pollution to investigate all ' for available federal grants and for the purpose of providing clear and objective public nay directly or indirectly result,_ policy statements of a general program to improve the water resources of the state; itten complaint by the Commis- provided no standard of water quality adopted shall plan for,encourage or permit any municipality,the warden or any wastes to be discharged into any of the waters of the state without having first received ire district or a local or district the treatment available and necessary for the elimination of pollution. Such standards )r order the person who caused 1 of quality shall: (1) Apply to interstate waters or portions thereof within the state; (2) i 244 ENVIRONMENTAL PROTECTION Title 22a Ch. 439 ENVIRONMENTAL P AND S' Sec. 22a-5b. Special funds and accounts administered by the department.Re- port required.On orbefore February fifteenth,annually,the Commissioner of Environ- punishable as a criminal offense under s� mental Protection shall submit a report to the joint standing committee of the General tract for the construction or repair of any Assembly having cognizance of matters relating to appropriations and the bydgets of his control and management, make or c( state agencies, through the legislative Office of Fiscal Analysis. The report shall set or addition to any other real asset under forth,for the current and the ensuing fiscal year,the estimated expenditure requirements or leased premises, involving an expend and estimated revenue for each special fund or special account administered by the and, with prior approval of the Commis Department of Environmental Protection.The report shall also set forth,for such fiscal the making of any alteration,repair or ad, years,for each program which receives funds from a special fund or account:The number and management involving an expenditu of positions funded by such fund or account, the estimated expenditures for personal but not more than one million dollars; (1 services, other expenses and equipment,and estimated revenue. the provisions of chapter 54 require the pa: (June Sp.Sess.P.A.91-10,S.14,20.) cost of the search, duplication and revie Information Act, as defined in section 1-: acting upon an application for and monito Sec. 22a-6. Commissioner to establish environmental standards,regulations of any state or federal permit,license,regi and fees,to make contracts and studies and to issue permits.Complaints.Hearings. pursuant to subsection (i)of section 22a- Bonds. Notice of contested cases. (a) The commissioner may: (1) Adopt, amend or subsections(h),(i)and(k)of section 22a repeal,in accordance with the provisions of chapter 54,such environmental standards, 22a-134e,22a-135,22a-148,22a-150,21 criteria and regulations,and such procedural regulations as are necessary and proper to 22a-342, 22a-345, 22a-361, 22a-363c, 2,' carry out his functions, powers and duties; (2) enter into contracts with any person, 22a-416, 22a-428 to 22a-432, inclusive, firm,corporation or association to do all things necessary or convenient to carry out the and Section 401 of the federal Clean Wate1 functions,powers and duties of the department;(3)initiate and receive complaints as to but are not limited to the costs of(A)publ any actual or suspected violation of any statute,regulation,permit or order administered, incidental to the issuance of and monitorit adopted or issued by him. The commissioner shall have the power to hold hearings, t orders, certificates and approvals, and (C administer oaths,take testimony and subpoena witnesses and evidence,enter orders and applicant shall pay the fee established in a institute legal proceedings including, but not limited to, suits for injunctions, for the prior to the final decision of the commiss enforcement of any statute,regulation,order or permit administered,adopted or issued may postpone review of an application ur by him;(4)in accordance with regulations adopted by him,require,issue,renew,revoke, ' for monitoring compliance with the terms, modify ordeny permits,under such conditions as he may prescribe,governing all sources = as the commissioner deems necessary and of pollution in Connecticut within his jurisdiction;(5)in accordance with constitutional and(11)by regulations adopted in accorda limitations, enter at all reasonable times, without liability, upon any public or private the payment of a fee sufficient to cover tf property,except a private residence,for the purpose of inspection and investigation to - for information concerning the status of rea ascertain possible violations of any statute, regulation, order or permit administered, ' ronmental statutes,regulations,permits or adopted or issued by him and the owner,managing agent or occupant of any such prop- 1equesting such information at the time of tl erty shall permit such entry,and no action for trespass shall lie against the commissioner thousand dollars received by the commis: for such entry,or he may apply to any court having criminal jurisdiction for a warrant n, 22a-174,during the fiscal year ending Jun( to inspect such premises to determine compliance with any statute,regulation,order or Fund and credited to the appropriations of t permit administered,adopted or enforced by him,provided any information relating to ` in accordance with the provisions of sectic secret processes or methods of manufacture or production ascertained by the commis- June 30, 1986. In any action brought agai sioner during,or as a result of,any inspection,investigation,hearing or otherwise shall within his scope of delegated authority in p, be kept confidential and shall not be disclosed except that,notwithstanding the provi- employee shall be represented by the Attoi sions of subdivision (5) of subsection (b) of section 1-210, such information may be disclosed by the commissioner to the United States Environmental Protection Agency _ (b) Notwithstanding the provisions of s pursuant to the federal Freedom of Information Act of 1976,(5 USC 552)and regulations .,shall be required to pay more than fifty per adopted thereunder or,if such information is submitted after June 4,1986,to any person loner pursuant to said subsection and any pursuant to the federal Clean Water Act(33 USC 1251 et seq.);(6)undertake any studies, I ,. ' er May 15, 1984, and prior to October inquiries,surveys or analyses he may deem relevant,through the personnel of the depart- ent of any amount so paidagainst the ment or in cooperation with any public or private agency,to accomplish the functions, section(c)on or after October 1, 1985. powers and duties of the commissioner;(7)require the posting of sufficient performance bond or other security to assure compliance with any permit or order; (8)provide byO The commissioner shall adopt regul notice printed on any form that any false statement made thereon or pursuant thereto isAter 54 establishing a separate fee schedu PROTECTION Title 22a Ch. 439 ENVIRONMENTAL PROTECTION DEPARTMENT 245 AND STATE POLICY s administered by the department.Re. annually,the Commissioner of Envirori= punishable as a criminal offense under section 53a-157b;(9)construct or repair or con- joint standing committee of the Genera' tract for the construction or repair of any dam or flood and erosion control system under ing to appropriations and the budgets of his control and management,make or contract for the making of any alteration,repair of Fiscal Analysis. The report shall se't or addition to any other real asset under his control and management,including rented •,the estimated expenditure requirements or leased premises, involving an expenditure of five hundred thousand dollars or less, or special account administered by the and, with prior approval of the Commissioner of Public Works, make or contract for report shall also set forth,for such fiscal the making of any alteration,repair or addition to such other real asset under his control om a special fund or account:The number and management involving an expenditure of more than five hundred thousand dollars the estimated expenditures for personal but not more than one million dollars; (10)by regulations adopted in accordance with ;stimated revenue. the provisions of chapter 54 require the payment of a fee sufficient to cover the reasonable cost of the search, duplication and review of records requested under the Freedom of Information Act,as defined in section 1-200,and the reasonable cost of reviewing and acting upon an application for and monitoring compliance with the terms and conditions environmental standards,regulations of any state or federal permit,license,registration,order,certificate or approval required o issue permits.Complaints.Hearings. pursuant to subsection(i)of section 22a-39,subsections(c)and(d)of section 22a-96, ommissioner may: (1) Adopt, amend or: subsections(h),(i)and(k)of section 22a-424,and sections 22a-6d,22a-32,22a-134a, iapter 54,such environmental standards, 22a-134e,22a-135,22a-148,22a-150,22a-174,22a-174a,22a-208,22a-208a,22a-209, -gulations as are necessary and proper to 22a-342, 22a-345, 22a-361, 22a-363c, 22a-368,22a-372, 22a-379, 22a-403, 22a-409, 2) enter into contracts with any person, 22a-416, 22a-428 to 22a-432, inclusive, 22a-449 and 22a-454 to 22a-454c, inclusive, s necessary or convenient to carry out the and Section 401 of the federal Clean Water Act,(33 USC 1341).Such costs may include, t;(3)initiate and receive complaints as to but are not limited to the costs of(A)public notice,(B)reviews,inspections and testing regulation,permit or order administered, incidental to the issuance of and monitoring of compliance with such permits,licenses, shall have the power to hold hearings; orders, certificates and approvals, and (C) surveying and staking boundary lines. The witnesses and evidence,enter orders and applicant shall pay the fee established in accordance with the provisions of this section limited to, suits for injunctions, for the prior to the final decision of the commissioner on the application. The commissioner �r permit administered,adopted or issued may postpone review of an application until receipt of the payment. Payment of a fee )ted by him,require,issue,renew,revoke, for monitoring compliance with the terms or conditions of a permit shall be at such time is he may prescribe,governing all sources as the commissioner deems necessary and is required for an approval to remain valid; ion;(5)in accordance with constitutional and(11)by regulations adopted in accordance with the provisions of chapter 54,require lout liability, upon any public or private the payment of a fee sufficient to cover the reasonable cost of responding to requests irpose of inspection and investigation to for information concerning the status of real estate with regard to compliance with envi- -gulation, order or permit administered, ronmental statutes,regulations,permits or orders.Such fee shall be paid by the person ging agent or occupant of any such prop- requesting such information at the time of the request.Funds not exceeding two hundred -espass shall lie against the commissioner thousand dollars received by the commissioner pursuant to subsection (g) of section aving criminal jurisdiction for a warrant 22a-174,during the fiscal year ending June 30, 1985,shall be deposited in the General .nce with any statute,regulation,order or - Fund and credited to the appropriations of the Department of Environmental Protection din,provided any information relating to in accordance with the provisions of section 4-86, and such funds shall not lapse until r production ascertained by the commis- _ June 30, 1986. In any action brought against any employee of the department acting investigation,hearing or otherwise shall within his scope of delegated authority in performing any of the above-listed duties,the i except that, notwithstanding the prove- employee shall be represented by the Attorney General. section 1-210, such information may be States Environmental Protection Agency: (b) Notwithstanding the provisions of subsection(a)of this section no municipality Act of 1976,(5 USC 552)and regulations shall be required to pay more than fifty per cent of any fee established by the commis- zbmitted after June 4,1986,to any person sioner pursuant to said subsection and any municipality which paid any such fee on or C 1251 et seq.);(6)undertake any studies, after May 15, 1984, and prior to October 1, 1985, shall be entitled to a credit to the :want,through the personnel of the depart- extent of any amount so paid against the payment of any fees required pursuant to +ate agency,to accomplish the functions, subsection(c)on or after October 1, 1985. uire the posting of sufficient performance with any permit or order; (8)provide by (c) The commissioner shall adopt regulations in accordance with the provisions of ment made thereon or pursuant thereto is chapter 54 establishing a separate fee schedule for the payment of fees by municipalities. 246 ENVIRONMENTAL PROTECTION Title 22a Ch. 439 ENVIRONMENTAL AND The schedule of fees paid by municipalities pursuant to section 22a-430 shall be gradua- ted and reflect the sum of the average daily flows of wastewater in a municipality of fee tocovercostof reviewing application for and in( for permit. certificates or approvals,and provided that all funds applying P Sec.19-508 during fiscal year 82-83 shall be deposite, not lapse until June 30,1984;P.A.82-180 amended Su (d) The Commissioner of Environmental Protection shall provide notice of any Protection Agency pursuant to federal law;P.A.83-5' proceeding involving a specific site if any decision by the commissioner concerning acting upon and monitoring compliance with permits of payment for an application and any subsequent moi such site is contested. The notice shall be sent to the chief executive officer of the for deposit of funds received in general fund and time municipality in which such site is located and to each member of the legi slature in whose the commissioner of environmental protection to cons district such site is located.A copy of such notice shall be made a part of the record of an expenditure of less than two Hundred fifty o lvin alteration of any real asset under his control invoh�in any other proceeding before the commissioner on such site. the same for real assets involving an expenditure ben dollars,with the prior approval of the commissioner o (e) Whenever the commissioner issues an order to enforce any statute,regulation, commissioner to contract for repairs,etc.costing fifty i permit or order administered or issued b him, an person or municipality aggrieved between twenty-five thousandandfiftythousanddolla P Y Y P P Y bb ing compliance with the terms and conditions of any re; by such order may, except as otherwise provided by law, request a hearing before the 22a-174 and which are earmarked for the department( commissioner within thirty days from the date such order is sent.Such hearing shall be to two hundred thousand dollars;P.A.84-546 made t P.A.85-392 amended Subdiv.