Loading...
HomeMy WebLinkAboutStreet Cut Permits 240 Chapel Road (2) 1700236 TOWN OF SOUTH WINDSOR, CT PERMIT NUMBER STREET CUT PERMIT DATE: 12/05/2017 GIS ID: 18000240 FEE: 0.00 MUNIS APPLICATION# 201701735 EXPIRATION DATE: 12/05/2018 APPLICANT LOCATION NAME: VMS CONSTRUCTION.COMPANY ADDRESS: 240`CHAPEL ROAD ADDRESS: 162 LAKE STREET, OWNER: DABROWSKI HIPOLIT C&BOZENA VERNON ROCKVILLE,CT 06066 56 FARM BROOK LANE SOUTH WINDSOR,CT 06074 PHONE 860-871-0278 WORK DESCRIPTION: EXCAVATE TO OPEN UP MANHOLE TO ALLOW FOR LINING WORK TO BE PERFORMED NO`FEE TOWN PROJECT APPLICANT AGREES TO FURNISH THE TOWN OF SOUTH WINDSOR THE AMOUNT OF BOND REQUIRED AND TO REIMBURSE THE TOWN OF SOUTH WINDSOR FOR ANY EXPENSES INCURRED BY THE TOWN FOR MAINTENANCE OR REPAIR,WORK IN CONNECTION WITH THIS PERMIT AND THE.APPLICANT IS FAMILIAR WITH AND WILL ABIDE BY THE RULES AND REGULATIONS FOR PERMITS AS OUTLINED IN THE TOWN OF SOUTH WIM'S STREET CUT PERMIT MANUAL. mo N - ISSUED DATE INSPECTED INSPECTED BY 12/5/2017 11:46 AM *** PERMIT TO BE KEPT ON JOB SITE AT ALL TIMES*** TOWN OF SOUTH WINDSOR INSPECTION REPORT PERMIT NO.:—flet9d CONTRACTOR: LOCATION: `l 0 C o TYPE OF WORK: Eyzaon 4e fz�rye a iT a kn IP Ac r o ;,74 I, oer,�C DATE INSP NEEDED: DATE INSP: z & INSPECTED BY: f5 1) WORK IN PROGRESS: G°-n) 1��ee/a c:r to 4 SEPTIC TANK PUMPED, SMASHED, FILLED WITNESSED ❑ YES ❑ NO AS-BUILT: INPUT: '. DATE: S/molloy/forms 2014 Town of South Windsor INPSECrION REPORT 14 a 00 ® ` 7J s APPLICATION FOR STREET EXCAVATION PERMIT 1100 ad 36 Appl. No. TOWN OF SOUTH WINDSOR PUBLIC WORKS DEPARTMENT Permit No. TOWN HALL 1540 SULLIVAN AVENUE SOUTH WINDSOR,CT 06074 FEE $60.00 Name of Firm_ VMS Construction Company Phone No. 860-871-0278 Address of Firm 162 Lake Street Vernon, CT Zip Code 06066 Location of proposed work 240 Chapel Road Describe fully nature.of permit requested Excavate to Open up Manhole to allow for lining work to be performed Starting date 12/11/17 Call Before You Dig No 20174701358 PLEASE NOTE: THE DEPOSIT FOR THE PERMANENT PAVEMENT PATCH AND CURB REPLACEMENT IS A PRELIMINARY ESTIMATE. THE APPLICANT IS RESPONSIBLE FOR THE FULL FINAL COST OF THE PERMANENT PATCH AND CURB REPLACEMENT,INCLUDING ANY INCREASES-IN PATCH AREA,CURB LENGTH,TRAFFIC CONTROL AND THE TOWN'S CONTRACT COSTS. THE PERMANENT PATCH IS TYPICALLY COMPLETED WITHIN A YEAR OF THE TEMPORARY PATCH BUT IT COULD BE LATER THAN A YEAR. Check Applicable: ❑ No Pavement,Curb or Sidewalk Cut El Pavement Cut ❑ Curb Cut ❑Sidewalk Cut ❑ Existing Driveway, No Changes ❑ Proposed Driveway Widening ❑ Proposed New Driveway Water Supply: ❑ Public Water ❑Well Sewage Service: ® Public Sewer ❑ Septic Show sketch of proposed work or fumish Indicate North This section to be filled out by Town two copies of separate drawing No.cuts Per Chapel Road Project Plans and Specifications Est. Patch Size(s) sf 0 Est. Pvt.Thickness in. Q ��e �Q� � ��,��� � Est.Patch Unit Price$ /sf Est.Patch Cost$ Est.Curb Replacement ft Est.Curb Unit Price$ /ft Est.Curb Cost$ Est.Sidewalk Replacement sf Est.Sidewalk Unit Price$ !sf Est.Sidewalk Cost$ Est.Traffic Hours hr Est.Traffic Unit Cost$ Ihr Est.Traffic Control$ Amt.of Deposit$ DRIVEWAYS must be 3ft or more from the property line per Total Due$ section 2.17 of the zoning regulations { ( ) Applicant is responsible for contacting the Police Dept.and C.B.Y.D )Cash Check# PERMIT SHALL BE KEPT ON JOBSITE AT ALL TIMES Paid By I AGREE TO FURNISH TO THE TOWN OF SOUTH WINDSOR THE AMOUNT OF BOND REQUIRED AND TO REIMBURSE THE TOWN OF SOUTH WINDSOR FOR ANY EXPENSES INCURRED BY THE TOWN FOR MAINTENANCE OR REPAIR WORK IN CONNECTION WITH THIS PERMIT AND THAT I AM FAMILIAR WITH AND WILL ABIDE BY THE RULES AND REGULATIONS FOR PERMITS AS OUTLINED IN THE TOWN OF SOUTH WINDSOR'S PERMIT Signed--�` Print Name Brett Adams Date: 11/30/17 Engineering/permits/Street Excavation Permit 2017