Loading...
HomeMy WebLinkAboutPierce Road Contract PW Street File CONTRACT DOCUMENTS F � 0 R FLf- (1py. RECONSTRUCTION OF PIER AO CE ROAD o T lFemou E SOUTH WINDSOR CONNECTICUT ��a �1 SEPTEMBER 1974 f b Y,R-'9+ N�' tiicTl�16rY5sil If _r«�vvy� ,i;a.KLY�lllu3^"2i4i�+Y'�k ' f V� N ol� o Fq 0 rr.� r OR C r T GRISWOLO & FUSS. INC. CONSULTING ENGINEERS AND SURVEYORS MANCHESTER. C0111NECTICUT t AGREEMENT THIS AGREEMENT, made this 17th day of October 1974 by and between the Town of South Windsor, a municipality located within the County of Hartford in the State of Connecticut, acting through Charles N. En-ek, Acting Town Manager, hereinafter called "OWNER, party of the first part, and King Contractors, Ltd. , . a Corporation in the State of Connecticut, County of Hartford, acting through its Vice President, John H.' King, ' hereinafter termed the "CONTRACTOR", party of the second part, WITNESSETH: That the parties to this Agreement each in consider- ation of the Agreements on the part of the other herein contained have agreed, and b these 9 , y presents do hereby agree, the OWNER for itself, and the CONTRACTOR for himself and his heirs, executors, administrators, successors and assigns, as follows: That the Contract Documents consisting of this Agreement, together with the Legal and Procedural Documents, General Conditions,. Special Provisions, Technical Provisions, Contract Drawings, and any Addenda issued before execution of the Agreement, for the Contract: That the CONTRACTOR has informed himself fully in regard to all - conditions pertaining to the place where the work is to be done-and other circumstances affecting the work: TT That the CONTRACTOR has obtained all the information he needs to ' enable him to estimate fully and fairly the costs of the work herein contemplated: That the CONTRACTOR shall furnish all plant, labor, materials., supplies, tools, equipment and other facilities and things necessary or property for or incidental to construct. the following: Reconstruction of Pierce Road from Ellington Road to Strong -toad (excluding all work bid as "Item #37 - Metal Beam Rail") . s Y for the party of the first part, in accordance with this Contract,. and " completing everything required of him under this Contract not later than the time stipulated in -the Instructions to Bidders. That the OWNER shall pay and the CONTRACTOR shall receive as full compensation for fulfilling everything required of the CONTRACTOR under this the unit price and lump sums recorded in the Bid. That the quantities shown in the Bid are approximate only and are solely for-the purpose of facilitating the comparison of Bids, that the OWNER shall not be held responsible if these quantities are not even approximately correct, that for all work upon which unit prices and lump sums are quoted, the CONTRACTOR'S compensation shall be computed upon the work actually performed, measured by the units of measurement specified, whether greater`or_ less than the quantities as shown in the Bid, and that the unit prices and lump sums set against the several items cover all incidental services required of the CONTRACTOR under the Contract. That the CONTRACTOR shall give to the OWNER, liquidated damages, for each day lost by the CONTRACTOR in completion of the work of the Contract after the time herein stipulated the sum of ($50.00) Fifty Dollars. IN WITNESS WHEREOF, the parties to these present have executed this AGREEMENT in the year and day first above mentioned. TOWN OF SOUTH WINDSOR, CONN. l (Seal) BY Charles N. Enes Actin' Town Manager 62/vt OToR '(Seal) BYt �Crti John H. Kin vice President IMPORTANT: Execute Acknowledgement of Officer or Agent of Contractor who signs this document (use proper form next page). AGREEMENT (ACKNOWLEDGMENT OF PRINCIPAL,,. IF A CORPORATION) State of Connecticut ) SS: County of Hartford ) 19 74. On this 17th day of October before me personally came and appeared John. H. King to me known, who, being by me duly sworn, did depose and say that he resides at 431 Poauonock Avenue, Windsor, Connecticut that he is the Vice President of King Contractors, Ltd. the corporation described in and which executed the foregoing instrument; that he knows the seal of said corporation; that one of the impressions affixed to said instrument is an impression of such seal; that it was so affixed by order of the directors of said corp- oration., and he he signed his name thereto by like order. (SEAL) Notary Public (ACKNOWLEDGMENT OF PRINCIPAL, IF A PARTNERSHIP) State of ) SS: County of ) On this day of before me personally came and appeared to me known and known to me to be one of the members of the firm of , described in and who executed the foregoing instrument and he acknowledged to me that he executed the same as and for the act and deed of said firm. (SEAL) Notary Public TOWN OF SOUTH WINDSOR OFFICE OF THE TOWN MANAGER TOWN HALL SOUTH WINDSOR, CONNECTICUT PROPOSAL Mr. Terry V. Sprenkel Town Manager Town of South ,Windsor Town Hall South Windsor, Connecticut 06074 Dear Sir: Having carefully examined the Invitation to Bid, Instructions to Bidders, Form of Agreement, General Conditions, Special General Conditions, Special Conditions, Technical Provisions, Special Provisions, Drawings (as listed in the Schedule of Drawings) and Addenda (if any) for RECONSTRUCTION .OF PIERCE ROAD from Ellington Road northerly 4,200 feet to Strong Road, as well as the site conditions affecting the work, the undersigned hereby proposes to complete- the below listed work for the lump sum and unit prices for the work in place for the following items and quantities (Amounts to be shown in both words and figures. In case of discrepancy, amount shown in words will govern.). Engineer's Item Estimate of Computed No. Item and Unit Price Quantity Total 1 Clearing and Grubbing at the lump sum price of FIVE THOUSAND . Dollars and N O Cents ($ 5,000.00 ) 1 $ 5.000.00 2 Earth Excavation at the per cubic yard price of ONE Dollars and FIFTY Cents ($ 1. 50 ) 4,840 $ 71260.00 3 Rock Excavation at the per cubic yard price of TEN Dollars and NO Cents ($ 10.00 ) FIXED PRICE 50 $ 500.00 ! , -2- PROPOSAII_ Engineer's Item Estimate of Computed No. Item and Unit Price Quantity Total 4 Borrow at the per cubic yard price of THREE Dollars and NO Cents ($ 3.00 ) 5,200 $ 15.600.00 5 Formation of Subgrade at the per square yard price of NO Dollars and TH I RTY Cents ($ . 30 ) 142775 $ 4.432,50 6 Bituminous Concrete, at the per ton price of TWENTY Dollars and NO Cents ($ 20.00 ) 21600 $ 52,000.00 7 Processed Aggregate Base at the per ton price of FOUR Dollars and. F I FTY Cents ($ 4.50 ) 32800 $ 17, 100.00 8 Rolled Gravel Base at the per cubic s yard price of FOUR Dollars and F I FTY Cents ($ 4.50 ) 2,500 $ 11,250.00 9 Bituminous Concrete Curbing at the per linear foot price of ON E Dollars and NO Cents ($ 1 .00 ) 8,400 $ 8,400.00 10 Bikeway at the per square yard price of FIVE Dollars and FIFTY Cents /� QQ ($ 5.50. ) - 3,760 $ 20,600.00 -3- PROPOSAL Engineer's Item Estimate of Computed No. Item and Unit Price Quantity Total 11 Trench Excavation at the per cubic yard price of THREE Dollars and NO Cents - C$ 3.00 ) 1 ,120 $ 1,36 12 Rock in Trench Excavation at the per cubic yard price of FIFTEEN Dollars and NO Cents ($ 15.00 ) FIXED PRICE 35 $ 525.00 13 Bedding, Material at the per cubic yard price of EIGHT Dollars and NO Cents ($ 8.00 ) 200 $ 1,600.00 14 Gravel Fill at the per cubic yard price of FIVE Dollars and NO Cents ($ 5.00 ) 250 $ 1,250.00 15 15" Perforated Asphalt Coated Cor- rugated Metal Pipe at the per linear foot price of TWELVE Dollars - and NO Cents ($ 12.00 ) 356 $ 4,272.00 16 1511 Reinforced Concrete Pipe at the per linear foot price of E IGHT Dollars and NO Cents ($ 8.00 ) 1 ,158 $ g, 264.00 17 21" Reinforced Concrete Pipe at the per linear foot price of F 1 FTEEN Dollars and NO Cents ($ 15.00 ) 68 $ 1,020.00 -4- PROPOSAL Engineer's Item Estimate of Computed No. Item and Unit Price Quantity Total 18 2411 Reinforced Concrete Pipe at the per linear foot price of TWENTY Dollars and NO Cents ($ 20.00 ) 56 $ 1;120.00 19 3611 Reinforced Concrete Pipe at the per linear foot price of TH I RTY Dollars and NO Cents ($ 30.00 ) 56 $ 1,680.00 20 43/1 x 2711 Asphalt Coated Corrugated .Metal Pipe Arch at the per linear foot price of F I FTY Dollars and NO Cents ($ 50.00 ) 56 $ 2,800.00 21 Underdrain at the per linear foot price of FIVE Dollars and NO Cents ($ 5.00 ) 1 ,200 $ 6,000.00 22 Type 11C11 Catch Basin with Sump at the per each price of FIVE HUNDRED Dollars and NO Cents ($ 500.00 ) 19 $ 9, 500.00 23 Type 11C1' Catch Basin Without Sump at the per each price of FOUR HUNDRED FIFTY Dollars and NO Cents ($ 450.00 ) s $ 2. 250.00 24 Manhole at the per each price of SEVEN HUNDRED FIFTY Dollars and NO Cents ($ 750.00 ) 1 $ 750:00 -5- PROPOSAL Engineer's Item Estimate of Computed No. Item. and Unit Price Quantity Total 25 Hay Bale Erosion Checks at the per linear foot price of ON E Dollars and N 0 Cents ($ 1 .00 - ) 23000 $ 2,000.00 26 Log and Hay Bale Check Dams at the per each price of FIVE HUNDRED Dollars and NO Cents ($ 500.00 ) 4 $ 2,000.00 27 Bituminous Concrete Driveway at the per square yard price of SEVEN Dollars and NO Cents ($ 7.00 ) 450 $ 3, 150.00 28 Cement Rubble Masonry at the per cubic yard price -of ONE HUNDRED FIFTY Dollars and NO Cents - ($ 150■00 ) 45 - $ 6,7 50.00 29 Miscellaneous Concrete at the per ; cubic yard price of ONE HUNDRED FIFTY Dollars and NO Cents ($ 150.00 ) 40 $ 6,000.00 30 Furnishing and Placing Topsoil at the per square yard price of ONE Dollars and NO Cents ($ 1.00 ) 6,750 $ 6,750.00 31 Fertilizing and Seeding at the per square yard price of NO Dollars and THIRTY-FIVE Cents ($ . 35 ) 6,750 $ 2, 362.50 • = -6- PROPOSAL Engineer's Item Estimate of Computed No. Item. and Unit Price Quantity Total 32 Siltation Chamber at the lump sum price of TWO THOUSAND,F IVE HUNDRED Dollars and NO Cents _ ($ 2, 500.00 ) 1 $_� 500.00 33 Removal of Existing Structure at the lump sum price of ONE THOUSAND Dollars and NO Cents ($ 1,000.00 1 $ 1, 000.00 34 Box Culvert at the lump sum price of TWENTY-ONE THOUSAND Dollars and NO Cents 1 $ 21,000.00 35 Dry Rubble Masonry at the per cubic yard price of TWO HUNDRED Dollars and NO Cents ($ 200.00 ) 15 $ 1, 000.00 36 -Porous Material for° Tree Root Protection at the per cubic yard r p ice of TEN Dollars and NO Cents ($ 10.00 ) 50 - $ 500.-00 (�V 37 Metal Beam Rail (Type R-I) at the V per I-thear foot pri `11w ELE Dollars - a _.,..: NO Cents ($ 11 .00 ) 3,450 $ 37,950.00 38 Wood Rail at the per linear foot price of EIGHT Dollars and NO Cents ($ 8.00 ) 120 $ 960.00 -7- PROPOSAL Engineer's Item Estimate of Computed No. Item and Unit Price Quantity Total 39 Observation Platform at the lump sum price of EIGHT THOUSAND Dollars and NO Cents ($ 8, 000.00 ) 1 . $ 8,000.00 40 Walkway at the per linear foot price of ONE HUNDRED TH I RTY Dollars and NO Cents ($ 130.00 ) 80 $ 10,400.00 41 Gage Well at the lump sum price of ONE THOUSAND,TWO HUNDRED FIFTY Dollars and NO Cents ($ 1, 250.20 ) 1 $ 1,250.00 42 Maintenance and Protection of Traffic at the lump sum price of TWO THOUSAND Dollars and NO Cents ($ 2,000.00 1 $ 2,000.00 43 Sanitary Sewer Laterals at the per linear foot price of ' TWENTY Dollars and NO Cents ($ 20.00 ) J 320 - $ 6,400.00 44 10" Sanitary Sewer at the per linear foot price of F 1 FTY Dollars and NO Cents ($ 50.00 ) 60 $ 3,000.00 TOTAL PRICE $ 314, 586.00 It is agreed that the above listed "FIXED PRICE" allowance(s) will be paid if and where the item is ordered by the Engineer and furnished 'and _per- formed by the Contractor just as if it were a unit price Bid. -8- PROPOSAL Bid Security attached in the amount of 10/0 of Bid is to become the property of the Town in the event the Contract and Bond are not executed within the time set forth in the Contract Documents, as liquidated damages for the delay and additional expense to the Town caused thereby. BIDDER KING CONTRACTORS,LTD. ADDRESS 16 Northwood Drive, Bloomfield, Connecticut 06002 w SIGNED BY Vr 4 TITLE Vice-President John i g DATE October 9, 1974 The Contractor hereby acknowledges the receipt of the following addenda: Addendum No. Signature 2 3 �. �491 BID BOND KNOW ALL MEN BY THESE PRESENTS, that we the undersigned, (Name of Principal) King rnnfr^rtnrc. I fd As PRINCIPAL, and • as SURETY are held firmly bound unto the Town of South Windsor, Connecticut, hereinafter called the "Towwn", in the penal sum of Ten Percent Of Amount Bid Dollars., ($ ), lawful money of the United States for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has submitted the Accompanying Bid, dated M+nfir�r A , i9 ; NOW, THEREFORE, if the Principal shall not withdraw said Bid within the period specified therein after the. opening of the same, or, if no period be specified, within thirty (30) days after the said opening, and shall within the period specified therefor, or if no period be specified, within ten (10) days after the prescribed forms are presented to him for signature, enter into a written Contract with the Town in accordance with the Bid as accepted, and give bond with good and sufficient surety or -sureties, as may be. required, for the faithful performance and proper fulfillment of such Contract; or in the event of the withdrawal of said Bid within the period specified, or the failure to enter into such Contract shall pay the Town theL difference between the amount specified in said Bid and the amount for which the Town may procure the required work or supplies or both, if the latter be in excess of the former, then the above obligation shall be void and of no effect, otherwise to remain in full force and virtue- i IN WITNESS WHEREOF, the above-bounded parties have executed this -instrument under their several seals this 9+h day of , 19_j4 the name and corporate seal of each cor- porate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. In the presence of -(SEAL) (Individual Principal Business Address (SEAL) Partnership Business Address x By; Attes 3 Corporate Princi pal , `,,1ii11}��Jl1�Firr3ijrr Fi No +hw�nd nr_ ,, R1 ��I».4P Conn. r (Business Address s J • iffi ' °�' oat@+ .'Se 1 , ti - M Attest: n= Corporate e y Y A orneY- in-Fact, Corporate Soa4, ount er s i e d By• C.t� (Power-of-Attorney for person signing for surety company must be attached to bond. ) THE TRAVELERS Certificate of Insurance This is to certify that policies of insurance as described below have been issued to the insured named below and are in force at this time. If such policies are canceled or changed during the periods of coverage as stated herein, in such a manner as to affect this certificate, written notice will be mailed to the party designated below for whom this certificate is issued. 1. Name and address of party to whom this certificate is issued 2. Name and address of insured r— Town of South Windsor King Construction, Inc. & King Contractors, Ltd. Town Hall 16 Northwood Drive Bloomfield, CT 06002 South Windsor, Conn. 06074 L J 3. Location of operations to which this certificate applies Connecticut 4. Coverages For Which Insurance is Afforded Limits of Liability Policy Number Policy Period"* Workmen's Compensation and Compensation—Statutory ' Employers'Liability in the state named in item 3 hereof DOUB-795A174-9-74 2-1-74/75 Bodily Injury Liability + —except automobile $ ,000 each person ffi 500 ,000 each occurrence $ 500 ,000 aggregatet tCompleted Operations In cluding Protective and Products only Property Damage Liability ' —except automobile $ 100 ,000 each occurrence In cluding Protective $ 200 ,000 aggregate 650-795A173-7-IND-74 2-1-74/75 Bodily Injury Liability —automobile $ 250 ,000 each person $ ,000 each accident $ 500 ,000 each occurrence ------------------------------------------ ----------------------------------------------- Property Damage Liability + —automobile $ ,000 each accident $ 100 ,000 each occurrence 650-795A173-7-IND-74 2-1-74/75 Liability (Bodily Injury and $ ,000 each occurrence Property Damage) $ ,000 aggregate Vie'+@:�h89Cle $ 2,000 ;000 each occurrence American Motorists Ins. C Catastrophe or Excess $ 23000 ,000 each aggregate $ 10 ,000 deductible amt. 3SB 003 532 2-1-73/76 "Absence of an entry in these spaces means that insurance is not afforded with respect to the coverages opposite thereto. "Policy is effective and expires at 12:01 A.M., standard time at the address of the named insured as stated herein. Description of Operations,or Automobiles to which the policy applies: Road Reconstruction Pierce Road South Windsor, Conn. The insurance afforded is subject to all of the terms of the policy,including endorsements,applicable thereto. Producer — Boccaccio & Susanin, Inc. Office—Hartford, CT Date 10-17-74 EQUITABLE FIRE AND MARINE3�]��Td�� %'9'�N' INC. TTHE TRAVELERS INSURANCE COMPANY HE TRAVELERS INDEMNITY COMPANY B INSURANCE — BONDING THE CHARTER OAK FIRE INSURANCE COMPANY y 638 PROSPECT AVENUE Secretary, Casualty-Property D IN r By c-5918 Rev.7-68 PRINTED IN U.S.A. 371 'IttTRD, CONN. 06105 Secretary, Casualty-Property Department THE TRAVELER► THE TRAVELERS INDEMNITY COMPANY • HARTFORD, CONNECTICUT T PERFORMANCE BOND Approved by The American Institute of Architects, A.I.A. Document No. A-311 February 1970 Edition KNOW ALL MEN BY THESE PRESENTS: That— —_— King Contractors, Ltd. (Here insert full name and address or legal title of Contractor) 16 Northwood Drive, Bloomfield, Connecticut 06002 as Principal, hereinafter called Contractor, and THE TRAVELERS INDEMNITY COMPANY, a corporation, organized and existing under the laws of the State of Connecticut and having its principal place of business in Hartford, Connecticut, as Surety, hereinafter called Surety, are held and firmly bound unto ------ Town of South Windsor, Town Hall, South Windsor, Conn. (Here insert full name and address or legal title of Owner) i as Obligee, hereinafter called Owner, in the amount of ------ -------- Two Hundred Seventy Six Thousand Six Hundred Thirty Six--- Dollars ($--276,636_---- — --------- --- — ---- — — ---), . ; for the payment whereof Contractor and Surety bind themselves,their heirs,executors,administrators,successors j and assigns,jointly and severally, firmly by these presents. I WHEREAS, Contractor has by written agreement dated—_— October 17, 1974 ---- — entered into a contract with Owner for -- Road Reconstruction Pierce Road ------------------------ South Windsor.- Conn. ------ En s in accordance with drawings and specifications prepared by Griswold neers--- ---- ------ 210 Main_St• , Manchester, Conn. (Here insert full name and address or legal title of Architect) which contract is by reference made a part hereof, and is hereinafter referred to as the Contract. S-1834 REV.4-70 PRINTED IN U.S.A. NOW, THEREFORE, the condition of this obligation is such that, if Contractor shall promptly and faithfully perform said contract,then this obligation shall be null and void; otherwise it shall remain in full force and effect. The Surety hereby waives notice of any alteration or extension of time made by the'Owner. . Whenever Contractor shall be, and declared by Owner to be in default under the Contract, the Owner having performed Owner's obligations thereunder, the Surety may promptly remedy the default, or shall promptly (1) Complete the Contract in accordance with its terms and conditions, or (2) Obtain a bid or bids for completing the Contract in accordance with its terms and conditions,and upon deter- mination by Surety of the lowest responsible bidder, or, if the Owner elects, upon determination by the Owner i and the Surety jointly of the lowest responsible bidder, arrange for a contract between such bidder and Owner, and make available as Work progresses (even though there should be a default or a succession of defaults under the contract or contracts of completion arranged under this paragraph) sufficient funds to pay the cost of com- pletion less the balance of the contract price; but not exceeding, including other.costs and damages for which the Surety may be liable hereunder, the amount set forth in the first paragraph hereof. The term "balance of the contract price," as used in this paragraph, shall mean the total amount payable by Owner to Contractor under the Contract and any amendments thereto, less the amount properly paid by Owner to Contractor. Any suit under this bond must be instituted before the expiration of two (2) years from the date on which final payment under the Contract falls"due. No right of action shall accrue on this bond to or for the use of any person or corporation other than the Owner named herein or the heirs, executors, administrators or successors of the Owner. SIGNED AND SEALED this_ -- 17th -------day of—October----A A.D. 19 74 - ----- i IN THE PRESENCE OF: King Contractors , Ltd. (Principal) (Seal) j BY: P (Title i THE TRAVELERS INDEMNITY COMPANY j ur ty) (Seal) by / Attorney-in-Fact E. SUsanin i r . a THE TRAVELER K' THE TRAVELERS INDEMNITY COMPANY . HARTFORD, CONNECTICUT .4 T LABOR AND MATERIAL PAYMENT BOND Approved by The American Institute of Architects THIS BOND IS ISSUED SIMULTANEOUSLY WITH PERFORMANCE BOND IN FAVOR OF THE OWNER CONDITIONED ON THE FULL AND FAITHFUL PERFORMANCE OF THE CONTRACT KNOW ALL MEN BY THESE PRESENTS; That Contractors,Ltd_ . -----------� (Here insert full name and address or legal title of Contractor) 16 Northwood Drive, Bloomfield, Conn. 06002 as Principal, hereinafter called Principal, and THE TRAVELERS INDEMNITY COMPANY, a corporation, organized and existing under the laws of Connecticut and having its principal place of business in Hartford, Connecticut, as Surety, hereinafter called Surety, are held and firmly bound unto --------_ --- --Town of South Windsor Town Hall -i South Windsor-Z- Conn. -- ------- —� (Here insert full name and address or legal title of Owner) as Obligee, hereinafter called Owner, for the use and benefit of claimants as hereinbelow defined, in the amount Thirty Six 1 of Two Hundred Sevent Six Thousand Six Hundred— —Dollars ($---276 636=--- --------y---------------- -�--- ) (Here insert a sum equal to at least one-half of the contract price) for the payment whereof Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these presents. WHEREAS, Principal has by written agreement dated -- October 17, 1974 ------- entered into a contract with Owner for-- — Road Reconstruction— r • Pierce Road South Windsor, Conn_--- __ in accordance with drawings andspecifications prepared b Griswold Engineers 210 Main St. , Manchester, Conn. (Here insert full name and address or legal title of Architect) which contract is by reference made a part hereof, and is hereinafter referred to as the Contract. S-1834 REV.4-70 PRINTED IN U.S.A. ;I! Is Issiclo 1 s. 7 NOW,THEREFORE, the condition of this obligation is such that if the Principal shall promptly make payment to all claimants as hereinafter defined, for all labor and material used or reasonably required for use in the per- formance of the Contract, then this obligation shall be void; otherwise it shall remain in full force and effect, subject, however, to the following conditions: , 1. A claimant is defined as one having a direct contract with the Principal or with a subcontractor of the Prin- cipal for labor, material, or both, used or reasonably required for use in the performance of the contract, labor and material being construed to include that part of water,gas, power,light, heat, oil,gasoline, telephone service or rental of equipment directly applicable to the Contract., 2. The above named Principal and Surety hereby jointly and severally agree with the Owner that every claimant as herein defined,who has not been paid in full before the expiration of a period of ninety (90) days after the date on which the last of such claimant's work or labor was done or performed, or materials were furnished by such claimant, may sue on this bond for the use of such claimant, prosecute the suit to final judgment for such sum or sums as may be justly due claimant, and have execution thereon. The Owner shall not be liable for the payment I of any costs or expenses of any such suit. 1 3. No suit or action shall be'commenced hereunder by any claimant, (a) Unless claimant, other than one having a direct contract with the Principal, shall have given written notice to any two of the following: The Principal, the Owner, or the Surety above named, within ninety (90) days after such claimant did or performed the last of the work or labor, or furnished the last of the materials for which said claim is made, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were furnished, or for whom the work or labor was done or performed. Such notice shall be served by mailing the same by registered mail or certified mail, postage prepaid, in an envelope addressed to the Principal, Owner or Surety, at any place where-an office is regularly maintained for the transaction of business, or served in any manner in which legal process may be served in the state in which the aforesaid project is located, save that such service need not be made by a public officer. (b) After the expiration of one (1) year following the date on which Principal ceased work on said Contract, it being understood, however, that if any limitation embodied in this bond is prohibited by any law controlling the construction hereof such limitation shall be deemed to be amended_so as to be equal to the minimum period of limitation permitted by such law. (c) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state in which the project,or any part thereof,is situated,or in the United States District Court for the district in which the project, or any part thereof, is situated, and not elsewhere. 4. The amount of this bond shall be reduced by and to the extent of any payment or payments made in good faith hereunder, inclusive of the payment by Surety of mechanics' liens which may be filed of record against said improvement, whether or not claim for-the amount of.such lien be presented under and against this bond. Signed and sealed this 17 th y October ---------------da of ----------------- A. D. 19 74 —_ IN THE PRESENCE OF: King Contractors, Ltd. Principal (Seal) i 3 Title 1 THE TRAVELERS INDEMNITY COMPANY (S ) (Seal) by E. Susanin Attorney-in-Fact I The Travelers Indemnity Company Hartford, Connecticut POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That THE TRAVELERS INDEMNITY COMPANY, a corporation of the State of Connecticut, does hereby make, constitute and appoint E. Susanin, R. Boccaccio, S. Boccaccio, G. Koldys, A. Tchaikow, all of Hartford, Connecticut, EACH its true and lawful Attorney(s)-in-Fact, with full power and authority, for and on behalf of the Company as surety, to execute and deliver and affix the seal of the Company thereto, if a seal is required, bonds, undertakings,recognizances,consents of surety or other written obligations in the nature thereof, as follows: Any and all bonds, undertakings, recognizances, consents of surety or other written obligations in the nature thereof and to bind THE TRAVELERS INDEMNITY COMPANY thereby,and all of the acts of said Attorney(s)- in-Fact, pursuant to these presents, are hereby ratified and confirmed. This appointment is made under and by authority of the following by-laws of the Company which by-laws are now in full force and effect: ARTICLE IV, SECTION 13. The Chairman of the Board,the President,the Chairman of the Finance Committee, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, any Secretary or any Department Secretary may appoint attorneys-in-fact or agents with power and authority, as defined or limited in their respective powers of attorney,for and on behalf of the Company to execute and deliver, and affix the seal of the Company thereto,bonds,undertakings,recognizances,consents of surety or other written obligations in the nature thereof and any of said officers may remove any such attorney-in-fact or agent and revoke the power and authority given to him. ARTICLE IV, SECTION 15. Any bond, undertaking, recognizance,consent of surety or written obligation in the nature thereof shall be valid and binding upon the Company when signed by the Chairman of the Board, the President, the Chairman of the Finance Committee,any Executive Vice President, any Senior Vice President, any Vice President or any Second Vice President and duly attested and sealed,if a seal is required,by any Sec- retary or any Department Secretary or any Assistant Secretary or when signed by the Chairman of the Board, the President,the Chairman of the Finance Committee,any Executive Vice President,any Senior Vice President, any Vice President or any Second Vice President and countersigned and sealed, if a seal is required,by a duly authorized attorney-in-fact or agent;and any such bond,undertaking,recognizance,consent of surety or written obligation in the nature thereof shall be valid and binding upon the Company when duly executed and sealed,if a seal is required, by one or more attorneys-in-fact or agents pursuant to and within the limits of the authority granted by his or their power or powers of attorney. This power of attorney is signed and sealed by facsimile under and by the authority of the following Resolu- tion adopted by the Directors of THE TRAVELERS INDEMNITY COMPANY at a meeting duly called and held on the 30th day of November, 1959: VOTED: That the signature of any officer authorized by the By-Laws and the Company seal may be affixed by facsimile to any power of attorney or special power of attorney or certification of either given for the execution of any bond, undertaking, recognizance or other written obligation in the nature thereof;such signature and seal, when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company,to be valid and binding upon the Company with the same force and effect as though manually affixed. This power of attorney revokes that dated June 20, 1972 on behalf of E. Susanin, R. Boccaccio, S. Boccaccio, G. Koldys CERTIFICATION I, D. J. Nash, Assistant Secretary (Surety) of THE TRAVELERS INDEMNITY COMPANY certify that the foregoing power of attorney, the above quoted Sections 13. and 15. of Article IV of the By-Laws and the Resolution of the Board of Directors of November 30, 1959 have not been abridged or revoked and are now in full force and effect. Signed and Sealed at Hartford, Connecticut, this 17th day of October 19 74 . �4 rS55� a SEAL 9 ; Assistant Secretary, Surety %A S-1869 (BACK) ' R TOWN OF SOUTH WINDSOR, CONNECTICUT CONTRACT DOCUMENTS I FOR RECONSTRUCTION OF PIERCE ROAD ADDENDUM NO. 1 The prospective Bidders are advised of the following change to the Contract Documents: Special Provisions SP-3 should read: "5. Surplus Material: All surplus excavated material shall become the property of the Town and shall be disposed of at the Town's Sanitary Landfill on Strong Road or at such areas as directed by the Engineer.." Receipt of this ADDENDUM is to be acknowledged on the Proposal Form. Terry V. Sprenkel, Town Manager October 1 . 