(10)to authorize a fee I conducted in accordance with the procedures provided by chapter 54. 209;P.A.85-515 made existing provisions Subsec.( and adoption of regulations establishing municipal fee (f) The provisions of sections 22a-45a and 22a-174,Subsection (r)Of section 22a- municipality paying fee on or after May 15,1984,and 208a, sections 22a-349a, 22a-354 22a-378a, 22a-411 and 22a-430b and subsection Subsecs.(b)and(c);P.A.86-277 amended Subdiv. P• regulations that incorporate amendments to federal la, (d)of section 22a-454 which authorize the issuance of general permits shall not affect fifteen persons or more or a governmental subdivisiot s the authority of the commissioner, under any statute or regulation, to abate pollution disclosure of information submitted after June 4, 19£ ol or to enforce the laws under his jurisdiction, including the authority to institute legal amended Subdiv.(1)of Subsec.g s e delete es;Pprov.i P.A. .l g Y g re notice of proceedings involving specific sites;P.A. proceedings. Such proceedings may include summary suspension in accordance with commissionerto charge a fee to determine the status ol subsection(c)of section 4-182.The commissioner may reissue,modify,revoke or sus- editor ally by thecommissionerRrs to alphabetic is indicators numeric editorially by the Revisors to alphabetic indicators in pend any general permit in accordance with the procedures set forth for the issuance of expenditure limits in Subsec.(a)(9);P.A.89-197 an such permit. hazardous waste establishments under Sec.22a-134a fees covercostof search,duplication and review ofrec( The Commissioner of Environmental Protection ma ado t regulations in ac- to Sees.22a-6d,22a-134e,22a-13s,22a-148,22a-I50 (g) Y P In 454a to 22a-454c,inclusive;P.A.91-200 amended cordance with the provisions of chapter 54,establishing a schedule of subscription fees = dollarsorless,eliminating previous distinction betwee to cover the reasonable cost to the Department of Environmental Protection of re- other real assets and to increase expenditure limit wht one million dollars;P.A.92-51 added Subsec.(e)re sponding to requests for notices of applications for permits and other licenses and tenta- y Subsec,(f)re authority of commissioner relative to gt tive determinations thereon issued by the commissioner. (a)to authorize the commissioner to adopt regulatior 401 of the federal Clean WaterAct;P.A.93-428 added t (h) The commissioner may adopt regulations pertaining to activities for which the effectiveJuly 1,1993;P.A.96-145 deleted areference ' (a)by inserting reference to Sec.1-I8a;P.A.98-134 federal government has adopted standards or procedures.All provisions of such regula- applicable federal standards. tions which differ from the applicable federal standards or procedures shall be clearly See chapter 54 re uniform administrative procedut distinguishable from such standards or procedures either on the face of the proposed See Sec.22a-27i re exemption of municipality for regulation or through supplemental documentation accompanying the proposed regula- Cited.192 C.591,596.Cited.204 C.38,44."En, tion at the time of the public hearing on such regulation required under chapter 54.An Cited.215 C.82,86.Cited.227 C.545,559. explanation for all such provisions shall be included in the regulation-making record Cited.19 CA 216,220. required under chapter 54. This subsection shall apply to an regulation for which a Subsec.(a>: q p pp y y g Subdiv.(3)cited.237 C.135,136,157,158. notice of intent to adopt is published on and after July 1, 1999. Subdiv.(3)cited.41 CA 120,121. *J Subsec.(d): (1971,P.A.872,S.7;P.A.73-665,S.3,17;P.A.74-188;P.A.81-227,S.1;P.A.82-91,S.17,38;82-180;P.A.83- Cited,239 C.124. 555,S. 1;June Sp.Sess.P.A.83-38,S.3;P.A.84-120,S.2;84-542,S.5;84-546,S.68,173;P.A.85-392,S.1,5;85- Subsec.(e): 515,S.1;P.A.85-571,S.14;P.A.86-277,S.1,4;86-403,S.48,132;P.A.87-98;87-144;87-219,S.1,2;87-496,S.90, Cited.229 C.654,659,662. 110;P.A.89-139;89-197;P.A.90-231,S.22,28;P.A.91-200,S.1,3;P.A.92-51;92-162,S.2,25;92-217,S.1,5;P.A• 93-428,S.13,39;P.A.96-145,S.9;P.A.97-47,S.44;P.A.98-134,S.3.) History:P.A.73-665 replaced alphabetic Subdiv.indicators with numeric ones,deleted listing of specific sections and Sec. 22a-6a. Violators liable t0 5 chapters with regard to which commissioner has power,granted commissioner power to make"procedural regulations', not exclusive of others. (a) Any per; deleted references to powers of commissioner's agents,empowered commissioner to control permits,allowed commis- provision Of Section 14-1 OOb Or 14-1E sioner to obtain warrant for inspection purposes,empowered commissioner to require performance bonds and to provide notice that false statement is a criminal offense and deleted provisions re procedure for hearings held by commissioner or " 15-121, section 15-171, 15-172, 15-1 hearing officer appointed by him;P.A.74-188 added Subdiv.(9)re commissioner's power to make contracts;P.A.$1- 441 subsei 227 authorized the commissioner to enter upon private property without liability and without being subject to suit for , section -174, a 22a-74, -177, trespass and required that attorney general represent department employees in suits against them for actions performed to 22a"171, 22a-174, 22a-175, 22a-177, course of their duties;P.A.82-91 added Subdiv.(10)which authorized commissioner,by regulation,to require payment 22a-208,22a-208a,22a-209,22a-213 PROTECTION Title 22a Ch. 439 ENVIRONMENTAL PROTECTION DEPARTMENT 247 AND STATE POLICY rsuant to section 22a-430 shall be gradua- / flows of wastewater in a muniCipalitY of fee to cover cost of reviewing application for and monitoring compliance with terms of various permits,licenses,orders, certificates or approvals,and provided that all funds received by commissioner under this section and subsection(g)of Sec.19-508 during fiscal year 82-83 shall be deposited in general fund,credited to appropriations of department and shall 1 Protection shall provide notice Of not lapse until June 30,1984;P.A.82-180 amended Subdiv.(5)to authorize disclosure of information to the Environmental P any Protection Agency pursuant to federal law;P.A.83-555 empowered the commissioner to require the payment of a fee for eClsiOri by the commissioner concerning acting upon and monitoring compliance with permits required by Secs.22a-424,22a-174 and 22a-368,specified the time ent to the chief executive officer of the of payment for an application and any subsequent monitoring of compliance with the terms of a permit and extended time for deposit of funds received in general fund and time at which funds lapse by one year;June Sp.Sess.P.A.83-38 allowed o each member of the legislature in whose the commissioner of environmental protection to construct or repair any dam or flood or erosion control system involving ►tice shall be made a part of the record of an expenditure of less than two hundred fifty thousand dollars and allowed the commissioner to contract for the repair or :r On SUCK Site. alteration of any real asset under his control involving an expenditure of one hundred thousand dollars or less and to do the same for real assets involving an expenditure between one hundred thousand dollars and two hundred fifty thousand dollars,with the prior approval of the commissioner of administrative services,replacing provision which had authorized i order to enforce any statute,regulation,_ commissioner to contract for repairs,etc.costing fifty thousand dollars or less but which had required bids for expenditures between twenty-five thousand and fifty thousand dollars;P.A.84-120 amended Subdiv.(10)to authorize a fee for monitor- ri, any person Or municipality aggrieved ing compliance with the terms and conditions of any registration;P.A.84-542 limited the funds received pursuant to section ded by law, request a hearing before the 22a-174 and which are earmarked for the department of environmental protection for the fiscal year ending June 30,1985, such order is sent.Such hearing Shall be to two hundred thousand dollars;P.A.84-546 made technical changes to section and added language re payment of fee; provided by chapter 54. P.A.85-392 amended Subdiv.(10)to authorize a fee for solid waste permits,adding references to Secs.22a-208 and 22a- 209;P.A.85-515 made existing provisions Subsec.(a)and added Subsec.(b),re amount of fees paid by municipalities and adoption of regulations establishing municipal fee schedules;P.A.85-571 added provision in Subsec.(b)entitling any d 22a-174, subsection(r)of Section 22a-, municipality paying fee on or after May 15,1984,and prior to October 1,1985 to a credit,and divided Subsec.(b)to create Subsecs.(b)and(�);P.A.86-277 amended Subdiv.(1)of Subsec.(a)by requiring public hearings for amendments to 1, 22a-411 and 22a-430b and subsection regulations that incorporate amendments to federal law which is a part of state regulation only upon request of a group of Dance Of general permits Shall not affect fifteen persons or more or a governmental subdivision or agency,and amended Subdiv.(5)of Subsec.(a)by authorizing statute or regulation, to abate pollution disclosure of information submitted after June 4,1986;P.A 86-403 made technical changes in Subsec.(a);P.A.87-98 including the authority t0 institute le al amended Subdiv.(1)of Subsec.(a)to delete provisions re public hearings on regulations;P.A.87-144 added Subsec.(d) g _ re notice of proceedings involving specific sites;P.A.87-219 amended Subsec.(a)by adding Subdiv.(11)authorizing the ;ummary suspension in accordance with commissioner to charge a fee to determine the status of real estate;P.A.87-496 substituted"public works"for"administra- oner may reissue,modify,revoke or sus-, tive services"commissioner in Subsec.(a);the numeric subparagraph indicators in Subdiv.(10)of Subsec.(a)were changed e procedures Set forth for the issuance Of editorially by the Revisors to alphabetic indicators in 1989 in the interests of consistency of usage;P.A.89-139 doubled . expenditure limits in Subsec.(a)(9);P.A.89-197 amended Subdiv.(10)to authorize a fee for reviews of transfers of hazardous waste establishments under Sec.22a-134a;P.A.90-231 amended Subdiv.(10)of Subsec.(a)to require that fees cover cost of search,duplication and review of records requested under freedom of information act and to add references Protection may adopt regulations,In aC- to Secs.22a-6d,22a-134e,22a-135,22a-148,22a-150,22a-174a,22a-363c,22a-372,22a-379,22a-409,22a-449 and 22a- 454a to 22a-454c,inclusive;P.A.91-200 amended Subsec.(a)to authorize all expenditures of five hundred thousand ablishing a schedule of subscription fees " dollarsorless,eliminating previous distinction between expenditures for dams or flood control systems and those involving ent Of Environmental Protection of re- other real assets and to increase expenditure limit where prior approval has been obtained from five hundred thousand to one million dollars;P.A.92-51 added Subsea(e)re hearings on orders of the commissioner;P.A.92-162 added new for permits and other licenses and tenta- Subsec.(f)re authority of commissioner relative to general permits issued under title 22a;P.A.92-217 amended Subsec. missioner. (a)to authorize the commissioner to adopt regulations re fees for applications and monitoring compliance with Section 401 of the federal Clean Water Act;P.A.93-428 added new Subsea(g)re subscription fees fornotices of permit applications, ins pertaining to activities for which the effective July 1,1993;P.A.96-145 deleted a reference to repealed Sec.22a-384in Subsec.(a);P.A.97-47 amended Subsec. (a)by inserting reference to Sec.1-18a;P.A.98-134 added new Subsec.(h)re adoption of regulations which differ from rocedures.All provisions of such re ula- P g applicable federal standards. standards or procedures shall be clearly See chapter 54 re uniform administrative procedure. lures either on the face of the proposed See Sec.22a-27i re exemption of municipality for one year. tion accompanying the proposed regula- Cited.192 C.591,596.Cited.204 C.38,44."Environmental policy act(Secs.22a-1-22a-13)"cited.Id.,212 et seq. egulation required under chapter 54.An Cited.215 C.82,86.Cited.227 C.545,559. Cluded in the regulation-making record Cited.19 CA 216,220. all apply to regulation for which a Subsec.(a): PP y any re g Subdiv.(3)cited.237 C.135,136,157,158. ter July 1, 1999. Subdiv.(3)cited.41 CA 120,121. Subsec.(d): �.81-227,S. 1;P.A.82-91,S.17,38;82-180;P.A.83- Cited.239 C.124. 542,S.5;84-546,S.68,173;P.A.85-392,S. 1,5;85 Subsee.(e): 132;P.A.87-98;87-144;87-219,S.1,2;87-496,S.90, Cited.229 C.654,659,662. 