Loading...
HomeMy WebLinkAboutMisc Correspondence 00 Main Street (2) O 1 "CONSULTING ENVIRONMENTAL ENGINEERS" 25 Terrace Drive ASSOCIATES, I N C. Vernon, Connecticut 06066 Telephone(203)872-2703 A.Richard Lombardi,P.E.,President James C.Sommers,L.S.,Vice President March 7, 1989 Robert Deptula, R.S. Environmental Health Officer Town of South Windsor 1540 Sullivan Ave. South Windsor, CT 06040 Re: Septic Modification for Peter Nelson Main Street, South Windsor ARL Project #88-1782 Dear Bob, We are forwarding plans on behalf of Mr. Peter Nelson for review and approval. They incorporate a modification and expansion of the existing septic system due to a proposed addition on the house. We are requesting that you send your approval letter to us. If you have any questions please call. Thank you. Sincerely, A.R. LOMBARDI ASSOCIATES, INC. Steven G. Heninger SGH/kc Enclosures WASTEWATER•WATER SUPPLY •HAZARDOUS WASTES • WATER RESOURCES• GEOHYDROLOGY SITE PLANNING •DRAINAGE •ENVIRONMENTAL IMPACT ASSESSMENT•SURVEYING r � n V/ S-0tdA W o � C U w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �NdSOR-CO AREA CODE 203/644-2511 March 20, 1989 Steven G. Heninger A.R. Lombardi Associates, Inc. 25 Terrace Drive Vernon, CT 06066 Re: Septic Modification for Pete Nelson Main Street, South Windsor Project Number 88-1782, Dated 2/1/89 Dear Steve, The above referenced plans have been reviewed and approved by this office. The renovation should function properly as proposed. Please advise Mr. Nelson that any material removed (septic tank and or leaching trenches ) is considered sewage and should be treated as such. Robert Depttila, R.S. Environmental Health Officer RD: ls i