1974 1 CONTRACT DOCUMENTS FOR ' RECONSTRUCTION OF PIERCE ROAD SOUTH WINDSOR, CONNECTICUT 1 SEPTEMBER, 1974 I i GRISWOLD & FUSS, INC. 210 Main Street Manchester, Connecticut ' CONTRACT DOCUMENTS RECONSTRUCTION OF PIERCE ROAD SOUTH WINDSOR, CONNECTICUT ' CONTENTS PAGE Invitation to Bid 1 sheet ' Instructions to Bidders 1 . General 1 ' 2. Contract Documents 1 3. Bids 1 4. Addenda and Interpretations 1 ' 5. Site Conditions 2 6. Bid Bond 2 7. Bidder's Qualification 2 ' 8. Unit Prices 2 9. Telegraphic Modification 2 10. Rejection of Bids 3 11 . Time of Completion and Liquidated Damages 3 12. Awa-rd of Contract 3 13. Wages and Salaries 3 ' 14. Subsurface Conditions 4 Forms ' Bid Bond (Sample Form) 2 sheets Proposal 8 sheets Agreement 4 sheets ' Performance Bond (Sample Form) 2 sheets Labor and Material Payment Bond (Sample Form) 1 sheet General Conditions Article No. ' 1 . Definitions GC-1 2. Progress & Submission Schedules Preconstruction Conference, Starting Work GC-3 3. Correlation, Interpretation and Intent of Contract Documents GC-4 4. Copies of Documents and Record Documents GC-4 5. Separate Contracts GC-5 6. Subcontracts GC-5 7. Materials, Equipment and Labor; or Equal Clause GC-6 8. Patent Fees and Royalties GC-6 -2- ' General Conditions Article No. Page 1 9. Permits, Laws and Regulations GC-6 10. Availability of Lands; Physical and Subsurface Conditions GC-7 ' 11 . Engineer's Control GC-7 12. Authority and Duties of Inspectors GC-8 13. Tests and Inspections GC-8 ' 14. Shop Drawings and Samples GC-9 15. Contractor's Supervision and Superintendence GC-10 16. Safety and Protection: Emergencies GC-11 ' 17. Access to Work: Uncovering Finished Work GC-12 18. Change in Work GC-13 19. Change Orders GC-13 ' 20. Change of the Contract Time GC-14 21 . Warranty and Guarantee: Correction, Removal or Acceptance of Defective Work GC-15 ' 22. Application for Progress Payments GC-16 23. Certificates of Completion and Final Payment GC-17 24. Waiver of Claims and Continuing Obligations GC-18 ' 25. Indemnification GC-19 26. Cleaning Up GC-20 27. Owner's Right to Stop or Suspend Work GC-20 28. Owner's Right to Terminate GC-20 29. Contractor's Right to Stop Work or Terminate GC-21 30. Provisions Required by Law Deemed Inserted GC-22 31 . Contract Surety GC-22 32. Time for Completion and Liquidated Damages GC-22 33. Contractor's and Subcontractor's Insurance GC-23 34. Wage Rates GC-24 ' Special General Conditions Article No. 1 . Minimum Wages SGC-1 2. Withholding SGC-2 3. Payrolls and Basic Records SGC-2 ' 4. Apprentices SGC-3 5. Compliance with Copeland Regulations SGC-4 6. Subcontracts SGC-4 ' 7. Contract Termination; Debarment SGC-4 . 8. Overtime Requirements SGC-4 9. Violation; Liability for Unpaid Wages; ' Liquidated Damages SGC-4 10. Withholding for Unpaid Wages and Liquidated Damages SGC-5 ' 11 . Subcontracts SGC-5 -3- ' Special Provisions Page 1 . General SP-1 2. Layout of Work S P-1 3. Access to Site SP-2 4. Dust and Erosion Control SP-2 5. Surplus Material SP-3 6. Permits SP-3 7. Traffic Routing SP-3 ' 8. Safety SP-3 9. Alterations of Plans or of Character of Work SP-3 10. Utilities SP-4 11 . Time of Completion SP-4 12. Drawings SP-4 13. Tests SP-4 ' Technical Provisions Clearing and Grubbing TP-1 to TP-2 Roadway Excavation, Formation of Embankment and Disposal of Surplus Material TP-3 to TP-7 B o r row T P-8 to T P-9 Formation of Subgrade TP-10 to TP-11 Bituminous Concrete TP-12 to TP-13 Processed Aggregate Base TP-14 Rolled Gravel Base TP-15 to TP-16 Bituminous Concrete Curb TP-17 ' Bikeway T P-18 to T P-19 Trench Excavation TP-20 to TP-26 Storm Drain TP-27 to TP-28 Catch Basins TP-29 to TP-30 Endwalls TP-31 to TP-32 Manholes TP-33 to TP-34 Hay Bale Erosion Checks TP-35 Log and Hay Bale Check Dams TP-36 Bituminous Concrete Driveway TP-37 to TP-38 Cement Rubble Masonry TP-39 to TP-40 Miscellaneous Concrete TP-41 ' Furnishing and Placing Topsoil TP-42 Fertilizing and Seeding TP-43 to TP-44 Siltation Chamber TP-45 to TP-46 ' Wood Chip Mulch TP-47 Removal of Existing Structure TP-48 Box Culvert TP-49 to TP-51 ' Tree Wells and Tree Root Protection TP-52 to TP-53 Metal Beam Rail (Type R-I) TP-54 to TP-55 Wood Rail TP-56 1 -4- Technical Provisions Page Observation Platform TP-57 Walkway TP-58 Gage Well TP-59 Maintenance and Protection of Traffic TP-60 Sanitary Sewers TP-61 to TP-63 Exhibit "A" State Wage Rates Exhibit "B" Federal Wage Rates Exhibit "C" Boring Log Data 1 1 i 1 1 r 1 N TOWN OF SOUTH WINDSOR ' OFFICE OF THE TOWN MANAGER TOWN HALL SOUTH WINDSOR, CONNECTICUT NOTICE TO CONTRACTORS - INVITATION TO BID In accordance with provisions of the Town Charter, sealed proposals will be received in the Office of the Town Manager of the Town of South Windsor, Connecticut not later than: ' 10:00 A.M. E.D.S.T. October 9, 1974 At which time and place said proposals shall publicly be opened for ' furnishing of all materials, labor, equipment and incidentals for RECONSTRUCTION OF PIERCE ROAD from Ellington Road to Strong Road. ' Contract Documents including drawings and technical specifications are on file at the office of the Town Manager located at the Town Hall, South Windsor, Connecticut. ' Copies of Contract Documents may be obtained by depositing Twenty - Five Dollars($25.00) with the Town Manager for each set of documents so obtained. Each such deposit will be refunded, to persons submitting a Bid, if the drawings and Contract Documents are returned in good condition within ten (10) days after the Bid opening. The Town of South Windsor reserves the right to waive any informalities or to reject any or all Bids. Each Bidder must deposit with his Bid, security in the amount, form and subject to the conditions provided in the Instructions to Bidders. ' Attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be ' paid under the Contract. No Bidder may withdraw his Bid within thirty (30) days after the actual ' date of the Bid opening. a IJI Terry V. Spre kel, Town Manager ' Pierce Road South Windsor, Connecticut ' INSTRUCTIONS TO BIDDERS 1 . General: Sealed proposals will be received by the Town Manager of the Town of South Windsor, Connecticut at the Town Hall for work as outlined in the "Notice to Contractors - Invitation to Bid". ' 2. Contract Documents: These Contract Documents include a complete set of Bidding and Contract Forms which are for the convenience of ' Bidders and are not to be detached from the Contract Documents, filled out, or executed. Separate copies of Bid Forms are furnished for that purpose. 3. Bids All Bids must be submitted on forms supplied by the Town and shall be subject to all requirements of the Contract Documents, including the Drawings and these "Instructions to Bidders". All Bids must be regular in every respect and no interlineations, excisions or special conditions shall be made or included in the Bid Form by the Bidders. Bid Documents, including the Bid and Bid Bond shall be enclosed in ' an envelope and clearly marked "BID FOR RECONSTRUCTION OF PIERCE ROAD", name of Bidder, and date and time of Bid opening in order to guard against premature opening of the Bid. The ' envelope shall be sealed. The Town may consider as irregular any Bid on which there is an alteration of or departure from the Bid Form hereto attached and at its option may reject the same. ' If the Contract or Contracts are awarded, they will be awarded by the Town of South Windsor to a responsible Bidder or Bidders on the basis of the lowest Bid. 1 4. Addenda and Interpretations: Any request from prospective Bidder for interpretation of meaning of Contract Documents, Specifications or other Contract Documents shall be made in writing to the Town Manager, Town Hall, South Windsor, Connecticut, and to be given consideration, must be received at least seven (7) days prior to date ' fixed for opening of proposals. Interpretations will be made in the form of written Addenda to Contract. Documents, which Addenda shall become a part of the Contract. Not later than three (3) days prior to date fixed for opening of proposals, Addenda will be mailed to all persons who obtain Contract Documents. Failure of any Bidder to receive any such Addenda shall not relieve Bidder from any obligation ' under his proposal as submitted. -1- Pierce Road South Windsor, Connecticut 5. Site Conditions: At the _date fixed for opening of Bids, it will be presumed that each Bidder has made an examination of location and site of work to be done under Contract; has satisfied himself as to actual conditions, requirements and quantities of work; and has read and become thoroughly familiar with Contract Documents including ' Contract Drawings, Specifications' and Addenda. 6. Bid Bond: The Bid must be accompanied by a Bid Bond which shall be not less. than ten (1 O) percent of the amount of the Bid. Bid Bond shall be prepared in the form of the sample Bid Bond hereto attached, duly executed by the Bidder as principal and having a surety thereon ' which shall be acceptable by the Town. Certified checks or bank drafts will not be accepted. ' 7. Bidder's Qualifications: The Town of South Windsor may make such investigation as deemed necessary to determine the ability of the Bidder to discharge his Contract. The Bidder shall furnish the Town with ' all such information and data as may be required for the purpose. The Town reserves the right to reject any Bid if the Bidder fails to satisfactorily convince the Town that he is properly qualified by ' experience and facilities to carry out the obligation of the Contract and to satisfactorily complete the work called for herein. Conditional Bids will not be accepted. ' 8. Unit Prices: The unit price for each of the several items in the proposal of each Bidder shall include its prorata share of overhead so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price Bid represents the total Bid. Any Bid not conforming to this requirement may be rejected as ' informal. The special attention of all Bidders is called to this provision, for should conditions make it necessary to revise the quantities, no limit will be fixed for such increased or decreased ' quantities nor extra compensation allowed. 9. Telegraphic Modification: Any Bidder may modify his Bid by tele- graphic communication at any time prior to the scheduled closing time for receipt of Bids, provided further that the Town is satisfied that a written confirmation of the telegraphic modification over the signature of the Bidder was mailed prior to the closing time. The telegraphic communication should not reveal the Bid price but should provide the addition or subtraction or other modification so that the final prices or terms will not be known by the Town until the sealed Bid is opened. If written confirmation is not received within two (2) days from the closing time, no consideration will be given to the telegraphic ' modification. -2- Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut 10. Rejection of Bids: The Town also reserves the right to reject any or all Bids, for any reason the Town deems advisable, and to award Contract or Contracts to any of Contractors bidding on work ' regardless of amount of Bid. It is intended that Contract or Contracts will be awarded lowest responsible and eligible Bidder (or Bidders) possessing skill, ability and integrity necessary to faithful perfor- mance of work. 11 . Time of Completion and Liquidated Damages: The Bidder must agree to fully complete the project within one hundred (100) consecutive calendar days after receipt of the Notice to Proceed. ' The Bidder must agree also to pay as liquidated damages, the sum of Fifty Dollars ($50.00) for each consecutive calendar day thereafter. ' Attention. is called to the Special Provision concerning Time of Completion. ' 12. Award of Contracts: The Contract will be awarded to the responsible Bidder submitting the lowest Bid complying with the conditions of these Contract Documents. The Bidder to whom the award is made ' will be notified at the earliest possible date. The successful Bidder shall execute and deliver to the Town, within ten (10) days after notification of the award, an Agreement in the form included in the ' Contract Documents, in such number as the Town may require. In addition to the Agreement, the successful Bidder shall also provide, ' within the time stipulated above, a Surety Bond by a company satis- factory to the Town in an amount equal to One Hundred (100) Percent of Estimated Total Contract Price recorded in Proposal of Contract ' as executed, and a Labor and Materials Payment Bond in like amount will be required from successful. Bidder for faithful performance of Contract. Surety Bonds shall be in accordance with sample forms ' attached to Contract Documents. 13. Wages and Salaries: Attention of Bidders is particularly called to the requirements concerning the payment of not less than the prevailing Federal wage and salary and the State of Connecticut wage and salary rates specified in the Contract Documents, the conditions of employ- ment with respect to certain categories and classifications of employees. (See General Conditions and Special General Conditions). ' The rates of pay set forth are the minima to be paid during the life of the Contract. It is, therefore, the responsibility of Bidders to inform themselves as to local labor conditions, such as the length of ' work day and work week, overtime compensation, health and welfare contributions, labor supply and prospective changes or adjustments of rates. -3- Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut 14. Subsurface Conditions: All information given on Drawings, or in Contract Documents, relating to subsurface conditions and existing pipes and other structures is from best sources at present avail- able to the Town. All such information and drawings of existing construction is furnished only for information and convenience of ' Bidders. It is understood and agreed that the Town does not warrant or guarantee that materials encountered during construction will be the same as those indicated by information given on drawings. Bidder must satisfy himself regarding character, quantities, and condition of various materials and work to be done. It is further understood and agreed that the Bidder or Contractor ' will not use any information made available to him, or obtained in any examination made by him, in any manner as a basis or ground of claim or demand of any nature, against Town or Engineer arising from or by reason of any variance which may exist between information offered and actual materials or structures encountered during construction work. ' -4- Griswold & Fuss, Inc. BID BOND ' KNOW ALL MEN BY THESE PRESENTS, that we the undersigned, ' (Name of Principal) As PRINCIPAL, and ' as SURETY are held firmly bound unto the Town of South Windsor, Connecticut, ' hereinafter called the "Town", in the penal sum of Dollars, ' ($ ), lawful money of the United States for the payment of which sum well and truly to be made, we bind ourselves, our heirs, ' executors, administrators, successors and assigns, jointly and severally, firmly by these presents. ' THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has submitted the Accompanying Bid, dated , 19 ; NOW, THEREFORE, if the Principal shall not withdraw said Bid within the period specified therein after the opening of the same, or, if no period be specified, within thirty (30) days after the said opening, ' and shall within the period specified therefor, or if no period be specified, within ten (10) days after the prescribed forms are presented to him for signature, enter into a written Contract with the Town in accordance with ' the Bid as accepted, and give bond with good and sufficient surety or sureties, as may be required, for the faithful performance and proper fulfillment of such Contract; or in the event of the withdrawal of said Bid ' within the period specified, or the failure to enter into such Contract shall pay the Town the difference between the amount specified in said Bid and the amount for which the Town may procure the required work or supplies ' or both, if the latter be in excess of the former, then the above obligation shall be void and of no effect, otherwise to remain in full force and virtue. IN WITNESS WHEREOF the above-bounded parties have executed this instrument under their several seals this day ' of , 19 , the name and corporate seal of each cor- porate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its ' governing body. In the presence of (SEAL) (Individual Principal) Business Address (SEAL) Partnership Bus ness Address By. Attest: (Corporate Principal) ' (Business Id dress) ' By: Affix Corporate Seal Attest: ' (Corporate Surety Affix ' Corporate Seal Countersigned ' By: (Power-of-Attorney for person signing for surety company must be attached to bond. ) TOWN OF SOUTH WINDSOR OFFICE OF THE TOWN MANAGER ' TOWN HALL SOUTH WINDSOR, CONNECTICUT PROPOSAL ' Mr. Terry V. Sprenkel Town Manager Town of South Windsor ' Town Hall South Windsor, Connecticut 06074 Dear Sir: Having carefully examined the Invitation to Bid, Instructions to Bidders, ' Form of Agreement, General Conditions, Special General Conditions, Special Conditions, Technical Provisions, Special Provisions, Drawings (as listed in the Schedule of Drawings) and Addenda (if any) for RECONSTRUCTION OF PIERCE ROAD from Ellington Road northerly 4,200 feet to Strong Road, as well as the site conditions affecting the work, the undersigned hereby proposes to complete the below listed work for the lump sum and ' unit prices for the work in place for the following items and quantities (Amounts to be shown in both words and figures. In case of discrepancy, amount shown in words will govern.). Engineer's Item Estimate of Computed No. Item and Unit Price Quantity Total 1 Clearing and Grubbing at the lump sum price of Dollars and Cents ($ ) 1 $ ' 2 Earth Excavation at the per cubic yard price of Dollars and Cents ($ ) 41840 $ ' 3 Rock Excavation at the per cubic yard price of TEN Dollars ' and NO Cents ($ 10.GO ) FIXED PRICE 50 $ 500.00 ' -2- PROPOSAL Engineer's Item Estimate of Computed No. Item and Unit Price Quantity Total ' 4 Borrow at the per cubic yard price of Dollars and Cents ($ ) 511200 $ ' 5 Formation of Subgrade at the per square yard price of Dollars and Cents ($ ) 14,775 $ ' 6 Bituminous Concrete at the per ton price of ' Dollars and Cents ($ ) 2,600 $ 7 Processed Aggregate Base at the per ton price of Dollars and Cents ($ ) 3,800 $ ' 8 Rolled Gravel Base at the per cubic yard price of Dollars and Cents ($ ) 2,500 $ 9 Bituminous Concrete Curbing at the per linear foot price of Dollars and Cents ($ ) 8,400 $ ' 10 Bikeway at the per square yard price of Dollars and Cents ($ ) 3,760 $ -3- PROPOSAL Engineer's Item Estimate of Computed No. Item and Unit Price Quantity Total ' 11 Trench Excavation at the per cubic yard price of ' Dollars and Cents ($ ) 1 .9120 $ ' 12 Rock in Trench Excavation at the per cubic yard price of ' FI FTEEN Dollars and NO Ce nts ($ 15.00 ) FIXED PRICE 35 $ 525.00 ' 13 Bedding Material at the per cubic yard price of ' Dollars and Cents ($ ) 200 $ 14 Gravel Fill at the per cubic yard price of Dollars and Cents ($ ) 250 $ ' 15 15" Perforated Asphalt Coated Cor- rugated Metal Pipe at the per linear ' foot price of Dollars and Cents ($ ) 356 $ 16 15" Reinforced Concrete Pipe at the per linear foot price of Dollars and Cents ' ($ ) 1 .9158 $ ' 17 21" Reinforced Concrete Pipe at the per linear foot price of Dollars and Cents ($ ) 68 $ -4- PROPOSAL Engineer's Item Estimate of Computed No. Item and Unit Price Quantity Total 18 24" Reinforced Concrete Pipe at the per linear foot price of ' Dollars and Cents ($ ) 56 $ 19 36" Reinforced Concrete Pipe at the per linear foot price of ' Dollars and Cents ($ ) 56 $ I20 43" x 27" Asphalt Coated Corrugated Metal Pipe Arch at the per linear I foot price of Dollars and Cents I ($ ) 56 $ 21 Underdrain at the per linear foot price of Dollars and Cents ' ($ ) 1 .9200 $ 22 Type "C" Catch Basin with Sump at ' the per each price of Dollars and Cents I ($ ) 19 $ 23 Type "C" Catch Basin Without Sump ' at the per each price of Dollars and Cents ($ ) 5 $ I 24 Manhole at the per each price of Dollars and Cents ($ ) 1 $ 1 1 1 -5- PROPOSAL ' Engineer's Item Estimate of Computed No. Item, and Unit Price Quantity Total ' 25 Hay Bale Erosion Checks at the per linear foot price of ' Dollars and Cents ($ ) 23000 $ ' 26 Log and Hay Bale Check Dams at the per each price of Dollars and Cents ($ ) 4 $ 27 Bituminous Concrete Driveway at the per square yard price of Dollars and Cents ($ ) 450 $ 28 Cement Rubble Masonry at the per cubic yard price of Dollars and Cents ($ ) 45 $ 29 Miscellaneous Concrete at the per cubic yard price of Dollars and Cents ($ ) 40 $ ' 30 Furnishing and Placing Topsoil at the per square yard price of ' Dollars and Cents ($ ) 6,750 $ ' 31 Fertilizing and Seeding at the per square yard price of Dollars and Cents ($ ) 61750 $ ' -6- P ROPOSA L Engineer's Item Estimate of Computed No. Item. and Unit Price Quantity Total ' 32 Siltation Chamber at the lump sum price of ' Dollars and Cents ($ ) 1 $ 33 Removal of Existing Structure at the lump sum price of Dollars and Cents ($ ) 1 $ 34 Box Culvert at the lump sum price of Dollars ' and Cents 1 $ 35 Dry Rubble Masonry at the per ' cubic yard price of Dollars and Cents ' ($ ) 15 $ 36 Porous Material for Tree Root ' Protection at the per cubic yard price of Dollars ' and Cents ($ ) 50 $ ' 37 Metal Beam Rail (Type R-I) at the per linear foot price of Dollars and Cents ($ ) 3,450 $ ' 38 Wood Rail at the per linear foot price of Dollars and Cents ($ ) 120 $ ' -7- PROPOSAL Engineer's Item Estimate of Computed No. Item and Unit Price Quantity Total 39 Observation Platform at the lump sum price of Dollars and Cents ($ ) 1 $ 40 Walkway at the per linear foot price of Dollars and Cents ($ ) 80 $ ' 41 Gage Well at the lump sum price of Dollars ' and Cents ($ ) 1 $ ' 42 Maintenance and Protection of Traffic at the lump sum price of Dollars and Cents ($ ) 1 $ ' 43 Sanitary Sewer Laterals at the per linear foot price of Dollars ' and Cents ($ ) 320 $ 44 10" Sanitary Sewer at the per linear foot price of Dollars and Cents ($ ) 60 $ TOTAL PRICE $ It is agreed that the above listed "FIXED PRICE" allowance(s) will be paid if and where the item is ordered by the Engineer and furnished and per- formed by the Contractor just as if it were a unit price Bid. -8- PROPOSAL Bid Security attached in the amount of 10% of Bid is to become the property of the Town in the event the Contract and Bond are not executed ' within the time set forth in the Contract Documents, as liquidated damages for the delay and additional expense to the Town caused thereby. BIDDER ' ADDRESS SIGNED BY TITLE DATE ' The Contractor hereby acknowledges the receipt of the following addenda: Addendum No. Signature 1 2 3 I 1 1 1 1 AGREEMENT THIS AGREEMENT, made this day of , 19 , ' by and between the Town of South Windsor, a municipality located within the County of Hartford in the State of Connecticut, acting through hereinafter called "OWNER, party ' of the first part, and hereinafter termed the "CONTRACTOR", party of the second part. WITNESSETH: That the parties to this Agreement each in consider- ation of the Agreements on the part of the other herein contained have agreed, and by these presents do hereby agree, the OWNER for itself, and the CONTRACTOR for himself and his heirs, executors, administrators, ' successors and assigns, as follows: That the Contract Documents consisting of this Agreement, together with the Legal and Procedural Documents, General Conditions, Special Provisions, Technical Provisions, Contract Drawings, and any Addenda issued before execution of the Agreement, for the Contract: ' That the CONTRACTOR has informed himself fully in regard to all conditions pertaining to the place where the work is to be done and other ' circumstances affecting the work: ' That the CONTRACTOR has obtained all the information he needs to enable him to estimate fully and fairly the costs of the work herein contemplated: ' That the CONTRACTOR shall furnish all plant, labor, materials, supplies, tools, equipment and other facilities and things necessary or ' property for or incidental to construct. the following: for the party of the first part, in accordance with this Contract, and completing everything required of him under this Contract not later than ' the time stipulated in the Instructions to Bidders. That the OWNER shall pay and the CONTRACTOR shall receive as full compensation for fulfilling everything required of the CONTRACTOR ' under this the unit price and lump sums recorded in the Bid. ' That the quantities shown in the Bid are approximate only and are solely for the purpose of facilitating the comparison of Bids, that the OWNER shall not be held responsible if these quantities are not even ' approximately correct, that for all work upon which unit prices and lump sums are quoted, the CONTRACTOR'S compensation shall be computed upon the work actually performed, measured by the units of measurement ' specified, whether greater or less than the quantities as shown in the Bid, and that the unit prices and lump sums set against the several items cover all incidental services required of the CONTRACTOR under the ' Contract. That the CONTRACTOR shall give to the OWNER, liquidated damages, for each day lost by the CONTRACTOR in completion of the work of the Contract after the time herein stipulated the sum of-- Dollars. IN WITNESS WHEREOF, the parties to these present have executed this AGREEMENT in the year and day first above mentioned. TOWN OF SOUTH WINDSOR, CONN. (Seal) By CONTRACTOR ' (Seal) By IMPORTANT: Execute Acknowledgement of Officer or Agent of Contractor who signs this ' document (use proper form next page). AGREEMENT (ACKNOWLEDGMENT OF PRINCIPAL,, IF A CORPORATION) ' S tate of ) SS: ' County of ) 19 On this day of ' before me personally came and appeared ' to me known, who, being by me duly sworn, did depose and say that he resides at ' that he is the of the corporation described in and which executed the foregoing instrument; that he knows the seal of said corporation; that one of the impressions affixed to said instrument is an impression of such seal; that it was so affixed by order of the directors of said corp- oration, and he he signed his name thereto by like order. (SEAL) Notary Public (ACKNOWLEDGMENT OF PRINCIPAL, IF A PARTNERSHIP) State of ) SS: ' County of ) On this day of ' before me personally came and appeared ' to me known and known to me to be one of the members of the firm of , described in and who executed the foregoing instrument and he acknowledged to me that he executed the same as and for the act and deed of said firm. (SEAL) Notary Public AGREEMENT (ACKNOWLEDGMENT OF PRINCIPAL, IF AN INDIVIDUAL) ' State of ) SS: 197 ' County of ) On this day of before me personally came and appeared to me known and to me to be the person described in and who executed the foregoing instrument and acknowledge that he executed the same. ' (SEAL) Notary Public PERFORMANCE BOND ' Bond No. KNOW ALL MEN BY THESE PRESENTS: ' That ' as Principal, Hereinafter called Principal, and as Surety, hereinafter called Surety are held and firmly bound unto the Town of South Windsor, Connecticut, as Obligee, hereinafter called Town, in the amount of Dollars, ($ ), for the payment whereof Principal and Surety bind themselves, their heirs, ' executors, administrators, successors and assigns, jointly and severally, firmly by these presents. ' WHEREAS, Principal has by written agreement dated ' entered into a Contract with Town for which Contract is by reference made a part hereof, and is hereinafter referred to as the Contract. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if Principal shall promptly and faithfully perform said Contract, and shall certify in writing that all wages paid under said Contract to any mechanic, laborer or workman were equal to the rates of wages customary or then prevailing for the same trade or occupation in the Town of South Windsor, then this obgliation shall be null and void, otherwise it shall ' remain in full force and effect. 1 The Surety hereby waives notice of any alteration or extension of time made by the Town. ' Whenever Principal shall be, and declared by the Town to be in de- fault under the Contract, the Town having performed Owner's obligations thereunder, the Surety may promptly remedy the default, or shall promptly: 1) Complete the Contract in accordance with its terms and conditions-; or, 2) Obtain a bid or bids for submission to the Town for completing ' the Contract in accordance with its terms and conditions, and upon determination by the Town and Surety of the lowest pos- sible bidder, arrange for a Contract between such bidder and the Town, and make available as work progresses (even though there should be a default or a succession of defaults under the Contract or Contracts of completion arranged under this para- graph) sufficient funds to pay the cost of completion less the balance of the Contract price; but not exceeding, including, other costs and damages for which the Surety may be liable ' hereunder, the amount set forth in the first paragraph hereof. The terms "balance of the Contract price", as used in this paragraph, shall mean the total amount payable by the Town • to Principal under the Contract and any amendments thereto, less the amount properly paid by the Town to the Principal. ' Any suit under this bond must be instituted before the expira- tion of two (2) years from the date on which final payment under the Contract falls due. ' No right of action shall accrue on this bond to or for the use of any person or corporation other than the Town named here- in or the heirs, executors, administrators or successors of Town. ' Signed and sealed this day of , A.D. 19 ' In the Presence of: (SEAL) (Principal) By: ' (S EA L) (Surety) By: LABOR AND MATERIAL PAYMENT BOND Bond No. Note: This bond is issued simultaneously with another bond in ' favor of the Town of South Windsor, Connecticut conditioned for the full and faithful performance of the Contract. ' KNOW ALL MEN BY THESE PRESENTS: That As Principal, hereinafter called Principal, and as Surety, hereinafter called Surety, are held and firmly bound unto the Town of South Windsor, Connecticut, as Obligee, hereinafter called Town, for the use and benefit of claimants as hereinbelow defined, in the amount of Dollars ($ ), for the payment whereof Principal and Surety bind themselves, their heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. WHEREAS, Principal has by written agreement dated ' entered into a Contract with Town for ' made a part hereof, and is hereinafter referred to as the Contract. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, ' that if the said Principal shall pay for all labor and materials furnished to himself or his subcontractors for use in the prosecution of the work, and used therein, then, this obligation to be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the ' provisions of Section 49-41 , 49-42 and 49-43 of the 1958 Revision of the General Statutes and the 1961 Supplement thereto, of the State of Connecticut, and the rights and liabilities hereunder shall be determined and ' limited by said sections to the same extent as if they were copies at length herein. ' Signed and sealed this day of A.D. 19 In the presence of: (SEAL) (Principal) BY: (SEAL) (Surety) ' BY: GENERAL CONDITIONS Article 1. Definitions ' Wherever used in these General Conditions or in the other Contract Documents, the following terms shall have the meanings which shall be applicable to both the singular and plural thereof: ' Agreement ' The written agreement between the OWNER and the CONTRACTOR covering the Work to be performed, including the CONTRACTOR'S Bid and the Bonds. Bid The offer or proposal of the Bidder submitted ' on the prescribed form setting forth the prices for the Work to be performed. ' Bidder Any person, firm or corporation submitting a ' Bid for the Work. Bonds Bid, performance and payment bonds and other instruments of security, furnished by the CONTRACTOR and his surety in accordance with the Contract Documents. Change Order A written order to the CONTRACTOR signed by ' the OWNER authorizing an addition, deletion or revision in the Work, or an adjustment in the Contract Price or the Contract Time issued after execution of the Agreement. Contract Documents The Agreement, Specifications, Drawings, Addenda (whether issued prior to opening of Bids or execution of the Agreement) and Modifications. ' Contract Price The total monies payable to the CONTRACTOR under the Contract Documents. Contract Time ' The number of calendar days stated in the Agree- ment for the completion of the work. ' Griswold & Fuss, Inc. GC-2 CONTRACTOR ' The person, firm or corporation with whom the OWNER has executed the Agreement. ' Drawings The drawings and plans which show the character and scope of ' the work to be performed and which have been prepared or approved by the Engineer and are referred to in the Contract Documents. ' ENGINEER Wherever in the Contract Documents the word "Engineer" is ' used, it shall be understood as referring to the Engineer of the Town Manager of the Town of South Windsor acting personally or through any assistants authorized in writing for such acts by the Engineer. ' Inspector ' The authorized representative of the Engineer or OWNER who is assigned to the Project or any parts thereof. ' Modification (a) A written amendment of the Contract Document signed by ' both parties, (b) a Change Order, (c) a written clarification or inter- pretation issued by the Engineer or (d) a written order for a minor change or alteration in the work issued by the Engineer. A modification ' may only be issued after execution of the Agreement. OWNER The Town of South Windsor Connecticut. Project The entire construction to be performed as provided in the ' Contract Documents. Shop Drawings ' All drawings, diagrams, illustrations, brochures, schedules and other data which are prepared by the Contractor, a Subcontractor, manu ' facturer, supplier or distributor and which illustrate the equipment, material or some portion of the work. ' Griswold & Fuss, Inc. ill GC-3 Specifications The Instructions to Bidders, these General Conditions., the Special Conditions and the Technical ' Provisions . Subcontractor ' An individual, firm or corporation having a direct contract with the Contractor or with any other Subcontractor for the performance of a part of the Work ' at the site. Work ' Any and all obligations, duties and responsi- bilities necessary to the successful completion of the Project assigned to or undertaken by the Contractor under the Contract Documents, including the furnishing of all labor, materials, equipment and other incidentals . ' Article 2. Progress and Submission Schedules• Preconstruction Conference; ime of Start ng the Work ' (a) Within ten days after execution of the Agreement, the Contractor will submit to the Engineer for approval, an estimated progress schedule indicating the ' starting and completion dates of the various stages of the Work, and a schedule of Shop Drawing submissions. (b) Before starting the Work, a conference will be held to review the above schedules, to establish procedures for handling Shop Drawings and other submissions and for processing Applications for Payment, and to establish a working understanding between the parties as to the Project. (c ) Prior to starting the Work the Contractor will furnish the Owner and Engineer certificates of insurance as required by the specifications. (d) The Contractor will start the Work on the ' Idate on which the Agreement is executed and delivered, or on such other date, if any, as may be specified in the Agreement. ' However, at the time of the execution and delivery of the Agreement the Owner may give the Contractor a written notice to proceed, stating a different date on which it is expected that the Contractor will start the Work, but such date shall not be more than thirty days after the date of execution and delivery of the Agreement. ' (e) The Contract Time shall commence to run on the date when the Work is to start as provided in the above paragraph. Griswold & Fuss, Inc. GC-4 Article 3. Correlation, Interpretation and Intent of ' Contract Documents (a) It is the intent of the Specifications and Drawings to describe a complete Project to be constructed ' in accordance with the Contract Documents. The Contract Documents comprise the entire Agreement between the Owner and the Contractor. They may be altered only by a Modification. (b) The Contract Documents are complimentary; what is called for by one is as binding as if called for by all. If the Contractor finds a conflict, error or discrepancy in the Contract Documents, he will call it to ' the Engineer' s attention in writing before proceeding with the Work affected thereby. In resolving such conflicts, errors and discrepancies, the documents shall be given ' precedence in the following order: Agreement, Specifications, Drawings. Within the Specifications the order of precedence shall be as follows : Special Conditions, Instructions to Bidders, General Conditions, Technical Provisions. Figure ' dimensions on Drawings shall govern over scale dimensions, and detailed Drawings shall govern over general Drawings. Any Work that may reasonably be inferred from the Specifica- tions or Drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Works materials or equipment described in words which so applied have a well-known technical or trade meaning shall be deemed to refer to such recognized standards. The Contractor assumes full responsibility for having familiarized himself with the nature and extent of the Contract Documents, Work, locality, and local conditions that may in any manner affect the Work to be done. Article Copies of Documents and Record Documents (a) The Owner will furnish the Contractor up to ten copies of the Specifications and Drawings as are reasonably necessary for the execution of the Work. Additional copies will be furnished, upon request, at the ' tcost of reproduction. (b) The Contractor will keep one record copy ' of all Specifications, Drawings, Addenda, Modifications, and Shop Drawings at the site in good order and annotated to show all changes made during the construction process . These shall be available to the Engineer and shall be delivered ' to him upon completion of the Project. ' Griswold & Fuss, Inc. GC-5 Article 5. Separate Contracts ' The Owner may award other contracts in the vicinity of the tdork which may proceed simultaneously with the execution of this Contract. The Contractor shall perform his work, causing as little interference with other Contractors, so far as circumstances will permit. ' Article 6. Subcontracts ' ( a) Prior to the execution and delivery of the Agreement, the successful Bidder will submit to the Engineer for acceptance a list of the names of Subcontractors and such other persons and organizations (including those who are to furnish materials or equipment fabricated to a special design) proposed for those portions of the Work as to which the identity of the Subcontractors and other persons 1 and organizations must be submitted as specified in the Contract Documents. Prior to the execution and delivery of the Agreement, the Engineer will notify the successful ' Bidder in writing if the Engineer after due investigation has reasonable objection to any Subcontractor, person or organization on such list. The failure of the Engineer to make objection to any Subcontractor, person or organization ' on the list prior to the execution and delivery of the Agreement shall constitute an acceptance of such Subcontractor, person or, organization. Acceptance of any such Subcontractor, person or organization shall not constitute a waiver of any right of the Engineer to reject defective work, material or equipment not in conformance with the requirements of the Contract Documents . (b) The Contractor will be fully responsible for all acts and omissions of his Subcontractors and of persons ' directly or indirectly employed by them and of persons for whose acts any of them may be liable to the same extent that he is responsible for the acts and omissions of persons directly employed by him. Nothing in the Contract Documents shall create any contractual relationship between any Sub- contractor and the Owner or the Engineer or any obligation ' on the part of the Owner or the Engineer to pay or to see �to the payment of any monies due any Subcontractor, except as may otherwise be required by law. ' (c ) The Contractor agrees to specifically bind every Subcontractor to all of the applicable terms and conditions of the Contract Documents. Every Subcontractor, ' by undertaking to perform any of the Work, will thereby automatically be deemed to be bound by such terms and conditions. ' Griswold & Fuss, Inc. GC-6 Article 7. Materials, Equipment and Labor; Or Equal Clause ' (a) The Contractor will provide and pay for all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, li-ht, heat, telephone, water and sanitary facilities and all other facilities and incidentals necessary for the e::ecution, testing, initial operation and completion of the ' Work. (b) All materials and equipment will be new. ' If required by the Engineer, the Contractor will furnish satisfactory evidence as to the kind and quality of materials and equipment. ' (c ) Wherever in these Contract Documents a particular brand, make of material, device or equipment is shown or specified, such brand, mare of material, device ' or equipment shall be regarded as standard. Where such items are specified, this shall not be interpreted to preclude the furnishing of items other than those specified ' where the quality, use and serviceability of the substitute is adjudged by the Engineer to be the same or equal of the standard. (d) All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manu- facturer, fabricator or processors, except as otherwise specifically provided in the Contract Documents. Article 8. Patent Fees and Royalties The Contractor will pay all license fees and ' royalties and assume all costs incident to the use of any invention, design, process or device which is the subject of patent rights or copyrights held by others. Fie will ' indemnify and hold harmless the Owner and the Engineer and anyone directly or indirectly employed by either of them from and against all claims, damages, losses and expenses (including attorneys ' fees ) arising out of any infringement ' "of such rights during or after completion of the Work, and shall defend all such claims in connection with any alleged infringement of such rights. Article 9. Permits, Laws and Regulations ' (a) The Contractor will secure and pay for all construction permits and licenses. Griswold & Fuss, Inc. GC-7 (b) The Contractor will give all notices and ' comply with all laws, ordinances, rules and regulations applicable to the work. If the Contractor observes that the Specifications or Drawings are at variance therewith, he will give the Engineer prompt written notice thereof, and any necessary changes shall be adjusted by an appropriate modification. If the Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and ' regulations, and without such notice to the Engineer, he will bear all costs arising therefrom. ' Article 10. Availability of Lands; Physical and Subsurface Conditions ' The Owner will provide, as indicated in the Contract Documents and not later than the date when needed by the Contractor, the lands upon which the Jork ' is to be done, rights-of-way for access thereto, and such other lands which are designated for the use of the Con- tractor. Easements for permanent structures or permanent changes in existing facilities will be secured and paid for ' by the Owner, unless otherwise specified in the Contract Documents. I£ the Contractor believes that any delay in the Ovmer' s furnishing these lands or providing such ease- ments entitles him to an extension of the Contract Time, he may make a claim therefor as provided hereafter . The Contractor will provide all additional lands and access ' thereto that may be rer_uired for temporary construction facilities or storage of materials and equipment. Subsurface information which may be contained in ' these Contract Documents, has been developed from the best available records, the accuracy of which cannot be guaranteed. If, in the course of construction, conditions are found which result in changes or alignment and/or delays necessitating the re-scheduling of the Contractor's operation, such changes in alignment or re-scheduling of operations shall not consti- tute the basis of a claim for extra payment . It is anticipated that the Contractor, will provide for contingencies which may confront him throughout the execution of the Work, in the preparation of his bid. Article 11. Engineer' s Control (a) In the performance of the Work, the Contractor shall abide by all orders, directions and requirements of the ' Engineer and shall perform all Work to the satisfaction of the Engineer,, and at such time and places, by. such methods ' Griswold & Fuss, Inc. GC-8 and in such manner and sequence as he may require. The Thgineer shall determine the amount, quality, acceptability and fitness of all parts of the Work, shall interpret the Contract Documents and Change Orders and shall decide all other questions in connection with the Work. (b) The enumeration herein or elsewhere in the Contract Documents of particular instances in which the opinion, judgment, discretion or determination of the Engineer shall control or in which Work shall be performed to his satisfaction or subject to his approval or inspection, shall not imply that only matters similar to those enumerated shall be so governed and performed, but without exception all the Work shall be governed and so performed. ' Article 12. Authority and Duties of Inspectors ' Inspectors employed by the Owner or the Engineer shall be authorized to inspect all work done and material furnished. Such inspection may extend to all or any part of the Work, and to the preparation or manufacture of the ' materials to be used. In case of any dispute arising be- tween the Contractor and the Inspector as to materials furnished or the manner of performing the Work, the In- spector shall have authority to reject material or suspend the Work until the auestion at issue can be referred to and decided by the Engineer. The Inspector shall not be authorized to revoke, alter, enlarge, relax or release any requirements ' of these specifications, nor to approve or to accept any portion of the Work, nor issue instructions contrary to the Plans and Specifications . The Inspector shall in no case act as foremen or perform other duties for the Contractor, or interfere with the management of the Work by the latter. Any advice which the Inspector may give the Contractor shall in no circumstance be construed as binding the Engineer or Owner in any way nor releasing the Contractor from fulfill- ment of the terms of the Contract . ' Article 13. Tests and Inspections ' ( a) If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority having jurisdiction require any Work to specifically be inspected, tested, or approved by someone other than the Contractor, the Contractor will give the Engineer timely notice of readiness therefor. The Contractor will furnish the Engineer the required certificates of inspection, testing or approval. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other ' Griswold & Fuss, Inc. GC-9 applicable organization as may be required by law or the ' Contract Documents . If any such Work required so to be inspected, tested or approved is covered up without written approval or consent of the Engineer, it must, if directed by the Engineer, be uncovered for observation at the Contractor' s expense. The cost of all such inspec- tions, tests and approvals shall be borne by the Contractor unless otherwise provided. ' (b) Any Work which fails to meet the requirements of any such test, inspection or approval and any Work which meets the requirements of any such test or approval but does not meet the requirements of the Contract Documents shall be considered defective. Such defective Work may be rejected, corrected or accepted as provided. ' (c ) Neither observations by the Engineer nor inspections , tests or approvals by persons other than the ' Contractor shall relieve the Contractor from his obligations to perform the Work in accordance with the requirere nts of the Contract Documents. ' Article 14. Shop Drawings and Samples ' (a ) After checking and verifying all field measurements, the Contractor will submit to the Engineer for approval, in accordance with the accepted schedule of ' Shop Drawing submissions, five copies (or at the Engineer' s option, one reproducible copy) of all Shop Drawings , which shall have been checked by and stamped with the approval ' of the Contractor and identified as the Engineer may require. The data shotim on the Shop Drawings will be complete with respect to dimensions, design criteria, materials of con- struction and the like to enable the Engineer to review the information as required. (b) The Contractor will also submit to the ' Engineer for approval, with such promptness as to cause no delay in Work, all samples required by the Contract Documents . All samples will have been checked by and stamped with the ' approval of the Contractor, identified clearly as to material, manufacturer, any pertinent catalog numbers and the use for which intended. (c ) At the time of each submission, the Contractor will, in writing, call the Engineer' s attention to any de- viations that the Shop Drawing or sample may have from the ' requirements of the Contract Documents. ' Griswold & Fuss, Inc. GC-10 (d) The Engineer will check and approve with ' reasonable promptness Shop Drawings and samples, but his checking and approval shall be only for conformance with the design concept of the Project and for compliance with the information given in the Contract Documents . The approval of a separate item as such will not indicate approval of the assembly in which the item functions. The Contractor will mske any corrections required by the j Fhgineer and will return the required number of corrected copies of Shop Drawings and resubmit new samples until approved. The Contractor shall direct specific attention in writing or on resubmitted Shop Drawings to revisions other than the corrections called for by the Engineer on previous submissions . (e) No Work requiring A Shop Drawing or sample submission shall be commenced until the submission has been approved by the Engineer. (f) The Engineer' s approval of Shop Drawings or sample shall not relieve the Contractor from his res- ponsibility for any deviations from the requirements of the Contract Documents unless the Contractor has in writing called the Engineer' s attention to such deviations at the ' time of submission and the Engineer has given written approval to the specific deviation, nor shall any approval by the Engineer relieve the Contractor from responsibility for errors or omissions in the Shop Drawings . Article 15. Contractor' s Supervision and Superintendence (a) The Contractor will supervise and direct the Work efficiently and with his best skill and attention. He will be solely responsible for the means , methods, techniques, ' sequences and procedures of construction. Before undertaking the Work he will carefully study and compare the Contract Documents and check and verify all figures shown thereon and all field.measurements . He will at once report in writing to the Engineer any conflict, error or discrepancy which he may discover. The Contractor will be responsible to see that the finished Work complies accurately with the ,Contract Documents . (b) The Contractor will keep on the Work at all ' times during its progress a resident superintendent satis- factory to the Engineer. The superintendent shall not be replaced without the consent of the Engineer except under ' extraordinary circumstances. The superintendent will be the Contractor' s representative at the site and shall have authority to act on behalf of the Contractor. All communi- cations given to the superintendent shall be as binding as if given to the Contractor. ' Griswold & Fuss, Inc. GC-11 (c ) The ehgineer will not be responsible for the ' acts or omissions of the Contractor, or any Subcontractors, or any of his or their agents or employees, or any other persons performing any of the Work. ' Article 16 . Safety and Protection; Emergencies (a) The Contractor will be responsible for initia- ting, maintaining and supervising all safety precautions and programs in connection with the Work. He will take all ' necessary precautions for the safety of, and will provide the necessary protection to prevent damage, injury or loss to: 1. All employees on the Work and other persons ' who may be affected thereby. 2. All the Work and all materials or equip- ment to be incorporated therein, whether in storage on or off the site, and ' 3. Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks , pavements, roadways , structures and utilities not designated for removal, relocation or replacement in the course of construction. (b) No materials or other obstruction shall be placed within 15 feet of any fire hydrant, which at all times must be readily accessible to the Fire Department. (c ) Not more than one block at a time of the ' street shall be torn up, obstructed or closed without the permission of the Engineer. Prior to street closings, the Contractor shall obtain the permission of the Police Depart- ment and shall notify the Fire Department immediately of ' such closings and openings . (d) The Contractor will comply with all applicable ' laws, ordinances, rules , regulations and orders of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss. He will erect ' ,and maintain, as required by the conditions and progress of `the Work, all necessary safeguards for safety and protection, including posting danger signs and other warnings against ' he.zards and promulgating safety regulations. He will notify Owners of adjacent utilities when prosecution of the Work may affect them. When the use or storage of explosives or other hazardous materials is necessary for the prosecution ' of the Work, the Contractor will exercise the utmost care and will carry on such activities under the supervision of properly qualified personnel. All damage, injury or loss ' Griswold & Fuss, Inc. GC-1? to any property referred to in the above paragraphs caused, ' directly or indirectly, in whole or in part, by the Con- tractor, any Subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of them ' may be liable, will be remedied by the Contractor, except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of the Owner or the Engineer or anyone employed by either of them or for whose acts either of them may be liable, and not attributable to the fault or negligence of the Contractor. (e ) In emergencies affecting the safety of persons or the Work or property at the site or adjacent. thereto, the Contractor, without special instruction or ' authorization from the Engineer or Owner, is obligated to act, at his discretion, to prevent threatened damage, injury or loss . He will give the Engineer prompt written notice of any significant changes in the Work or deviations from ' the Contract Documents caused thereby, and a Change Order shall thereupon be issued covering the changes and deviations involved. Article 17. Access to the Work; Uncovering Finished Work (a) The Engineer and his representatives will at all times have access to the Work. The Contractor will provide proper facilities for such access and observation of the Work and also for any inspection, or testing thereof by others . ' (b) If any Work is covered contrary to the request of the Engineer, it must, if requested by the Engineer, be uncovered for his observation and replaced at the Contractor' s expense. (c ) If any Work has been covered which the Engi- neer has not specifically requested to observe prior to its ' being covered, or if the Engineer considers it necessary or advisable that covered Work be inspected or tested by others, the Contractor, at the Engineer' s request, will uncover, ' expose or otherwise make available for observation, inspection %or testing as the Engineer may require, that portion of the Work in question, furnishing all necessary labor, material ' and equipment. If it is found that such Work is defective or does not meet the requirements of the Contract Documents, the Contractor will bear all the expenses of such uncovering, exposure, observation, inspection and testing and of satis- factory reconstruction, including compensation for additional Griswold & Fuss, Inc. I ' GC-13 professional services, and an appropriate Change Order shall ' be issued deducting all such costs from the Contract Price. If, however, such tilork is found to be nondefective and meet the requirements of the Contract Documents, the Contractor . will be allowed an increase in the Contract Price or extension of the Contract Time directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction if he makes a claim therefor as provided hereafter. Article 18. Change in the Work ( a) Without invalidating the Agreement, the Owner may, st any time or from time to time, order additions, dele- tions or revisions in the Work; these will be authorized by Change Orders . Upon receipt of a Change Order, the Contractor will proceed with the Work involved. All such Work shall be executed under the applicable conditions of the Contract Documents . If any Change Order causes an increase or de- crease in the Contract Price or an extension or shortening of the Contract Tirae, an equitable adjustment will be made as provided hereafter. (b) The Engineer may authorize minor changes or alterations in the Work not involving extra cost and not inconsistent with the overall intent of the Contract Documents . These may be accomplished by a Field Order. If the Contractor believes that any minor change or alteration ' authorized by the Engineer entitles him to an increase in the Contract Price, he may make a claim therefor as provided hereafter. ' (c ) Additional Work performed by the Contractor without authorization of a Change Order will not entitle him to an increase in the Contract Price or an extension of ' the Contract Time, except in the case of an emergency as provided in these Conditions. (d) It is the Contractor' s responsibility to notify his Surety of any changes affecting the general scope of the Work or change in the Contract Price and the amount ' of the applicable Bonds shall be adjusted accordingly. The Contractor will furnish proof of such adjustment to the Owner. Article 19. Change Orders ' (a) The value of any Work covered by a Change Order shall be determined in one of the following ways: ' Griswold & Fuss, Inc. GC-14 1. Where the Work involved is covered by ' unit prices contained in the Contract Documents, by applica- tion of unit prices to the quantities of the items involved. 2. By mutual acceptance of a lump sum. 3. By cost and a mutually acceptable fixed amount for overhead and profit. ' 4. If none of the above methods is agreed upon, the value shall be determined by the Engineer on the ' basis of costs and a percentage for overhead and profit. Costs shell only include labor (payroll, payroll taxes, fringe benefits, workmen' s compensation, etc . ) , materials, equipment, and other incidentals directly related to the ' 11ork involved. The maximum percentage which shall be allowed for Contractor's combined overhead and profit, shall be as follows : ' 5. For all such Work done by his own orga- nization, the Contractor may add up to ten percent of his actual net increase in costs , and 6. For all such Work done by Subcontractors, each Subcontractor may add up to ten percent of his actual net increase in costs for combined overhead and profit and the Contractor may add up to five percent of the Subcontractor' s total for his combined overhead and profit; provided that no ' overhead or profit shall be allowed on costs incurred in con- nection with premiums for public liability insurance or other- wise special insurance directly related to such Work. ' In such case, the Contractor will submit in form prescribed by the Engineer an itemized cost breakdown together with supporting data. ' (b) The amount of credit to be allowed by the Contractor to the Owner for any such change which results in a net decrease in cost, will be the amount of the actual net decrease as determined by the Engineer. When both additions and credits are involved in any one change, the combined ' overhead and profit shall be figured on the basis of the not tincrease, if any. Article 20. Change of the Contract Time (a) The Contract Time may only be changed by a Change Order. If the Contractor is entitled by the Contract Documents to make a claim for an extension in the Contract ' Griswold & Fuss, Inc. GC-15 Time, his claim shall be in writing delivered to the Engineer ' within 10 days of the occurrence of the event giving rise to theclaim. Any change in the Contract Time resulting from any such claim shall be incorporated in a Change Order. (b) The Contract Time will be extended in an amount equal to time lost due to delays beyond the control of the Contractor if he makes a claim therefor as provided in paragraph above. Such delays shall include, but not be restricted to, acts or neglect by any separate Contractor employed by the Owner, fires, floods , labor disputes, epi- demics, abnormal weather conditions, or acts of God. (c ) All time limits stated in the Contract Docu- ments are of the essence of the Agreement. The provisions ' of this article shall not exclude recovery for damages (including compensation for additional professional services) for delay by either party. Article 21. Warranty and Guarantee; Correction Removal or ' Acceptance of Defective Work (a) The Contractor warrants and guarantees to the Cwner and the Engineer that all materials and equipment will be new unless otherwise specified and that all Work will be of good quality and free from faults or defects and in accordance with the requirements of the Contract Documents and of any inspections, tests or approvals referred to in Article 13. All unsatisfactory Work, all faulty or defective Work and all Work not conforming to the requirements of the Contract Documents or of such inspections, tests or approvals ' shall be considered defective. Prompt notice of all defects shall be given to the Contractor. All defective :Mork, whether or not in place, may be rejected. (b) If required by the Engineer_ prior to the issuance of the certificate of completion, the Contractor will promptly, without cost to the Owner and as required by the Engineer, either correct any defective Work, whether or not fabricated, installed or completed, or, if the Work has been rejected by the Engineer, remove it from the site ' ;.and replace it with nondefective Work. If the Contractor does not correct such defective Work or remove and replace such rejected Work within a reasonable time, all as required by written notice from the Engineer, the Oimer may have the deficiency corrected or the rejected Work removed and replaced. All direct or indirect costs of .such correction or removal ' and replacement, including compensation for additional profes- sional services shall be paid by the Contractor, and an ' Griswold & Fuss, Inc. r KING CONTRACTORS, LTD. July 7, 1977 TOWN OF SOUTH WINDSOR 1540 Sullivan Avenue South Windsor, Connecticut 06074 ATTN: Allan S. Young Director of Public Works RE: Pierce Road SUBJECT: Retainage (- Gentlemen: We have been more than patient im waiting for release of our retainage in the amount of $ 4, 913\~.