1,3;P.A.92-51;92-162,S.2,25;92-217,S.1,5;P.A. 34,S.3.) ith numeric ones,deleted listing of specific sections and See. 22a-6a. Violators liable to state for costs and expenses.Statutory remedy :ommissioner power to make"procedural regulations", not exclusive of others. (a) Any person who knowingly or negligently violates any red commissioner control permits,allowed commis- missioner to requirere performance bonds and to provide Provision of section 14-100b or 14-164c, subdivision (3) of subsection (b) of section ions re procedure for hearings held by commissioner or 15-121, section 15-171, 15-172, 15-175, 22a-5, 22a-6 or 22a-7, chapter 440, chapter i re commissioner's power to make contracts;P.A.81- or 441 section 22a-69 or 22a-74 subsection b of section 22a-134 , section 22a-162, mployees in suits against them for actions performed in without liability and without being subject to suit for 22a-171, 22a-174, 22a-175, 22a-177, 22a-178, 22a-181, 22a-183, 22a-184, 22a-190, rrized commissioner,by regulation,to require payment 22a-208, 22a-208a,22a-209, 22a-213, 22a-220,22a-225,22a-231, 22a-336, 22a-342, Northeast111'. tirldrn Street. Berlin.CT 00087 Utilities System Northeast t tilitivs Service :0111ltam P.O. Box 270 Ilartford. (:'I 00141-02-0 (800)005-5000 January 3, 2000 D15315 Michael P. Senyk, Environmental Analyst Permitting, Enforcement, &Remediation Division Bureau of Water Management Connecticut Department of Environmental Protection 79 Elm Street Hartford, Connecticut 06106-5127 Reference: Letter(C09716),M.J. Harder to J.F. Barresi, dated October 20, 1999. Dear Mike: Barber Hill Road Substation Proposed Work Plan: Groundwater Assessment As requested in the reference letter, The Conneeh6ut Light and Power Company (CL&P) submits a proposed work plan to assess groundwater at CL&P's Barber Hill Road Substation in South Windsor, Connecticut. Northeast Utilities Service Company (NUSCO), as agent for CL&P, will conduct the investigation. NUSCO is proposing a two (2) phase approach. The first phase will focus on the upgradient/northern and western portion of the property to determine if solvents are migrating onto the property. The results will be discussed with representatives of Connecticut Department of Environmental Protection to determine if a second phase along the southern/downgradient portion of the property will need to be conducted. NUSCO plans to commence Feld activities the week of January 10, 2000. If you have any questions or comments, please call Mr. James T. Adamik, NUSCO Environmental Services,at(860) 665-3045. Very truly yours, CONNECTICUT LIGHT AND POWER COMPANY Joseph F. Barrek,Director_ Michael P. Senyk D15315/page 2 January 3, 2000 CC: (w/work plan) Mr. Robert Deptula, Sanitarian South Windsor Health Department 1540 Sullivan Avenue South Windsor,CT 06074-2734 Mr.Ronald P.Klattenberg,NUSCO Mr. James T. Adamik,NUSCO Mr.Donald Fleming, CL&P Mr.Francis A. Ginocchi, CL&P Mr.Richard H. Willis, CL&P Mr. Ronald C.Nichols,NUSCO WORK PLAN TO ASSESS GROUNDWATER AT THE BARBER HILL ROAD SUBSTATION IN SOUTH WINDSOR, CONNECTICUT Prepared by Northeast Utilities Service Company For The Connecticut Light and Power Company December 1999 a � TABLE OF CONTENTS 1.0 INTRODUCTION..................................................................................................................... 1 2.0 SITE DESCRIPTION....................................................................................................:.......... 1 2.1 Location...........................:..........................................................._.......................................1 2.2 Physical Setting.................................................................................................................. 1 3.0 PROPOSED SITE INVESTIGATION ....................................................................................3 3.1 Monitoring Wells ................................................................................................................3 3.2 Groundwater Sampling......................................................................................................3 3.3 Implementation Schedule..................................................................................................4 4.0 REFERENCES..........................................................................................................................5 5.0 FIGURES..................................................................................................................................6 6.0 APPENDICES........................................................................................................................... i LIST OF FIGURES 1. Location of the Barber Hill Road Substation in South Windsor, Connecticut 2. Proposed Monitoring-Well-Cluster Locations at the Barber Hill Road Substation in South Windsor, Connecticut. 3. Schematic Diagrams showing the Construction of the Proposed Monitoring Wells. ii LIST OF APPENDICES 1. Monitoring Well Installation Plan 2. Groundwater Sampling Plan 3. Health and Safety Plan(HASP) N4 111 i 1.0 INTRODUCTION On April 21 and 29, 1999, representatives of the Connecticut Department of Environmental Protection (CTDEP) conducted a limited subsurface investigation at the Barber Hill Road Substation in South Windsor, Connecticut. The investigation was prompted by the findings of chlorinated solvents, trichloroethylene (TCE) and tetrachloroethylene (PCE), in excess of the Connecticut Department of Public Health's drinking water action level in domestic wells topographically down gradient of the Substation. DEP reported levels of PCE (CTDEP, 1999) in the overburden groundwater beneath the Substation at just above the 5-part per billion (ppb) Ground-water Protection Criteria for GA and GAA areas level. In that same report, CTDEP reported the findings of limited investigations on other adjacent properties. In particular, Dzen Farm (244 Barber Hill Road) is both topographically and hydrologically upgradient of the Substation. This site had levels of PCE.and TCE in the onsite septic tank and building floor drains several orders of magnitude greater than Connecticut's Groundwater Protection Criteria. DEP has identified the Dzen Farm as a likely source area. However, DEP has determined that the CL&P Substation could also be a possible source area. Based on DEP's findings, the Substation is located in a recharge area with divergent shallow groundwater flow and the mere presence of the PCE signifies past usage. DEP has requested Northeast Utilities to conduct a subsurface investigation to determine if the Substation is a source area for the solvent contamination in the nearby domestic wells. Northeast Utilities Service Company, as agent for The Connecticut Light and Power Company, will perform the work presented in this plan. ' 2.0 SITE DESCRIPTION 2.1 Location The Barber Hill Road Substation is located on Barber Hill Road approximately 1.500 feet north of the intersection with Miller Road in South Windsor, Connecticut. Map bearings of the Substation are 41' 51' 03" North and 72' 31' 44" West. The Substation is depicted on Figure 1. The Substation and surrounding properties are zoned rural residential (Town of South Windsor, 1989). 2.2 Physical Setting The Substation is located in Central Lowland physiographic province of Connecticut (CTDEP, 1985). The topography surrounding the Substation gradually slopes from north and east to west with the residences on Barber Hill Road,between the Substation and the intersection with Miller Road,in a topographically lower setting. Surface material below the man-made gravel cover is mostly a till consisting of a reddish brown nonsorted mixture of clay, silt, sand, pebbles and cobbles (Colton, 1965). Depth to bedrock varies from less than 10 feet to 50 feet and slopes eastward (Handman and Colton, 1973). Bedrock beneath the Substation is mapped as Portland Arkose (CTDEP, 1985). Bedrock consists 1 of reddish brown to maroon micaceous arkose and siltstone and red to black fissile silty shale. Bedrock may also contain a coarse conglomerate (fanglomerate). Environmentally, the area is designated as residential land use. Groundwater beneath the substation is mapped as GA(CTDEP, 1998). For the purposes of this investigation, the results of groundwater samples will be compared to Connecticut's Remediation Standards in Section 22a- 133k-1 under,Protection Criteria for Ground-Water in GA and GAA areas and Surface Water. 14'4 2 6 a 3.0 PROPOSED SITE INVESTIGATION 3.1 Monitoring Wells Eight (8)monitoring well cluster locations are depicted on Figure 2. These locations were based on the conceptual model that combines both the physical/chemical properties of the PCE and TCE and the subsurface lithology to determine if solvent impacted groundwater is migrating into areas beneath the Substation. PCE and TCE have specific gravities (SG) of 1.62 (DOW, 1996) and 1.46 (DOW, 1990), respectively. Heavier than water compounds (S(; > 1.00) will have a propensity to sink in groundwater until a lithologic discontinuity andior impermeable layer is encountered. Then, they will likely migrate along that feature in a topographic downgradient direction. As presented, the subsurface is broadly_divided into the overburden and bedrock. As the first phase on the upgradient portion of the property, NUSCO proposes to install overburden and bedrock monitoring wells at each of the first four (4) monitoring well clusters (1-4). The overburden well will be finished at a lithologic discontinuity that is either the overburden/bedrock interface or an obvious impermeable layer (ie. clay or dense silt) below the water table. The bedrock well will be drilled to a depth(130 - 150 feet below land surface) that is equivalent to the depth of the impacted domestic wells near the Barber Hill and Miller Roads intersection. The bedrock wells should tap the same intra-bedrock structure that has allowed the migration of solvents to the domestic wells. General construction schematics of the overburden .and bedrock wells are presented in Figure 3. Instal*ion procedures are given in Appendix 1. All monitoring well measuring points will be surveyed to a common datum. Groundwater level information will be obtained to determine groundwater flow directions. After the groundwater level and quality data are reviewed, the results will be discussed with the CTDEP and the need evaluated to install monitoring wells at well clusters 5-8. 3.2 Groundwater Sampling Groundwater samples will be obtained from all monitoring wells to determine the quantity of PCE and TCE present. U.S. EPA Method 8260 will be used for the analysis. Groundwater sampling procedures are given in Appendix 2. All water extracted from the wells that is not used for sample analysis will be containerized and characterized for proper disposal. 3 h 3.3 Implementation Schedule Table 1 presents the project elements with proposed completion dates. Table 1 —Proposed Project Schedule. Project Work Element Proposed Completion Dates - 2000 Work Plan Submittal to CTDEP January 4 Monitoring Well Installation January 10-14 Monitoring Well Sampling February 10 Monitoring Well Sampling Results February 25 Communicate Results with CTDEP early March Final Report 30 days following CTDEP Discussions and finding the determination for no additional well installations 4 4.0 REFERENCES Colton,R. B.; 1965; Geologic Map of the Manchester Quadrangle Hartford and Tolland Counties Connecticut; Map GQ-433,published by the U.S. Geological Survey; Washington,D.C.; 1 sheet. Connecticut Department of Environmental Protection(CTDEP); 1985;. Bedrock Geological Map of Connecticut; compiled by John Rodgers of Yale University; 3 sheets. 1998; Water Quality Classifications Connecticut- Connecticut River and South Central Coastal Basins: adopted February, 1993; sheet l of 3. ;September 2, 1999;DEP Subsurface Investigation: Barber Hill Road Vicinity, South Windsor, Connecticut. Solvent Contamination Detected In Residential Potable Wells.; letter report. Dow Chemical U.S.A. Marketing; 1990;Material Safety Data Sheet for Trichloroethylene, obtained from internet address -http://msds.pdc.comell.edu/mede/siri/q l 37/g 117.11tml: 4 pages. 1996;Material Safety Data Sheet for Tetrachloroeth)lane, obtained from internet address -http://msds.pdc.comell.edu/msds/siri/g420/g154.htm1; 4 pages. Handman, E.H. and Colton,R.B.; 1973;Depth To Bedrock, Manchester Quadrangle, Connecticut; Miscellaneous Field Studies Map MF-425 B; 1 sheet. Town of South Windsor; 1989;Zoning Map of the Town of South Windsor, Hartford County, Connecticut; 1 sheet. 5 5.0 FIGURES 4t 6 s , 5.0 FIGURES 6 i X A .W % Iry � , �' •,j , SCALE 1:240M MILS r CONTOUR INTERVAL • FEET NATIONALe• DATUM OF eo 7- ED4297 S•80 /N�ORTHEAST /'�UTILI TIES SERVICE COMPANY -- SUBJECT �j A r.�o/G OZ — jY-ape-�,-j Gr1)kel,,,, BY DATE r ft- C1,�.f �t cir /fit O C Ct +1 J of I �4r CHKD. BY DATE _�G-✓ C fO ✓ 1 1-it'll RaP 4 �,-54c tos4aT-{ h /K CALC. N0. REV. ��01�t' YNt I.tGI,JO CLlY1 N PL*fCOtt SHEET N0. OF N. iv . Pro fpv 4- � aoo •L�e.t , a ° i • GLs P Pr oho. h L �2 � Cl a Z � O V_ F<<n C e . SL, c" \ 40 c-rd, �� ED4297 540 NORTHEAST UTILITIES SERVICE COMPANY SUBJECT : -SG/tCwia /1G.- BY DATE // S".O, w�iS'�'4 t7t"sK CHKD. BY— DATE— ���n nuiiaa.. � we JJ�� a e—�• �i OC CALC. N0._ REV. ^^Vl^^ 'FpJ � • ����� ' S SHEET NO. OF / �� ,n , -�or �� � Vllet 1`4lv �trllrK w Vy IQuSCvs. i thS4--Nr�Q + r oQi 1 t�C L1 K l 4 kLS . get-le fix\ r�IUJt"t� eAo%tM4f bax ell Fla �(j�droc� T tOMtA ov��lcu�d�K • �� CV6�i z a lie O — 6vri Gtau!' u�tc�c�r / ,:A 113Cd✓OGIA. In' i / r r-e c tet t e L .aP �s u r.A�4 c e I�ot T 0 ;SC a �e- 6.0 APPENDICES 7 s Appendix 1 —Monitoring Well Installation Plan 8 1 Overburden Monitoring Well Development • All overburden monitoring wells must be developed prior to the acquisition of groundwater samples for laboratory analysis. • The wells will be alternately bailed and surged with a disposable bailer. • At least 10 well volumes should be extracted or the well dewatered. which ever is reached first. • Water retrieved during these procedures should be placed into a 55-gallon drum. After all development and groundwater sampling has been concluded, the water will be tested for hazardous waste determinations and disposed. If a discernible product layer is observed, the free product must be collected in a separate container and disposed of properly. Bedrock Monitoring Well Development • Prior to sample aquisition, the bedrock monitoring wells will be allowed to equilibrate with bedrock conditions for two (2)weeks. 