Loading...
HomeMy WebLinkAboutStreet Cut Permits 35 Ferry Lane (2) 1400107 TOWN OF SOUTH WINDSOR, CT PERMIT NUMBER STREET CUT.PERMIT DATE: 05/12/2014 GIS ID:32700035 FEE: 25.00 MUNIS APPLICATION# 201400539 ,_, EXPIRATION DATE: 05/12/2015 I� APPLICAN LOCATION NAME: BOUTIN&SONS .,. Y t� ADDRESS 35 PE RY LANE ADDRESS: 121 WINDSORVILI1 RQAJ ; L t COHNtOBERT S&JEAN A BROAD BROOK,C. 1 23. 3 M yy� Y LANE e polalkY x '' r SfJi T VINDSOR,CT 06074 PHONE 860-623-2526 s WORK DESCRIPTION: DAX APPLICANT AGREES TO FURNISH THEE OI Q SO WI1,TI�SOH1 AI�OUNF QF 6OND REQUIRED AND TO REIMBURSE THE TOWN OF SOUTH WINDSOR FOR ANY X EN ES INC�I11 1 �t I11E�TO N FOj �vIAINTENANCE OR REPAIR WORK IN CONNECTION WITH THIS PERMIT AND T)E AT LIO T ISM F I1;I R WTH Al..,D,p LL ABIDE BY THE RULES AND REGULATIONS FOR PERMITS AS OUTLINED IN THE TO SOUTH NDSR} STI ET G1JT FEN MIT MANUAL. ISSUED BY DATE TED INSPECTED BY 5/12/2014 9:00 AM *** PERMIT TO BE KEPT ON JOB SITE AT ALL TIMES*** lk ya S,r"1 Y r ,y �" FrkiYZ4 � ,w }$ :i s t dt R l All :.y �� Ft��s7#R`� t� i �✓ � 3��t£ rto ✓.t �t� ., r� '4. yt ,f } a bra ¢ ✓ - } �� LAV y .,`' & ff ra TOWN OF SOUTH WINDSOR INSPECTION REPORT PERMIT NO.: ��1� CONTRACTOR: /)p LOCATION: TYPE OF WORK: DATE INSP NEEDED: DATE INSP: i INSPECTED BY: WORK IN PROGRESS: I SEPTIC TANK PUMPED, SMASHED, FILLED WITNESSED ❑ YES ❑ NO AS-BUILT: j i I INPUT: L _ DATE:TI s 1 i S/2014 Town of South Windsor INPSECTION REPORTI14 I I i I i i i i i i i I i I .. APPLICATION FOR STREET EXCAVATION PERMIT Appl. No. TOWN OF SOUTH WI DSOR PUBLIC WORKS DEPARTMENT Permit No, TOWN HALL 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 FEE $25.00 Name of Firm ed O Phone No. Address of Firm , eg",q 73 rac 1X„ _GT Zip Code al Location of proposed work Js�/ ? errr� 1 �� Describe fully nature of permit requested :r y ;S'T�=//ino �f/a_ �� l7 ri/;eE Starting dateG�h Call Before You Dig No ,,L..,7 el— De.-m� PLEASE NOTE: THE DEPOSIT FOR THE PERMANENT PAVEMENT PATCH AND CURB REPLACEMENT IS A PRELIMINARY ESTIMATE. THE APPLICANT IS RESPONSIBLE FOR THE FULL FINAL COST OF THE PERMANENT PATCH AND CURB REPLACEMENT,INCLUDING ANY INCREASES IN PATCH AREA,CURB LENGTH,TRAFFIC CON ROL AND THE TOWN'S CONTRACT COSTS. THE PERMANENT PATCH 1S TYPICALLY COMPLETED WITHIN A YEAR OF THE TEMPORARY PATCH BUT IT COULD BE LATER THAN A YEAR. Check Applicable: ❑ No Pavement, Curb or Sidewalk Cut ❑ Pavement Cut - Curb Cut ❑ Sidewalk Cut ❑ EAsting Driveway, No Changes ❑ Proposed Driveway Widening 0 Proposed New Driveway Water Supply: ❑ Public Water ❑ Well Sewage Service: ❑ Public Sewer ❑ Septic Show sketch of proposed work or furnish Indicate North This section to be filled out by Town two copies of separate drawing No.cuts Est.Patch Size(s) sf Est_Pvt:Thickness in. Est. Patch Unit Price$ /sf Est.Patch Cost$ Est.Curb Replacement ft Est.Curb Unit Price$ /ft Est.Curb Cost$ Est.Sidewalk Replacement sf Est.Sidewalk Unit Price Est.Sidewalk Cost$ Est.Traffic Hours hr Est.Traffic Unit Cost$ /hr Est.Traffic Control$ I 'Amt.of Deposit$ I Total Due$ O Cash O Check# Applicant is responsible for contacting the Police Dept::and C.B.Y.D PERMIT SHALL BE KEPT ON JOBSITE AT ALL TIMES Paid By I AGREE TO FURNISH TO THE TOWN OF SOUTH WINDSOR�THE AMOUNT OF BOND REQUIRED AND TO REIMBURSE THE TOWN OF SOUTH WINDS OR FOR NY EXPENSES INCURRED BY THE TOWN i OR MAINTENANCE OR REPAIR WORK IN CONNECTION WITH THIS PERMIT AND THAT I AM F 1 IAR WITH WILL ABIDE BY THE RULES AND REGULATIONS FOR PERMITS AS OUTLINED IN THE TOWN OF SOUTH WiNDSOR'S T f;T GUT PE MI M NUAL. </ / Signed: P lint Name (/d/�,(�i�L �JdIG/Y1�/�C`��Date: v'y Street Excavation Permit 2014 i I I i I