Loading...
HomeMy WebLinkAboutMisc Correspondence 0000 Barber Hill Roa 110W N S£q o , � �S_au� V4601�� -fi w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR•CO TELEPHONE (860) 644-2511 May 4, 2006 Mr. Jan Czeczotka, Supervising Environmental Analyst North Central District Remediation Section DEP 79 Elm Street Hartford, CT 06106-5122 Mr. Jan Czeczotka, The attached correspondence was inadvertently sent out with the incorrect date on it. The letter was actually typed and mailed on April 17, 2006. I apologize for any inconvenience this may have caused. Yours truly, A,"04�t Robert Deptula, R.S. Environmental Health Officer RD/cm Cc: Jeffrey Doolittle, Town Engineer Marcia A. Banach, Director of Planning SOW N SFq x � Wo� aps-ate V&U&ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 r4,SOR•co TELEPHONE (860) 644-2511 February 7, 2006 Mr. Jan Czeczotka, Supervising Environmental Analyst North Central District Remediation Section DEP 79 Elm Street Hartford, CT 06106-5122 Mr. Jan Czeczotka, As you may be aware, Northeast Utilities is currently planning on enlarging its substation located on Barber Hill Road in South Windsor. In 1999 this substation was investigated as a possible source of the solvent trichloroethylene and 1, 2, dichloropane found in drinking water wells in the area. (DEP subsurface investigation: Barber Hill Road vicinity, South Windsor, Ct. solvent contamination detected in residential potable wells. This report was to Michael Senyk, Environmental Analyst II from Frank Bartolomeo, Environmental Analyst III and dated September 2, 1999.) Included in this report was a recommendation that Northeast Utilities conduct a subsurface investigation located at the substation on Barber Hill Road. This correspondence inquires as to whether Northeast Utilities has conducted an investigation acceptable to the DEP. Does the DEP have any recommendations regarding the proposed substation expansion based on presently available information? If you have any questions, please call me at 644-2511, extension 248. Yours truly, A"14) Robert Deptula, R.S. Environmental Health Officer - RD cm- - - - - - Cc: Jeffrey Doolittle, Town Engineer Marcia A. Banach, Director of Planning owl PROP• SE'D 12 RCP P ROPOSED 20 D FT WI E Ir '7�110 139 LF AT 0 DRIVEWAY PROCESS AGG�EGATE M.05 !PROPOSED 24' RCP 36 LF AT 1.4% SOW N S. 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 r�OSOR-CO TELEPHONE (860) 644-2511 F.ebu996 ' Mr. Jan Czeczotka, Supervising Environmental Analyst North Central District Remediation Section DEP 79 Elm Street Hartford, CT 06106-5122 Mr. Jan Czeczotka, :As you may be aware, Northeast Utilities is currently planning on enlarging its .substation located on Barber Hill Road in South Windsor. In 1999 this-substation was investigated,as a-possible source of the solvent - trichloroethyiene and 1,2, dichloropane found in drinking water wells in the area. (DEP subsurface.investigation: Barber Hill Road vicinity, South Windsor, Ct. solvent contamination detected in residential potable wells. This report was to MichaelSenyk, Environmental Analyst II from Frank.Bartolomeo, Environmental Analyst III and dated September 2,.1999.) Included in this report was a recommendation that Northe st Utilities conduct a subsurface investigation located at the substation on Baer Hill Road. This correspondence inquires as to whether Northeast Utilities has conducted an investigation acceptable to the DEP. Does,the DEP have any recommendations regarding the proposed substation expansion based on presently available information? If you have any questions,please call me at 644-2511, extension 248. Yours truly, � 1. S Robert Deptula, R.S. Environmental Health Officer cm Cc: Jeffrey Doolittle,Town Engineer Marcia A. Banach, Director of Planning