10 a APPENDIX 2-GROUNDWATER SAMPLING PLAN 11 GROUNDWATER SAMPLING PLAN • Prior to conducting field activities; sampling equipment, sample containers, analytical requirements, preservatives, chain-of-custody forms, and container labels should be compiled. • Don the appropriate Levels D personal protective equipment(gloves, hardhat, safety glasses, hearing protection (if appropriate), and steel-toed shoes) before commencing field activities. See HASP Appendix 3 for details. • Use a photoionization detector to monitor the breathing zone for volatiles as defined in the HASP-Appendix 3.Respond accordingly to action levels. • Use an oil/water interface probe to measure depth to any immiscible layer (if present) and water from an established measuring point(ie. casing rim). • Use low-flow sampling techniques with a Waterra dedicated sample pump to sample the wells. The Waterra system is composed of a foot valve installed at the end of dedicated tubing and placed near the bottom of the well. The water level in the tube will rise to that in the well. A rapid upstroke closes the foot valve and lifts the water column inside the tubing to a distance equal to the stroke. At the end of the upstroke, the water column continues to rise due to momentum.A further column of water is thus simultaneously drawn into the tube. Pushing the tubing down immediately after the upstroke forces a further column of water into the tubing due to inertia of the water column. The cycle is repeated and water rises in pulses to discharge. Overburden Monitoring Wells: �4 Remove a minimum of three (3)well v6lumes. Then,monitor in over several two (2) to five (5) minute intervals the parameters of oxygen reduction potential, specific conductance,pH,temperature,turbidity, and dissolved oxygen. When the parameters have stabilized, collected the samples for laboratory analysis. Bedrock Monitoring Wells: Monitor over several two (2) to five (5) minute intervals the parameters of oxygen reduction potential, specific conductance, pH, temperature, turbidity, and dissolved oxygen. When the parameters have stabilized, collected the samples for laboratory analysis • Distribute the water samples into the appropriate sample containers. Preserve the samples as required. • Complete the chain-of-custody forms and transport the samples to the laboratory so that the analyses is completed within the analytical extraction and holding times. 12 APPENDIX 3 -HEALTH AND SAFETY PLAN (HASP) 13 HEALTH AND SAFETY PLAN (HASP) for the Barber Hill Road Substation on Barber Hill Road South Windsor, Connecticut Date Compiled - 12/15/99 1.O Introduction: This Health and Safety Plan (HASP) defines the requirements and designates the protocols to be followed at the Site during investigation, monitoring and remediation activities. Applicability extends to all NUSCO employees and contractors as well as visitors. Prior to entering the contaminant reduction zone or the exclusion zone,James T. Adamik, NUSCO Project Lead, will inform (tailboard discussion) all site workers and visitors of all requirements and protocols. Each worker or visitor may be requested to provide evidence they meet all relevant OSHA requirements for training (Soc. 4.0), and medical monitoring (Sec. 6.0) and respiratory protection requirements(if applicable). This HASP will only be considered in full compliance with applicable federal, state, and local regulations when all site workers and visitors sign section 13 0, Hazard Communication, on page K. This HASP was developed by consulting: • OSHA 29 CFR 1910.120 and EPA 40 CFR 311 • U.S. EPA, OERR ERT Standard Operating Safety Guides • NIOSH/OSHA/IJSCG/EPA Occ.Health and Safety Guidelines • Threshold Limit Values from ACGIH. 2.0 Key Personnel NUSCO Environmental Services Contact(Project Lead): • Name-James T. Adamik Title - Scientist • Location-Berlin, CT-N216 • Pager #7431 Tel.#(860) 665-3045 NUSCO Environmental Services Contact(Supervisor): • Name-Ronald P.Klattenberg Title-Manager • Location-Berlin, CT-N216 • Pager # 1479049 Tel.#(860) 665-3627 A NUSCO Health and Safety Officer(HSO) • Name-Jim Richardson Title - Safety and Health Administrator • Location-Hartford AWC,Hartford,CT • Pager #8711 Tel. #(860)280-2394 NUSCO Health and Safety Officer(HSO) • Name-Milo Ozkan Title-Safety and Health Administrator • Location-NUSCO Complex,Berlin,CT • Pager #8714 Tel. #(860) 665-3265 Site Supervisor: • Name-Rich Willis_Title - Supervisor, T&D Maint. • Location-Tolland AWC,Tolland. CT • Pager #5307 Tel.#(860) 871-3414 Site Environmental Coordinator: • Name -Don Fleming Title-Regional Environmental Coordinator • Location-Tolland AWC,Tolland, CT • Pager #5008 Tel. #(860) 871-3456 Drilling Contractor: • Name-Sima Drilling Company Title-Not Applicable • Location-Cheshire, CT , • Pager #Contact Office Tel. #(203) 272-3077 Regulatory Agency Contact: • Name - Michael Senyk Title - Environmental Analyst II • Agency-Connecticut Department of Environmental Protection • Address- 79 Elm Street Hartford, CT 06106 • Tel. #(860)424-3782 Groundwater Sampling Team Lead: • Name - Douglas P. Struthers Title -Environmental Specialist • Location-Northeast Generation Company.,Rocky Hill. CT • Pager # 3409 Tel.# (860) 665-3731 3.0 Task Safety and Health Risk Analysis Briefly describe the objectives of site activities: Conduct an initial investigation on the presence of Trichloroethylene (TCE) and Tetrachloroethylene PCE)in the groundwater beneath the Barber Hill Road Substation. Briefly describe site conditions that may present safety and health risks: Residual levels of TCE and PCE may be encountered in drill cuttings (subsurface soils and bedrock) and groundwater samples Respiratory., dermal and ingestion 12athwaYs are present Steam cleaner is used use to decon drill rig - drill stem and hollow stem augers. Contact, inhalation and flying debris hazards. B a + Describe the safety and health risks and risk reduction for each task: • Task# 1 - Surface and subsurface drilling Safety and Health Risk(s)Dermal contact. ingestion and inhalation of organic vapors and organic and inorganic impacted-soils Risk Reduction-Wear jyvek overalls and nitrite gloves Monitor the breathing zone for ,organic vapors and evaluate before action levels are reached Do not place gloved hands near your face or handle food Stand upwind of impacted soils • Task#2-Lifting heavy equipment and loads Safety and Health Risk(s)-Back strain Risk Reduction-Use proper lifting techniques. • Task#2 -Soil boring and monitoring well installations Safety and Health Risk(s) -High noise levels.Exhaust from drill rig Overhead and buried utilities. Moving parts on drill rig Risk Reduction-Wear noise reducing ear plugs Avoid standing downwind of the drill rig Check for overhead utilities and obstructions Check for buried utilities by contacting Call-Before-You-Dig(1-800-922-44551 and work with Substation personnel to identify the location of buried utilities and the appropriate distances to overhead utilities for unqualified personnel . Be aware of moving parts on the drill rig Do not wear loose clothing or dangling jewelry. *14 • Task#4-Decontaminating Drilling Equipment" Safety and Health Risk(s)-Injury from steam cleaner or flying debris Risk Reduction-Be sure steam cleaner is in good working condition Wear work gloves and safety glasses goggles or face shield Do not stand downstream of spray The operator must not direct the spray in the direction of work crews or the public • Task#5 -Monitoring well development and sampling Safety and Health Risk(s) -Exposure to organic vapors Contacting organic and inorganic- i=acted groundwater. Risk Reduction-Stand upwind of monitoring wells and collection containers Wear nitrile gloves and safety glasses, goggles or face shield Do not place gloved hands near your face or handle food. (For additional tasks.complete and attach copies of this page.) C Attach Applicable MSDSs MSDS Compound List (1) Trichloroethylene (2) Tetrachloroethylene (3) Methanol (4) 14, .r D DOW CHEMICAL U S A GOVERN...: 56530) - TRICHLOROETHYLENE, TECHNICA Page 1 of 4 DOW CHEMICAL U S A GOVERNMENT MARKETING -- NEU-TRI (R) SOLVENT (PRODUCT CODE: 5653 MATERIAL SAFETY DATA SHEET NSN: 6810001844800 Manufacturer's CAGE: 96717 Part No. Indicator: A Part Number/Trade Name: NEU-TRI (R) SOLVENT (PRODUCT CODE: 56530) General Information Item Name: TRICHLOROETHYLENE, TECHNICAL Company's Name: DOW CHEMICAL U.S.A. , GOVERNMENT MARKETING Company's Street: 2020 DOW CENTER Company's City: MIDLAND Company's State: MI Company's Country: US Company's Zip Code:. 48640-6030 Company's Emerg Ph #: 517-636-4400 Company's Info Ph #: 517-636-1000 Distributor/Vendor # 1: AMJAY CHEMICALS (713-492-2000) Distributor/Vendor # 1 Cage: 64184 Record No. For Safety Entry: 010 Tot Safety Entries This Stk#: 010 Status: SE Date MSDS Prepared: 14JUN90 Safety Data Review Date: 01NOV91 Supply Item Manager: CX MSDS Preparer's Name: UNKNOWN MSDS Serial Number: BDGYD Specification Number: O-T-634 Spec Type, Grade, Class: TYPE II Hazard Characteristic Code: T4 Unit Of Issue: DR Unit Of Issue Container Qty: 55.0 GL y Type Of Container: DRUM,METAL Net Unit Weight: 668.7 LBS Ingredients/Identity Information ------------------------------------------------------------- Proprietary: NO Ingredient: TRICHLOROETHYLENE (SARA III) Ingredient Sequence Number: 01 Percent: 99.4 NIOSH (RTECS) Number: KX4550000 CAS Number: 79-01-6 OSHA PEL: 100 PPM/100 STEL ACGIH TLV: 50 PPM/100,A5STEL;93 Other Recommended Limit: NONE SPECIFIED ------------------------------------- Proprietary: NO Ingredient: 1,2-BUTYLENE OXIDE (SARA III) Ingredient Sequence Number: 02 Percent: 0.5 NIOSH (RTECS) Number: EK3675000 CAS Number: 106-88-7 OSHA PEL: NOT ESTABLISHED ACGIH TLV: NOT ESTABLISHED Other Recommended Limit: 40 PPM; 100 PPM MAX. Physical/Chemical Characteristics Appearance And Odor: CLEAR, COLORLESS LIQUID, CHLOROFORM-LIKE ODOR. Boiling Point: 189F, 87C Melting Point: -123F, -86C Vapor Pressure (MM Hg/70 F) : 60 Vapor Density (Air=1) : 4.53 Specific Gravity: 1.46 Decomposition Temperature: UNKNOWN http://msds.pdc.comell.edu/msds/siri/ql37/qII7.htm] 12109:'1999 DOW CHEMICAL U S A GOVERN...: 56530) - TRICHLOROETHYLENE, TECHNICA Page 2 of 4 Evaporation Rate And Ref: 4.46 (N-BUTYL ACETATE=1) Solubility In Water: SLIGHT Percent Volatiles By Volume: 100 Viscosity: UNKNOWN Corrosion Rate (IPY) : UNKNOWN Autoignition Temperature: 788F Fire and Explosion Hazard Data Flash Point: NONE Flash Point Method: TCC Lower Explosive Limit: 8.0 Upper Explosive Limit: 44.8 Extinguishing Media: WATER FOG Special Fire Fighting Proc: WEAR A POSITIVE PRESSURE SELF-CONTAINED BREATHING APPARATUS. Unusual Fire And Expl Hazrds: STRONG UNPLEASANT ODOR. AUTOIGNITION TEMPERATURE IS 788F, 420C. -------------------------------- Reactivity Data Stability: YES Cond To Avoid (Stability) : AVOID OPEN FLAMES, WELDING ARCS, OR OTHER HIGH TEMPERATURE SOURECS WHICH INDUCE THERMAL DECOMPOSITION OF SOLVENT VAPOR. Materials To Avoid: STRONG ALKALIS, METALLIC ALUMINUM AND ZINC POWDERS. Hazardous Decomp Products: WHEN INVOLVED IN FIRE, TRICHLOROETHYLENE EMITS HIGHLY TOXIC AND IRRITATING HYDROGEN CHLORIDE AND PHOSGENE FUMES. Hazardous Poly Occur: NO Conditions To Avoid (Poly) : NOT APPLICABLE ------------------------------------------- Health Hazard Data LD50-LC50 Mixture: ORAL LD50 (RAT) = 4920 MG44'G Route Of Entry - Inhalation: YES Route Of Entry - Skin: NO Route Of Entry - Ingestion: NO Health Haz Acute And Chronic: ACUTE: MAY CAUSE EYE & SKIN IRRITATION. MAY CAUSE RESPIRATORY TRACT IRRITATION. CENTRAL NERVOUS SYSTEM DEPRESSANT. LOSS OF CONSCIOUSNESS AND EVEN DEATH CAN OCCUR AT HIGH LEVELS OF EXPOSURE. PROLONGED OR REPEATED EXPOSURE MAY CAUSE SKIN IRRITATION. HIGH EXPOSURE LEVELS HAVE CAUSED LIVER OR KIDNEY EFFECTS IN LAB ANIMALS. Carcinogenicity - NTP: NO Carcinogenicity - IARC: YES Carcinogenicity - OSHA: NO Explanation Carcinogenicity: A POS. RESPONSE HAS OCCURRED IN MICE GIVEN LARGE DOSES OF TRICHLOROETHYLENE. NO CARCINOGENIC HAZARD TO MAN IS INDICATED. Signs/Symptoms Of Overexp: MAY CAUSE SLIGHT EYE IRRITATION. MAY CAUSE DRYING OR FLAKING OF SKIN. MAY CAUSE REDDENING OF THE SKIN. VAPORS CAN CAUSE ANESTHETIC OR IRRITANT EFFECTS, DIZZINESS, DRUNKENNESS, UNCONSCIOUSNESS AND EVEN DEATH. Med Cond Aggravated By Exp: INCREASED SENSITIVITY TO ADRENALINE MAY BE CAUSED BY OVER EXPOSURE. PERSONS WITH LIVER OR KIDNEY DISEASE MAY BE AT INCREASED RISK. Emergency/First Aid Proc: INHALATION: REMOVE TO FRESH AIR. GIVE MOUTH- TO-MOUTH RESUSCITATION IF NOT BREATHING. GIVE OXYGEN IF BREATHING IS DIFFICULT. GET MEDICAL ATTENTION. EYES: FLUSH WITH RUNNING WATER FOR 15 MINUTES WHILE HOLDING EYELID. GET MEDICAL ATTENTION. SKIN: WASH WITH PLENTY OF SOAP & WATER. REMOVE CONTAMINATED CLOTHING. GET MEDICAL ATTENTION. INGESTED: DO NOT INDUCE VOMITING. GET MEDICAL ATTENTION IMMEDIATELY. Precautions for Safe Handling and Use Steps If Matl Released/Spill: SMALL SPILLS: MOP UP, WIPE UP OR SOAK UP IMMEDIATELY. REMOVE TO OUT OF DOORS. LARGE SPILLS: EVACUATE AREA. CONTAIN LIQUID; TRANSFER TO CLOSED METAL CONTAINERS. KEEP OUT OF WATER SUPPLY. Neutralizing Agent: NONE Waste Disposal Method: RECOMMENDED METHOD OF DISPOSAL OF UNUSED MATERIAL http://msds.pdc.comell.edu/msds/siri/ql37/ql 17.html 12/09/1999 DOW CHEMICAL U S A GOVERN...:56530) - TRICHLOROETHYLENE, TECHNICA Page 3 of 4 IS TO SEND IT TO LICENSED RECLAIMERS OR TO PERMITTED INCINERATORS. ANY DISPOSAL PRACTICE MUST BE IN COMPLIANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS. DO NOT DUMP INTO SEWERS OR ANY BODY OF WATER. Precautions-Handling/Storing: HANDLE WITH REASONABLE CARE. AVOID BREATHING VAPORS. STORE IN COOL PLACE. VAPORS ARE HEAVIER THAN AIR & WILL COLLECT IN LOW OR ENCLOSED AREAS. Other Precautions: DO NOT ENTER AREAS SUCH AS PITS, DEGREASERS, STORAGE TANKS AND OTHER CONFINED AREAS WHERE VAPORS OF THIS PRODUCT ARE SUSPECTED UNLESS SPECIAL BREATHING APPARATUS IS USED & AN OBSERVER IS PRESENT FOR ASSISTANCE. --------------------------------------------- Control Measures Respiratory Protection: USE A NIOSH/MSHA APPROVED AIR-PURIFYING RESPIRATOR WHEN EXPOSURE LEVELS SLIGHTLY EXCEED GUIDELINES. FOR HIGH EXPOSURE LEVELS OR CONFINED AREAS, USE AN APPROVED POSITIVE-PRESSURE SELF-CONTAINED BREATHING APPARATUS. Ventilation: LOCAL EXHAUST VENTILATION MAY BE NECESSARY FOR SOME OPERATIONS. USE ONLY WITH ADEQUATE VENTILATION. Protective Gloves: NEOPRENE, PVA GLOVES RECOMMENDED. Eye Protection: USE CHEMICAL SAFETY GOGGLES. Other Protective Equipment: USE BOOTS, APRON AND WORK CLOTHING TO MINIMIZE EXPOSURE AS REQUIRED. EYE WASH STATION AND SAFETY SHOWER RECOMMENDED. Work Hygienic Practices: WASH THOROUGHLY AFTER HANDLING. AVOID CONTACT WITH SKIN AND CLOTHING. DO NOT SMOKE WHILE USING THIS MATERIAL. Suppl. Safety & Health Data: NOTE TO PHYSICIAN: OVEREXPOSURE WILL CAUSE SYMPTOMS OF NARCOSIS AND, IF ACCOMPANIED BY ANOXIA, MAY TEMPORARILY INCREASE CARDIAC IRRITABILITY. MAINTAIN ADEQUATE OXYGENATION UNTIL RECOVERY. SYMPATHOMIMETIC AMINES, SUCH AS EPINEPHRINE, MAY PRECIPITATE ARRHYTHMIAS. USE ONLY AFTER CAREFUL CONSIDERATION. ---------------Transportation-D to ---------- ----------------------------- Trans Data Review Date: 91305 DOT PSN Code: OQK DOT Proper Shipping Name: TRICHLOROETHYLENE DOT Class: 6.1 DOT ID Number: UN1710 DOT Pack Group: III DOT Label: KEEP AWAY FROM FOOD IMO PSN Code: OVL IMO Proper Shipping Name: TRICHLOROETHYLENE IMO Regulations Page Number: 6273 IMO UN Number: 1710 IMO UN Class: 6.1 IMO Subsidiary Risk Label: - IATA PSN Code: YMD IATA UN ID Number: 1710 IATA Proper Shipping Name: TRICHLOROETHYLENE IATA UN Class: 6.1 IATA Label: TOXIC AFI PSN Code: YMD AFI Prop. Shipping Name: TRICHLOROETHYLENE AFI Class: 6.1 AFI ID Number: UN1710 AFI Pack Group: III AFI Special Prov: N36 AFI Basic Pac Ref: 10-10 Additional Trans Data: NONE ----------------------------------- Disposal Data Disposal Data Review Date: 88077 Rec # For This Disp Entry: 04 Tot Disp Entries Per NSN: 004 Landfill Ban Item: YES Disposal Supplemental Data: MSDS NUMBER FROM DOW CHEMICAL USA DATED:10/05/ 85; SPEC REFERENCE:O-T-634C, TYPE II. IN CASE OF ACCIDENTAL EXPOSURE OR http://msds.pdc.comell.edu/msds/siri/ql37/ql 17.html 12/09/l 999 DOW CHEMICAL U S A GOVERN...: 56530) - TRICHLOROETHYLENE, TECHNICA Page 4 of 4 DISCHARGE, CONSULT HEALTH AND SAFETY FILE FOR PRECAUTIONS. 