HomeMy WebLinkAboutSpinners Run rival
TI"1p J W7 x1
AM It z
art'
-7=,P V--.Y .1 — )I
Tw�c
c4"al
S ,j - r" P Tylp V(-5 -" y
r-,C tea V ° �V-nr n ab-a-o-Yp
a Cm kk";.
U 0�-
'lb0 ' ro�
V ux Ll elQc�r{_d• J ri a i�c��
(ICLAA.L,.. , ku.px�os 0-r) a)u L Llrl
4 aA m o s�j j- � of Inc--
t r��,-fun t.c l i Y c ,.�a. a.A-,-.-a- .
0 w► U�a,n - a nd�e r
�. 6 �ee c.A� Lj
CAIL
�C, ,rLctcl c� -- 3 nr�w c�tua�
3ffi - � 6 ��
J CAeM--h� a-vi cj roa c. s
cvcr hot-,
G� Ulcl" f'(�Ct.� cxG�i Y7ik— ll, ,�,
d� �6 C
�-saw
ca r�P��swt cl ca U ds
tice �a Ile c1 �� V) ie, 4-,b
l vb k —Ah b
C aAk N-1-11—
\)Ga1
.� �� sae c-d-s v
v I� q n n cam, u�'�--
Md-
39 Spinner' s Run �f►1�
South Windsor, CT 060`T4
February 6, iv95
Director of Public Works
South Windsor, Cal' 060`74
Dear Sir:
The town
me required to put in a
q
sidewalk parallel to the street when I
built my house three years ago . Con-
sequently P I have to keep it shoveled
after a snowstorm., which I do. But
last Saturday was typical. The town
plow waits ' til I've shoveled my side-
walk - then races about 40 mph along
the curb, and because of the speed,
covers the sidewalk again. Does the
plow have to go so fast that it covers
my clean sidewalk?
I'd like an answer.
Yours ,
Hal Rich rds on
R
FEB
8
1995
OWN SE.
T.. "PS. 2G).
C P
a �
C1 c -
. e e w
4bSOR.co�� AREA CODE 203/644-2511
be 4
February 16, 1995 .�' FEB 1 6Soo
1995
DEFT.
Mr. Harold Richardson
39 Spinners Run j j �T
South Windsor, CT 06074
Dear Mr. Richardson:
I am in receipt of your letter of concern about snow plowing on Spinners Run, dated February 6, 1995.
The letter refers to events that occurred "last Saturday" (February 4, 1995) and mentions the following:
1. "The Town required me to put in sidewalks parallel to the street when I built my house
three years ago."
2. "I have to keep it shoveled after every storm."
3. "The Town waits 'till I've shoveled my sidewalk - then races about 40 mph along the
curb."
4. "Does the plow have to go so fast that it covers my clean sidewalk?"
I would like to address these items one at a time.
1. The Town of South Windsor through it's elected officials (Town Council and Planning and Zoning
Commission) has adopted rules and regulations for the approval, construction, and acceptance of
subdivisions and the improvements made there-in. The sidewalks required on Spinners Run are a direct
result of the approval process and are required of the subdivision developer.
2. The Town Council, with input from residents at public hearing, has also provided the community with a
workable sidewalk ordinance for the removal of snow from the many miles of sidewalk being constructed.
This ordinance required the owner or occupant "... to remove snow and ice within twenty-four(24) hours
after the same shall have fallen or formed, or within twenty-four(24) hours after sunrise where the same
has fallen or formed in the fourteen (14) hours preceding such sunrise..."
3. The Town's snow removal program provides for keeping main roads and collectors in passable condition
throughout a storm event and to keep the centers of subdivisions and dead end streets open until the storm
has passed and then push the snow furrows back off the pavement. This is done to limit the amount of
snow and ice that would remain in the gutter to interfere with drainage structures and the ability of postal
employees to deliver mail.
4. Plow speed - our drivers are instructed each winter in how to minimize depositing snow on sidewalks
throughout Town. Different snow conditions(moisture content and snow depth) require speed adjustment
to maintain an optimum result when removing snow from the roadway. At no time should a plow operator
be traveling at speeds greater than 25 mph when engaged in plowing operations, and this only on main
roads in extremely rare'occasions.
a '
i
Mr. Harold Richardson
February 15, 1995
f
Most plowing operations are conducted at speeds of less than 20 mph. This is because extremely light
fluffy snow comes up over the plow and limits driver visibility and wet snow funnels off the end of the plow at a
height that damages mailboxes. The snow shelf(the area between the curb and sidewalk) is generally four to six
feet wide depending on construction,and can accommodate modest amounts of snow before allowing heavy amounts
of snow to land on the sidewalk. There will almost always be some snow that is rolled over onto the walk. More
so when snow is wet as was the case late in the storm that occurred on February 4th.
Six and one quarter inches of snowfall followed by a period of sleet and then changing to light rain and
then back to light snow occurred on February 4th. The timing of the storm was such that most homeowners were
at home and clearing their walks during the storm event and before the plows had cleared the streets. Push back
on Spinners Run occurred late in the day, around 5:00 p.m. The snow was very wet and large blocks of snow were
breaking off the end of the plow and froze as solid objects.
Truck speed does have an effect on how much snow is deposited on a sidewalk. We all try to minimize
the amount of snow that does by adjusting truck speed to conditions.
I offer the following suggestions to maximize your efforts and minimize the need to repeat snow removal
efforts. The ordinance allows for a clean up period of twenty-four(24) hours after the snow has fallen or twenty-
four (24) hours after sunrise if the snow has fallen within the fourteen (14) hours preceding such sunrise. Snow
will usually be cleared from Town streets ten to twelve hours after a storm has stopped. Sometimes sooner
depending on the temperature. Residents could adjust the sidewalk clearing to occur after the plow has made it's
last pass in many instances.
I realize this is not always convenient and that Mother Nature will do what she will, but this will avoid
duplication of effort on many occasions.
Should you have any further questions or comments, please feel free to contact me at 644-2531.
Sincerely,
Melvin C. Stead, Jr. X
Superintendent of Street Services
MCS/gh
cc: Michael Gantick, Director of Public Works ✓
,0%4N SF.4
O F TO-Wn O-PS-OUM, �•
a
1540 SULLIVAN AVENUE SOUTH WINOSOR, CONN. 06074
+'PbsoR•co"'" AREA CODE 203/644-2511
August 11, 1994
Mr. Joseph Citino
248 Franklin Avenue
Hartford, CT 06115
Dear Mr. Citino:
Subject: Lot No. 15 Spinner's Run
Driveway Encroachment
Per our conversation of August 4, 1994, no certificate of
occupancy will be granted for the subject property until the Town
has received and approved a hold harmless and indemnification
agreement, in satisfactory form, which is recordable on the land
records to evidence the Town' s continuing right of easement along
with protections from claims should the Town need to protect or,
repair the easement or its sanitary sewer lines.
Very truly yours,
Michael J. Ga ck, . E.
Director of Public Works
MJG:bmr
cc: John Collins, Chief Building Inspector
Jerry Iazzetta, Town Engineer
Fred Shaw_,_Ass' t. Director of Public Works
Marcia Banach, Director of Planning