Loading...
HomeMy WebLinkAboutWell New 252 Buckland Road S State of Connecticut WILL COMPLETION REPORT DO NOT FILL IN WATER RESOURCES COMMISSION This report must be completed and submitted 223 State Office Building State Well No.`� L to State Water Resources Commission no later Hartford, Connecticut than 30 days after completion of well. Other No.'-- WELL OWNER William Start 252 Budiland_ Rd. Wapping, Conn. Name WELL street Address City and Town DRILLER Stavens Bros. , Inc® Lake St; , Vernon, Conn. Name street Address ¢ity and Town PROPOSED USE OR USES (Check): �© domestic ❑ Farm Business U Irrigation ❑ Establishment ❑ Municipal ❑ Industrial (.] Test Well CASING DETAILS YIELD TEST WATER LEVEL . SCREEN DETAILS ❑ Bailed (measure; from land surface) Length: 40 Feet or Static: [I Pumped Hours 2(} Feet Make: or During Yield Diameter:. inches Compressed Air Airl.. g G.P.M. Test: Feet Length Slot IO 9 ft. Size DRILLING EQUIPMENT Kind: Cable Tool . steel Yield: G.P.M Ea ❑ Other (SpecifY) Diameter: In. 8 Rotary . ................ TOTAL DEPTH Of WELL-125 —FEET WELL LOG p"th From Give description of formations penetrated, such as: peat, silt,sand, gravel,clay, hardpan, shale,sandstone, Grqund Surface granite, etc. Include size of gravel (diameter) and;sand (fine,;medium,'coarse), color of material, structure (loose,packed,cemented,soft,hard).for example:0 ft.to 27 ft.fine, packed,yellow sand;27 ft.to 134 ft.gray granite. a FT.to S FT. Rocky Siib s o f t 8 FT.to30 FT. Hardpan 3a FT.tol25FT. Gray Bedrock FT.to FT. FT.to FT. 1•; FT. to FT. FT.to FT. FT. to FT. YIELD TEST DATA IN G.P.M. If Yield Was Tested At Different Depths During Drilling, List Below FT G.P.M. FT G.P.M. FT. G.P.M. ------ FT G.P.M. -- Date Well Was Completed: May 19, 1969 Date of Report June 16, 1969 Town Permit Number: 130 # Well Driller_. (Signature) 7Q�� ,