1st EPA Haz Wst Code New: U228 1st EPA Haz Wst Name New: TRICHLOROETHYLENE; TRICHLOROETHENE 1st EPA Haz Wst Char New: TOXIC (T) 1st EPA Acute Hazard New: NO Label Data --------------------------------------------------------------------------- Label Required: YES Technical Review Date: OINOV91 MFR Label Number: D979 Label Status: G Common Name: NEU-TRI (R) SOLVENT (PRODUCT CODE: 56530) Chronic Hazard: YES Signal Word: WARNING! Acute Health Hazard-Moderate: X Contact Hazard-Moderate: X Fire Hazard-Slight: X Reactivity Hazard-None: X Special Hazard Precautions: HARMFUL IF INHALED. CAN CAUSE DEATH IF TOO MUCH IS BREATHED. HARMFUL IF SWALLOWED. MAY CAUSE SKIN IRRITATION. AVOID BREATHING VAPOR. KEEP CONTAINER CLOSED. USE WITH ADEQUATE VENTILATION. DO NOT TAKE INTERNALLY. WASH THOROUGHLY AFTER HANDLING. AVOID CONTACT WITH SKIN AND CLOTHING. FIRST AID: IF ILL EFFECTS, SUCH AS DIZZINESS AND/OR DRUNKENNESS OCCUR FROM EXPOSURE TO VAPORS, REMOVE TO FRESH AIR. IF NOT BREATHING GIVE ARTIFICIAL RESPIRATION, PREFERABLY NOUTH TO MOUTH. IF BREATHING IS DIFFICULT, GIVE OXYGEN. CALL A PHYSICIAN. IF SWALLOWED, DO NOT INDUCE VOMITING. CALL A PHYSICIAN. IN CASE OF CONTACT, FLUSH SKIN WITH PLENTY OF WATER. Protect Eye: Y Protect Skin: Y Protect Respiratory: Y Label Name: DOW CHEMICAL U.S.A. , GOVERNMENT._MARKETING Label Street: 2020 DOW CENTER Label City: MIDLAND Label State: MI Label Zip Code: 48640-6030 Label Country: US Label Emergency Number: 517-636-4400 Year Procured: 1991 http://msds.pdc.comell.edu/msds/siri/gl37/ql 17.html 12/09/1999 DOW CHEMICAL U S A-- TETRACHLOROETHYLENE - TETRACHLOROETHYLE.. Page 1 of 4 DOW CHEMICAL U S A -- TETRACHLOROETHYLENE - TETRACHLOROETHYLENE,TECHNICAL MATERIAL SAFETY DATA SHEET NSN: 6810010993435 Manufacturer's CAGE: 96717 Part No. Indicator: A Part Number/Trade Name: TETRACHLOROETHYLENE General Information Item Name: TE.TRACHLOROETHYLENE,TECHNICAL Company's Name: DOW CHEMICAL U.S.A. Company's Street: CHEMICAL AND METALS DEPARTMENT Company's City: MIDLAND Company's State: MI Company's Country: US Company's Zip Code: 48674 Company's Emerg Ph #: 517-636-4400 Company's Info Ph #: 800-258-2436 Distributor/Vendor # 1: AMJAY CORP DBA AMJAY CHEMICALS Distributor/Vendor # 1 Cage: 64184 Record No. For Safety Entry: 007 Tot Safety Entries This Stk#: 007 Status: SE Date MSDS Prepared: 29FEB96 Safety Data Review Date: 11FEB98 Supply Item Manager: CX MSDS Preparer's Name: UNKNOWN MSDS Serial Number: BGLSV Specification Number: ASTM D 4376-94 Spec Type, Grade, Class: NONE Hazard Characteristic Code: T4 Unit Of Issue: DR ' Unit Of Issue Container Qty: 700 LBS Type Of Container: DRUM Net Unit Weight: 700 LBS NRC/State License Number: NOT RELEVANT Ingredients/Identity Information ------------------------------------------------------- --------------------------------- Proprietary: NO Ingredient: PERCHLOROETHYLENE (TETRACHLOROETHYLENE) (SARA 313) (CERCLA) Ingredient Sequence Number: 01 Percent: 99.9 NIOSH (RTECS) Number: KX3850000 CAS Number: 127-18-4 OSHA PEL: 100 PPM, Z-2 ACGIH TLV: 25PPM/100STEL,A3; 96 Other Recommended Limit: NONE RECOMMENDED Physical/Chemical Characteristics Appearance And Odor: CLEAR, COLORLESS LIQUID - IRRITATING ODOR Boiling Point: 250F,121C Melting Point: -8F, -22C Vapor Pressure (MM Hg/70 F) : 13 @ 68F Vapor Density (Air=1) : 5.76 Specific Gravity: 1.619 Decomposition Temperature: UNKNOWN Evaporation Rate And Ref: UNKNOWN Solubility In Water: 0.015 % @ 25C/77F Percent Volatiles By Volume: 99.9 Viscosity: UNKNOWN Radioactivity: NOT RELEVANT Corrosion Rate (IPY) : UNKNOWN Fire and Explosion Hazard Data http://msds.pdc.comell.edu/msds/siri/q420/q1 54.html 12/09/1999 DOW CHEMICAL U S A-- TETRACHLOROETHYLENE - TETRACHLOROETHYLE.. Page 2 of 4 Flash Point: NONE Lower Explosive Limit: NOT RELEVANT Upper Explosive Limit: NOT RELEVANT Extinguishing Media: WATER SPRAY, CARBON DIOXIDE, FOAM OR DRY CHEMICAL FOR SURROUNDING FIRE. USE WATER SPRAY TO COOL FIRE EXPOSED CONTAINERS. Special Fire Fighting Proc: WEAR PROTECTIVE CLOTHING AND NIOSH-APPROVED SELF-CONTAINED BREATHING APPARATUS. HAZARDOUS DECOMPOSITION PRODUCTS MAY BE FORMED. Unusual Fire And Expl Hazrds: TOXIC AND CORROSIVE GASES MAY BE FORMED. Reactivity Data ------------- Stability: YES Cond To Avoid (Stability) : EXCESSIVE HEAT, OPEN FLAMES, WELDING ARCS, DIRECT SUNLIGHT, ULTRAVIOLET SOURCES Materials To Avoid: STRONG ALKALIS, STRONG OXIDIZING AGENTS, AMINES, ALUMINUM POWDER, MAGNESIUM POWDER, ZINC POWDER, SODIUM, POTASSIUM Hazardous Decomp Products: HYDROGEN CHLORIDE, PHOSGENE, CARBON MONOXIDE, CARBON DIOXIDE, CHLORINE Hazardous Poly Occur: NO Conditions To Avoid (Poly) : NOT RELEVANT ----------------------------------------____ Health Hazard Data ----------------------------------------------------------------__ LD50-LC50 Mixture: LD50 (ORAL, RAT) IS >5000 MG/KG. Route Of Entry - Inhalation: YES Route Of Entry - Skin: YES Route Of Entry - Ingestion: NO Health Haz Acute And Chronic: TARGET ORGANS:CNS, LIVER, KIDNEYS, RESPIRATORY SYSTEM. ACUTE- MAY BE ABSORBED THROUGH SKIN. MAY CAUSE EYE IRRITATION & PAIN. ASPIRATION HAZARD IF SWALLOWED. EXCESSIVE INHALATION MAY CAUSE CNS EFFECTS, MYOCARDIAL IRRITABILITY. CHRONIC- MAY CAUSE LIVER & KIDNEY DAMAGE BASED ON ANIMAL STUDIES. Carcinogenicity - NTP: YES Carcinogenicity - IARC: NO Carcinogenicity - OSHA: NO Explanation Carcinogenicity: CARCINOGEN PER MSDS. Signs/Symptoms Of Overexp: IRRITATION, HEADACHE, DIZZINESS, NAUSEA, VOMITING, DROWSINESS, TEARNING, BLURRED VISION, PAIN, IRREGULAR HEARTBEAT Med Cond Aggravated By Exp: INDIVIDUALS WITH PRE-EXISTING DISEASES OF THE EYE, SKIN, RESPIRATORY TRACT, LIVER, KIDNEYS, CNS MAY HAVE INCREASED SUSCEPTIBILITY TO THE TOXICITY OF EXCESSIVE EXPOSURES. Emergency/First Aid Proc: GET MEDICAL HELP IF SYMPTOMS PERSIST. INHALED:MOVE TO FRESH AIR. PROVIDE CPR/OXYGEN IF NEEDED. EYES:IMMEDIATELY FLUSH WITH WATER FOR 15 MINUTES. HOLD EYELIDS OPEN. SKIN:WASH WITH PLENTY OF SOAP & WATER. ORAL:DO NOT INDUCE VOMITING. GET MEDICAL ATTENTION IMMEDIATELY. ----------------------------------------------- Precautions for Safe Handling and Use Steps If Matl Released/Spill: WEAR PROTECTIVE EQUIPMENT. VENTILATE AREA. ABSORB SPILL WITH INERT MATERIAL SUCH AS SAND OR USE PUMP. PLACE IN A CONTAINER FOR DISPOSAL. CLEAN AREA THOROUGHLY TO REMOVE RESIDUAL CONTAMINATION. PREVENT RUNOFF FROM ENTERING SEWERS OR WATERWAYS, Neutralizing Agent: NOT RELEVENT Waste Disposal Method: DISPOSE OF IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS. RECYCLE OR CONTRACT WITH A LICENSED WASTE DISPOSAL AGENCY. Precautions-Handling/Storing: STORE IN COOL, VENTILATED AREA, AWAY FROM FLAMES & INCOMPATIBLE MATERIALS. KEEP CONTAINER TIGHTLY CLOSED. DO NOT STORE IN ALUMINUM CAN OR PLASTIC. Other Precautions: AVOID BREATHING VAPORS. DO NOT GET IN EYES, ON SKIN OR ON CLOTHING. WASH THOROUGHLY AFTER HANDLING AND BEFORE EATING OR DRINKING. DO NOT EAT OR DRINK NEAR THIS PRODUCT. ----------------------------------------- Control Measures Respiratory Protection: IF ENGINEERING CONTROLS DO NOT MAINTAIN AIRBORNE http://msds.pdc.comell.edu/msds/siri/g420/q 154.htm1 12/09/1999 DOW CHEMICAL U S A-- TETRACHLOROETHYLENE - TETRACHLOROETHYLE.. Page 3 of 4 CONCENTRATIONS TO AN ACCEPTABLE LEVEL, A NIOSH-APPROVED AIR-SUPPLIED RESPIRATOR MUST BE WORN. Ventilation: USE GENERAL OR LOCAL EXHAUST VENTILATION TO MEET TLV REQUIREMENTS. Protective Gloves: NEOPRENE Eye Protection: SAFETY GLASSES WITH SIDE SHIELD/GOGGLES Other Protective Equipment: EYE BATH, SAFETY SHOWER, WASHING FACILITIES Work Hygienic Practices: OBSERVE GOOD INDUSTRIAL HYGIENE PRACTICES AND RECOMMENDED PROCEDURES. Suppl. Safety & Health Data: NOTE TO PHYSICIAN: IN CASE OF INGESTION, GASTRIC LAVAGE MAY BE USED. THE USE OF AN INTRATRACHEAL TUBE PREVENTS ASPIRATION. INDIVIDUALS INTOXICATED SHOULD BE HOSPITALIZED FOR OBSERVATION AND DELAYED EFFECTS ON BLOOD, HEART AND LUNGS. HYDROCARBONS MAY SENSITIZE HEART TO CATECHOLAMINES. - -------------------- Transportation Data ----------------------------------------------- Trans Data Review Date: 98042 DOT PSN Code: NYB DOT Proper Shipping Name: TETRACHLOROETHYLENE DOT Class: 6.1 DOT ID Number: UN1897 DOT Pack Group: III DOT Label: KEEP AWAY FROM FOOD DOT/DoD Exemption Number: NOT RELEVANT IMO PSN Code: OJV IMO Proper Shipping Name: TETRACHLOROETHYLENE IMO Regulations Page Number: 6264 IMO UN Number: 1897 IMO UN Class: 6.1 IMO Subsidiary Risk Label: - IATA PSN Code: XOW IATA UN ID Number: 1897 IATA Proper Shipping Name: TETRACHLOROETHYLENE IATA UN Class: 6.1 IATA Label: TOXIC AFI PSN Code: XOW API Prop. Shipping Name: TETRACHLOROETHYLENE AFI Class: 6.1 AFI ID Number: UN1897 AFI Pack Group: III AFI Special Prov: P5, N36 AFI Basic Pac Ref: A10.5 Additional Trans Data: REPORTABLE QUANTITY (RQ) : 100 POUNDS. THIS IS REPORTABLE QUANTITY. Disposal Data Disposal Data Review Date: 88228 Rec # For This Disp Entry: 03 Tot Disp Entries Per NSN: 003 Landfill Ban Item: YES Disposal Supplemental Data: UPDATE PER OSHA HCS MSDS DTD 10 APRIL 85 IN CASE OF ACCIDENTAL EXPOSURE OR DISCHARGE, CONSULT HEALTH AND SAFETY FILE FOR PRECAUTIONS. 1st EPA Haz Wst Code New: U210 1st EPA Haz Wst Name New: TETRACHLOROETHYLENE; 1, 1,2,2- TETRACHLOROETHENE 1st EPA Haz Wst Char New: TOXIC (T) 1st EPA Acute Hazard New: NO ------------------------------------------------------------ Label Data Label Required: YES Technical Review Date: 11FEE98 Label Date:. 29FEB96 MFR Label Number: UNKNOWN Label Status: G Common Name: TETRACHLOROETHYLENE http://msds.pdc.comell.edu/msds/siri/g420/gl54.html 12/09/1999 DOW CHEMICAL U S A-- TETRACHLOROETHYLENE - TETRACHLOROETHYLE.. Page 4 of 4 Signal Word: WARNING! Acute Health Hazard-Moderate: X Contact Hazard-Moderate: X Fire Hazard-None: X Reactivity Hazard-None: X Special Hazard Precautions: TARGET ORGANS:CNS, LIVER, KIDNEYS, RESPIRATORY SYSTEM. ACUTE- MAY BE ABSORBED THROUGH SKIN. MAY CAUSE EYE IRRITATION & PAIN. ASPIRATION HAZARD IF SWALLOWED. INHALATION MAY CAUSE CNS EFFECTS. CHRONIC- MAY CAUSE LIVER & KIDNEY DAMAGE. STORE IN VENTILATED AREA, AWAY FROM FLAMES & INCOMPATIBLES. ABSORB SPILL WITH INERT MATERIAL/USE PUMP. PLACE IN A CONTAINER FOR DISPOSAL. FIRST AID- GET MEDICAL HELP IF SYMPTOMS IMMEDIATELY FLUSH WITH WATER FOR 15 MINUTES. HOLD EYELIDS OPEN. SKIN:WASH WITH PLENTY OF SOAP & WATER. ORAL:DO NOT INDUCE VOMITING. GET MEDICAL ATTENTION IMMEDIATELY. Protect Eye: Y Protect Skin: Y Protect Respiratory: Y Label Name: DOW CHEMICAL U.S.A. Label Street: CHEMICAL AND METALS DEPARTMENT Label City: MIDLAND Label State: MI Label Zip Code: 48674 Label Country: US Label Emergency Number: 517-636-4400 Year Procured: 1998 4 http://msds.pdc.comell.edu/msds/siri/g420/g 154.html 12/09/1999 • METHYL ALCOHOL Page I of 7 Please reduce your browser font size for getter viewing and printing. 24 Hour Ernorgoeney Telephone:908-859-2161 CMUMEC:1800424.93DD ai rospona In Coned nMSDSMaterial,Sat # Data Sheet CANUTEC:6t3.998€66ti Ouuldo U.S and Conodn Chomtreci 202-4W-7616 From: Mallinekrodt Baker,Inc. _. _._ __..._......_._ .._._.. 222 tied Schaal lane MALLINCKRODT 413NSwr woT>w CEtiw.hiTF1FC,caratiTEr,3ntl National Phillipsburg,NJ 08*65 Rmonse C cn,Crcmorgon-cy n�mb�rs o used orly in Mr.event*i chemoa!errorg Ives involving:r upol.lu ilk lire.expo-Am,ar uCCir4nl in'rOlvin g CNgrrvr„-rlr Al nari"emergency quesiimns should be directed 1a Cusio;:ner Service(1-803-582.2637)for assistance. METHYL ALCOHOL MSDS Number: M2015---Effective Date: 12108196 1. Product Identification Synonyms: Wood alcohol; methanol; carbinol CAS No.: 67-56-1 Molecular Weight: 32.04 Chemical Formula: CH30H 147, Product Codes: J.T. Baker: 5217, 5370, 5794, 5807, 5811, 5842, 5869, 9049, 9063, 9067, 9069, 9070, 9071, 9073, 9075,9076, 9077, 9091, 9093, 9096, 9097, 9098, 9263, 9893 Mallinckrodt: 3004, 3006, 3016, 3017, 3018, 3024, 3041, 3701, 4295, 5160, 8814, H080, H488,H603, V079, V571 2. Composition/Information on Ingredients Ingredient CAS No Percent Hazardous --------------------------------------- ------------ ------- --------- Methyl Alcohol 67-56-1 100% Yes 3. Hazards Identification Emergency Overview -------------------------- POISONl.DANGER! VAPOR HARMFUL. MAY BE FATAL OR CAUSE BLINDNESS IF SWALLOWED. HARMFUL IF INHALED OR ABSORBED THROUGH SKIN. CANNOT BE MADE NONPOISONOUS. FLAMMABLE LIQUID AND VAPOR. CAUSES IRRITATION TO SKIN, EYES AND RESPIRATORY TRACT. AFFECTS THE LIVER. http://www.jtbaker.com/msds/m20l5.htm 12/13/1999 ' METHYL ALCOHOL Page 2 of 7 J.T. Baker SAF-T-DATA(tm) Ratings (Provided here for your convenience) ----------------------------------------------------------------------------------------------------------- Health Rating: 3 - Severe(Poison) Flammability Rating: 4 - Extreme (Flammable) Reactivity Rating: 1 - Slight Contact Rating: 1 - Slight Lab Protective Equip: GOGGLES & SHIELD; LAB COAT & APRON; VENT HOOD; PROPER GLOVES; CLASS B EXTINGUISHER Storage Color Code: Red(Flammable) ----------------------------------------------------------------------------------------------------------- Potential Health Effects ---------------------------------- Inhalation: A slight irritant to the mucous membranes. Toxic effects exerted upon nervous system, particularly the optic nerve. Once absorbed into the body, it is very slowly eliminated. Symptoms of overexposure may include headache, drowsiness, nausea, vomiting, blurred vision,blindness, coma, and death. A person may get better but then worse again up to 30 hours later. Ingestion: Toxic. Symptoms parallel inhalation. Can intoxicate and cause blindness. Usual fatal dose: 100-125 milliliters. Skin Contact: Methyl alcohol is a defatting agent and may cause skin to become dry and cracked. Skin absorption can occur; symptoms may parallel inhalation exposure. Eye Contact: , Irritant. Continued exposure may cause eye lesions. Chronic Exposure: Marked impairment of vision and enlargement of the liver has been reported. Repeated or prolonged exposure may cause skin irritation. Aggravation of Pre-existing Conditions: Persons with pre-existing skin disorders or eye problems or impaired liver or kidney function may be more susceptible to the effects of the substance. 