-W----"Your letter of March 9, 1977 advising that the retainage could not be released prior to aline 24, 1977 is without basis. Forty- our information, this project was completed the 1st week of September 1975 and final billing was September 30, 1975. In accordance with standard practices and the specifications, the one (1) year guarantee period started October of 1975 and ended September 30, 1976. We realize that there was a difference of oninion concernirig the roadway base, but this in no way affects the completion date of the project. s_ The roadway base problem was handled with a $ 26,000.00 bond executed February 26, 1976 and shortly after, the balance of money due us ( less 2% retainage) for work performed, was paid. ry The $ 5, 100.00 for materials purchased prior to the deletion of Items # 10, 39, 40 & 41 should have been paid in March of 1975 but this money was not received until June 26, 1976, over one (1) year later. The Town of South Windsor certainly cannot use this date as "Final Payment Date". The withholding of this payment of $ 5, 100.00 for over one (1) year was without justification and showed a lack of concern on the Town's part. According to Article 21, Paragraph (c) of the General Conditions in the specifications, we were to receive written instructions prior to the one (1) year expiration date, if there was any defective work to be corrected. Inasmuch as one (1) year and nine (9) months have passed without any written notice from the Town, we therefore request immediate payment of our retainage. If we receive it before July 15, 1977 we will waive interest. However, if not received by that date, we will expect nine (9) months 16 NORTHWOOD DRIVE, BLOOMFIELD, CT. 06002 TEL. 242-2263 < ► 4 Page 2 .- July 7, 1977 - Cont. interest at 9% plus any other costs involved in collecting money long overdue. Very truly yours, KING CONTRACTORS,LTD. Bob Chagnon General Manager CC: Wm. Klock- G & F T.G. Dennis-Atty i KING CONTRACTORS, LTD. 16 NORTHWOOD DRIVE, BLOOMFIELD, CT. 06002 TEL. 242-2263 KING CONTRACTORS , LTD. ` 16 NORTHWOOD DRIVE, BLOOMFIELD, CONNECTICUT 06002 O' R USAw* + TOWN OF SOUTH WINDSOR RFTUIRN RF 1 PT RFQIIFSTFn 1540 Sullivan Avenue CFRTIFI_ D ti-�_ AIL South Windsor, Connecticut 06074 ATTENTION : Allan S. Young Director of Public Works No. 91 '57 7 - —?-� ` 4—I CMO from TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONN. 06074 TO Allan Young DATE 7/5/78 Director of Public Works L SUBJECT: FOLD- Please furnish Attorney Rittenband with the requested information in attached letter. r-1 Y Paul F. Talbot By r v RICHARD M. RITTENBAND ATTORNEY AT LAW 1734 ELLINGTON ROAD SOUTH WINDSOR, CONNECTICUT 06074 AREA CODE 203 644-2456 June 23, 1978 Mr. Paul Talbot Town Manager South Windsor Town Hall 1540 Sullivan Avenue South Windsor, Connecticut 06074 Re : Sancho vs. Wolkon, Town of South Windsor Dear Paul: The attorney for the Town' s insurance carrier has requested a copy of our contract with King Contractors Ltd. which I have sent him as per the enclose However, the agreement also includes the contract documents , etc. , mentioned in paragraph three. I have one copy of the contract documents for reconstruction of Pierce Road dated September, 1974. Will you kindly have Allan Young furnish me with a copy of that and whatever else formed part of the -agreement with ing, incTudingany signed ro osa s , etc. , so at I may orwar a copy of all parts of the contract. Very truly yours , Richard M. Rittenband South Windsor Town Attorney RMR/dds Enc. r. Y rs RICHARD M. RITTENEAND ATTORNEY AT LAW 1734 ELLINGTON ROAD SOUTH WINDSOR, CONNECTICUT 06074 AREA CODE 203 644.2456 June 23, 1978 Jesse M. Frankl, Esquire Frankl & Dahlmeyer P. O. Box 7-1 65 LaSalle Road, Suite 405 West Hartford, Connecticut 06107 Re : Sancho vs.• Wolkon, Town of South Windsor Dear Jesse : In reply to your letter concerning an accident on December 6 , 1974 on the west side of Pierce Road about 15 or 20 yards south of the Podunk River Bridge, I enclose herewith copy of agreement dated October 17, 1974 with King Contractors Ltd. which does not appear to have a _hold harmless clause. However, the agreement includes the proposai and other contract documents. I have requested them from the Town Manager and will forward same upon receipt. Thank you. 4 Very truly yours , Richard M. Rittenband South Windsor Town Attorney RMR/dds Enc. cc: Paul Talbot 2 01 / { . � AVR� THIS AGREEMENT, made this 17th day of October .,fig ?fir by and between the Town of South Windsor, a municipality located within the County of Hartford in the State of Connectic.�t, acting through Charles N. Enes, Acting Town Manager �� { L n , hereinafter called OWNER, party r f of the first part, and King Contractors, Ltd. , . a Corporation 'in the 1 DL.ate of Connecticut, County of E:artford, acting through r Vice President, John H. King, � t hereinafter termed the "CONTRACTOR", party of the second rt.' otiy4� I WI T NESSETH: That the parties to this Agreement each in consi er ation of the Agreements on the part of the other herein contained have agreed, and by these presents do hereby agree, the OWNER for itself, and the CONTRACTOR for himself and his heirs, executors, administrators, successors and assigns, as follows: That the Contract Documents consisting of this Agreement', together with the Legal and Procedural Documents; General Conditions;.:Special-:_ `. . . f Provisions, Technical Provisions, Contract Drawings, and any Addenda-` issued before execution of the Agreement, for �ha Contract: i That the CONTRACTOR has infonmad himself fully in regard to'all conditions pertaining to the place where the work is to-be done and,other circumstances affecting the work: That the CONTRACTOR has obtained all the information he needs to. enable him to estimate fully and fairly the costs of the work herein contemplated: That the CONTRACTOR shall furnish all plant, labor, materials, supplies, tools, equipment and other facilities and things necessary or property for or incidental to .construct the following: Reconstruction of Pierce Road from Ellington Road to Strong _—_Road (ex lc udina all, work bid as "Item �='37 - Metal Beam Rail") AGREEMEN 1 i (ACKNOWLEDGMENT OF PRINCIPAL,,: IF A CORPORA T ION) State of Connecticut . SS: County of Hartford ) 19, 74. t - On this 17th day of Octo'Aer before me personally came and appeared JonnH. Kana,, to me known, who, being by me duly sworn, did depose and say that he resides at 431 Pocruonock Avenue, Windsor, Connecticut that he is the Vice President - of King Contractors, Ltd. the corporation described in and which ,j executed the foregoing instrument; that he knows the seal of said corporation;. that one of the impressions affixed to said instrument is an impression of such seal; that 'it was so affixed by order of the directors of said core- - ' - . . oration, and he he signed his name the M^ to by_ like order. (SEAL) Notary Public _ (ACKNOWLEDGMENT OF PRINCIPAL, IF A PARTNERSHIP) State of ) SS:. ffCounty of ) I On this day of before me personalty came and appeared to me known and known to me to be one of the members of the firm of , described in and who executed the foregoing instrument and he acknowledged to me that he executed the same as and for the act and deed of said firm. _ (S,=AL) Notary Public' t _... .. • i i i for the party of the first part, in accordance with this Contract,. and completing everything required of him under this Contract not later than 1 the time stipulated in 'the Instructions to. Bidders. That the OWNER shall pay and the CONTRACTOR shall receive as i full compensation for fulfilling everything required of the CONTRACTOR under this the unit price and lump sums recorded in the Bid. i � That the quantities shown in the Bid are approximate only and are solely for-the purpose of facilitating the comparison of Bids, that the OWNER shall. not be held responsible if these quantities are not even approximately correct, that for all work upon which unit prices and lump sums are quoted, the CONTRACTOR'S compensation shall be computed upon the work actually performed, measured by the units of measurement specified, whether greater`or less than.the quantities as shown Ln the Bid, and that the unit prices and lump sums set against the sevai^ai items cover all 'incidental services required of the CONTRACTOR under the Contract. g �give to th Y OWNEER , That the CONTRACTOR shall s liquidated damages for each day, lost by the CONTRACTOR in completion of t;ne work of the Contract after the time herein stipulated the 'sum of ($50.00) Fifty Dollars. IN WITNESS WHEREOF, the parties 'to these present have executed this AGREEMENT in the year and day first above mentioned. TOWN OF SOUTH WINDSOR, CONN.. I (S eal) B Charles N. Enes Acting Town manager CONj4� TO (Seal) BY ''�: ���✓�' �-� . John I!. Kinqj Vice President IMPORTANT: Execute Acknowledgement of Officer or Agent of Contractor who signs this document (use proper form next page).' GC-16 appropriate Change Order shall be issued deducting all such ' costs from the Contract Price. The Contractor will also bear the expenses of making good all Work of others destroyed or dammed by his correction, removal or replacement of his defective ,fork. ' (c ) If, after the approval of final payment and prior to the expiration of one year after the date of comple- ' Lion, any ;Mork is found to be defective the Contractor will, promptly without cost to the Owner and in accordance with the Owner' s written instructions, either correct such de- fective Work, or, if it has been rejected by the Owner, remove it from the site and replace it with nondefective Work. If the Contractor does not promptly comply with the terms of such instructions, the Owner may have the defective Work corrected or the rejected Work removed and replaced, and. all direct and indirect costs of such removal and replace- ment, including compensation for additional professional ' services, will be paid by the Contractor. (d) It is agreed that the Owner shall withhold of the final payment, (See Article 23) "Certificate of Completion and Final Payment, " for a period of one year after the date of completion which time shall be the warranty and guarantee period. Article 22. Applications for Progress Payments ' (a) At least ten days before each progress payment falls due (but not more often than once a month), the Contractor will submit to the Engineer for review the Application for Payment filled out and signed by the Contractor covering the Work completed as of the date of the Application and supported by such data as the Engineer ' may reasonably require. If payment is requested on the basis of materials and equipment not incorporated in the ?-:ork but delivered and suitably stored at the site or at ' another location agreed to in writing, the Application for Payment shall also be accompanied by such supporting data, satisfactory to the Owner, as will establish the Owner' s ' title to the material and equipment and protect his interest ttherein, including applicable insurance. (b) The Contractor warrants and guarantees that ' title to all Work, materials and equipment covered by an Application for Payment, whether incorporated in the Project or not, will have passed to the Owner prior to the making ' of the Application for Payment, free and clear of all liens, claims, security interests and encumbrances; and that no Work, materials or equipment covered by an Application for ' Griswold & Fuss, Inc. ' GC-17 Payment will have been acquired by the Contractor or by ' any other person performing the Work at the site or furnish- ing materials and equipment for the Project, subject to an agreement under which an interest therein or encumbrance 1 thereon is retained by the seller or otherwise imposed by the Contractor or such other person. (c ) The Engineer will, within ten days after receipt of each Application for Payment, either indicate in writing his approval of payment and present the Applica- tion to the Owner, or return the Application to the Contractor indicating in writing his reasons for refusing to approve payment. In the latter case, the Contractor may make the necessary corrections and resubmit the Application. ' (d) The amount paid the Contractor shall be the amount due less 10;o retainage. The retainage shall be held by the Owner until completion of the Work except that after the value of acceptable Work completed is more than 500 of the total bid, no additional retainage will be deducted from monthly payments. ' (e) The Owner will, within ten days of presen- tation to him of an approved Application for Payment, pay ' the Contractor the amount approved by the Engineer. Article 23. Certificates of Completion and Final Payment ' (a) Upon written notice from the Contractor that the Project is complete, the Engineer will make a final inspection with the Owner and the Contractor and will notify the Contractor in writing of any particulars in which this inspection reveals that the Work is defective. The Contractor shall immediately make such corrections as are necessary to remedy such defects. (b) After the Contractor has completed any such ' corrections to the satisfaction of the Engineer and delivered all maintenance and operating instructions, schedules, gua- rantees, bonds, certificates of inspection and other documents - ' all as required by the Contract Documents, the Owner will ;issue a certificate of completion and Contractor may make application for final payment following the procedure for progress payments . The final Application for Payment shall be accompanied by -such supporting data as the Engineer may require, to ether with complete and legally effective releases or waivers satisfactory to the Owner) of all Liens arising ' out of the Contract Documents and the labor and services performed and the material and equipment furnished thereunder. In lieu thereof and as approved by the Owner, the Contractor ' Griswold & Fuss, Inc. ' GC-18 may furnish receipts or releases in full; an affidavit of ' the Contractor that the releases and receipts include all labor, services, material and equipment for which a Lien could be filed, and that all payrolls, material and equip- ment bills , and other indebtedness connected with the Work for which the Owner or his property might in any way be responsible, have been paid or otherwise satisfied; and ' consent of the surety, if any, to final payment. If any Subcontractor or supplier fails to furnish a release or receipt in full, the Contractor may furnish a bond satis- factory to the Owner to indemnify him against any Lien. ' (c ) If, on the basis of his observation and review of the Work during construction, his final inspection ' and his review of the final Application for Payment - all as required by the Contract Documents, the Engineer is satisfied that the Work has been completed and the Contractor has fulfilled all of his obligations under the Contract Documents, he will, within ten days after receipt of the final Application for Payment, indicate in writing his approval of payment and present the Application to the ' Owner for payment. Otherwise, he will return the Application to the Contractor, indicating in writing his reasons for refusing to approve final payment, in which case the Con- tractor will make the necessary corrections and resubmit the Application. ' (d) Final payment shall constitute 980 of the final Contract amount. The remaining 2o will be payable in accordance with Article 21 " Warranty and Guarantee, Removal or Acceptance of Defective Work. " The Owner will, ' within ten days of presentation to him of an approved final Application for Payment, pay the Contractor the amount approved by the Engineer. ' Ar ticle 24. Waivers of Claims and Continuing Obligations (a) The Contractor 's obligation to perform the Work and complete the Project in accordance with the Contract Documents shall be absolute . Neither approval ' of any progress or final payment by the Engineer, nor any -payment by the Owner to the Contractor under the Contract Documents, nor any use or occupancy of the Project or any ' part thereof by the Owner, nor any act of acceptance by the Owner nor any failure to do so, nor any correction of faulty or defective Work by the Owner shall constitute an acceptance of Work not in accordance with the Contract Documents. ' (b) The making and acceptance of final payment shall constitute : P P ym Griswold & Fuss, Inc. ' GC-19 1. A waiver of a.11 claims by the Owner against ' the Contractor other than those arising from unsettled Liens, from faulty or defective Work appearing after final payment or from failure to comply with the requirements of the Contract Documents or the terms of any special guarantees specified therein, and 2. A waiver of all claims by the Contractor against the Owner other than those previously made in writing and still unsettled. ' Article 25. Indemnification (a) The Contractor shall indemnify and hold harmless the Owner and the Engineer and their agents and employees from and against all claims , damages, losses and expenses including attorney' s fees arising out of or resulting ' from the performance of the Work, provided that any such claim, damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruc- tion of tangible property (other than the Work itself) including the loss of use resulting therefrom and (b) is caused in whole or in part by any negligent act or omission of the Contractor, ' any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder. (b) In any and all claims against the Owner or the Engineer or any of their agents or -employees by any ' employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnifica- tion obligation under this article shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any Subcontractor under Workmen' s Compensation Acts, Disability Benefit Acts or other employee benefit acts. (c ) The obligations of the Contractor under ' this article shall not extend to the liability of the Engi- neer, his agents or employees arising out of (a) the prepa- ration or approval of maps, drawings , opinions, reports surveys, Change Orders, designs or specifications or (b� the giving of or the failure to give directions or instructions by the Engineer, his agents or employees provided such giving or failure to give is the primary cause of injury or damage. ' Griswold & Fuss, Inc. ' GC-20 Article 2.6. Cleaning Up The Contractor will keep the premises free from accumulations of waste materials, rubbish and other debris ' resulting from the Work, and at the completion of the Work he will remove all waste materials, rubbish and debris from and about the premises as well as all tools, construction ' equipment and machinery, and surplus materials, and will leave the site clean and ready for occupancy by the Owner. The Contractor will restore to their original condition those portions of the site not designated for alteration by the Contract Documents . ' Article 27. Owner' s Right to Stop or Suspend Work (a) If the Work is defective, or the Contractor ' fails to supply sufficient skilled workmen or suitable materials or equipment, or if the Contractor fails to make prompt payments to Subcontractors or for labor, materials or equipment, the Owner may order the Contractor to stop ' the Work, or any portion thereof, until the cause for such order has been eliminated. ' (b) The Owner may, at any time and without cause, suspend the Work or any portion thereof for a period of not more than ninety days by notice in writing ' to the Contractor which shall fix the date on which Work shall be resumed. The Contractor will resume the Work on the date so fixed. The Contractor will be allowed an in- crease in the Contract Price or an extension of the Con- tract Time directly attributable to any suspension if he makes a claim therefor as provided in the General Conditions. ' Article 28. Owner' s Right to Terminate ' (a) If the Contractor is adjudged a bankrupt or insolvent, or if he makes a general assignment for the benefit of his creditors, or if a trustee or receiver is appointed for the Contractor or for any of his property, or if he ' files a petition to take advantage of any debtor' s act, or `to reorganize under the bankruptcy or similar laws, or if he repeatedly fails to supply sufficient skilled workmen ' or suitable materials or equipment, or if he repeatedly fails to make prompt payments to Subcontractors or for labor, materials or equipment or if he disregards laws, ordinances, rules, regulations or orders of any public ' body having jurisdiction, or if he disregards the authority of the Engineer, or if he otherwise violates any provision of the Contract Documents, then the Owner may, without pre- judice to any other right or remedy and after giving the ' Griswold & Fuss, Inc. GC-21 ' Contractor and his surety seven days written notice, termi- nate the services of the Contractor and take possession of the Project and of all materials, equipment, tools, construc- tion equipment and machinery thereon owned by the Contractor, and finish the Work by whatever method he may deem expedient. In such case the Contractor shell not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds the direct and indirect costs of completing the Project, including compensation for additional professional services, such excess shall be paid ' to the Contractor. If such costs exceed such unpaid balance, the Contractor will pay the difference to the Owner. Such costs incurred by the Owner will be determined by the Engineer ' and incorporated in a Change Order. (b) Where the Contractor' s services have been so terminated by the Owner, said Termination shall not affect ' any rights of the Owner against the Contractor then existing or which may thereafter accrue . Any retention or payment of monies by the Owner due the Contractor will not release ' the Contractor from liability. (c ) Upon seven days written notice to the Con- tractor and the Engineer, the Owner may, without cause and without prejudice to any other right or remedy, elect to abandon the Project and terminate the Agreement. In such case, the Contractor shall be paid for all Work executed ' and any expense sustained plus a reasonable profit . ' Article 29. Contractor' s Right to Stop Work or Terminate If, through no Pct or fault of the Contractor, the :fork is suspended for a period of more than ninety days ' by the Owner or under Pn order of court or other public authority, or the Engineer fails to act on any Application for Payment within thirty days after it is submitted, or ' the Owner fails to pay the Contractor any sum approved by the Engineer within thirty days of its approval and pre- sentation, then the Contractor may, upon seven days' written ' notice to the Owner and the Engineer, terminate the Agreement and recover from the Owner payment for all Work executed and any expense sustained plus a reasonable profit. In addition and in lieu of terminating the Agreement, if the Engineer ' has failed to act on an Application for Payment or the Owner has . failed to make any payment as aforesaid, the Contractor may upon seven days notice to the Owner stop the Work until he has been paid all amounts then due. ' _Griswold & Fuss, Inc. GC-22 Article 30. Provisions Required by Law Deemed Inserted Each and every provision of law and clause required by law to be inserted in this Contract shall be deemed to be inserted herein and the Contract shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted or is not correctly inserted, then upon the application of either the Owner or the Contractor, the Contract shall forthwith be physically amended to make such insertion. Article 31. Contract Security The Contractor shall furnish a surety bond acceptable to the Owner in an amount at least equal to 100 percent of the Contract trice as security for the faithful performance of this Contract and for payment of all ' persons performing labor under this Contract and furnishing materials in connection with this Contract. The surety on such bond shall be a duly authorized surety company, satis- factory to the Owner and authorized to do business in the State of Connecticut. Article 32. Time for Completion and Liquidated Damages It is hereby understood and mutually agreed, by and between the Contractor and the Owner, that the date of beginning ' and the time for completion as specified in the Contract of the work to be done hereunder are ESSENTIAL CONDITIONS of this Contract; and it is further mutually understood and agreed that the work embraced in this Contract shall be commenced on a date to be specified in the notice to proceed. The Contractor agrees that said work shall be prose- cuted regularly, diligently and uninterruptedly at such rate of progress as will insure full completion thereof within the time specified. It is expressly understood and agreed, by and between the Contractor and the Owner, that the time for the completion of the work described herein is a reasonable time for the completion of the same, taking into consideration the average climatic range and usual industrial conditions prevailing in this locality. ' If the said Contractor shall neglect, fail or refuse to complete the work within the time herein specified, or any proper extension thereof granted by the Owner, then the- Contrac- tor does hereby agree, as a part consideration for the awarding of this Contract, to pay to the Owner the amount specified in the 1 Contract, not as a penalty but as liquidated damages for such breach of Contract as hereinafter set forth, for each and every calendar day that the Contractor shall be in default after the time stipulated in the Contract for a mpleting the work. ' Griswold & Fuss, Inc. ' GC-23 ' The said amount is fixed and agreed upon by and between the Contractor and the Owner because of the impracticability and extreme difficulty of fixing and ascertaining the actual damages the Owner would in such event sustain, and said amount is agreed to be the amount of damages which the Owner would sustain and said amount shall be retained from time to time by the Owner from current pert- ' odical estimates. It is further agreed that time is of the essence of each ' and every portion of this Contract and of the specifications wherein a definite and certain length of time is fixed for the performance of any act whatsoever; and where under the Contract an additional time is allowed for the completion of any work, the new time limit fixed by such extension shall be of the essence of this Contract. Provided, that the Contractor shall not be charged with liquidated damages or ' any excess cost when the delay in completion of the work is due: (a) To any preference, priority or allocation order duly issued by the Government; (b) To unforeseeable cause beyond the control and without the fault or negligence of the Contractor, including, but not restricted to, acts of God, or of the public enemy, acts of the Owner, acts of another Contractor in the performance of a Contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and unusually severe weather; and ' (c) To any delays of subcontractors or suppliers occasioned by any of the causes specified in subsections (a) and (b) of this Article: Provided further that Article 20 of the General Conditions shall be complied with. Article 33. Contractor's and Subcontractor's Insurance ' (a) The Contractor shall, after being awarded the Contract but prior to starting work, furnish Certificates of Insurance, including ' automobile, or property damage liability, bodily injury liability, and Workmen's Compensation Insurance in the following amounts: ' Public Liability, Bodily Injury, and Property Damage: (1) Injury or death of one person $ 500,000 (2) Injury to more than one person in single accident $1 ,000,000 (3) Property Damage $ 100,000 ' Griswold & Fuss, Inc. GC-24 ' Automobile and Truck Public Liability Bodily Injury: (1) Injury or death of one person $ 500,000 ' (2) Injury to more than one person in single accident $1 ,000,000 (3) Property Damage $ 100,000 ' Workmen's Compensation as required by law. ' (b) The above insurance requirements shall also apply to all Subcontractors and the Contractor shall not allow any Sub- contractor to commence work until the Subcontractor's insurance ' has been so obtained and approved. Article 34. Wage Rates The wages paid on an hourly basis to any mechanic, laborer or workmen employed upon the work herein contracted to be done and the amount of payment or contribution paid or payable on behalf of each such employee to any employee welfare fund, as defined in section 31-78 of the General Statutes, shall be at a rate equal to the ' rate customary or prevailing for the same work in the same trade or occupation in the Town in which such public works project is being constructed. Any