HomeMy WebLinkAboutStreet Cut Permits 75 Quail Run (2) 1800177 TOWN OF SOUTH WINDSOR, CT
PENT NUMBER STREET CUT PERMIT
DATE: 11/21/2018
GIS ID: 74400075 FEE: 50.00
MUNIS APPLICATION# 201802293 EXPIRATION DATE: 11/21/2019
APPLICANT LOCATION
NAME: HATHAWAY LANDSCAPING LLC ADDRESS:, 75 QUAIL RUN
ADDRESS: P O BOX 3153 OWNER: BUTLER JOSEPH J&PAMELA J
75 QUAIL RUN
VERNON,CT 06066'
PHONE
WORK DESCRIPTION: REMOVE&REPLACE 2'5'OF 8" CONCRETE SIDEWALK AT DRIVEWAY
ENTRANCE
APPLICANT AGREES TO FURNISH THE TOWN OF SOUTH WINDSOR THE AMOUNT OF BOND REQUIRED AND TO REIMBURSE
THE TOWN OF SOUTH WINDSOR FOR ANY EXPENSES INCURRED BY THE TOWN FOR MAINTENANCE OR REPAIR WORK IN
CONNECTION WITH THIS PERMIT AND THE APPLICANT IS FAMILIAR WITH AND WILL ABIDE BY THE RULES AND REGULATIONS
FOR PERMITS AS OUTLINED IN THE TOWN OF SOUTH WINDSOR'S STREET CUT PERMIT MANUAL.
p I to cl ig 111 /t �
ISSUED BY—J DATE INSPECTED INSPECTED BY
1 1/26/201 8 9:33AM *** PERMIT TO BE KEPT ON JOB SITE AT ALL TIMES***
TOWN OF SOUTH IA INDSOR INSPECTION REPORT
err No.: r o� CONTR M!;L
TYPE OF 1NQRK: �P �- r� ,j��� S ' " LS► Pt
DATE INSP NEED: BATE INSP:
INSPECTED BY:_
WORK IN .
PROGRESS: -5 S R 13- eL
V _ .!
SEP' C TMK PUMM- .SMASHED; FILLED WrMESSED EI-YES (�NO'
AS-BUILT:
INPUT: DATE:
* riwm=4TmofsaO WrW" -BVS&nbN Rftff14
APPLICATION FOR STREET EXCAVATION PERMIT
Appl. No. TOWN OF SOUTH WINDSOR PUBLIC WORKS DEPARTMENT Permit No.
TOWN HALL 1540 SULLIVAN AVENUE SOUTH WINDSOR,CT 060074 FEE $50.00
Name of Firm 1AA'T4A-\A;" 2G'�j9f CAL 1 L,�-- Phone No. &O 9,Y zqJ(,
Address of Firm L' - !2o r-:3/c 3 Zip Code /76
Location of proposed work '7 57 A 1
Describe fully nature of permit requested
�/ !2- W' c1 T7L �.�CE
Starting date % `9 Call Before You Dig No 3C%l S'1-/SO
PLEASE NOTE: THE DEPOSIT FOR THE PERMANENT PAVEMENT PATCH AND CURB REPLACEMENT IS A PRELIMINARY ESTIMATE. THE
APPLICANT IS RESPONSIBLE FOR THE FULL FINAL COST OF THE PERMANENT PATCH AND CURB REPLACEMENT,INCLUDING ANY
INCREASESJN PATCH AREA,CURB LENGTH,TRAFFIC CONTROL AND THE TOWN'S CONTRACT COSTS. THE PERMANENT PATCH IS
TYPICALLY COMPLETED WITHIN A YEAR OF THE TEMPORARY PATCH BUT IT COULD BE LATER THAN A YEAR.
Check Applicable: ❑No Pavement,Curb or Sidewalk Cut ❑ Pavement Cut ❑ Curb Cut 0 Sidewalk Cut
O Existing Driveway,No Changes ❑Proposed Driveway Widening ❑Proposed New Driveway
Water Supply: ❑Public Water ❑Well Sewage Service: ❑Public Sewer 0 Septic
Show sketch of proposed work or furnish Indicate North This section to be filled out by Town
two copies of separate drawing
No.cuts
s
Est. Patch Size(s) sf
Est.Pvt.Thickness in.
Est.Patch Unit Price
Est.Patch Cost$
Est.Curb Replacement ft
Est.Curb Unit Price
Est.Curb Cost
Est.Sidewalk Replacement sf
/ %r Est.Sidewalk Unit Price$ !sf
Est.Sidewalk Cost:$
�G� !I C r( ` i✓t�i,�'���- AT D12-1 v" Est.Traffic Hours hr
/ Est.Traffic Unit Cost$ lhr
Est.Traffic Control$
Amt.of Deposit$
DRIVEWAYS must be aft or more from the property line per Total Due$
section 2.17 of the zoning regulations
(
Applicant is responsible for contacting the Police Dept.and C.B.Y.D )Cash ( )Check#
PERMIT SHALL BE KEPT ON JOBSITE AT ALL TIMES Paid By
I AGREE TO FURNISH TO THE TOWN OF SOUTH WINDSOR THE AMOUNT OF BOND REQUIRED AND TO REIMBURSE THE TOWN OF SOUTH
WINDSOR F ANY EXPENSES INCUR D BY THE TOWN FOR MAINTENANCE OR REPAIR WORK IN CONNECTION WITH THIS PERMIT AND
THAT I AM LIAR WITH AND WILL DE BY THE RULES AND REGULATIONS FOR PERMITS AS OUTLINED IN THE TOWN OF SOUTH
WINDSOR' EET PE IT
Signed: _ Print Name Date: av
Engineering/permits/Street Excavation Permit 2017