Driveway at 35/47 Ferry Lane Please refer to the attached plot plan for 47 Ferry Lane,which reflects the approximate placement of the driveway. The driveway will be 10 feet wide and will fl re out at the opening to approximately 12 feet. The driveway will run along the property line as shown,and the eastern edge of the driveway will be located at approximately one foot from the line,and approximately three feet from the existing split rail fence. At the opening of the driveway,the existing split rail fence on 35 Ferry Lane's property will be moved further east to allow for the 12 foot flare at the opening. The guide wire for the SNET telephone pole is approximately five feet from the property line,so the eastern edge of the driveway will be located approximately three feet from the'gu de wide_ The driveway will connect to the existing gravel parking area at 47 Ferry Lane. Mutual easements vyill be provided by the owners at 47 and 35 Ferry Lane. Grading at the opening of the driveway up until the top of the slope(approximately 38 feet from the road,or about where an existing tree stump is located)will be approximately 10%. The slopes along each side of the driveway will be graded. To �:0_qw- �� � 3 ,' i%I i I i I i i I i I _ i I I I I I j i i i I I i i I i i r LAVEY N47.22'5l'w s . LAV/EY 29.94` AQo \� 3.10 Ralf � Ets COOP W 0 I5.56' N32.44'15'E 50'W r 31.7 N56'32'W&W cu is SHADED AREA �. SEE NOTE 47 20 N/F ROBERT So- JEAN A. OECK t s i 5i.2' cu I 50' F.Y. - -- . EXIS-nNG HOUSE y r /Y N e DECORATIVE PICKET FENCE 227.82' 1.4 , t^AGO A7#AAdvr �' TOWN OF SOUTH WINDSOR INSPECTION REPORT PROJECT: DEVELOPER: STREET CONTRACTOR: DATE: !(3 TIME: WEATHER: 1 f� a i INSP: �► WORK IN PROGRESS: Q ll v! a W�x,1,3 orda ,vp, eij o ve colicir-C -� CA CA Pq&v-Al - 141) IN, C�- .. • CL.rn. ► (A r J f E C0.V r I I I AREA OF CONCERN: I 7 i I i i w._ 3 off SPECIAL INSTRUCTIONS: Z I ikpw I s I . . - • db'.M P N � f 1'' li b ,;}• "F.+'�r•#.ems; �� ��,, :'n. J/� ro . `�.. S r.•F. .. - 'tea A� �. �''+". .. .• � / . `'u'. .YID � • F'u7 XZ— ih.j ,�:iN��M�� i$L S Yt` ..a. �, { i,x;>�k.,� �m�n� w�_ � ..,�`f _ .� IfF:.�.Q y •. as r �,�.i` s! v ° �� y �, �4r�'�_.T�i' e��,.r � a* :.y'{� �r '�ts� � •��.'; � � x - �d�l _I Y PK SY3: a :: *h h &• � � � s e#f�"''�s - 1 '� `q "�'� ! �� c .: �: ��s�.� `5•• c +z. ti�� I _� �92 � '� r I t r ���,�1.y.>?1�^: '`• uz..xy:- .-5-.. : +�.�s,�._:.�...� :.�....�'�"'�*..�.�_. _ cy"�^'i"-""—}�'- -1,.'t:...�,z��..�g" �.r. :�`.at+�_.-_!."` ��sSX.+j n�,•,,.s�a,�.a���� �;.s.. STIPULATION OF THE PARTIES 1 The Plaintiffs will construct a ten (10') foot wide asphalt driveway in the location indicated on th it plan to the Defendant, South Windsor Historic District Commission whic driveway shall be to the following specifications: a. The driveway shall have no retaining walls; b. The driveway will flare out at the opening to approximately twelve (12') feet and the slopes along each side of the driveway cut will be graded. 2 All surfaces other than the driveway will consist of indigenous vegetation (grass, groundcover, shr bs, etc.). 3 Upon the entry of this Stipulation by the Court in accordance with Conn. Gen. Stat. Section 8-8 (n), the Plaintiffs will seek review and approval from the South Windsor Town Engineer of the construction details of the driveway as required under Town of South Windsor municipal ordinances. a. If, pursuant-to such review and approval, the Town Engineer determines that the slopes alongside the proposed driveway ..need stabilization to conform to proper engineering standards, the Plaintiffs will redesign th e driveway slopes to accomplish this goal in such a manner as to not include visible structures. Examples of how this might be done include, but are not limited to subsurface geotextile fabric or subsurface structural support. 