4. First Aid Measures Inhalation: Remove to fresh air. If not breathing, give artificial respiration. If breathing is difficult, give oxygen. Call a physician. Ingestion: Induce vomiting immediately as directed by medical personnel. Never give anything by mouth to an unconscious person. Skin Contact: Remove any contaminated clothing. Wash skin with soap or mild detergent and water for at least 15 minutes. Get medical attention if irritation develops or persists. Eye Contact: Immediately flush eyes with plenty of water for at least 15 minutes, lifting lower and upper eyelids occasionally. Get medical attention immediately. 5. Fire Fighting Measures http://www.jtbaker.com/msds/m20l5.htm 12/13/1999 j METHYL ALCOHOL Page 3 of 7 Fire: Flash point: 12C (54F) CC Autoignition temperature: 464C (867F) Flammable limits in air%by volume: lel: 7.3; uel: 36 Flammable. Explosion: Above flash point, vapor-air mixtures are explosive within flammable limits noted above. Moderate explosion hazard and dangerous fire hazard when exposed to heat, sparks or flames. Sensitive to static discharge. Fire Extinguishing Media: Water spray, dry chemical, alcohol foam, or carbon dioxide. Special Information: In the event of a fire, wear full protective clothing and NIOSH-approved self-contained breathing apparatus with full facepiece operated in the pressure demand or other positive pressure mode. Use water spray to blanket fire, cool fire exposed containers, and to flush non-ignited spills or vapors away from fire. Vapors can flow along surfaces to distant ignition source and flash back. 6. Accidental Release Measures Ventilate area of leak or spill. Remove all sources of ignition. Wear appropriate personal protective equipment as specified in Section 8. Isolate hazard area. Keep unnecessary and unprotected personnel from entering. Contain'and recover liquid when possible. Use non-sparking tools and equipment. Collect liquid in an appropriate container or absorb with an inert material (e. g., vermiculite, dry sand, earth), and place in a chemical waste container. Do not use combustible materials, such as saw dust. Do not flush to sewer! J. T. Baker SOLUSORB(tm) solvent adsorbent is recommended for spills of this product. 7. Handling and Storage Protect against physical damage. Store in a cool, dry well-ventilated location, away from any area where the fire hazard may be acute. Outside or detached storage is preferred. Separate from incompatibles. Containers should be bonded and grounded for transfers to avoid static sparks. Storage and use areas should be No Smoking areas. Use non- sparking type tools and equipment, including explosion proof ventilation. Containers of this material may be hazardous when empty since they retain product residues(vapors, liquid); observe all warnings and precautions listed for the product. 8. Exposure Controls/Personal Protection Airborne Exposure Limits: For Methyl Alcohol: - OSHA Permissible Exposure Limit(PEL): 200 ppm (TWA) -ACGIH Threshold Limit Value (TLV): http://wwwjtbaker.com/msds/M20l5.htm 12/13/1999 ' METHYL ALCOHOL Page 4 of 7 200 ppm (TWA), 250 ppm (STEL) skin Ventilation System: A system of local and/or general exhaust is recommended to keep employee exposures below the Airborne Exposure Limits. Local exhaust ventilation is generally preferred because it can control the emissions of the contaminant at its source, preventing dispersion of it into the general work area. Please refer to the ACGIH document, Industrial Ventilation, A Manual of Recommended Practices , most recent edition, for details. Personal Respirators (NIOSH Approved): If the exposure limit is exceeded, wear a supplied air, full-facepiece respirator, airlined hood, or full-facepiece self-contained breathing apparatus. Skin Protection: Rubber or neoprene gloves and additional protection including impervious boots, apron, or coveralls, as needed in areas of unusual exposure. Eye Protection: Use chemical safety goggles. Maintain eye wash fountain and quick-drench facilities in work area. 9. Physical and Chemical Properties Appearance: Clear, colorless liquid. Odor: Characteristic odor. Solubility: Miscible in water. Specific Gravity: 0.8 pH: No information found. % Volatiles by volume @ 21C(70F): 100 Boiling Point: 64.5C(147F) Melting Point: -98C (-144F) Vapor Density(Air=1): 1.1 Vapor Pressure (mm Hg): 97 @ 20C (68F) Evaporation Rate (BuAc=1): 5.9 10. Stability and Reactivity Stability: Stable under ordinary conditions of use and storage. Hazardous Decomposition Products: May form carbon dioxide, carbon monoxide, and formaldehyde when heated to decomposition. Hazardous Polymerization: Will not occur. http://www.jtbaker.com/msds/m20l5.htm 12/13/1999 METHYL ALCOHOL Page 5 of 7 Incompatibilities: Strong oxidizing agents such as nitrates,perchlorates or sulfuric acid. Will attack some forms of plastics, rubber, and coatings. May react with metallic aluminum and generate hydrogen gas. Conditions to Avoid: Heat, flames, ignition sources and incompatibles. 11. Toxicological Information Methyl Alcohol(Methanol) Oral rat LD50: 5628 mg/kg; inhalation rat LC50: 64000 ppm/4H; skin rabbit LD50: 15800 mg/kg; Irritation data-standard Draize test: skin, rabbit: 20mg/24 hr. Moderate; eye, rabbit: 100 mg/24 hr. Moderate; Investigated as a mutagen,reproductive effector. --------\Cancer Lists\------------------------------------------------------ ---NTP Carcinogen--- Ingredient Known Anticipated IARC Category ------------------------------------ ----- ----------- ------------- Methyl Alcohol (67-56-1) No No None 12. Ecological Information Environmental Fate: y When released into the soil, this material is expected to readily biodegrade. When released into the soil, this material is expected to leach into groundwater. When released into the soil, this material is expected to quickly evaporate. When released into the water, this material is expected to have a half-life between 1 and 10 days. When released into water, this material is expected to readily biodegrade. When released into the air, this material is expected to exist in the aerosol phase with a short half-life. When released into the air,this material is expected to be readily degraded by reaction with photochemically produced hydroxyl radicals. When released into air, this material is expected to have a half-life between 10 and 30 days. When released into the air, this material is expected to be readily removed from the atmosphere by wet deposition. Environmental Toxicity: This material is expected to be slightly toxic to aquatic life. 13: Disposal Considerations Whatever cannot be saved for recovery or recycling should be handled as hazardous waste and sent to a RCRA approved incinerator or disposed in a RCRA approved waste facility. Processing,use or contamination of this product may change the waste management options. State and local disposal regulations may differ from federal disposal regulations. Dispose of container and unused contents in accordance with federal, state and local requirements. 14. Transport Information http://www.jtbaker.com/msds/m20l5.htm 12113/1999 METHYL ALCOHOL Page 6 of 7 Domestic (Land, D.O.T.) ----------------------- Proper Shipping Name: METHANOL Hazard Class: 3 UN/NA: UN1230 Packing Group: II Information reported for product/size: 350LB International(Water,I.M.O.) ----------------------------- Proper Shipping Name: METHANOL Hazard Class: 3.2, 6.1 UN/NA: UN1230 Packing Group: II Information reported for product/size: 350LB 15. Regulatory Information --------\Chemical Inventory Status - Part 1\--------------------------------- Ingredient TSCA EC Japan Australia ----------------------------------------------- ---- --- ----- --------- Methyl Alcohol (67-56-1) Yes Yes Yes Yes --------\Chemical Inventory Status - Part 22\--------------------------------- --Canada-- Ingredient Korea DSL NDSL Phil. - ----------------------------------------------- ----- --- ---- ----- Methyl Alcohol (67-56-1) Yes Yes No Yes --------\Federal, State & International Regulations - Part 1\---------------- -SARA 302- ------SARA 313------ Ingredient RQ TPQ List Chemical Catg. ----------------------------------------- --- ----- ---- -------------- Methyl Alcohol (67-56-1) No No Yes No --------\Federal, State & International Regulations - Part 2\---------------- -RCRA- -TSCA- Ingredient CERCLA 261.33 8 (d) ----------------------------------------- ------ ----- ------ Methyl Alcohol (67-56-1) 5000 U154 No Chemical Weapons convention: No TSCA 12 (b) : No CDTA: No SARA 311/312 : Acute: Yes Chronic: Yes Fire: Yes Pressure: No Reactivity: No (Pure / Liquid) Australian Hazchem Code: 2PE Poison Schedule: S6 WHMIS: This MSDS has been prepared according to the hazard criteria of the Controlled Products Regulations (CPR) and the MSDS contains all of the information required by the CPR. 16. Other Information http://www.jtbaker.com/msds/m20l5.htm 12/13/1999 ' METHYL ALCOHOL Page 7 of 7 NFPA Ratings: Health: 1 Flammability: 3 Reactivity: 0 Label Hazard Warning: POISON! DANGER! VAPOR HARMFUL. MAYBE FATAL OR CAUSE BLINDNESS IF SWALLOWED. HARMFUL IF INHALED OR ABSORBED THROUGH SKIN. CANNOT BE MADE NONPOISONOUS. FLAMMABLE LIQUID AND VAPOR. CAUSES IRRITATION TO SKIN, EYES AND RESPIRATORY TRACT. AFFECTS THE LIVER. Label Precautions: Keep away from heat, sparks and flame. Keep container closed. Use only with adequate ventilation. Wash thoroughly after handling. Avoid breathing vapor. Avoid contact with eyes, skin and clothing. Label First Aid: If swallowed, induce vomiting immediately as directed by medical personnel. Never give anything by mouth to an unconscious person. In case of contact, immediately flush eyes or skin with plenty of water for at least 15 minutes while removing contaminated clothing and shoes. Wash clothing before reuse. If inhaled, remove to fresh air. If not breathing give artificial respiration. If breathing is difficult, give oxygen. In all cases get medical attention immediately. Product Use: Laboratory Reagent. Revision Information: New 16 section MSDS format, all sections have been revised. Disclaimer: *#4 Mallinckrodt Baker, Inc. provides the information contained herein in good faith but makes no representation as to its comprehensiveness or accuracy. This document is intended only as a guide to the'appropriate precautionary handling of the material by a properly trained person using this product. Individuals receiving the information must exercise their independent judgment in determining its appropriateness for a particular purpose. MALLINCKRODT BAKER, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION ANY WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE WITH RESPECT TO THE INFORMATION SET FORTH HEREIN OR THE PRODUCT TO WHICH THE INFORMATION REFERS. ACCORDINGLY, MALLINCKRODT BAKER, INC. WILL NOT BE RESPONSIBLE FOR DAMAGES RESULTING FROM USE OF OR RELIANCE UPON THIS INFORMATION. Prepared by: Strategic Services Division Phone Number: (314) 539-1600 (U.S.A.) http://www.jtbaker.com/msds/m20l5.htm 12/13/1999 4.0 Personnel Training Requirements Consistent with OSHA's 29 CFR 1910.120, all site personnel are required to be trained in accordance with the standard. At a minimum all personnel are required to be trained to recognize the hazards on-site,the provisions of this HASP,and responsible personnel. Prior to arrival on-site, site workers designated to work in the Exclusion and Contaminant Reduction Zones must meet OSHA's 29 CFR 1910.120 paragraph (e) (3) requirements. The employer should be able to provide a document certifying the each general site worker has received a minimum of 24 hours of instruction off site, and 24 hours of training for any workers who are on site only occasionally for a specific task. If an individual employee has work experience and/or training that is equivalent to that provided in the initial training, an employer may waive the 24-hour training so long as that equivalent experience is documented or certified. Each site worker should be able to provide documents certifying 8 hours of annual refresher training. Consistent with the OSHA 29 CFR 1910.120 paragraph (e) (8), individuals designated as site supervisors require an additional 8 hours of"Supervisor Training". The following individuals are identified as site supervisors: Name Title None Identified 4 5.0 Personnel Protective Equipment To Be Used This section designates the EPA Levels of Protection (A-D) and modifications for each task. 0 Level A- Should be worn when the highest level of respiratory, skin, and eye protection is needed. • Level B - Should be worn when the highest level of respiratory protection is needed, but a lesser level of skin protection. Level B is the primary level of choice when encountering unknown environments. • Level C- Should be worn when the criteria for using air-purifying respirators are met, and a lesser level of skin protection is needed. • Level D- Should be worn only as a work uniform and not in any area with respiratory or skin hazards. It provides minimal protection against chemical hazards: The site level of protection is LEVEL-D-modified Discuss justification for the selected level of protection: Protect against splash, ingestion and contact hazards from free liquids and impacted soil and groundwater. Wear nitrile gloves and tyvek overalls. Don hardhat, steel-toed shoes, and safety glasses, goggles or face shield. With gloved hands, avoid touching or placing hands near your face and do not handle food. E Personal Protective Equipment(PPE): • nitrile gloves • hardh • safe1y glasses. goggles or face shield • steel-toed shoes • Tyvek overalls Inspection and Maintenance of PPE(if applicable): • Check nitrile gloves and tyvek overalls for wear,tear and soil. Replace as needed. 