Contractor who is not obligated by agreement to ' make payment or contribution on behalf of such employees to any such employee welfare fund shall pay to each employee as part of his wages the amount of payment or contribution for his classification on each pay day. Griswold & Fuss, Inc. S GC-1 ' SUPPLEMENTARY GENERAL CONDITIONS ' Article 1 . Minimum Wages (a) All mechanics and laborers employed or working upon ' the site of the work, or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project, will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR Part 3), the full amounts due at time of payment computed at wage rates not less than those contained in the wage determination decision of the Secretary of Labor which is attached hereto and made a part hereof, regardless of ' any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics; and the wage determination decision shall be posted by the contractor at the site of the work in a ' prominent place where it can be easily seen by the workers. For the purpose of this clause, contributions made or costs reasonably antici- pated under section 1 (b) (2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of 29 CFR 5.5 (a) (1) (iv). Also for the purpose of this clause, regular contributions made or costs ' incurred for more than a weekly period under plans, funds, or programs, but covering the particular weekly period, are deemed to be constructively made or incurred during such weekly period. ' (b) The contracting officer shall require that any class of laborers or mechanics which is not listed in the wage determination ' and which is to be employed under the contract, shall be classified or reclassified conformably to the wage determination, and a report of the action taken shall be sent by the Federal agency to the Secretary ' of Labor. In the event the interested parties cannot agree on the proper classification or reclassification of a particular class of laborers and mechanics to be used, the question accompanied by the recommendation of the contracting officer shall be referred to the Secretary for final determination. ' (c) The contracting officer shall require, whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly wage rate and the contractor is obligated to pay a cash equivalent of such a fringe benefit, an hourly cash equivalent thereof to be esta- blished, In the event the interested parties cannot agree upon a cash equivalent of the fringe benefit, the question, accompanied by the re- commendation of the contracting officer, shall be referred to the ' Secretary of Labor for determination. ' Griswold & Fuss, Inc. ' SGC-2 (d) If the contractor does not make payments to a trustee or other third person, he may consider as part of the wages of any ' laborer or mechanic the amount of any costs reasonably anticipated in providing benefits under a plan or program of a type expressly listed in the wage determination decision of the Secretary of Labor which is ' a part of this Contract: Provided, however, The Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of ' Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. ' Article 2. Withholding (a) The regulating Federal Agency may withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics employed by the contractor or any subcontractor on the work the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic employed or working on the site of the work, or under the United States Housing Act of 1937 or under the ' Housing Act of. 1949 in the construction or development of the project, all or part of the wages required by the contract, the regulating Agency may, after written notice to the contractor, sponsor, applicant, or owner take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations ' have ceased. Article 3. Payrolls and Basic Records ' (a) Payrolls and basic records relating thereto will be maintained during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at ' the site of the work, or under the United States Housing Act of 1937, or under the Housing Act of 1949, in the construction or development of the project. Such records will contain the name and address of ' each such employee, his correct classification, rates of pay (including rates of contributions or costs anticipated of the types described in section 1 (b) (2) of the Davis-Bacon Act), daily and weekly number of ' hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5 (a) (1) (iv) that the wages of any laborer or mechanic include the amount of any costs ' reasonably anticipated in providing benefits under a plan or program described in section 1 (b) (2) (B) of the Davis-Bacon Act, the contractor ' shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs antici- pated or the actual cost incurred in providing such benefits. ' Griswold & Fuss, Inc. SGC-3 (b) The contractor will submit weekly a copy of all payrolls to the regulating Federal Agency if the Agency is a party ' to the contract, but if the Agency is not such a party the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the regulating Federal Agency. ' The copy shall be accompanied by a statement signed by the employer or his agent indicating that the payrolls are correct and complete, that the wage rates contained therein are not less than those determined ' by the Secretary of Labor and that the classifications set forth for each laborer or mechanic conform with the work he performed. A sub- mission of a "Weekly Statement of Compliance" which is required under ' this contract and the Copeland regulations of the Secretary of Labor (29 CFR, Part 3) and the filing with the initial payroll or any subsequent payroll of a copy of any findings by the Secretary of Labor under 29 CFR ' 5.5 (a) (1) (iv) shall satisfy this requirement. The prime contractor shall be responsible for the submission of copies of payrolls of all sub- contractors. The contractor will make the records required under the ' labor standards clauses of the contract available for inspection by authorized representatives of the regulating Federal Agency and the Department of Labor, and will permit such representatives to interview ' employees during working hours on the job. ' Article 4. Apprentices (a) Apprentices will be permitted to work as such only when they are registered, individually, under a bona fide apprenticeship program registered with a State apprenticeship agency which is recognized by the Bureau of Apprenticeship and Training, United States Department of Labor; or, if no such recognized agency exists in a State, under a ' program registered with the Bureau of Apprenticeship and Training, United States Department of Labor. The allowable ratio of apprentices to ' journeymen in any craft classification shall not be greater than the ratio permitted to the contractor as to his entire work force under the registered program. Any employee listed on a payroll at an apprentice wage rate, who is not registered as above, shall be paid the wage rate determined by the Secretary of Labor for the classification of work he actually per- formed. The contractor or subcontractor will be required to furnish to the contracting officer written evidence of the registration of his program ' and apprentices as well as of the appropriate ratios and wage rates, for the area of construction prior to using any apprentices on the contract ' work. II ' Griswold & Fuss, Inc. ' SGC-4 ' Article 5. Compliance With Copeland Regulations (29 CFR Part 3) (a) The contractor shall comply with the Copeland Regu- lations (29 CFR Part 3) of the Secretary of Labor which are herein incorporated by reference. ' Article 6. Subcontracts (a) The contractor will insert in any subcontracts the clauses contained in 29 CFR 5.5 (a) (1) through (5) and (7) and such other clauses as the regulating Federal Agency may by appropriate ' instructions require, and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts which they may enter into, together with a clause requiring this insertion in any further subcontracts that may in turn be made. Article 7. Contract Termination; Debarment ' (a) A breach of clauses (1) through (6) may be grounds for termination of the contract, and for debarment as provided in ' 29 CFR 5.6. Article B. Overtime Requirements ' a No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any laborer or me- chanic in any workweek in which he is employed on such work to work in excess of eight hours in any calendar day or in excess of forty hours ' in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times his basic rate of pay for all hours worked in excess of eight hours in any calendar day or in ' excess of forty hours in such workweek, as the case may be. Article 9. Violation; Liability for Unpaid Wages; Liquidated Damages (a) In the event of any violation of the clause set forth ' in subparagraph (8) , the contractor and any subcontractor responsible therefor shall be liable to any affected employee for his unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with ' respect to each individual laborer or mechanic employed in violation of the clause set forth in subparagraph (8), in the sum of $10.00 for each calendar day on which such employee was required or permitted ' Griswold & Fuss, Inc. ' SGC-5 ' to work in excess of eight hours or in excess of the standard workweek of foray hours without payment of the overtime wages required by the ' clause set forth in subparagraph (8). ' Article 10. Withholding for Unpaid Wages and Liquidated Damages (a) The regulating Federal Agency may withhold or cause to be withheld, from any moneys payable on account of work performed ' by the contractor or subcontractor, such sums as may administratively be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in ' the clause set forth in subparagraph (9). Article 11 . Subcontracts The contractor shall insert in any subcontracts the clauses ' set forth in subparagraphs (8), (9) and (10) and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts which they may enter into, together with a clause requiring this insertion ' in any further subcontracts that may in turn be made. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' SP-1 SPECIAL PROVISIONS ' 1 . General: The Contractor shall furnish all tools, labor, equipment, materials and incidentals to complete all items of work set forth in ' the Bid Documents in a manner described in the Contract Documents, General Conditions, Special General Conditions, Special Provisions, Technical Provisions and Drawings. ' The Owner reserves the right to eliminate from the Contract any of the work shown on the Bid Form in the event it deems it to be in ' the best interests of the Owner. 2. Layout of Work: Construction staking shall be performed by the Con- tractor in accordance with the following provisions: a. Construction staking shall consist of construction layout and ' reference staking necessary for the proper control and satis- factory completion of the construction work and the acceptance of the Contract. ' b. The Contractor shall be responsible for the placement and 1 preservation of adequate ties to all control points, center line pins, street monuments and property lines, whether established by him or found on the project, necessary for the accurate re-establishment of all existing points. c. The Contractor shall be solely and completely responsible for the accuracy of the line and grade of all features of the work. ' Any errors or apparent discrepancies found in previous surveys, plans, specifications or special provisions shall be called to the Engineer's attention by the Contractor for correction or inter- pretation prior to proceeding with the work. ' d. All staking shall be performed by qualified engineering or surveying personnel who are trained, experienced and skilled in construction layout, and who are acceptable to the Engineer. ' e. The Contractor will arrange with the Engineer for measuring of any item that is paid for on a unit price basis. ' f. The Owner shall supply to the Contractor all control points and bench marks necessary for the prosecution of the work. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' S P-2 3. Access to Site: The Contractor shall make every effort to minimize ' damage to all access routes, and he shall be required to restore them to their original condition. The Contractor shall acquire all necessary permits for working in, on or from public streets or rights of way ' and for securing access rights of their own. All costs of the removal and restoration to original condition of walls, ' fences, structures, utility lines, poles, guy wires or anchors, and other improvements required for passage of the Contractor's equip- ment shall be borne by the Contractor. The Contractor shall notify the proper authorities of the Town and all utilities of any intended modification or disruption to their property prior to the start of con- struction, and shall cooperate with them in the scheduling and perfor- mance of his operations. If the Contractor, by direct negotiation and bargain with any land ' owner, leasee or tenant, has secured for himself any right to use more space or greater privileges in the space provided by the Owner for purposes incidental to the performance of the Contract, he shall, upon request of the Engineer, furnish to the Engineer proper evidence that such additional rights have been properly secured and assurance that no damage to or claim upon the Engineer will arise therefrom. 1 The Engineer shall not be liable in any way for any expense incurred by the Contractor in securing any such right to use additional property. The Contractor shall be responsible for and reimburse the Owner and others for any and all losses, damage or expense which the Owner or those others may suffer, either directly or indirectly or through ' any claims of any person or party, for any trespass outside the spaces and rights of way provided by the Owner to the Contractor or any violation or disregard of the terms and conditions established for the use or occupancy of those rights or for negligence in the exercise of those rights. The Owner may retain or deduct from any sum or ' sums due or to become due to the Contractor such amount or amounts as may be proper to insure the Owner against loss or expense by reason of the failure of the Contractor to observe the limits and ' conditions of the rights of way, rights of access, etc. , provided by the Owner. ' 4. Dust and Erosion Control: During the progress of the work, the Con- tractor shall conduct his operations and maintain the area of his activities so as to minimize the creation and dispersion of dust. If ' the Engineer decides that it is necessary to use water or calcium chloride for more effective dust control, the Contractor shall furnish ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut S P-3 and spread the material, as directed, and without additional compensation. Special attention is called to the fact that erosion control devices may be required in areas directed by the Engineer. Specifications ' for Hay Bale Erosion Checks and Log and Hay Bale Check Dams are contained in the Technical Provisions. The Contractor is to exercize special care in the prevention of erosion and sedimentation of existing watercourses during the construction of the roadway, box culvert and other appurtenant features. ' 5. Surplus Material: All surplus excavated material shall become the property of the Contractor except where otherwise specifically noted in the Contract Documents or required for other portions of the work as directed by the Engineer. The Contractor shall remove and dispose of such surplus material not required for other portions of the job. ' 6. Permits: The Contractor shall be responsible for obtaining all required permits from the Town of South Windsor or any other agency having jurisdiction. A permit will be required from the State Department of Transportation, District I, for the Route *30 (Ellington Road) intersection. 1 The Contractor shall be responsible for obtaining all insurance required in connection with permits. ' 7. Traffic Routing: At least one lane of traffic shall be maintained whenever possible. No road shall be closed to traffic for more than four hours without permission of the Engineer. In addition, before any road is closed to traffic, the Contractor shall notify the Police Department and Fire Department. If any roads are to be closed ' while schools are in session, the Board of Eduction shall be notified. The road may be closed to through traffic during the construction of ' the box culvert. Request to close the road under these conditions shall be accompanied by a time work schedule for the construction of the box culvert. The closing of the road to through traffic shall ' be for as short a time as possible. 8. Safety: The Contractor shall comply with all requirements of the Occupational Safety and Health Act (OSHA). 9. Alterations of Plans or of Character of Work: The right is reserved ' for the Town to make, from time to time, such alterations in the plans or in character of the work as may be considered necessary or desirable to complete fully the proposed construction and such alterations shall not be considered as a waiver of any conditions of the Contract, nor to invalidate any of the provisions thereof. Should ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut S P-4 such alterations result in an increase or decrease of the quantity of ' work to be performed, and should added or eliminated work be of the same character as shown on the original plans, the Contractor shall accept payment in full at the Contract unit price for the actual quantities of work done. 10. Utilities: The Contractor shall notify all utility companies before starting any work so that they may relocate all facilities required to be moved. ' 11 . Time of Completion: It is required that the bottom course of bitu- minous concrete be placed for the roadway before winter. Therefore, all work leading to this goal shall be given first priority. ' A winter shutdown of the project will be allowed if desired by the Contractor, but only after the first course of bituminous concrete has been placed for the roadway. The maximum time of shutdown shall be one hundred (100) calendar days, and the Contractor shall ' notify the Engineer at least five (5) days prior to the shutdown and at least ten (10) days prior to starting operations at the end of the shutdown. It shall be the Contractor's responsibility to maintain the travelled way in a safe and passable condition during the shutdown period except that the Town shall perform all snow and ice removal operations. 12. Drawings: The following drawings, dated September, 1974, and titled ' "Reconstruction of Pierce Road" are hereby made part of this Contract: Sheet 1 - Title Sheet ' Sheet 2 - Typical Cross Sections Sheet 3 - Drainage Details Sheet 4 - Drainage Details ' Sheet 5 - Miscellaneous Details Sheet 6 - Box Culvert Details Sheet 7 - Observation Area ' Sheet B-11 - Plan and Profile Sheet 12-26 - Cross Sections 13. Tests: Any testing to be done for compaction or other items called for in the Contract Documents will be performed by the Town at the Town's expense. Should any items be found to not meet the requirements and require retesting, the tests will be performed by the Town at the Contractor's expense. Griswold & Fuss, Inc. tPierce Road South Windsor, Connecticut TP-1 CLEARING AND GRUBBING DESCRIPTION: This work shall consist of clearing the round of trees, , stumps, brush, rubbish and all objectionable material within the roadway excavation, embankments, and fill areas, except that these limits may be reduced as necessary to confine this work within the highway limits, all as indicated on. the plans or as directed by the Engineer. This work ' shall also include the clearing of the ground necessary for the construction and installation of drainage, structures, ditches, channels, fences and other highway appurtenances. Included in this work shall be the preser- vation from injury or defacement of vegetation and objects designated to remain. ' CONSTRUCTION METHODS: Within the excavation lines all trees shall be cut off and stumps removed to a depth of not less 'than 12 inches below 1 the graded surface. Within the fill lines where an embankment is to be made not more than 5 feet in depth, trees, stumps, roots, etc. , shall be removed. Where the embankments to be made exceed 5 feet in depth, stumps, roots, trees, etc. , shall be cut off to within 6 inches of the ground surface. 1 Outside of the roadway in areas where. clearing is necessary for the con- struction and installation of various highway appurtenances, all trees and ' stumps shall be cut flush with the ground and all dead or uprooted trees, brush, roots or otherwise objectionable material shall be removed as directed unless otherwise indicated on the plans. All trees that are cut shall be removed from within the limits of the highway, at the earliest possible moment, before the grading is started. All elm wood cut shall be burned by the Contractor, provided that local ordinances are conformed to and all necessary permits are obtained. All branches of trees extending within the roadway shall be trimmed as directed to provide a 16-foot minimum vertical clearance including selective trimming of such trees as directed. ' All branches and brush shall be chipped and stockpiled and shall be placed on slopes as shown on the plans or as ordered by the Engineer. ' The Contractor shall dispose of all such trees, stumps, brush, etc. , in a satisfactory manner and shall remove all rubbish and refuse from within ' the highway limits. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut T P-2 All excavations made below subgrade surface by the removal of trees, stumps, etc. , shall be filled with suitable material, which shall be compacted thoroughly in accordance with the provisions governing formation of embankments. ' All fences, railings, stonewall fences etc, within the highway limits shall be removed as directed. When stonewall fences are to be rebuilt, ' the stones removed shall be carefully preserved. All road signs, mail boxes, etc. , shall be removed and reset as directed. ' All ditches, waterways, drainage structures, Y , g and culverts constructed under the contract shall be cleaned and cleared of obstructions in a Isatisfactory manner and shall be left in a neat and trimmed condition. When directed by the Engineer, all existing ditches, waterways, drainage structures and culverts shall be cleaned of obstructions resulting from ' construction operations. METHOD OF MEASUREMENT: This work shall be measured as a unit. ' BASIS OF PAYMENT: This t work will be paid for at the Contract lump ' sum price for "Clearing and Grubbing", which price shall include all equipment, tools and labor incidental to the completion of this item. ' Also included shall be the cost of chipping, stockpiling chips and placing chips on slopes. Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-3 ROADWAY EXCAVATION, FORMATION OF ' EMBANKMENT AND DISPOSAL OF SURPLUS MATERIAL ' DESCRIPTION: Roadway excavation shall consist of the removal and satisfactory disposal, in the manner herein required, of all material taken from within the - limits of the work contracted for, the removal of which ' is necessary for the construction of the roadbed, subgrade, shoulders, slopes, entrances, gutters and other miscellaneous construction to the dimensions and limits shown on the plans or as ordered and shall include ' the necessary excavation for pervious structure backfill outside of structure excavation limits. It shall also include the formation of embank- ments, the disposal of surplus or unsuitable material, removal of old foundations, concrete or masonry walls and filling of cellar or other holes, and the shaping and cleaning of slopes and of shoulders. ' (a) Classification: Roadway excavation shall be classified for the purpose of payment, as "Earth" , or "Rock", in accordance with the following definitions. Earth Excavation shall include all materials removed as indicated or directed, except water and "Rock". ' Rock Excavation shall include rock in definite ledge formation and ' boulders, or the portion of boulders, one (1) cubic yard, or more, in volume. CONSTRUCTION METHODS: Excavation shall be made in conformity with ' the requirements of the plans and as ordered by the Engineer. The Contractor shall, when necessary in excavation areas, provide and maintain ditches which are adequate to prevent free water from becoming incorporated in material to be used to form embankments, such ditching to be at the sole expense of the Contractor. Where buildings have been removed to clear the way for construction or where old foundations, concrete or masonry walls exist, they shall be removed to two (2) feet below the directed or finished grading; and all cellar and other holes shall be filled with suitable material. (a) Stumps, trees, sod or other organic matter shall not be incorporated in embankments, but shall be disposed of as directed by the Engineer. (b) Frozen material, otherwise suitable formation of embankments, ' shall be placed on embankment slopes or disposed of as directed by the Engineer. The Engineer may direct the removal of any portion ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-4 of an accepted layer which has become frozen after placement and ' compaction. This frozen material shall be placed on embankment slopes or disposed of as directed by the Engineer. The removal and placement of frozen material shall be at the sole expense of the Contractor. (c) Excavation of Rock: When bedrock is encountered, it shall be exca- vated to the slope lines and depths indicated on the plans. The Contractor shall schedule his operations so that all rock exca- vation within a distance of one hundred feet (1001) of bridge or other large structures, or any portions thereof, is completed to the required slope lines and depths before any structure work is started. ' All loose and unstable material, even if located beyond the payment lines, and all breakage and slices shall be removed as directed. It shall be, at all times, the responsibility of the Contractor to perform all phases of this work to produce the required rock slope faces to the satisfaction of the Engineer. ' Where explosives and blasting are used, all laws and ordinances of municipal, state and federal agencies relating to the use of explosives ' shall be complied with. All blasting shall be performed by qualified personnel and proper precautions shall be taken to protect persons, property, or the work from damage or injury from blast or explosion. ' The Contractor shall be responsible ,for all damage due either directly or indirectly to such operation. (d) Placement of Excavated Material: All excavated material shall be used in the formation of embankments, except as provided elsewhere ' herein or as ordered by the Engineer. Overhaul will not be allowed; but excavated material including topsoil ' shall be transported where directed, provided the designated point of deposit is not more than 100 yards beyond the limits of the work contracted for. ' When embankments are to be constructed on slopes steeper than 1 vertical to 3 horizontal, the slope of the existing ground on which the embankment is to be placed shall be plowed deeply or cut into steps 1 before the filling is begun. ' Embankments shall be constructed of earth, rock, or a mixture of earth and rock. The embankment shall be constructed by depositing Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-5 successive layers of fill for the full width of the embankments, unless ' a partial width is permitted by the Engineer. No embankment layer shall be deposited on surfaces of snow or ice, nor shall it be placed on frozen or unstable surfaces except under the conditions permitted ' elsewhere herein. If the Contractor is permitted to continue work, he shall remove, at no cost to the Town, any frozen embankment material unless otherwise directed by the Engineer. ' The depths of each layer, before compaction, shall not exceed 12 inches except as permitted hereinafter by these specifications, or with the permission of the Engineer. The embankment shall be crowned or pitched to provide drainage at ' the close of each day's operations. Where filling in 12-inch layers is impracticable as in the case of ' filling in water or over slopes too steep for the operation of equip- ment, the embankment may be constructed in one layer to the minimum elevation at which equipment can be operated, as determined by the ' Engineer; and above this elevation, the embankment shall be con- structed as specified herein. Embankments to an elevation 3 feet above the free water surface at the time of filling, shall be constructed of rock or free-draining material, or a mixture of both. ' In fills where the top of the proposed pavement will be less than 4 feet above an existing flexible pavement, and the existing pavement ' is not required to be removed, it shall be scarified as directed by the Engineer. ' When present pavement not in cut or fill is removed, as called for on the plans or directed, the area shall be backfilled with a suitable earth material which shall be free from admixture of subsoil, refuse, ' stumps, roots, rocks, brush, weeds and other material which will prevent the formation of a suitable seed bed. ' The entire area of each layer shall be leveled off by suitable grading equipment and shall be compacted as hereinafter specified. ' No rockfill shall be placed above an elevation which is 2 feet below the top of the embankment. ' No stone over 5 inches in its greatest dimension shall be placed within 12 inches of the elevation of the top of the prepared subbase ' unless otherwise specifically authorized. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-6 (e) Compaction: The entire area of each layer shall be uniformly ' compacted to at least the required minimum density by use of compaction equipment consisting of rollers, compactors or a com- bination thereof. Earth-moving and other equipment not specifically ' manufactured for compaction purposes will not be considered as compaction equipment. The dry density after compaction shall not be less than 95 percent of the dry density for that soil when tested in accordance with AASHO T 180, Method D, except that the mold used in the test shall be ' 6. 