5022224.1 b. Should this redesign be required, any such support materials utilized will be covered by soil and indigenous vegetation so as not to be visible above the surface of the gro nd. 4 The Defendant, Commission, agrees to issue a.Certificate of Appropriateness for the demolition of the concrete stairs as required by Conn. Gen. Stats. Section 7-147d(b) "Nobuilding permit for erection of a building or structure or r for alteration of an exterior architectural feature within an historic district and no demolition permit for demolition or removal of a building or structure within an historic district shall be issued by a municipality or any department, agency or official thereof until a Certificate of Appropriateness has been issued. A Certificate of Appropriateness shall be required whether or not a building permit is required." 5 Pursuant to the terms of this Stipulation, the driveway may be constructed in accordance herewith and without further review or action by the Commission. i 6 The Plaintiffs shall withdraw their pending FOIA claims against the Defendant, I Commission and all other,individuals named therein. 7 The Commission agrees Ion behalf of each of its members, within thirty (30) days of the entry of this Stipulation, that all members and alternates of the Commission shall attend a workshop presented by Town Counsel concerning I - the Commission's obligati ns under the Freedom of Information Act. _ 8 The Commission agrees that it and each of its members and alternates shall conform to the requirements of the Freedom of Information Act. I i 5022224.1 I I I i I I i I i I I i i i Page 1 of 2 Doolittle, Jeffrey From: boutl21@aol.com Sent: Monday,April 28, 2014.11:06 AM To: Doolittle, Jeffrey Subject: Re: Ferry Road (Bob Cohn) Hello, a I have no plans it was too much drawing fir my estimator to do this is why we wanted io G o set up an appointment with you and Bob to show you what he would like to do and discuss what he can and can not do I am not even sure what Mr. Cohen wants to do please let JJ me know if setting up an appointment is an option for us. Thank You, Corrine -----Original Message---- From: Doolittle, Jeffrey <Jeffrey.Doolittle@southwindsor.org> To: 'bout121@aol.com' <bout121 @aol.com> Sent: Fri,Apr 25, 2014 4:42 pm i Subject: RE: Ferry Road (Bob Cohn) Hi, This driveway was approved as part of a court settlement and has certain requirements and limitations. I need to see a detailed plan for this proposed driveway and the necessary grading to review and approve before any permits are issued and before any work can begin. I also need to discuss this with Mr. Cohn, as will as his engineer and contractor. Please send me the plan and then we can discuss further. Thank You i Jeffrey Doolittle, P.E. Town Engineer 1540 Sullivan Avenue South Windsor, CT 06074 860-644-2511 x 245 jeffrey.doolittle@southwindsor.org From: bout121@aol.com [ma!Ito:bout121@aol.com] Sent: Thursday, April 24, 2014 12:18 PM To: Doolittle, Jeffrey Subject: Ferry Road (Bob Cohn) G ,� ry i T Hello, l need to set up an appointment with you and Mr. Cohn along with my estimator Ray Boutin to go over a 4/28/2014 I Page 2 of 2 Y paving job we would like to do for the homeowner, Could you please let me know when is a good time for you, we are looking at next week. Thank You, Corrine Shemerluk (Boutin &Sons Paving) i 4/28/2014 Print Map Page 1 of 1 Town of South Windsor � 6 wx sr4 Geographic Information System (GIS) `" Vi +ryBSpk.t�y Date Printed:5/2/2014 I It MAP DISCLAIMER-NOTICE OF LIABILITY Approximate Scale:1 inch=40 feet This map is for assessment purposes only.It is not for legal W E description or conveyances.All information is subject to verification by 0 40 any user.The Town of South Windsor and its mapping contractors assume no legal responsibility for the information contained herein. Feet S http://southwindsor.mapxpress.net/ags_map/printmap.asp?extentYmin=873 864.4166666663... 