6.0 Medical Surveillance Requirements Medical monitoring programs are designed to track the physical condition of employees on a regular basis as well as survey pre-employment or baseline conditions prior to potential exposures. Site workers required to don a respirator must be included in a medical monitoring program. Will site workers be required to don a respirator?No If yes, all site workers must receive approval to wear a respirator from a medical doctor (MD) specializing in industrial health and safety prior to conducting site operations. For NUSCO employees, contact the Berlin Health Unit at NUSW, Headquarters for additional information. The industrial health and safety MD will decide"on the content and frequency of medical monitoring requirements. For site workers required to don Level C or higher PPE, attach approvals and health summaries from the industrial health and safety MD. During site activities, air monitoring will be conducted. If levels of target compounds approach the action levels, the work area will be evacuated to allow levels to dissipate. If levels remain at or above the action levels, the use of respiratory protection will be required. For requirements, refer to the discussion under the "yes"response. Appropriate respiratory protection will be determined by the site HSO. 7.0 Frequency and Types of Air Monitoring Air monitoring is used to identify and quantify the airborne contaminants in order to verify and determine the level of worker protection needed. Is there a need to monitor airborne contaminants?Yes If yes, complete this section. • Air Monitoring Instrument: Photoionization Detector Hazard Monitored: Organic Vapors Monitoring Frequency and Location: Monitor breathing zone once per morning and afternoon or when organic vapors are suspected. F Action Level and Action: 10 parts per million as total volatiles as nerchloroethylene (PCE). Evacuate area and evaluate source of organic vapors After a review with the HSO it may be necessary to don Level C Respirators Reporting Format: Field notebook 8.0 Site Control Measures This section defines measures and procedures for maintaining site control. The work site is divided into one of three work zones. • Exclusion Zone-The area where contamination is either known or likely to be present, or because of activity,will provide a potential to cause harm to personnel. Entry into this zone requires use of the selected PPE. • Contaminant Reduction Zone-The area where personnel conduct personal and equipment decontamination. It is essentially a buffer zone between contaminated areas and clean areas. Activities conducted here require personal protection as defined in the decontamination plan. • Support Zone-The area is situated in clean areas where the chance to encounter hazardous materials or conditions is minima,., Describe the location, extent and standing orders for each work zone: Exclusion Zone-Immediate area around soil boring and monitoring well Contaminant Reduction Zone- Soil sampling area, groundwater sampling area, decontamination area, and drilling equipment decontamination area This zone is within a 75-foot radius from the soil boring or monitoring well. The person-in-charge will monitor site boundaries to prevent intrusion by unqualified individuals or individuals not outfitted with the appropriate PPE. Support Zone-The area greater than 75 feet from site sampling activities Attach a map and directions to the nearest medical facility. Describe emergency alarm procedures for the work site: The person-in-charge will instruct personnel in the event of an emergency. If an evacuation of the work area is necessary all personnel must immediately report to the substation entrance for roll call and further instructions. G " Directions Print Page 1 of 2 Figure 8.1 -Map to the nearest medical facility. 159 .74 Barber Hill 4Rd MapBlastl 194 5 85 FROM: so Barber Hill Road Substation 29 South Windsor, CT 44 TO: A la S* 84 Manchester Memorial Hospital 1 Haynes St 71 Haynes Street 9 Uoinh oh m; Manchester, CT Your trip's estimated travel time is 15 minutes for 7.58 miles of travel, total of 10 steps. These driving directions are provided only as a rough guideline. Please be sure to call ahead to verify the location and directions . Step 1 Begin at 1 Barber Hill Rd on Barber Hill Rd and go South for 0.3 miles (elapsed distance: 0.3 mi) Step 2 Turn Left on Miller Rd and go Southeast for 0.3 miles (elapsed distance: 0.6 mi) Step 3 Turn right on CT-74,Ellington Rd and go Southwest for 2.0 miles (elapsed distance: 2.6 mi) Step 4 Turn left on CT-194,Sullivan Ave and go South for 0.3 miles (elapsed distance: 2.9 mi) Step 5 Bear right on Buckland Rd and go South for 1.3 miles (elapsed distance: 4.2 mi) Step 6 Continue on Buckland St and go South for 0.9 miles (elapsed distance: 5.1 mi) .../dpmt.mb?CMD=PATH&IC=41.853754%3A-72.529885%3A621%3A1+Barber+Hill+Rd 12/13/1999 ' Directions Print Page 2 of 2 Step 7 Turn left on Tolland Tpke and go East for 0.3 miles (elapsed distance: 5.4 mi) Step 8 Continue on N Main St and go Southeast for 2.1 miles (elapsed distance: 7.4 mi) Step 9 Turn right on Haynes St and go West for 0.2 miles (elapsed distance: 7.6 mi) Step 10 Turn right and go Northwest for less than 100 feet to 71 Haynes St (elapsed distance: 7.6 mi) US maps Copyright GDT 1999.Canadian maps Copyright DMTI,Inc. 1999. IN nor'T All Rights Reserved.Use Subject to License. . ' s-F.2 .. .../dPrnt.mb?CMD=PATH&IC=41.853754%3A-72.529885%3A621%3A1+Barber+Hill+Rd 12,'13/1999 9.0 Decontamination Plan This section provides a step by step representation of both personnel and equipment decontamination procedures as well as the disposition of decontamination wastes. Discuss personnel decontamination: Discard used nitrile gloves and tvvek overalls. Wash hands before handling food. Discuss equipment decontamination: If hand-held equipment is used. Decontamination should be conducted as follows --- "Consumer" detergent wash - followed by a distilled water rinse - followed by a methanol rinse - followed by a final distilled water rinse - allow utensil to air dry Drilling equipment is steam cleaned until all visible traces of soil are removed A dedicated disposable bailer is used at each well and discarded after well development and sampling_ Discuss disposition of decontamination wastes: Excess soil and water generated during the site assessment will be containerized in 55-gallon drums After activities are completed, the soils and waters will be characterized by comparing_parameter levels to RCRA hazardous waste limits The results will be used to determine appropriate disposal options 10.0 Emergency Response/Contingency Plan Description of the evacuation routes/procedures fdv;the site: All personnel must meet at the entrance to the Substation for roll call and further instructions. Emergency contacts(also see Section 2.0 Key Personnel): Organization Contact Telephone NUSCO,Environmental Ronald P. Klattenberg (860) 665-3627 Services Site Contact Tolland AWC (860) 872-8794 Ambulance Ambulance Service of (860) 647-9798 Manchester Police South Windsor 911 Fire South Windsor 911 State Police South Windsor 911 Hospital(For directions,see Figure Manchester Memorial Hosp. (860) 646-1222 8.1.) Poison Control Center 1-800-343-2722 Regional EPA (617) 565-3420 EPA Emergency Response (617) 860-4363 Team National Response Center 1-800-424-8802 Department of Environmental Connecticut (860)424-3333 Protection Center for Disease Control (404)488-4100 CHEMTREC 1-800-424-9555 H T � Any person who becomes ill or injured in the exclusion zone must be decontaminated to the maximum extent possible. If the injury or illness is minor, full decontamination should be completed and first aid administered prior to transport. If the patient's condition is serious, at least partial decontamination should be completed (i.e., complete disrobing of the victim and redressing in clean overalls or wrapping in a blanket). First aid should be administered-while awaiting an ambulance or paramedics. All injuries and illnesses must be reported to the project manager. Any person being transported to a clinic or hospital for treatment should take with them information on the chemical(s)they have been exposed to at the site. Any vehicle used to transport contaminated personnel must be treated and cleaned as necessary. Attach a map or provide a description of the location of emergency equipment/facilities: First Aid Kit-On NUSCO vehicle (#6162N09) Fire Extinguisher-On NUSCO vehicle(#6162N09) and the drill rig Telephone -On NUSCO vehicle (#6162N092 Spill Kits-On NUSCO vehicle(#6162N09) Eye Wash-Located in the Substation Control Room 11.0 Confined Space Entry Procedures A confined space is any space having limited or restricted means for entry or exit, large enough and so configured that an employee can bodily enter and perform assigned work, and not designed for continuous occupancy. Does site work include entry into a confined space? No If yes, follow the procedures outlined in NUSCO's "Accident Prevention Manual" under Section 1.15 Confined Space. 12.0 Spill Containment Program Discuss the spill containment program in place for activities at the site: Any rinsates generated decontamination procedures will be containerized and characterized to determine appropriate disposal options NUSCO vehicle (#6162N09) is equipped with a spill kit and instructions for incidental oil spills For large spills, on-site personnel will notify appropriate company officials and State authorities and provide assistance as needed I Y � 13.0 Hazard Communication In order to comply with 29 CFR 1910.1200 (Hazard Communication) the following written Hazard Communication Program has been established. All site workers will be briefed on this program, and have an opportunity to review this written copy. • Container Labeling All containers used in conjunction with the site work will be inspected: (1) all unattended,non-empty,covered containers will be clearly labeled as to the contents; (2) the appropriate hazard warnings will be noted; and (3)the name of a contact person will be listed. • Material Safety Data Sheets(MSDSs) Copies of MSDSs for all hazardous materials used in conjunction with the site work or known or suspected in the work zones will be maintained as part of this HASP. The MSDSs will be available to all site workers for review during the work shift. • Employee Information Prior to starting work, each site worker will receive a site health and safety orientation known as a"tailboard discussion"and will be given information on the following: (1) an overview of the requirements contained in the Hazard Communication Standard, 29 CFR 1910.1200; (2) chemicals present in their workplace operations; (3) location and availability of the HASP; (4) physical and health effects of the hazardous chemicals; (5) methods and observation techniques used to determine the presence or release of hazardous chemicals; (6) how to lessen or prevent exposure to these hazardous chemicals through usage of control/work practices and personal protective equipment; (7) emergency procedures to follow if they are exposed to these chemicals; (8) how to read labels and review MSDSs to obtain appropriate hazard information; and (9) location of the MSDS file and hazardous chemical list. J 1 � • Concurrence On_/ /_, the following site workers and visitors took part (Number) in a "tailboard discussion" discussing the nine (9)elements under the preceding section, Employee Information. , NUSCO Project Lead, conducted the "tailboard discussion". Print Name Affiliation Signature Date Print Name Affiliation Signature Date Print Name Affiliation Signature Date Print Name Affiliation Signature Date Print Name Affiliation Signature Date Print Name Affiliation Signature Date Print Name Affiliation Signature Date Print Name Affiliation Signature Date K y (- Print Name Affiliation Signature Date Print Name Affiliation Signature Date Print Name Affiliation Signature Date Print Name Affiliation Signature Date Print Name Affiliation Signature Date Print Name Affiliation Signature Date Print Name Affiliation / 1 Signature Date Print Name Affiliation Signature Date Print Name Affiliation Signature Date Print Name Affiliation Signature Date L IHSCIENTISTS ENGINEERS E N V I R O N M E N T A L GIS SPECIALISTS Janus 7, 2000 Post-it®Fax Note 7671 Date pages► To �„( _ t^ From Co./Dept. i CO 7 ISLAND DOCK ROAD Mr. Robert Deptula, R.S. Phone# Phone# Environmental Health Officer HADDAM CT 06438 Town of South Windsor Fax# Fax# 1.860.345.4578 1540 Sullivan Ave. 1.800.524.9256 South Windsor, CT 06074 FAX 1.860.345.3854 Re: raft Consent Order Miller and Barber Hill Roads 600 CHARLTON STREET SOUTHBRIDGE MA 01550 Dear Mr. Deptula: 1.508.764.8755 As you requested, Marin Environmental, Inc. (Mann) has prepared preliminary costs for 1.800.676.3707 conducting tasks required by the above Draft Consent Order. FAX 1.508.764.4054 Sampling of the approximately 15 water supply wells, including a summary report, is 114 SOUTH STATE STREET estimated to be $2,000. Costs for laboratory analysis (EPA Method 624 GC/MS), if included, would be approximately$100 per sample. PO BOX 1414 CONCORD NH 03302 A scope of work, as referenced under Section 4B of the Order, is estimated to be$1,500. 1.603.224.8871 1,800,636.6030 An engineering report, as referenced under Section 4D, is estimated to be $2,500. The FAX 1.603.224.8688 report would include a hydrogeologic evaluation, a present-worth analysis and schedule. The estimated cost assumes that information is readily available and that no additional test borings or wells will be required. Costs for preparation of the water supply plans and 1700 HEGEMAN AVENUE specifications would not be included. COLCHESTER VT 05446 1.802.655.0011 Should you have any questions or require anything further, feel free to contact us at(860) 345- 4578. 