Loading...
HomeMy WebLinkAboutWell New 346 Long Hill Road State of Connecticut WELL COMPLETION REPORT DO NOT FILL IN WATER RESOURCES COMMISSION This report trust be completed and submitted 223 State Office Building to State Water Resources Commission no later State Well Hartford, Connecticut than 30 days after completion of well. 01L Other No. _ WELL OWNER JOs gph A. Kizis 346 Long Hill Rd• • i South Win dsor ndsor, Conn. WELL Street Address Clty and Town DRILLER Stavens Bros, Lake St. , Vernon, Conn, Name Street Address City and Town PROPOSED USE OR USES (Check): Domestic Farm Business O ❑ Irrigation ❑ Establishment ❑ Municipal ❑ Industrial [j Test Well CASING DETAILS YIELD TEST WATER LEVEL SCREEN DETAILS E] Boiled (measure rom and su ace) Length: 41 Feet or 4 10 ❑ Pumped Hours Static: Feet Make: Diameter 73 Inches or During Yield Compressed Air' 50 G.P.M. Test: 40 Feet Length Ft. Slot Size Kind: steel DRILLING EQUIPMENT Yield: Cable Tool Other (Specify) Diameter: 5Q.P.M Rotary In. .............................. TOTAL DEPTH OF WELL___73 --FEET WELL LOG Depth From Give description of formations penetrated, such as: peat, silt, sand Ground Surface granite, etc. Include size of gravel (diameter) and sand (fine, mediwmracove arse),.'color ha of material structure (loose,packed,cemented,soft,hard). For example:0 ft.to 27 ft.fine granite. , packed,yellow sand;27 ft.to 134 ft. gray 0 FT.to 30 FT- Sand & Gravel 30 FT-to 73 FT Bedrock FT.to FT. FT.to FT. t nG GS er—W C' FT.to FT. - FT.to FT. "y" 1 FT.to FT. t L r:; FT. to FT. i YIELD TEST DATA IN G.P.M - If Yield Was Tested'At different Depths During Drilling List Below f : FT. G.P.M. 1. FT G.P.M. FT. G.P.M. ---- --- F'Fi'. G.P.M. ----- ----- Date Weii Was Completed: Nov. 6. 1965 Date of Report NO Town Permit Number:__ 78 Weil Driller (Signature) 1978 LOCATION OF WELL: TOWN OF So fill/ SKETCH SHOWING LOCATION OF PREMISES IN TOWN:-- (Show distance and direction from road intersection or other landmark.) // INDICATE NORTH DIAGRAM SHOWING LOCATION OF WELL ON PREMISES: ri . 71? ROUTE DIRECTIONS FOR REACHING WELL SITE FROM NEAREST CITY OR VILLAGE CENTER: I� Ckl-s- W