5/2/2014 Print Map Page 1 of 1 w Town of South Windsor � 6 iov�N se,�� Geographic Information System (GIS) C' 7 .f ti �NasoR�cor Date Printed:5/2/2014 I 'rra 64 2,. N MAP DISCLAIMER-NOTICE OF LIABILITY Approximate Scale:1 inch=40 feet This map is for assessment purposes only.It is not for legal W E description or conveyances.All information is subject to verification by 0 40 any user.The Town of South Windsor and its mapping contractors assume no legal responsibility for the information contained herein. mommilliltzz=Feet S http://southwindsor.mapxpress.net/ags_map/printrnap.asp?extentYmin=873 855.6666666663... 5/2/2014 i LAVEY N47.22'51'W �l LAVEY, --_. E. � 29.94 cu Ll Ckl S58' 7'19'E 2 83i C"%o(Ell COOP cc 15.56' GAP / N32'44'15'E r 31.7 NS6'32'10'W a SHADED. AREA, ,_ . .:.... :.. .. . , _., . SEE' NOTE 07 ROBERT S.- COHN JEAN A. COHN U DE 51.2' Ri cc 50' F.Y. m v EXISTING HOUSE P O�y FCFC C . a ' DECORATIVE PICKET FENCE \Q 14 a S49.42'44'E FERRY LAND CENTER LINE ROAD TN. 860.291.8753 REMMMY PRE MW FM SHEET Fax $60.201.8757 0' ,a esign �"� "� PA UL R. & L YMV K. LA VEY 1 r_o_fesslonals, Inc. VESM mil-AWG RPM, 47 FERRY � �lvll ansinaars• plannwrs• survoyors ' landecap* arohltoeta.• sis .sps rq9 MA:2023 #AM 8124104 $QUTH WQID�OR, GQNNBCI'ECU'1' 165 South Satalate Road. South Mlindsof. Connecticut 06474 4T��. M.�. M���.1�.�• rt» GRAVEL DRIVE 1s�,42' 44 SHED, f • Cif �r I i S52��2'43 �� > . NOTES: 1. ALL MONUMENTATION FOUND OR SET IS DEPICTED HEREON. 2. PROPERTY IS IN A-40 ZONE. 3. PROPERTY IS IN HISTORIC DISTRICT. 4.• PROPERTY IS IN FLOOD ZONE X AREA DETERMINE -TO BE OUTSIDE 500—YEAR FLOODPLAIN AS PER FIRM COMMUNITY PANEL NUMBER 090036 00010 MAP REVISED 'FEBRUARY 23, 2001. R 5. AREA OF PROPERTY 30,789 sq. ft. 0.71 6. PROPERTY LINE/STREET LINE DETERMINED AT 16.5' NaRTH OF E)QsinNG CENTERLINE OF PAVEMENt 7. REVOCABLE LICENSE GRANTED AS PER VOL 1424 PG. 320, ITEM #5 OF THE SOUTH : VANDSOR LAND RECORDS: & DRIVEWAY EASEMENT GRANTED.AS PER VOL 1424, PG. 32a, ITEM #1 OF THE SOUTH WINDSOR LAND RECORDS AND PER MAP REFERENCE #2 9. ALL BUILDINGS ARE NON—CONFORMNG �37'� �o`a N'l225x MAP REFERENCE: OD X 1. PROPERTY BELONGING TO WINTHROP A. 8c MARY S. RICHARDSON EAST WINDSOR. CONN. cu SCALE 1"=30' MAY 24, 1958 BY PHILIP F. ELLSWORTHwow 2 ' EASEMENT PLAN.- DEPENDANT RESURVEY PREPARED FOR ROBERT S. & JEAN A.�COHN 38.56 z 35`FERRY ROAD SOUTH WINDSOR, CONNECTICUT DATE 4-18-01 SCALE 1 -20 L BY: DESIGN PROFESSIONALS. INC. i- Q 12.3' (BRICK GARAGE / wood _../ N/F i GARAGE_ DEBORAH BURNHAM 3 & DAINE MccDONALD CD QECORATIVE PICKET SEE NOTE 1.LMSSS u aA � � I£WSICNS � N� � vsni'��� n s SHOWN ERWISE AaA 04 TINOA E ut�OF OPU STARED IN�QCS srium SMOETS AND MAPS wNE e RIF~70L ALL EIOSeN6 VTLr 1Es SHOULD STALE OF cowEcmwr As ADOPTED BY rile COMNeemouT AsswArm OF LAND SURVEYOR$RR:. d - BE MO%IMW PRIOR TO COMIRWROM.. aNs SUR1iCY CONFORM TO MgB2ANiAL ACCu CLASS A-2. 2 ALL U71UTIES ARE TO BE STAKED IN THE r8a TO THE BEST OF MY KNOMEDCE AM 'NAP 6 SLOWM11A LY CORIM AS NOW NERIO L BY A UCOM LAND 5UAWM PRIOR TO caNslRuolloN 3.THIS PLAN IS WAD UNLESS IT BEARS INC i2:lsf2 aF' ;a PR�ROF�ESSIONAL E�NaNEERu `� NO. DATE DESCRIPTION BY Roos P. LIC.Na