1.800.520.6065 i FAX 1.802.655.6076 Sincerely, INTERNET Marin Environmental, Inc. WWW.MARI NENV.CO.M Robert D. Bristol, LEP Senior Hydrogeologist 99014/AO09rd101.doc 40wN Seq< 05 r„ �� 0-1de SoatA ?Vzfuik�t y" 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CT 06074-2786 AREA CODE 860/644-2511,EXTENSION 279 �sox•coN FAX 8601644-3781 BARRY D. GULIANO Town Attorney June 26, 2001 Bureau of Water Management Connecticut Dept. of Environmental Protection 79 Elm Street Hartford, CT 06106-5727 Re: Water Line Extension, Barber Hill/Miller Road Area To Whom It May Concern: I am the Town Attorney for the Town of South Windsor, Connecticut. By this letter, I hereby certify that it is my opinion that all necessary easements, rights of way and site acquisitions have been acquired for the installation of the water main pipe on the above-referenced project. This opinion and certification is based upon the representations of Fuss & O'Neill, Inc., the designer of the project, that the water main will be entirely within the paved portion of Miller Road and Barber Hill Road. Very truly yours 4. Gu O.tl N se 44 Town ap S.OUA Vzow&ot O a y" 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074-2786 AREA CODE 860/644-2511,EXTENSION 279 SOR•CO FAX 860/644-3781 BARRY D. GULIANO Town Attorney June 26, 2001 Bureau of Water Management Connecticut Dept. of Environmental Protection 79 Elm Street Hartford, CT 06106-5727 Re: Water Line Extension, Barber Hill/Miller Road Area To Whom It May Concern: I am the Town Attorney for the Town of South Windsor, Connecticut. By this letter, I hereby certify that it is my opinion that all necessary easements, rights of way and site acquisitions have been acquired for the installation of the water main pipe on the above-referenced project. This opinion and certification is based upon the representations of Fuss & O'Neill, Inc., the designer of the project, that the water main will be entirely within the paved portion of Miller Road and Barber Hill Road. Very truly yours aWtorne To Fuss&O'Neill InC. Consulting Engineers 146 Hartford Road,Manchester,CT 06040-5921 TEL 86o 646.2469 Fax 86o 643-6313 INTERNET:www.fussandoneill.com Other Offices: July 5, 2001 West Springfield,Massachusetts Trumbull,Connecticut Providence,Rhode Island Mr. Gil Richards Bureau of Water Management Department of Environmental Protection 79 Elm Street Hartford, CT 06106 RE: WS-163 Water Main Extension Miller Road&Barber Hill Road Dear Gil: Bids for the referenced contract were received and opened by the Town of South Windsor on June 26, 2001. We are submitting all necessary documents for you to authorize awarding the referenced contract. The following documents are enclosed for your consideration: l. Two(2) copies of the bid tabulation; 2. Two (2) copies of the proposal of the lowest responsive bidder; 3. A copy of a letter addressed to the Town of South Windsor, indicating the name of the lowest qualified and responsive bidder that we have recommended for award of the contract; 4. One (1) copy of the bid advertisement, and 5. One(1)copy of Proj ect Cost Estimate Form. A signed copy will be sent to you by the Town. Please notify us of your decision to authorize awarding of this contract. Thank you for your consideration. Sincerely, Thomas DeSantos Civil Engineer III /ew Enclosures ala 36b'-Dcptul&',South-`V fnd§or mealth Dept- G:\P2000\301\A10\TPD070201_DEP.wpd Cones.(HQ) BID TABULATION BARBER HILL ROAD WATER MAIN EXTENSION SOUTH WINDSOR JUNE 26,2001 ENGINEERS ESTIMATE BID#1 BID#2 BID#3 BID#4 Paganelli Construction Spazz rind Construction Folsom Construction CFL ITEM DESCRIPTION UNIT QUANTITY $KNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE 02221.2 TEST PITS C.Y. 30 $15.00 $450.00 $78.00 $2,340.00 $50.55 $1,500.00 $200.00 $6,000.00 $20.00 $600.00 02221.3 ROCK EXCAVATION C.Y. 100 $35.00 $3,5W.00 $70.00 $7,000.00 $100.00 $10,000.00 $275.00 $27,500.00 $1.00 $100.00 02221A TRENCH EXCAVATION FOR SERVICES L.F. 700----WOO 14,000.00 $34.00 $23,800.00 10.W $7,000.00 7.00 $18,900.00 $7.00 $4,900.00 02221.5 GRAVEL FILL C.Y. 30 $10.00 $300.00 $18.00 $540.00 $25.00 $750.W $28.W $840.00 $15.00 .00 02291.1 HAYBALE EROSION CHECKS L.F. 100 $3.00 $300.00 $4.00 $400.00 $5.00 $500.00 $3.00 $300.00 $2.50 $250.00 02292.1 BARRIER FENCE L.F. 200 $3.00 $600.00 $2.W $400.00 $5.00 $1,000.00 $3.00 $6W.00 $7.00 1AW.00 02293.1 SILT FENCE L.F. 1000 $2,50 $2=00 $2.00 $2,WO.W $3.00 $3,W0.W $2.00 $2,0W.W $2.50 $2=00 02410.1 SIX INCHUNDERDRAIN L.F. 40 $35.00 $1,400.00 $40.W $1,6W.W $25.00 $1,WO.W .50 9W.W .W ,4W.W 02483.1 OAKTREES EA 5 $300.00 $1.500.00 $415.00 $2,075.00 $450.00 $2.250.00 $550.00 $2,750.00 $615.00 $3,075.00 024832 PINE TREES FA 5 $2W.0 $1,0W.W $155.00 $775.00 $170.00 $850.W $825.00 $4,125.00 $200.00 $1,000.00 02483.3 ICOMPACT BURNING BUSHES FA 10 $80.00 $800.00 $35.00 $350.W .W $400.00 .W $550.00 $100.00 1,WO.00 02483A SPREADINGYEWS EA 10 $80.00 $800.00 $44.00 $440.00 $50.00 $500.00 $55.00 $550.00 $110.00 $1.100.00 02483.5 GRAVELICRUSHED STONE SURFACE REPAIR S.Y. 50 $10.00 $500.00 $14.W $700.00 $10.00 $500.W .W ,000.W 10.00 $500.W 02527.1 BITUMINOUS CONCRETE CURB LF. 11W .W $3,300.00 $3.00 $3,300.00 $4.00 $4,400.00 $4.40 $4,840.00 $3.00 $3,3W.W 02551.1 DRIVEWAY APRON OVERLAY S.Y. 1W .W $600.00 $14.00 $1,400.00 $20.00 $2,000.W $17.30 $1,730.00 $7.80 $780.00 02551.2 DRIVEWAY REPLACEMENT S.Y. 1W $16.00 $1,600.00 $20.00 $2,000.W .00 $3,W0.00 $18.25 $1,825.W .W =00 02555.1 CONCRETE DRIVEWAYS S.Y. 2W $55.00 $11,000.00 $60.00 $12,000.00 $80.00 $16,W0.00 $32.W $6,400.00 $65.00 $13,000.W 02575.1 TEMPORARY PAVEMENT REPAIR L.F. 2650 $10.W 6,500.W $13.00 $34,450.W $20.W $53,000.W .W $74,200.W $4.W $10,6W.W 02575.2 PERMANENT PAVEMENT REPAIR LF. 2650 $1&00 $39,750.00 $16.00 $42,4W.W $20.00 $53,WO.00 $18.W $47,700.00 $7.00 $18AW.W 02575.3 MISCELLANEOUS BITUMINOUS CONCRETE TON 20 $45.00 $900.00 $75.00 $115W.00 $100.00 $2,000.00 $101.00 $2,020.00 $56.00 1,120.01) 02585.1 MAINTENANCE AND PROTECTION OF TRAFFIC L.S. 1 $20,01)0.00 $20,000.00 $11,367.99 $111367.99 $21.500.00 $21,500.00 $29588.00 $29,W.00. $10,000.00 $10,000.01) 02645.1 BL.OWOFFS EA. 1 WO0000 $2,000.00 $1,800.00 $1,800.01) $500.001 $500,00 $960.40 $960.40 $1,300.00 $1,300.55 02670.1 POTABLE WELL ABANDONMENT FA. 36 $1,400.00 $50AM.00 12W.00 $432W.00 $1,200.00 $132W.00 $11=00 $47,700.00 $3,950.W $127,8W.00 02713.1 8"DUCTILE IRON WATER MAIN L.F. 880 $45.00 $39,600.00 $46.00 $40,480.00 $39.00 $34,320.00 $46.50 $40.920.00 $84.00 $73,920.00 027132 12"DUCTILE IRON WATER MAIN L.F. 1440 96DO $79,200.00 $56.00 $80,640.00 $56.00 $80,640.01) $53.00 $76,320.00 $100.00 $1144,000.01) 02713.3 8"GATE VALVE EA. 2 $650.00 $1AW.00 $1,0013.00 $2,000.00 $570.00 $1.140.01) $1,450.00 $2,900.00 $1,060.00 $2,120.00 02713.4 12'GATEVALVE FA 2 1.500.00 ,000.00 1,8013.00 ,600.00 $1,055.00 $2,110.00 1,700.00 $3,400.00 $1,8W.00 $3,720.00 02718.1 1"COPPER WATER SERVICE CONNECTION LF. 2300 $30.00 $69,000.00 .W $46.000.00 $16.50 $37,950.00 $26.00 $59,800.00 $46.00 $105,8W.00 02718.2 1 11r COPPER WATER SERVICE CONNECTION L.F. 1000 $34.00 $34,000.00 $20.00 $20,000.00 $20.00 $20,01)(3.00 $32.00 $32,01)0.00 $48.00 $48,000.00 02718.3 PREPARE METER AND CONNECT SERVICE EA 36 $250.013 $9,000.00 $5W.W $18.000.00 .W 18,000.00 $675.00 $24,300.01) $480.00 $17280.00 02718.4 METER PIT FA. 2 $700.00 $1,400.00 $600.00 $1=00 $800.00 $1,6W.00 $1,075.00 $2,150.00 $1,300.00 $2.600.00 OZ718.5 TEMPORARY POTABLE WATER GAL. 500 $1.00 $SOO.00 .W $1,000.00 $1.00 $500.W 1.115 $575.00 $1.00 $500.00 02718.E INTERIOR PLUMBING MODIFICATIONS FA 15 $500.00 $7,500.00 $450.00 $6,750.00 $5W.0 $7,500.W $1,8W.W $27,000.00 $500.00 $7,500.00 02726.1 LEACHING FACILITY REPAIR LF. 80 $30.00 $2,400.00 $20.W. $1,6W.00 $15.00 $121313.00 $24.00 $1,920.00 $1.00 $80.00 03316.1 MISCELLANEOUS CONCRETE C.Y. 10 $1W.W 1,OW.00 $260.001 $2,6W.00 $500:00 $5,91313.00 .W .00 1.W tO.W TOTAL BASE BID $431,900.00 $419,9W.99 $438,410.001 $558.291AOI $613,485.00 ALTERNATES 02232.1 ROLLED GRAVEL BASE S.Y. 300 $9.00 $2.700.00 $12.00 $3,61k.00 $3.00 $900.00 $12.00 $3,600.00 .85 1,455.00 0ZMA PROCESSED AGGREGATE BASE S.Y. 300 $10.00 $3,000.00 $10.00 $3,000.00 $5.65 $1,695.00 $15.00 $45W.00 $11.00 $3,300.00 02575A 3"BITUMINOUS CONCRETE S.Y. 300 $9.00 $2,700.00 $11.00 $3,300.00 $9.00 $2,700.00 .W ,6W.00 $14.80 $4A40.00 02575.5 FULL WIDTH 11-10OVERLAY S.Y. 5900 $5.00 $29,500.00 $525 $30,975.00 $527 $31,093.01) $8.50 $50,150.00 $4.80 $28,320.00 02575.6 MILLING S.Y. 5900 $6.00 $35AW.00 $2.50 $14,750.00 $223 $13,157.00 $2.75 $16,225.00 $2.20 $12,980.00 02579.1 4"YELLOW PAVEMENT MARKINGS L.F. 48M .30 1,440.00 $0.25 $12W.00 $025 $1,ZW.66 $025 1,MOD .22 1,056.00 025792 12"WHITE PAVEMENT MARKINGS L.F. 40 $3.00 $120.00 $3.50 $140.01) $1.00 $40.00 $1.00 $40.00 $2.65 $106.00 02544.1 FIRE HYDRANT EA. 3 $2,000.00 ,WO.00 $4,500.00 13,500.00 .700.00 $8,100.00 $7.500.00 $22,500.00 $5A70.W $16,410.00 TOTAL ALTERNATE BID $80.M.001 $70,465.001 $58,885.001 $104,815.001 $68,067.00 SUPPORTING DOCUMENTATION BID BOND YES YES YES YES DOCUMENTS TYPED YES YES YES YES P-1 OR P-7 LICENSE SUBMITTED YES YES YES YES BALANCED BID FORM YES YES YES NO PROJECT REFERENCES YES YES YES YES LIST OF SUBCONTRACTORS YES YES YES YES NUMBER OF UNBALANCED BID ITEMS 0 0 0 4 % BID ITEMS UNBALANCED 0% 0% 0% 11% %OF BID UNBALANCED(Eng.Est cost less Bid cost divided by Total Base Bid for Unbalanced bid items. 0% 1 1 0% 1 1 0% 1 1 1% G:VD2 W 01301%101SpecsIBIDTAB.gpw 06/21/01 THU 08:21 FAX 18606230660 PAGANELLI CONSTRUCTION Z 003/004 r , PENAL SUhi FOR2,1 BID BOND BIDDERN * and AddEess Paganelli Construction Corporation 3 Ucar Street Suffield, CT 060 SIMTY-war.e an of Pri c' a of Business): United States Fidelity and Guaranty Company Franklin Oa s ice ar ' 124 rove treet, FranKiin, Q DER (Name and Address)-. Town or bouChWindsor 1540 Sullivan Avenue South Windsor, CT 060/4 BID DUE DATE: June 26, 2001 PROJECT(Brief Description Including Location): Miller Road &.,Barker Hill Road Water Main Extension, South Windsor B0IND BOND NUMBER: N/A DATE(Not later than Bid due date): June 26, 2001 PENAL SUM: Five Percent of Amount Bid (5%) (Words) (Figures) IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative, BIDDER •SURETY Paganelli Construction Cor oration P (Seal) United States Fidelity and Guazaa5y Compar Bidder's Name and Corporate Seal Surety's Name and Corporate Seal + " ` •• 2 . By. ) By: ef -G`, S&L and Title Patr.Lcia K. IS1$K%1fureA-R4dTA (Attach'Power of Aittorney)ac t Attest: ACes Signatu d Title G p54;qwk i e and Title Note: (1) Above addresses are to be used far giving required notice, - (2) Any singular reference to Bidder; Surety, OWNER or other parry shall be considered plural where applicable. E]'CDC N0. 1910-28-C (1996 Edition) 00410-1 106121A01 THU 08:21 FAX 18606230660 PAGANELLI CONSTRUCTION Z 004/004 PENAL SUM FORM I. Bidder and Surety, jointly and severally, bind S. Notices required hereunder shall be in writing themselves, their heirs, executors, administrators, sent to Bidder and Surety at their respectiv a ddressed ses successors and assigns to pay to OWNER upon default shown on the face of this Bond. Such notices may be of Bidder the penal sum set forth on the face of this sent by personal delivery, commercial courier or by Bond. United States Registered or Certified Mail, return ? receipt requested,postage pre-paid, and shall be deemai Default of Bidder shall occur upon the failure of to be effective upon receipt by the parry concerned. Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in 9. Surety shall cause to be attached to this Bond a writing by OWNER) the executed Agreement required current and effective Power or Attorney evidencing the by the Bidding Documents and any performance and authority of the officer, agent or representative who payment Bonds required by the Bidding Documents. executed this Bond on behalf of Surety to execute, sej and deliver such Bond and bind the Surety thereby. 3_ This obligation shall be null and void if: 3.1. OWNER accepts Bidder's Bid and Bidder 10. This Bond is intended to conform to all applicable delivers within the time required by the Bidding statutory requirements. Any applicable requirement of Documents(or any extension thereof agreed to any applicable statute that has been omitted from this in writing by OWNER) the executed Bond shall be deemed to be included herein as if set Agreement required by the Bidding Docutents forth at length. If any provision of this Bond conflicts and any performance and payment Bonds with any applicable statute, then the provision of said required by the Bidding Documents, or statute shall govern and the remainder of this Bond that 3.2. AlI Bids are rejected by OWNER, or is not in conflict therewith shall continue in full force 3.3. OWNER fails to issue a Notice of Award to and effect, Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to 11. The term"Bid" as used herein includes a Ed, offer in writing by Bidder and, if applicable, or proposal as applicable. consented to by Surety when required by paragraph 5 hereof). 4. Payment under this Bond will be due and payable upon default by Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from OWNER, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due. 5. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by OWNER and Bidder,provided that the total time for issuing Noice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety's written consent. 6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received byBidder and Surety and in no case later than one year after Bid due date. 7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located. EJCDC N0. 1910-28-C (1996 Edition) 0041N2 Date t1IZ3�cm Hour I -- 0-k� t-- To WH YOU WERE OUT M e �E�G✓i Sam Phone Area Code Phone Number �s Telephoned Returned Call Left Package ���. (t Please Call Was In Please See Me Will Call Again Will Return Impo/rta_n�t ' i Message � L a � � 1 Signed (pep re ��► 1 �c✓J(� ��� � ✓ Tr"G"�' 1 Date y(3l� Hours. y� �� / G•Df�,�n,> f�� AVERY FORM NO. PRINTED IN USA TO WHIL - YOU WERE OUT ul S�`'�L>eS3 b 1 Of rit�✓1, -�;' Of Phone ILLI�� 0&s3U Area Code Phone Number 12,1,70 S Hour °zz Telephoned Returned Call Left Package Date Please Call Was In Please See Me To Will Call Again Will Return Important WHIL 'YOU WERE OUT Messa M Of Phone Area Code Phone Number Telephoned Returned Call Left Package Please Call Was In Please See Me Will Call Again Will Return Important Signed Message `"EPY FORM NO.50-736 PRINTED IN USA Signed AVERY FORM NO.50-736 PRINTED IN USA