11 inches high. In this test, material retained on the 3/4-inch sieve shall be replaced with material retained on the No. 4 sieve, as noted as an option in the specifications for this test. ' (f) Stability: If after full compliance with the requirements of these specifications with regard to excavation, placement and compaction density requirements, a stable embankment has not been obtained, the Contractor shall proceed to perform such corrective work as is necessary to produce a stable embankment. This work may include ' but not necessarily be limited to control of moisture to within limits suitable for obtaining the required stability; blending with rock or granular material from roadway excavation or borrow, or free ' draining material or any combination thereof; removal and replacement with acceptably compacted material or a combination of these methods approved by the Engineer. Any of the foregoing methods ' may be supplemented by suspending embankment operations and allowing the material to dry. ' When embankments are constructed of material from roadway exca- vation and the Engineer determines that the material properly com- pacted is not sufficiently stabilized, the cost of corrective measures ' directed by the Engineer shall be paid for at applicable contract unit prices, or in the absence thereof, as extra work. ' (g) Surplus Excavated Material: Any surplus or unsuitable material not required or permitted to be used for such purposes, shall be ' removed from within the limits of the highway, and deposited at such point or points as the Contractor shall determine. METHOD OF MEASUREMENT: Payment lines for earth excavation shall coincide with the slope and subgrade lines as shown on the plans or as ordered. Also measured for payment shall be the volume of earth moved 1 in cutting or plowing of steps on steep slopes. Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-7 Payment lines for rock excavation shall coincide with the depth shown on the plans or to the depth directed; and payment lines for the slopes will be extended to a limit of one foot (1') outside of and parallel to the slope lines shown on the plans, or as directed, to include rock actually removed ' within this limit. Where removal of rock is necessary for reasons of safety or due to conditions clearly not attributable to the Contractor's method of operation, the payment lines will be fixed to coincide with ' limits ordered by the Engineer. Existing concrete and cement masonry structures over one (1) cubic yard ' shall be measured in place before removal. Only individual units of material of one (1) cubic yard or more will be included in this measurement. When rock is encountered, and its removal is to be paid for as "Rock Excavation", the Contractor shall strip or expose the rock to such an extent that in the Engineer's opinion the necessary measurements can be ' taken. The Contractor shall notify the Engineer at least 2 days prior to disturbing any of the rock to allow ample time to obtain the necessary measurements. If the Contractor shall fail to give such notice or remove ' any rock prior to the taking of the measurements, the Engineer shall presume that measurements taken at the time he first sees the material in question will give a true quantity of excavation. The amount of excavation will be determined by the method of average end areas. ' The work of scarifying existing pavement will not be measured for payment, but the cost shall be considered as included in the general cost of the ' Contract. BASIS OF PAYMENT: Roadway excavation will be paid for at the Contract ' unit price per cubic yard for "Earth Excavation", or "Rock Excavation", as the case may be, in accordance with the classification given herein and subject to the method of measurement described above. The price shall ' include all equipment, tools and labor incidental to the completion of the excavation, the formation and compaction of embankments, and the disposal of surplus or unsuitable material in accordance with the provisions of the ' plans and of these specification. Topsoil excavation, including all handling, will be measured and paid for at the Contract unit price per cubic yard for "Earth Excavation" . This price shall include placing of topsoil on the slopes ' in accordance with the requirements of the Section "Furnishing and Placing Topsoil". ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut ' T P-8 BORROW ' DESCRIPTION: When the amount of usable material excavated within the limits of the work contracted for is not sufficient to form the embankments ' and other features of the work, additional material shall be furnished by the Contractor From borrow pits obtained by him at his expense and located beyond the limits of the highway. This material shall be known as borrow. Borrow shall include the furnishing, removing and satis- factory placing of the additional material necessary to complete the embankments and other features of the work. ' MATERIALS: Borrow shall conform to the requirements of the Section, "Roadway Excavation, Formation of Embankment and Disposal of Surplus ' Material", herein for performance when incorporated in embankments for roadways. CONSTRUCTION METHODS: Borrow will be permitted only to the extent necessary to complete the embankments and similar details and only after all usable material from the excavation has been placed. With the approval ' of the Engineer, the Contractor may be permitted to place borrow before the excavation is completed; but he will be held responsible for the proper placing of all suitable excavated material, and no payment will be allowed for any borrow placed in lieu of suitable excavated material. This permission may be revoked by the Engineer at any time if in his opinion ' satisfactory progress is not maintained on other operations. The Contractor shall notify the Engineer at least 5 days prior to obtaining material from any borrow pits so that an examination may be made of the ' fitness of the material and so that the necessary measurements may be taken. The limits of the proposed borrow pit shall be shown to the Engineer; and prior to the taking of measurements, the Contractor shall ' be required to clear the area of all unsuitable material. No payment will be made for any material removed outside of the area measured or which was not used in the work. No excavation shall be made within the confines of a borrow pit after the Engineers have taken their original measurements, other than for material to be used in the formation of ' embankments or elsewhere as shown on the plans or as directed by the Engineer; except that material may be taken for contract items other than borrow with the permission of the Engineer under terms and conditions set forth in writing. If the Contractor elects to obtain borrow from a commercial pit, it will be necessary for him to have a section of the pit set off for his use solely, so that the amount of material removed may be accurately determined. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-9 During the period between the original and the final measurements and ' release by the Engineer, no material shall be taken from a measured borrow pit except by the Contractor-and by him only--for use in the work under this contract. Borrow pits shall be excavated to regular lines as staked, so as to permit accurate measurements, and shall be drained and left in a neat condition as directed. ' Borrow shall be placed where directed and in accordance with the provisions for the formation of embankments of the Section, "Roadway Excavation, Formation of Embankments and Disposal of Surplus Material" herein. METHOD OF MEASUREMENT: The amount of borrow to be paid for will be determined by the average end area method, from the results of cross-sectional elevations taken before and after the borrow material has been excavated from the pit or stockpile. Measurements of stockpiles will not be taken until they are firm and can be measured safely and ' accurately. BASIS OF PAYMENT: Payment will be at the contract unit price per cubic yard for "Borrow" complete in place, which price shall include furnishing and placing the material and all equipment, tools and labor necessary thereto. ' No payment will be allowed for "Borrow" until all excavation has been placed in embankments except under the following conditions: If the Con- tractor has secured the permission of the Engineer to place borrow before ' the excavation is complete, payment for such borrow material may be made at the discretion of the Enqineer, before completion of-the excavation. A reauest for such payment shall be made by the Contractor in writing, and he ' shall certify therein that he waives payment for any borrow placed in lieu of suitable excavated material. ' Deductions will be made from borrow measurements for any materials wasted from the cuts or placed in embankments outside of the cross-sections, except when unsuitable material is ordered wasted by the Engineer. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' TP-10 FORMATION OF SUBGRADE ' DESCRIPTION: The area of the roadbed upon which the pavement structure, including base courses and rolled gravel base are placed, shall be known as the subgrade. This is the plane coincident with the bottom of the rolled gravel base, as shown on the plans. The work of Formation of Subgrade shall be performed at this plane. ' After all grading for the roadbed has been substantially completed and all drains laid, the subgrade shall be brought to the 'lines, grade and cross sections shown on the plans. CONSTRUCTION METHODS: All soft and yielding material and other portions of the subgrade which will not compact readily when rolled, vibrated or tamped shall be removed and replaced with suitable material. The surface shall be compacted uniformly by rolling with an approved power roller having a minimum compression of 300 pounds per inch of width of tread on the rear wheel or wheels, and weighing not less than 10 tons, or with an equivalent vibratory roller or compactor. ' When more than one compacting unit is used, the unit exerting the greatest compactive effort shall be used to make the initial compaction. Any ' portion of the subgrade which is not accessible to a roller or other com- pacting unit shall be compacted thoroughly with hand tampers or with approved mechanical vibrators. The rolling, vibrating or tamping shall be continued until the entire sub- grade is uniformly and thoroughly compacted, true to lines and grade .given. ' In cut areas, there shall be no direct payment for any materials reauired to bring the subgrade to the lines, grade and cross section shown on the ' plans. The Contractor shall protect the subgrade from damage by exercising such ' precautions as the Engineer may deem necessary. At all times the sub- grade surface shall be kept in such condition that it will drain readily and correctly. The subgrade shall be checked and approved before any tfoundation or surfacing material is placed thereon. METHOD OF MEASUREMENT: Formation of Subgrade will be measured by the actual square yards completed. Payment lines shall be coincident with the outside edges of the pavement structure. Payment for Formation of Subgrade will not be allowed for drives, walks, bikeways and parking ' areas. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut TP-11 BASIS OF PAYMENT: This work shall be paid for at the Contract unit price per square yard for "Formation of Subgrade" including all labor, materials, tools and equipment incidental thereto. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' TP-12 BITUMINOUS CONCRETE DESCRIPTION: This work shall consist of two-course bituminous concrete pavement placed upon a completed base course in accordance with these ' specifications and in conformity with the lines, grades and typical cross section shown on the plans. MATERIALS: The materials for the bituminous concrete mixture, the sources of supply, formula for mix, mix tolerances, approval of mix formula, and the control of the mixture shall conform to the requirements ' of Article M.04.01 , Class 1 of the State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . ' CONSTRUCTI'ON METHODS: The methods employed in performing the work and all equipment, tools, machinery and other plant used in handling ' material and executing any part of the work shall conform to all the re- quirements of Article 4.02.03 of the State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental ' Construction, Form 811 , except that Articles 4.02.03-1 and 4.02.03-2 will not apply. ' The line between existing pavement to remain and existing pavement to be removed shall be snapped with a chalk line and cut with a saw or pneumatically operated spade so as to leave a smooth, straight vertical ' edge. Before bituminous concrete is placed, the kerfed edges shall be given a light tack coat of asphalt emulsion or RC-2. ' METHOD OF MEASUREMENT: Bituminous concrete pavement will be measured by the actual tonnage placed subject to the following provisions: ' The thickness shall be as indicated on the plans within a tolerance of plus or minus one-half inch. The total overrun from the theoretical amount shall not exceed 5.0 percent. ' Where the thickness exceeds that indicated on the plans by more than the prescribed tolerance, that material which is in excess of the total planned depth plus the tolerance will not be included for payment. Areas deficient in thickness in excess of the prescribed thickness shall be corrected at the Contractor's expense. ' Determination of the quantity to be used for adjustments will be based on 110 pounds per square yard per inch of thickness. ' Griswold & Fuss, Inc. 1 Pierce Road South Windsor, Connecticut 1 TP-13 BASIS OF PAYMENT: This work shall be paid for at the Contract unit 1 price per ton for "Bituminous Concrete", completed and accepted in place, which price shall include all materials, equipment, tools, labor and work incidental thereto. 1 ' 1 1 1 1 i 1 i 1 1 1 ' 1 1 ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut TP-14 PROCESSED AGGREGATE BASE ' DESCRIPTION: This work shall consist of processed aggregate base placed upon a completed rolled gravel base, in accordance with these ' specification and in conformity with the lines, grades and typical cross section shown on the plans. ' MATERIALS: All materials for this work shall conform to the requirements of Article M.05.01 of the State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, ' Form 811 . CONSTRUCTION METHODS: Coarse aggregate shall be either gravel or ' broken stone at the option of the Contractor. However, only one type of coarse aggregate shall be used on the project unless otherwise permitted by the Engineer, and shall be constructed in accordance with the require- ments of Article 3.04.03 of the State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . METHOD OF MEASUREMENT: This work will be measured by the actual tonnage placed subject to the following provisions: The thickness shall be as indicated on the plans or as ordered by the Engineer and within a tolerance of plus or minus three-fourths (±3/4) of ' an inch. Where the thickness exceeds that indicated on the plans by more than the ' prescribed tolerance, that material which is in excess of the total planned depth, plus the tolerance, will not be included for payment. ' Areas deficient in thickness in excess of the prescribed tolerance shall be corrected at the Contractor's expense, or with written permission of the ' Town, may remain and payment will be made for adjusted quantities. Determination of the quantity to be used for adjustments will be based on ' 0.0643 tons per square yard per inch of thickness. BASIS OF PAYMENT: This work will be paid for at the Contract unit ' price per ton for "Processed Aggregate Base", complete in place, which price shall include all materials, tools, equipment and work incidental thereto. I ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' TP-15 ROLLED GRAVEL BASE ' DESCRIPTION: This work shall consist of rolled gravel base placed upon the completed subgrade in accordance with these specifications and in ' conformity with the lines, grades and typical cross section shown on the plans. ' MATERIALS: The materials for this work shall conform to the requirements of Article M.02.03 of the State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . ' CONSTRUCTION METHODS: Bases 6 inches or less in specified depth may be constructed in one course; bases over 6 inches in specified depth shall be constructed in two courses of equal depth. ' Gravel shall be spread upon the prepared subbase to such depth that this course will be of the specified depth after final compaction. If, after the ' material has been spread and shaped, it is found that additional binder is necessary, it shall be furnished and applied in an amount directed by the Engineer. Such binder material shall be carefully and uniformly incor- porated with the material in place by scarifying, harrowing, brooming or other approved methods. The material shall then be shaped, wetted and compacted with power roller weighing not less than ten tons or an equivalent vibratory roller or compactor until thoroughly compacted. All ' areas of segregated coarse or fine material shall be corrected or removed and replaced with well graded material as directed by the Engineer. The ' compacting and wetting shall be continued until all voids are filled after which this portion may be left to dry. The compacting shall be continued until the course is thoroughly compacted to a firm and uniform surface ' satisfactory to the Engineer. The material shall be recompacted and wetted on succeeding days. The rate and extent of the compacting and the quantity and method of applying water shall be as directed by the Engineer. ' After the first course has been compacted and bound as specified herein, the succeeding course, if necessary in order to achieve the specified base ' depth, shall be similarly placed. METHOD OF MEASUREMENT: This work will be measured for payment 1 horizontally after compaction and to the limits as shown on the plans or as ordered by the Engineer. The thickness shall be as indicated on the plans or as ordered by the Engineer and within a tolerance of plus or minus ' three-fourths of an inch (±3/411). Areas found to be in excess of the allowable tolerances will be corrected as ordered and at the Contractor's expense. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut TP-16 BASIS OF PAYMENT: This work will be paid for at the Contract unit ' price per cubic yard for "Rolled Gravel Base" complete in place, which price shall include all materials, tools, equipment and labor incidental ' the reto. 1 ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut TP-17 ' BITUMINOUS CONCRETE CURBING DESCRIPTION: Bituminous concrete curbing shall consist of machine laid bituminous concrete, constructed on the pavement to the dimensions and details shown on the plans, or as ordered, and in conformity with the specifications. MATERIALS: Materials for this work shall conform to the requirements of Article M.04.01 , Class 3 of the State of Connecticut, Department of ' Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . ' CONSTRUCTION METHODS: Bituminous Concrete Curbing shall be con- structed in accordance with the requirements of Article 8. 15.03 of the State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . METHOD OF MEASUREMENT: This work will be measured for payment along the top of the curb and will be the actual number of linear feet of ' bituminous concrete curbing completed and accepted. ' BASIS OF PAYMENT: This work will be paid for at the Contract unit price per linear foot for "Bituminous Concrete Curbing" complete in place, which price shall include all materials, equipment, tools and labor incidental thereto. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut TP-18 BIKEWAY DESCRIPTION: This work shall consist of the construction of a bituminous 1 concrete bikeway to the line and grade shown on the plans or as ordered by the Engineer, including excavation, backfill, base, surface and surface sealer. MATERIALS: ' (a) Processed aggregate shall conform to the requirements of Article M.05.01 of the State of Connecticut'. Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, ' Form 811 . (b) Bituminous Concrete shall conform to the requirements of Article ' M.04.01 of the State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 and shall be Class 2 for the top course and Class 1 for the bottom course. CONSTRUCTION METHODS: ' (a) Excavation: Excavation shall be made to the required depth below the finished grade, as shown on the plans or as directed. All ' soft and yielding material shall be removed and replaced with suitable material. (b) Processed Aggregate Base: The base shall be constructed in accordance with the Section "Processed Aggregate Base" herein. ' (c) Bituminous Concrete: The two courses of bituminous concrete shall be constructed in accordance with the Section "Bituminous Concrete" herein. ' When the bituminous concrete is spread by hand, forms shall be used. Forms shall be of metal or wood, straight, free from warp and of ' sufficient strength to resist springing from the impact of the roller. If of wood, they shall be of 2-inch surfaced plank except that at sharp curves thinner material may be used; if of metal, they shall be of ' an approved section. All forms shall be of a depth equal to the depth of the bikeway and shall be securely staked, braced, and held firmly to the required line and grade. All forms shall be cleaned and oiled each time they are used. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut ' TP-19 (d) Backfilling and Removal of Surplus Material: The sides of the bikeway shall be backfilled with suitable material thoroughly com- pacted and finished flush with the top of the bikeway. All surplus material shall be removed and the site left in a neat and presentable condition to the satisfaction of the Engineer. In sections inaccessible to the roller, the base course, surface course and backfill shall be hand-tamped with tampers weighing not less than 10 pounds, the face ' of which shall not exceed 50 square inches in area. ' METHOD OF MEASUREMENT: This work will be measured for payment as follows: ' (a) Bituminous Concrete Bikeway: This work will be measured by the actual number of square yards of completed and accepted bikeway. ' (b) Excavation: Excavation below the finished grade of the bikeway, backfilling and disposal of surplus material will not be measured for payment; but the cost shall be included in the price bid for the bikeway. Excavation above the finished grade of the bikeway will be classified and paid for as roadway excavation. ' (c) Processed Aggregate Base: This work will not be measured for pay- ment but the cost thereof shall be included in the price bid for the bikeway. BASIS OF PAYMENT: This work will be paid for at the Contract unit price per square yard for "Bikeway", complete in place, which price shall include all excavation as specified above, backfill, disposal of surplus material, bituminous concrete, processed aggregate base, and all equip- ment, tools, labor and materials incidental thereto. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut T P-20 TRENCH EXCAVATION DESCRIPTION: Trench excavation shall consist of the removal and satis- factory use or disposal of all materials, except materials classified as rock, necessary for the proper completion of the work as shown on the plans or as ordered and backfilling, all in accordance with these specifi- cations for the construction of manholes, drain inlets, storm drains and appurtenant work. ' Rock, insofar as it applies to trench excavation, shall be defined as rock in definite ledge formation, boulders, or portions of boulders, cement masonry structures, concrete structures, of 1/2 cubic yard or more in ' volume, removed as indicated or directed from within payment lines for trench excavation. ' CONSTRUCTION METHODS: Trench excavation shall be made in con- formity with the requirements of the plans or as ordered. The banks shall be as nearly vertical as practicable. ' Except where rock is encountered, care shall be taken not to excavate below the depths indicated. The Contractor shall furnish and employ ' such shores, braces, sheeting, pumps, etc. , as may be necessary for the protection of property, proper completion of the work and the safety of the public and employees of the Contractor and the Owner. All ' bracing, sheeting, etc. , shall be removed when no longer required for the construction of safety of the work. After the excavation is completed, the Contractor shall notify the Engineer and no masonry, pipe or other material shall be placed in the excavated area until the Engineer has approved the depth of excavation and the ' character of the foundation material. During excavation, granular material suitable for backfilling shall be piled in an orderly manner a sufficient distance from the banks of the trench to avoid overloading and to prevent slides or cave-ins. All excavated materials not required or suitable for backfill shall be removed and dis- posed of as directed by the Engineer. Unless otherwise specified or approved by the Engineer, excavation shall be by open cut. Trench excavation shall consist of the removal of all materials not classified as "Rock Excavation" and shall include clay, silt, sand, muck, gravel, hardpan, loose shale, loose stone in masses and boulders measuring less than 1/2 cubic yard in volume. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut ' T P-21 ' (a) Extent of Open Excavation: The extent of excavation open at any time will be controlled by the conditions but shall always be con- fined to the limits prescribed by the Engineer. ' (b) Cutting and Removing Pavement: The Contractor shall' remove only as much existing pavement as necessary to do the work. Where ' excavations are to be made in paved surfaces to remain, he shall cut the pavement ahead of the excavation. All pavement shall be cut with a saw or pneumatically operated spade. Cutting and removal shall be done so as to produce clean, uniform, vertical edges without damage to the remaining pavement. ' Removed pavement shall not be mixed with other excavated material, but shall be disposed of away from the site of the work before the remainder of the excavation is made. ' (c) Trench Width: Pipe trenches shall be made as narrow as practicable and shall not be widened by scraping or loosening of material from ' the sides. Every effort shall be made to keep the sides of the trenches firm and undisturbed until backfilling has been completed and consolidated. ' (d) Sheeting and Bracing: The Contractor shall furnish, put in place, and maintain such sheeting, bracing, shoring, etc. , as may be ' necessary to support the sides of the excavation and to prevent any movement of earth other than that intended to be accomplished by the excavation. Such sheeting, shoring, and bracing shall be done as may be necessary for the protection of the work and for the safety of personnel and shall comply with the safety precautions as outlined in the Associated General Contractors of America, "Manual ' of Accident Prevention in Construction", and the "Occupational Safety and Health Act" of 1970 (OSHA). Sheeting shall be driven and excavation work conducted in such a manner as to prevent material in back of sheeting from running under sheeting and into the trench. ' Care shall be taken to prevent voids outside of sheeting; but if voids are formed, they shall be immediately filled and well rammed. Sheeting shall not be carried to such a depth at structures if it crosses the pipe line that it will bear upon the pipe. Sheeting shall not unnecessarily be driven below the pipe invert and thereby necessitate its being left permanently in place. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut TP-22 (e) Seepage or Surface Water: To insure proper conditions at all times during construction, the Contractor shall provide and maintain ample means and devices with which to intercept and/or remove promptly and dispose properly of all water entering trenches and other exca- vations. Excavations shall be kept dry until the structures, pipes and appurtenances to be built therein have been completed to such extent that they will not be floated or otherwise damaged. All water pumped or drained from the work shall be disposed of in a suitable manner without undue interference with other work or damage to pavements, other surfaces or property. (f) Rock Excavation: Where rock is encountered in the excavation, it shall be removed as required to permit the construction as specified. Where explosives and blasting are used, all laws and ordinances of ' municipal, state and federal agencies relating to the use of explo- sives shall be complied with. All blasting shall be performed by qualified personnel and proper precautions shall be taken to protect ' persons, property or the work from damage or injury from blast or explosion. ' Rock shall be excavated, within the limits of the trench, to a depth required for curshed stone or screened gravel bedding. Where rock is encountered in rights of way close to buildings or other structures, special precautions will be observed. In extreme cases the Contractor may be required to remove rock without the ' use of explosives. (g) Extra Excavation: Whenever wet or otherwise unstable soil that is ' incapable of properly supporting the pipe or structure is encountered as determined by the Engineer, such soil shall be removed to the depth required and refilled with compacted pipe bedding material. No excavation shall be made below the limits of the excavation called for on the plans or herein specified without prior approval by ' the Engineer. (h) Disposal of Surplus Excavation: Surplus excavated material not required on other portions of the work or suitable for backfill shall be disposed of by the Contractor, as set forth under Section "Earth Excavation, Formation of Embankment and Disposal of Surplus Material". ' (i) Gravel Fill: This material shall be used when directed by the Engineer for the purpose of replacing unsuitable material used in fGriswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-23 backfill of trenches and in mounding over the pipe. Material for ' gravel fill shall conform to Section M.02.01-Gravel Fill of the State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form ' 811 . (j) Construction Without the Use of Machinery: The Owner does not ' guarantee that all sewers proposed for construction under this Contract can be constructed by use of machinery. In some cases, the alignments or revised alignments may preclude the use of machinery. In this event, the Contractor will be required to perform this work at the same unit price bid in his proposal. ' (k) Pipe Bedding: Pipe bedding material shall be used where directed by the Engineer in storm drain installations. Pipe bedding material shall be screened gravel or crushed stone furnished by the Con- tractor. Where pipe bedding material is ordered, excavation shall be made for the full width of the trench and shall be backfilled from the trench bottom to the grade of the pipe with tamped, screened ' gravel uniformly graded from No. 4 sieve to 1/2-inch, or 1/2-inch crushed stone to form a bed for the pipe. After the pipe is bedded, the trench shall be filled to the center line of the pipe with tamped ' crushed stone or tamped screened gravel except at the joint. After the joint is approved, that portion shall be filled in with the same bedding material and tamped. ' 1 Backfill: The backfill material above the center line of the i( ) � pipe ' and below the center line of the pipe when no bedding is ordered, shall be placed and compacted, in six (F) inch layers, by hand, until the backfill material is at least twelve (12) inches compacted thickness above the top of the pipe. The backfill material shall ' be suitable material from the excavation or, if directed, shall be approved gravel fill as herein specified. Mechanical rammers or ' pneumatic tampers shall be used only after backfill has been com- pacted by hand to a depth of twelve (12) inches above the pipe. Backfill shall be compacted in layers not more than six (6) inches compacted thickness. No stones other than bedding stone shall be placed within eighteen (18) inches of the pipe in backfilling. When any stone is used in the remainder of backfilling, each piece shall be embedded in dirt and no stone weighing over fifty (50) pounds ' shall be included in the trench. Nesting of stones will not be allowed. The intent of this specification is to require thorough ' tamping of bedding and backfill material. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut T P-24 In grassed areas the backfilling shall be to a contour which will ' allow for the placement of topsoil. Should there be a deficiency in suitable backfill material from other parts of the work, the Engineer may order the placement of gravel fill. ' METHOD OF MEASUREMENT: Except as noted below, trench excavation will be measured in its original position by taking the difference between the ground surface at the time the trench is excavated and that after the excavations are complete. Before starting any excavation, the Con- tractor shall notify the Engineer so that elevations and measurements of the work may be obtained. Any work done prior to such notification will ' not be paid for. Trench excavation in roadway cuts shall include only that portion outside of the limits of roadway excavation and will not include open ditches. Payment limits shall be as described hereinafter. Horizontal Payment Limits: Payment lines shall be vertical and shall be the width to which the material is actually removed except that in no case ' shall the width between payment lines be more than the following: (a) 2 feet greater than the nominal inside diameter of circular pipe, ' or nominal inside span of eliptical pipe or pipe arch for such diameters or spans of less than 30 inches. ' (b) 3 feet greater than the nominal diameter of circular pipe or the nominal inside span of eliptical pipe or pipe arch for such diameters or spans that are 30 inches or greater. ' For endwalis, manholes, drop inlets and catch basins, payment lines shall ' be vertical and 2 feet outside of the neat lines of the foundations in each direction horizontally. ' In case it is necessary to excavate to a greater width than that specified above on account of the removal of existing structures, such additional excavation will be considered as trench excavation and will be measured and paid for as such. For the removal of underground obstructions such as pipelines, tanks, etc. , payment lines shall be vertical and 2 feet outside of the underground item measured horizontally. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-25 If rock is encountered, the Contractor shall strip it of sufficient over- lying material to allow for proper measurements and shall then notify the Engineer that the rock surface is ready for measurement. If the Contractor shall fail to give such notice, the Engineer shall presume that ' the measurements taken at the time he first saw the material in question will give the true quantity of excavation. ' Vertical Payment Limits: Where pipe bedding is used, the lower vertical payment limit shall be as shown on the plans. There will be no direct payment for the excavation necessitated by the shaping of the bedding, but the cost shall be included in the cost per linear foot for the pipe culvert specified. The upper vertical payment limit shall be that prescribed below except when in the opinion of the Engineer roadway excavation cannot be made prior to or simultaneously with the trench excavation, then the upper ' vertical payment limit will be the surface existing at the time the trench excavation is made. Vertical Payment Limits Other Than in Fills: Payment lines will extend vertically from the bottom of the trench to the bottom of the roadway excavation. If trench excavation is not located within the limits of roadway excavation, payment lines will extend vertically from the bottom of the trench to ' the existing ground surface. Vertical Payment Limits in Fills: For the various drainage installations ' the vertical payment lines shall extend from the bottom of the completed and accepted trench to the lowest of the following upper limits: ' (a) Bottom of subbase. (b) In the case of culverts, one foot above the top of the pipe. ' (c) In the case of drainage structure other than culverts, one foot above the top of the uppermost culvert pipe placed in the structure. ' (d) In the case of culvert installations transverse to the roadway extending down fill slopes, the vertical payment limit will be the depth below 1 bottom of loam or embankment surface, as the case may be, and measured perpendicular to the bottom of the trench. 1 Vertical payment limits shall be as described above except that in no case shall the depth measurement used for payment be greater than that actually excavated. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut T P-26 If gravel fill or borrow are used for trench backfill, they will be measured ' in place within the payment limits described herein. BASIS OF PAYMENT: This work will be paid for at the Contract unit price per cubic yard for "Trench Excavation" . Test pits ordered by the Engineer will be paid for as."Trench Excavation" . ' Where rock is encountered within the payment lines for trench excavation, its removal will be classified and paid for at the Contract unit price per cubic yard for "Rock in Trench Excavation" . When payment is made for trench excavation in fill, no such excavation ' will be classified as "Rock in Trench" . Excavation necessary for the removal of pipe culverts or other installations ' described herein will be paid for as trench excavation. The above prices shall include all materials, tools, equipment and labor ' necessary to complete the excavation in confirmity with the plans or as ordered. They shall also include backfilling where required and the disposal of surplus material. No additional payment will be made for shoring, bracing, sheeting, pumping, bailing or for material or equip- ment necessary For the satisfactory completion of the work. Bedding material as authorized by the Engineer will be paid for at the Contract unit price per cubic yard for "Bedding Material" . ' Gravel Backfill as authorized by the Engineer will be paid for at the Contract unit price per cubic yard Bid for "Gravel Fill" . 1 ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut ' T P-27 STORM DRAIN DESCRIPTION: This item shall consist of furnishing and installing new pipe culverts and new pipe-arch culverts of the type, size and length called for on the plans or as ordered at the locations and to the lines and grades designated on the plans, or as directed by the Engineer and in conformity with these specifications. This item shall also consist of furnishing and installing Perforated Asphalt- Coated Corrugated Metal Pipe for Underdrains of the size shown on the ' plans, at the location, to the lines and grades designated, or as ordered by the Engineer and in conformance with these specifications. ' MATERIALS: The materials for this work shall conform to the following: (a) Reinforced Concrete Pipe (R.C.P.) shall conform to the latest revision of ASTM Specification C-76. Pipe shall be Class IV and shall be tongue and grooved and of standard lengths. (b) Asphalt-Coated Corrugated Metal Pipe Arches (A.C.C.M.P.A.) shall conform to the requirements of Article M.08.01 of the State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . (c) Perforated Asphalt-Coated Corrugated Metal Pipe for Underdrains shall conform to the requirements of Article M.08.01 of the State of Connecticut, Department of Transportation, Standard Specifications for Roads'. Bridges and Incidental Construction, Form 811 . ' (d) Joints in concrete pipe shall be sealed with either cold-applied bituminous sealer, preformed plastic gaskets or flexible, watertight, rubber- type gaskets conforming to the requirements of Article M.08.01 of the State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . (e) Gravel Fill and Bedding Material shall conform with the requirements as set forth in the section, "Trench Excavation". CONSTRUCTION METHODS: Normally the placement of pipe shall start at the downstream end and progress upstream. All pipe shall be care- fully laid, true to the lines and grades given, hubs upgrade and with the spigot ends fully entered into the adjacent hubs. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut ' T P-28 When cold-applied bituminous sealer is used to seal concrete pipe, the bell and spigot or tongue-and-groove pipe shall be wiped clean and dry before applying the bituminous sealer to the pipe joint. Before the pipes are placed in contact with each other, the spigot or tongue end shall be completely covered with an excess of bituminous sealer; then the pipe shall be laid to line and grade so the inside surface of the abutting pipes are flush.. The joints shall be completely filled with bituminous sealer. All excess joint sealant shall be removed from inside of the pipe. Metal pipe and pipe arches shall be carefully jointed and firmly clamped together by approved connecting bands which shall be properly bolted in place before any backfill is placed. ' If so ordered by the Engineer, any pipe which is not in true alignment or which shows any settlement or distortion after laying, shall be taken up and relaid or corrected, to the satisfaction of the Engineer without additional compensation. METHOD OF MEASUREMENT: All new pipe culverts and underdrain will be measured for payment by the actual number of linear feet of pipe of the size and type, completed and accepted, and measured in place ' along the invert. BASIS OF PAYMENT: All new pipe culverts and underdrain will be paid ' for at the Contract unit price per linear foot for pipe of the type and size specified, complete in place including all materials, equipment, tools and labor incidental thereto. Trench excavation will be paid for at the Contract unit price per cubic yard for "Trench Excavation". Bedding material will be paid for at the Contract unit price per cubic yard for "Bedding Material". ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-29 CATCH BASINS ' DESCRIPTION: This item shall include the construction of catch basins in conformity with the lines, grades, dimensions and details shown on the plans and in accordance with these specifications. MATERIALS: ' (a) Precast concrete masonry units shall conform to the requirements of ASTM Specification C-139. (b) Concrete shall be in accordance with requirements in the section "Miscellaneous Concrete". ' (c) Inlet frames shall be of precast concrete and gratings of structural steel conforming to ASTM Specification A-7-56T. Dimensions, ' manufacture, curing and fabrication shall comply with the standard pattern of the Connecticut State Highway Department as indicated by details shown on the drawings. Following fabrication, all ' steel shall be given a coat of Bitumastic Primer or approved equal and, on completion of the installation, the primer shall be touched up and all steel given one (1) coat of Bitumastic 50 or approved ' equal. (d) Brick shall conform to the requirements of AASHO M-91 , Grade MA. ' (e) Mortar shall be composed of one (1) part portland cement and two (2) parts, by volume of surface dry, fine aggregate. (f) Pervious material for structure backfill shall conform to the fol- lowing gradation: Square Mesh Sieves 5" 1/4" *40 *100 ' Percent (passing by weight) 100 30-65 5-30 0-10 CONSTRUCTION METHODS: Catch basins shall be constructed in accordance ' with the requirements contained herein and details shown on the drawings. Pervious material shall be used for backfilling the upper portion of the excavation down to the invert of the outlet pipe but in no case to a depth greater than three (3) feet below the top of the structure. Drainage openings shall be formed in the four (4) walls of the inlets at or immedi- ately above the bottom of the pervious backfill. Openings shall be formed by the insertion of two (2) inch pipes or by leaving two (2) open vertical ' joints in the masonry. Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut ' T P-30 METHOD OF MEASUREMENT: Catch Basins will be measured as units. ' BASIS OF PAYMENT: Structure construction shall be paid for as follows: (a) Trench Excavation will be paid for at the Contract unit price per cubic yard for "Trench Excavation". (b) Pervious material will not be paid for directly but will be considered included in the Contract unit price for Catch Basins. (c) Catch Basins will be paid for at the Contract unit price each, complete in place, including all materials, equipment, tools and labor incidental thereto for: ' "Type "C" Catch Basin With Sump" "Type "C" .Catch Basin Without Sump" r ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut ' T P-31 EN DWA L LS DESCRIPTION: This work shall consist of the construction of concrete endwalls. All such structures shall be built in the locations indicated or directed conforming to the lines, grades, dimensions and details shown on the plans ' and in accordance with the provisions of these specifications for the various items which constitute the completed structure. ' MATERIALS: The materials furnished and used in the work shall be those prescribed herein for the several contract items which constitute the completed structure. ' Unless otherwise noted, concrete shall be Class "A" Concrete confo rming to Article M.03.01 , State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . ' CONSTRUCTION METHODS: All construction methods for endwalls shall be in accordance with the detailed requirements prescribed for the con- struction of the several contract items entering into the completed structure. ' All requirements relative to concrete structures in Form 811 that are pertinent shall apply equally to work covered by this section. (a) Foundations shall be excavated to the depth shown on the plans or as ordered by the Engineer. No construction material shall be placed in any foundation until the Engineer has examined the material encountered and approved its character and the depth of the excavation. ' (b) Endwalls shall be built in the location and to the dimensions and details shown on the plans; or as ordered, and they shall be neatly and accurately finished, true to the lines and grades given. Pipes shall be of sufficient length to extend to the exposed face of the endwall, and the end shall be finished to provide neat, watertight joints. The ends of pipe culverts which enter endwalls on a skew shall be cut to the angle of the skew; or the short side of the pipe may be built out with adequate forms, if this method is approved by the Engineer. METHOD OF MEASUREMENT: This work will be measured by the actual ' cubic yards of concrete placed and accepted. Forming, reinforcing steel, joints, finishing and other items required for the completion of work will not be measured for payment. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-32 BASIS OF PAYMENT: This work will be paid for at the Contract unit ' price per cubic yard for "Miscellaneous Concrete", including all labor, materials, equipment and tools incidental thereto. Excavation for endwalls will be paid for as trench excavation. Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut T P-33 ' MANHOLES DESCRIPTION: This work shall consist of the construction of storm ' manholes in conformity with the lines, grades, dimensions and details shown on the plans and in accordance with the specifications. ' MATERIALS: (a) Concrete masonry units shall conform to the requirements of ASTM ' Specification C-139. (b) Concrete shall be in accordance with requirements of Article M.03, State of Connecticut, Department of Transportation, Standard Specifi- cations for Roads, Bridges and Incidental Construction, Form 811 , and shall be Class "All . ' (c) Brick shall conform to the requirements of AASHO M-91 , Grade MA. ' (d) Mortar shall be composed of one (1) part portland cement and two (2 parts, by volume of surface dry, fine aggregate. ' (e) If precast reinforced concrete manhole sections are substituted for concrete masonry units, they shall conform to the requirements of ASTM Specification C 478. ' (f) Manhole frames and covers shall conform to the applicable parts of Article M.08.02, State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 81 1 , and the details shown on the plans. (g) Manhole steps shall be similar or equal to ALCOA Aluminum #12653A. CONSTRUCTION METHODS: Manholes shall be constructed in accordance ' with the requirements contained herein and as shown on the plans. All metal fittings shall be set in a full mortar bed. ' Inlet and outlet pipes shall extend through the walls for a sufficient distance beyond the outside surface to allow for satisfactory connections, ' and the concrete or masonry shall be constructed around them neatly to prevent leakage along their outer surfaces. The pipe shall be cut flush with the inside face of the wall, or as shown on the plans. ' METHOD OF MEASUREMENT: Manholes will be measured for payment as units. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut TP-34 BASIS OF PAYMENT: This work will be paid for at the Contract unit ' price per each for "Manhole", including all materials, equipment, tools and labor incidental thereto. ' Excavation for manholes will be paid for under "Trench Excavation" . ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut T P-35 HAY BALE EROSION CHECKS ' DESCRIPTION: Ha Bale Erosion Checks are a temporary system of y p y y anchored bales of hay strategically located to check erosion and trap sediment resulting from the formation of embankment, earth, trench and/ or channel excavation. ' MATERIALS: Hay bales shall be durable and be from acceptable grass or legume mowings, free from weeds, reeds, twigs, debris or other objec- tionable material. They shall be free from rot or mould and shall be dry ' when delivered to the project. Wood stakes shall be as approved by the Engineer. 1 CONSTRUCTION METHODS: Hay Bale Erosion Checks shall be placed as directed by the Engineer or shown on the plans at areas of concentrated runoff in the vicinity of new construction that, in the opinion of the Engineer, the runoff would or is creating an erosion or sediment problem. Hay Bale Erosion Checks will remain and be periodically checked and maintained in place until such time that the Engineer deems that they are no longer required. At such time they will be removed by the Contractor ' and disposed of as directed by the Engineer. METHOD OF MEASUREMENT: Hay Bale Erosion Checks will be measured ' for payment along the top of the Hay Bales as installed and will be the actual number of lineal feet of Baled Hay installed and accepted. BASIS OF PAYMENT: This work shall be paid for at the Contract unit price per lineal foot for "Hay Bale Erosion Checks" installed in place, including all materials, equipment, tools and labor incidental thereto. The above price shall include the removal and disposal of Hay Bale material, accumulated sediment and the restoration and grading of the Iarea that is acceptable to the Engineer. The above price shall also include maintenance and replacement of Hay Bales as directed by the Engineer. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut T P-36 LOG AND HAY BALE CHECK DAMS DESCRIPTION: Log and Hay Bale Check Dams are temporary structures P y built of baled hay, logs of 4"-6" diameter and native stone. Check dams are to be used as temporary protective measures across natural or manmade watercourses subject to sediment laden flows resulting from the Contractor's construction operation. The intent of the Check Dams is to restrict the movement of sediment while the Contractor is performing construction operations at or near natural or manmade watercourses. Installation of the Check Dams shall be made in locations directed by the Engineer. ' MATERIALS: Hay bales shall be durable and be from acceptable grass or legume mowings, free from weeds, reeds, twigs, debris or other objec- tionable material. They shall be free from rot or mould and shall be dry when delivered to the project. Logs shall be as approved by the Engineer. Stones shall be as approved by the Engineer. CONSTRUCTION METHODS: Log and Hay Bale Check Dams shall be con- structed similar to details shown on the plans and placed as shown on the plans or as directed by the Engineer. Log and Hay Bale Check Dams will remain and be periodically checked and ' maintained in place until such time that the Engineer deems that they are no longer required. At such time they will be removed by the, Contractor and disposed of as directed by the Engineer. ' METHOD OF MEASUREMENT: Log and Hay Bale Check Dams will be measured as units. ' BASIS OF PAYMENT: Log and Hay Bale Check Dams will be paid for at the Contract unit price per each for "Log and Hay Bale Check Dams" complete in place, including all materials, equipment, tools and labor ' incidental thereto. 1 The above price shall include the removal and disposal of the check dams, accumulated sediment, the maintenance and replacement of Check Dams and the restoration and grading of the area as directed by the Engineer. ' Griswold & Fuss, Inc. . ' Pierce Road South Windsor, Connecticut T P-37 BITUMINOUS CONCRETE DRIVEWAY ' DESCRIPTION: This work shall consist of the construction of bituminous concrete driveways to the lines and grades shown on the plans or as ordered by the Engineer including excavation, backfill, gravel base and bituminous concrete surface. ' MATERIALS: (a) Gravel for the base course shall conform to the requirements of ' Article M.02.01 , State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 and shall be gravel fill. ' (b) Bituminous concrete for the surface course shall conform to the requirements of Article M.04.01 , State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 and shall be Class 2. ' CONSTRUCTION METHODS: (a) Excavation: Excavation, including removal of any existing side- walk, or driveway, shall be made to the required depth below the finished grade, as shown on the plans or as directed. All ' soft and yielding material shall be removed and replaced with suitable material. (b) Forms: When the bituminous concrete is spread by hand, forms ' ' shall be used. Forms shall be of metal or wood, straight, free from warp and of sufficient strength to resist springing from the . ' impact of the roller. If of wood, they shall be of 2-inch surfaced plank except that at sharp curves thinner material may be used; if of metal, they shall be of an approved section. All forms shall be of a depth equal to the depth of the driveways and shall be securely staked, braced, and held firmly to the required line and grade. All forms shall be cleaned and oiled each time they are used. (c) Base Course: Gravel for the base course shall be uniformly spread ' upon the subgrade to the required depth and thoroughly compacted with a roller weighing not less than 500 pounds. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-38 (d) Bituminous Concrete Surface: The material shall be spread, on the prepared gravel base, evenly and uniformly and to such a depth so as to have a compacted thickness of two inches (211). It shall .be spread by suitable hand tools and hand screeded. A power roller weighing not less than five hundred (500) pounds shall be used to obtain the required compaction. The roller shall be wet with sufficient water so as to prevent pickup of material. Rolling shall continue until all roller marks are eliminated and no further compaction is possible. Placing and rolling shall be continuous. Where a joint is formed, the old pavement shall be cut back square with the pavement in a vertical and horizontal direction. The exposed edge shall receive a thin coating of asphalt paint. ' (e) Backfilling and Removal of Surplus Material: The sides of the driveway shall be backfilled with suitable material thoroughly compacted and finished flush with the top of the driveway. All surplus material shall be removed and the site left in a neat and presentable condition to the satisfaction of the Engineer. In sections inaccessible to the roller, the base course, surface ' course and backfill shall be hand-tamped with tampers weighing not less than 12 pounds, the face of which shall not exceed 50 square inches in area. ' METHOD OF MEASUREMENT: This work will be measured for a men p y t as follows: (a) Bituminous Concrete Driveway: This work will be mea sured asu red by the actual number of square yards of completed and accepted d riveway.. (b) Excavation: Excavation below the finished grade of the driveway, backfilling, and disposal of surplus material will not be measured for payment; but the cost shall be included in the price bid for the ' driveway. Excavation above the finished grade of the driveway will be classified and paid for as roadway excavation. ' (c) Gravel Base: This work will not be measured for payment but the cost thereof shall be included in the price bid for the driveway. ' BASIS OF PAYMENT: This work will be paid for at the Contract unit price per square yard for "Bituminous Concrete Driveway", complete in place, which price shall include all excavation as specified above, back- fill, disposal of surplus material, gravel base, and all equipment, tools, ' labor and materials incidental thereto. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut ' T P-39 CEMENT RUBBLE MASONRY ' DESCRIPTION: This item shall consist of approved stone, , laid to full mortar beds, constructed in such shapes and at such places as indicated on the plans or where directed, and in accordance with these specifications. MATERIALS: The materials for this work shall conform to the require- ments of Article M. 11 .02 for rubble masonry stone and Article M. 11 .04 for mortar of State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . ' CONSTRUCTION METHODS: The ma sonry shall be constructed in the location and to the dimensions shown on the plans or as ordered. ' (a) DressingStone: All necessary y dressing or shaping shall be done before the stone is laid in the wall. No dressing or hammering which will loosen the stone will be permitted after it is placed. Stone at angles or at ends of walls shall be roughly squared and dressed to the required lines. (b) Laying Stone: Stone shall not be laid when the air temperature in the shade and away from artificial heat is 40 degrees F. or below and falling, except with the approval of the Engineer and subject to such conditions as he may impose. ' The masonry shall be laid to line and in courses roughly leveled up. The bottom or foundation courses shall be composed of large, selected stones; and all courses shall be laid with bearing beds ' parallel to the natural bed of the material. Each stone shall be cleaned and thoroughly saturated with water ' before being set. Stone shall not be dropped or slid over the wall but shall be carefully set without jarring stone already laid. All ' stone shall be well bedded in freshly made mortar. The mortar joints shall be full and the stones carefully settled in place before the mortar has set. No spalls will be permitted in the beds. Joints and beds shall have an average thickness of not more than 136 inches. ' Headers shall be placed in each course and shall have a width of not less than 1'2 times their thickness. They shall bond with the core or backing not less than 12 inches; and in walls 2 feet or less ' in thickness, they shall extend entirely through the wall. Headers shall occupy not less than 1/5 of the face area of the wall and shall be evenly distributed. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut T P-40 Whenever possible the face joints shall be properly pointed before the mortar becomes set. Joints which cannot be so pointed shall be prepared for pointing by raking them out to a depth of about 2 inches before the mortar has set. The face surfaces of stones shall not be smeared with the mortar forced out of the joints or that used in pointing. The vertical joints in each course shall break joints with those in adjoining courses at least 6 inches. In no case shall vertical joints be so located as to occur directly above or below a header. In case any stone is moved or the joint broken, the stone shall be taken up, the mortar thoroughly cleaned from bed and joints, and the stone reset in fresh mortar. ' (c) Pointing: Pointing shall not be done in freezing weather or when the stones contain frost. Joints not pointed at the time the stones are laid shall be thoroughly ' wet with water and filled with mortar. The mortar shall be well driven into the joints and finished with an approved pointing tool. The wall shall be kept wet while pointing is being done; and in hot ' or dry weather, the pointed masonry shall be protected from the sun and kept wet for a period of at least three days after completion. ' After the pointing is completed and the mortar set, the wall shall be thoroughly cleaned and left in a neat and workmanlike condition. ' Cofferdams shall be so maintained that the masonry is not exposed to the action of running water until such time as the mortar has ' attained a strength sufficient, in the opinion of the Engineer, to prevent injury to the work from such exposure. METHOD OF MEASUREMENT: This work will be measured for payment by the actual cubic yardage, completed and accepted, within the neat lines as shown on the plans or as ordered by the Engineer. No deduction will be made for the volume occupied by culvert or drainage pipes. BASIS OF PAYMENT: This work will be paid for at the Contract unit price per cubic yard for "Cement Rubble Masonry" complete in place, which price shall include all materials, equipment, tools and labor incidental thereto. The cost of weep holes will be included in the cost of "Cement Rubble Masonry". ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-41 MISCELLANEOUS CONCRETE DESCRIPTION: Work under this section shall include furnishing all labor, materials, equipment and services for placing and curing portland cement ' concrete as required for catch basins, base slabs, endwalis, or where directed by the Engineer. The Engineer, where he deems advisable, may substitute the use of masonry for concrete. MATERIALS: All materials used in cement concrete shall conform to the requirements of Article M.03 State of Connecticut, Department of ' Transportation, Standard Specifications for Roads, Bridges and Incidental Construction Form 81 1 and shall be Class "A". ' CONSTRUCTION METHODS: (a) All concrete shall be. placed in accordance with Article 6.01 .03, ' State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . No separate finishing shall be required for unexposed concrete ' placed as specified and having a homogeneous surface finish when stripped. ' Backfilling against concrete shall begin only after approval of the concrete, the curing and, if required, the waterproofing. ' METHOD OF MEASUREMENT: Concrete to be measured will be the actual cubic yards of concrete placed in accordance with these specifications. The items of concrete construction that will be measured for payment are ' endwalls and that directed to be placed according to field requirements and will be measured for payment as "Miscellaneous Concrete" . ' Reinforcement, if required, will not be measured. Concrete for catch basin, manhole, and inlet base slabs shall be considered as incidental to ' those items of work. BASIS OF PAYMENT: Work under this section will be paid for at the ' Contract unit price per cubic yard bid for "Miscellaneous Concrete" . Payment made under this section shall be considered as full compensation ' for reinforcement, curing, forming, stripping and all related work. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-42 FURNISHING AND PLACING TOPSOIL ' DESCRIPTION: This work shall consist of furnishing, placing and shaping topsoil in areas shown on the plans or where directed by the Engineer. ' The topsoil shall be placed to a depth of four (4) inches. MATERIALS: The material for this work shall conform to the requirements ' of Article M. 13.01-1 , State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . CONSTRUCTION METHODS: The areas on which topsoil is to be placed shall be graded to a reasonably true surface. Topsoil shall then be ' spread and shaped to the lines and grades shown on the plans or as directed by the Engineer. The depth to which the topsoil is to be placed is that required after settlement of the material has taken place. All ' stones, roots, debris, sod, weeds and other undesirable material shall be removed. After shaping and grading, all truck and other equipment shall be excluded from the topsoiled area to prevent excessive compaction. The Contractor shall perform such work as required to provide a friable surface for seed germination and plant growth prior to seeding. ' During hauling and spreading operations, the Contractor shall immediately remove any material dumped or spilled on the shoulders or pavement. ' It shall be the Contractor's responsibility to restore to the line, grade and surface all eroded areas with approved material and to keep topsoiled areas in acceptable condition until the completion of the construction work. METHOD OF MEASUREMENT: This work will be measured for payment by the number of square yards of area on which the placing of topsoil ' supplied by the Contractor from offsite sources has been completed and the work accepted. BASIS OF PAYMENT: This work will be paid for at the Contract unit price per square yard for Furnishing and Placing Topsoil which price shall include all materials, equipment, tools, labor and work incidental ' thereto. Topsoil obtained from excavations within the limits of the project will not be measured for payment under this item, but will be included in the cost of the item "Earth Excavation". ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut T P-43 FERTILIZING AND SEEDING DESCRIPTION: The work included under this item shall consist of furnishing and placing fertilizer and seed on unpaved areas disturbed by ' construction where shown on the plans and where specifically ordered by the Engineer. ' MATERIALS: The materials for this work shall conform to Article M. 13.03 for fertilizer and Article M. 13.04 for seed mixture of State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . CONSTRUCTION METHODS: ' (a) Preparation of Seed Bed: Prior to application of seed and fertilizer, the soil surface shall be made friable by means of discing or other ' approved methods. (b) Seeding Seasons: The normal seasonal dates for seeding shall be ' as follows: Spring Seeding: March 15th - June 15th Fall Seeding: August 15th - October 15th ' Seeding at other than the above times shall be allowed only with the written permission of the Engineer. (c) Areas of disturbed soil which will contribute significantly to stream and air pollution shall be established to the designated vegetative cover as soon as feasible or when directed by the Engineer. C >d Seeding Methods: Seed shall be uniformly applied by any agron- omically acceptable and feasible method approved by the Engineer. ' The seed mixture shall be applied at the rate of 65 pounds per acre. Fertilizer shall be uniformly placed at the rate of 1 ,000 pounds per ' acre. (e) Compaction: The Contractor shall keep all heavy equipment off areas to be seeded and areas which have been seeded to prevent excessive compaction. Contractor shall be required to keep Maintenance: The Co q p all seeded areas free from annual weeds, growth foreign to the seed mixture ' Griswold & Fuss, Inc. Pierce Road ' South Windsor Connecticut T P-44 and debris, such as stones, cable, bate wire, etc. , and maintain ' these areas until acceptance by the Owner. He shall repair at his own expense, any seeded areas damaged by wind, fire or other causes. Until acceptance by the Owner, loamed areas shall be mowed when the growth has reached a height of six (6) to eight (8) inches and ' all mulched areas shall be mowed when the growth has reached a height of ten (10) to twelve (12) inches, as directed by the Engineer. An acceptable stand of grass shall consist of a uniform stand of at ' least sixty (60) percent established permanent grass species, with a uniform count of at least one hundred (100) plants per square foot. The Contractor shall be responsible for protecting areas outside the limits of his work and for damage caused by delivery, handling and storage of materials, washouts due to drainage diversions, or ' by his workmen or equipment. These areas shall be repaired and restored by the Contractor, at his own expense, to the condition that prevailed previous to the time of damage. ' METHOD OF MEASUREMENT: This work will be me asured red by the number of square yards, surface areas, actually covered by fertilizer and seed, ' within pay limits shown on the plans or which has been ordered by the Engineer. BASIS OF PAYMENT: This work shall be paid for at the Contract unit price per square yard for "Fertilizing and Seeding", which price shall ' include all tools, labor, material, equipment, maintenance, and all other incidental items necessary for a complete job. 1 ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut T P-45 SILTATION CHAMBER DESCRIPTION: This work shall consist of the construction of a siltation chamber as shown on the plans and as directed by the Engineer including excavation, backfill, precast concrete chamber with appurtenances and access manholes. MATERIALS: The precast chamber shall be as detailed on the plans and shall be equal to "Precast Septic Tank ST 5 z x 14-25" as manufactured by Rotondo & Sons, Inc. , Avon, Connecticut, with modification of pipe knockouts ' and holes in the baffle. The tank shall have a design loading of AASHO- HS20-44. ' The risers for manholes may be precast concrete, concrete block or brick. The cast iron hood over the outlet pipe shall be Catalog No. R-3701-15 as manufactured by Neenah Foundry Company, Neenah, Wisconsin, or an approved equal. ' Manhole frames and covers shall be cast iron heavy duty similar to Catalog No. R-1643 as manufactured by Neenah Foundry Company, Neenah, Wisconsin, or an approved equal. ' CONSTRUCTION METHODS: The siltation chamber shall be constructed in strict accordance with the line, grade and details shown on the plans. ' The gravel base shall be thoroughly compacted and the surface carefully leveled so that the chamber will be level when installed and will have ' firm, even support. The excavation shall be dry when the chamber is set. If the chamber is to be set below the normal water level in the excavation, at least two (2) feet of water shall be placed in the chamber before the excavation is allowed to fill with water to prevent floatation. ' Backfill shall be placed in six (6) inch layers with each layer thoroughly compacted. Fill shall not be placed more than one foot above fill on ' other sides of the chamber. Manholes shall be constructed in accordance with the details on the plans. All metal fittings shall be set in a full mortar bed. Hooks for holding hood over outlet pipe shall be grouted into the wall of the chamber. Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut T P-46 METHOD OF MEASUREMENT: This work will be measured as a unit. ' BASIS OF PAYMENT: This work will be paid for at the Contract lump sum price for "Siltation Chamber" , which price shall include all materials, equipment, tools and labor incidental to the siltation chamber including excavation, chamber, manholes and backfill. I r Griswold & Fuss, It'd. 1 Pierce Road South Windsor, Connecticut 1 T P-47 WOOD CHIP MULCH ' DESCRIPTION: This work shall consist of placing wood chip mulch on the slopes where directed by the Engineer. 1 MATERIALS: The wood chip mulch shall be the material stockpiled as outlined in the Section "Clearing and Grubbing". 1 CONSTRUCTION METHODS: As soon as slopes are shaped to final grade, wood chips shall be evenly spread to a minimum depth of three (3) inches on all exposed soil where shown on the plans or where directed by the Engineer. 1 METHOD OF MEASUREMENT: This work will not be measured for payment. BASIS OF PAYMENT: This work will not be paid for directly, but will 1 be considered as part of the cost of "Clearing and Grubbing". 1 1 1 i 1 Griswold & Fuss, Inc. 1 ' Pierce Road South Windsor, Connecticut ' T P-48 REMOVAL OF EXISTING STRUCTURE DESCRIPTION: This work shall consist of the removal of the existing box culvert under Pierce Road as necessary to the final completion of ' the work. All work shall be done in accordance with the requirements of the plans or as ordered and in conformity with these specifications. CONSTRUCTION METHODS: The culvert shall be removed and disposed of by such methods as the Contractor may propose, subject to the approval of the Engineer. Care shall be taken that the removal does ' not result in injury to any permanent construction or to adjoining property. All material not required for backfilling or for use elsewhere at the project shall be disposed of by the Contractor. METHOD OF MEASUREMENT: This work will be measured as a unit. ' BASIS OF PAYMENT: This work will be paid for at the Contract lump sum price for "Removal of Existing Structure", including the disposal of surplus material, all equipment, tools and labor incidental thereto. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut TP-49 BOX CULVERT ' DESCRIPTION: This work shall consist of the construction of a precast concrete box culvert on a cast-in-place concrete base slab and concrete mud mat along with wing walls all as shown on the plans and as directed by the Engineer. MATERIALS: The precast concrete culvert shall be to the dimensions shown on the plans and shall be as manufactured by the Leonard Concrete Pipe Company, Inc. , Hamden, Connecticut or an approved equal. The design loading shall be H-20. The successful bidder shall submit complete Shop Drawings and design calculations to the Engineer for review and approval. ' Concrete for base slab and curb wall shall conform to the requirements of the Section "Miscellaneous Concrete" herein. Concrete for the mud mat shall have a maximum aggregate size of two (2) inches and a minimum 28-day compressive strength of 1 ,500 pounds per ' square inch. Reinforcing steel shall conform to the requirements of Article M.06.01 , State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . ' Dampproofing shall conform to the requirements of Article M. 12.05, State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, , Form 811 . ' Pervious structure backfill shall conform to the requirements of Article M.02.05, State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . All applicable sections of Article M.03, State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 , shall apply to this work. Materials for wing walls shall be as outlined in the section "Cement Rubble Masonry" herein. CONSTRUCTION METHODS: Installation of the precast units shall be done in accordance with these specifications and the manufacturer's recommendations. Concrete work shall be done in accordance with the applicable requirements of Article 6.01 , State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-50 ' The concrete mud mat shall be carefully struck off so that the minimum thickness of the floor slab shall be the dimensions shown on the plans when the slab is placed to the, proper grade as shown on the plans. The mud mat shall be cured until sufficient strength is obtained to support the ' slab and construction equipment. ' Methods of controlling water during construction shall be approved by the Engineer. Methods to be used shall be submitted to the Engineer well in advance to allow sufficient time for approval by the Engineer. Methods ' of water control shall be such as to minimize pollution of the Podunk River during construction operations. ' Reinforcing steel shall be fabricated and placed in accordance with applicable requirements of Article 6.02.03, State of Connecticut, Depart- ment of Transportation, Standard Specifications for Roads, Bridges and ' Incidental Construction, Form 811 . Before fabricating any reinforcing steel, the Contractor shall submit shop drawings showing bending diagrams, material lists and material designations t to the Engineer for approval. Any expenses incidental to the revision of materials furnished in accordance with shop drawings and order lists to ' make them comply with the requirements of the plans, specifications or special provisions shall be borne by the Contractor. ' Construction methods for construction of the wing walls shall be as outlined in the section "Cement Rubble Masonry" herein. METHOD OF MEASUREMENT: The items .to be measured for payment will be box culvert and cement rubble masonry for the wing walls. The box culvert will be measured as a unit including the precast units, cast-in-place concrete, mud mat, reinforcing steel, joint filler, excavation, backfill, water control and any other work required for the completion of ' the culvert. Cement rubble masonry for the wing walls shall be measured as outlined in the Section "Cement Rubble Masonry" herein. Excavation, backfill and weep holes will not be measured for payment. ' BASIS OF PAYMENT: The box culvert will be paid for at the lump sum price for "Box Culvert" including precast units, cast-in-place concrete, mud mat, reinforcing steel, joint filler, excavation and backfilling for box ' culvert, excavation and backfilling for wing walls and water control. ' Griswold & Fuss, Inc. Pierce Road South Windsor ' TP-51 The wing walls will be paid for at the per cubic yard price for "Cement Rubble Masonry" including weep holes. Payment under this section shall be considered as full payment for furnishing 1 all materials, equipment, tools and labor incidental to the construction. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut TP-52 TREE WELLS AND TREE ROOT PROTECTION DESCRIPTION: This item shall consist of the protection of selected trees, shrubs, or other woody plants by tree wells and by porous material placed to protect the root system in accordance with these specifications and as directed by the Engineer. Tree wells shall be constructed of dry rubble ' masonry as indicated on the plans and in accordance with these specifications. MATERIALS: The material for root protection shall be approved material ' ranging from one to six inches in size and may consist of stone, screened gravel or slag taken from the roadway excavation. ' The materials for tree wells shall conform to the requirements of Article M. 11 .02, State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, ' Form 811 . Mulch shall consist of either decomposed leaves, well rotted grass cuttings, ' hay or straw as it may be available and acceptable to the Engineer. CONSTRUCTION METHODS: Tree wells shall be constructed in accordance ' with the dimensions and arrangement shown on the plans or as directed by the Engineer. They shall be made of dry rubble masonry. ' No backfill of any nature shall be placed by the Contractor above the root spread of a tree or plant which it is desired to preserve until a fill of porous material not less than three inches in depth, or as directed by the ' Engineer, and a mulch layer have first been placed above its roots. Where tree root protection is ordered, the area to be protected shall be thoroughly cleaned of all vegetation. Porous material shall then be spread loosely over the area to a depth ranging from three to twelve inches. On top of the porous material, a mulch layer shall be spread, over which a layer of fill material acceptable to the Engineer shall be placed. ' Care shall be taken that trees or shrubs which are to be preserved in place are not scarred or damaged by the operations under this item. The root area to be protected shall be the area of ground surface lying within ' the periphery of the tree or as directed by the Engineer. METHOD OF MEASUREMENT: The yardage of masonry to be paid for ' shall be the number of cubic yards of dry rubble masonry measured com- plete in place. The yardage of tree root protection to be paid for shall be the number of cubic yards of stone, screened gravel, or slag placed ' in tree root protection measured complete in place. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut III , TP-53 BASIS OF PAYMENT: Masonry will be paid for at the Contract unit price ' per cubic yard for "Dry Rubble Masonry". The yardage of porous material for tree root protection will be paid for at the Contract unit price per cubic yard of "Porous Material for Tree Root Protection", which price and payment shall be full compensation for clearing the ground surface, for placing the porous fill, for furnishing and placing the mulch layer, ' and all incidentals necessary to complete the work. Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut TP-54 ' METAL BEAM RAIL (TYPE R-I) DESCRIPTION: This work shall consist of the construction of metal beam ' rail consisting of a single line of rail elements fastened to steel posts and the appropriate terminal treatment as shown on the plans. It shall be erected in the locations given and fabricated in accordance with the dimensions and details shown on the plans or as ordered, and in accordance ' with these specifications. MATERIALS: The material for this work shall conform to the require- ments of Article M. 10.02, State of Ccnnecticut, Department of Transpor- tation, Standard Specifications for Roads, Bridges and Incidental Con- struction, Form 811 . CONSTRUCTION METHODS: The rail elements shall be erected to ' produce a smooth continuous rail paralleling the line and grade of the highway surface or as shown on the plans. The rail elements shall be lapped in the direction of traffic. When designated on the plans, the rail elements shall be fabricated so as to be constructed on curves which have the required radius or curvatures. Where railing is to be constructed on curves which have a radius of 150 feet or less, the rail elements shall be fabricated to the proper radius with the road side of the rail either concave or convex as required. ' Whenever metal beam rail is being constructed adjacent to roadways open to traffic, the Contractor shall complete the installation of the beam rail to and including the designed terminal treatment at the close of each day's work so as to prevent any hazard that would be caused by leaving an ex- posed end of the beam rail. ' On long runs, or other locations when it is not practical to complete the installation to and including the designed terminal treatment, .the Contractor ' shall use temporary methods for terminating the beam rail so as to mini- mize any hazard by lowering the rail end to the ground and providing adequate anchorage of the same by bolting, weighting, burying, etc. ' The Contractor shall submit to the Engineer for approval details of his proposed methods for the temporary terminal treatment of the end section. ' No work shall be performed adjacent to the areas open to traffic until approval is given. ' The posts shall be spaced as shown on the plans. They shall be driven into the ground, or they shall be set in holes dug in thoroughly compact soil. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut ' TP-55 The bottom of dug holes shall be thoroughly rammed so that the posts ' will have a stable foundation. Should rock or boulders be encountered in making the excavation in fill, ' this material shall be removed so as to make a hole of sufficient size to set the post to the normal depth as called for on the plans. ' When steel posts are driven, suitable driving caps and equipment shall be provided to prevent battering or injury to the posts and to prevent the galvanizing on the posts above the ground line from being scratched, ' defaced or damaged. The posts shall be spaced as shown on the plans, set plumb and normally with the front faces at a uniform distance from the centerline of the road- way. All holes dug shall be backfilled with approved material, which shall be thoroughly compacted. Each end of each continuous ou installation of rail shall be fitted with a suitable terminal section or the appropriate terminal treatment as shown ' on the plans. Before erection, all galvanized rail elements that are cut to fit a revised post spacing shall have the exposed base metal thoroughly cleaned and painted with one coat of Zinc Dust Zinc Oxide Paint conforming to the ' requirements of Type I, II or III as specified in Federal Specification TT-P-641 b and a finish coat of Aluminum Paint conforming to the requirements of Article M.07.06. ' The Contractor will be required to furnish extra length posts where field conditions warrant. These posts shall be of such length that the minimum ' depth in the ground, as shown on the plans, shall be maintained. METHOD OF MEASUREMENT: Metal beam rail will be measured by the ' number of linear feet ofinetal beam rail (Type R-I) measured along the top of rail from outside of terminal sections or the appropriate terminal treatment, as the case may be, completed and accepted. ' BASIS OF PAYMENT: This work will be paid for at the Contract unit price per linear foot for "Metal Beam Rail (Type R-I)" of the gage ' specified on the plans, complete in place, which price shall include all materials, equipment, tools and labor incidental to the complete instal- lation and removal of surplus material. Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut T P-56 WOOD RAIL ' DESCRIPTION: This work shall consist of the constr uction of wood rail fence on and adjacent to the box culvert at the Podunk River as shown on the plans or as directed by the Engineer. MATERIALS: Posts shall be 10" x 10" oak and rails shall be 5" x 8" oak. Twelve (12) 1" dowels shall be installed at each post. This fence shall be as supplied by Webster and Webster, Inc. , East Hartford, Connecticut, ' or an approved equal. All hardware for attaching posts to the box culvert shall be of the sizes ' shown on the plans and shall be galvanized. Preservative for all wood units shall be natural finish Cuprinol as manu- factured by Darworth Inc. , Avon, Connecticut, or an approved equal. CONSTRUCTION METHODS: Wood rail shall be installed as shown on the ' plans and as directed by the Engineer. Rail elements shall be erected to produce a smooth rail paralleling ' the line and grade of the road surface. The posts shall be spaced as shown on the plans and shall be set in holes dug thoroughly compact soil. The bottoms of dug holes shall be thoroughly rammed so that the posts will have a stable foundation. Holes shall be backfilled with approved material which shall be thoroughly com- pacted. Posts to be set on the curb wall of the box culvert shall be cut to the ' proper length and bolted to angles attached to the concrete. The angles may be attached by means of inserts set in the fresh concrete or by drilling and grouting bolts in the hardened concrete. Preservative shall be applied to all sides of all wood members in accordance with the manufacturer's recommendations before installation. ' METHOD OF MEASUREMENT: This work will be measured for payment by the linear feet of wood rail measured along the rail. No separate measure- ment will be made for wood rail set in dug holes or set on the curb wall of the box culvert. BASIS OF PAYMENT: This work will be paid for at the Contract unit price per linear foot for "Wood Rail", including all materials, equipment, tools and labor incidental thereto. ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut TP-57 ' OBSERVATION PLATFORM DESCRIPTION: This work shall consist of the construction of the obser- vation platform as shown on the plans or as directed by the Engineer. Included shall be excavation, retaining wall, steps and backfill. MATERIALS: The wood for the retaining wall and steps shall be native red or white oak treated with preservative at the rate of 350 to 400 square inches per gallon. The preservative shall be natural finish Cuprinol as manufactured by Darworth, Inc. , Avon, Connecticut, or an approved equal. ' Hardware shall be galvanized and shall cmform to the requirements of ASTM A 153. Backfill shall conform to the requirements of Article M.02.01 of State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 , Gravel Fill. CONSTRUCTION METHODS: Walls and steps shall be constructed in strict conformance with the details shown on the plans. Joints shall be staggered at" least two (2) feet. All exposed edges shall be chamfered 1/4 inch. Exposed dowel holes and recessed bolts shall be plugged, and ' the plugs treated with two (2) coats of preservative. Gravel Fill shall be deposited in layers not over six (6) inches in depth, with each layer thoroughly compacted before. the addition of other layers. METHOD OF MEASUREMENT: This work shall be measured as a unit. ' BASIS OF PAYMENT: This work will be paid for at the Contract lump sum price for "Observation Platform", which price shall include all materials, equipment, tools and labor incidental to the construction of the observation platform including excavation, walls, steps and backfill. 1 ' Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut T P-58 WALKWAY DESCRIPTION: This work shall consist of the construction of the walkway as shown on the plans or as directed by the Engineer. Included shall be posts, rails, decking, framing, and all required hardware. MATERIALS: Posts shall be not less than 8 inches in diameter and shall conform to the applicable requirements of Article M. 10.01-3 of State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 811 . Lumber for framing and deck planking shall be free from cracks, splits and loose knots that would adversely affect the strength or appearance of the completed work, and shall be finished lumber. ' Preservative for the lumber for framing and deck planking shall be natural finish Cuprinol as manufactured by Darworth, Inc. , Avon, Connecticut, or an approved equal. CONSTRUCTION METHODS: Posts shall accurately located at the spacings shown on the plans and driven to a depth that will provide ample support for the structure. Preservative shall be applied to all sides of all lumber in accordance with the manufacturer's recommendations before installation. All lumber shall be neatly installed to the line, grade and details shown on the plans. METHOD OF MEASUREMENT: This work will be measured by the actual ' linear feet installed as measured along the center line of the deck. BASIS OF PAYMENT: This work will be paid for at the Contract unit price per linear foot for "Walkway" including all materials, labor, tools and equipment incidental thereto. Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut T P-59 GAGE WELL DESCRIPTION: This work shall consist of the construction of a gage well along with all required piping as shown on the plans and in accordance with ' the specification. MATERIALS: The well shall be asphalt coated corrugated metal pipe and ' shall conform to the reauirements of Article M.08.01-2, State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 81 1 , and shall be 12 gage. The bottom shall have a 1/4 inch steel plate attached with a continuous weld. The top of the well shall be one (1) inch exterior grade plywood, grade A-C. ' The hardware for attaching the top shall be galvanized. Galvanized steel pipe shall conform to the requirements of ASTM A 120-63T. ' Fittings shall be malleable iron screwed fittings. All pipe and fittings shall be galvanized to meet the requirements of ASTM A-153. CONSTRUCTION METHODS: The gage well shall be constructed in accordance with the requirements contained herein and details shown on the drawings. The joint where the intake pipe enters the well shall be carefully sealed to prevent infiltration of water. ' All pipe openings in the well shall be provided with suitable plugs. METHOD OF MEASUREMENT: This work will be measured as a unit. BASIS OF PAYMENT: This work will be paid for at the lump sum price ' for "Gage Well", including the well, cover, intake pipe and fittings, and all materials, equipment, tools and labor incidental thereto. ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-60 MAINTENANCE AND PROTECTION OF TRAFFIC ' DESCRIPTION: Work under this section shall include all operations necessary to maintain traffic flow, both vehicular and pedestrian, on all ' roads along which work is to be done under this Contract and to maintain access to all properties adjacent to the work. This work shall include, but not be limited to, furnishing, erecting, moving and dismantling bar- ricades., signs and temporary lighting to inform the general public of hazards existing at the site(s) of the work. Work under this section shall also include maintenance of trench surfaces and the furnishing, erecting, moving and dismantling of temporary bridging for vehicular traffic across trenches. Work under this section shall also include pre- vention of slippery surface conditions resulting directly or indirectly from ' the Contractor's operations. (a) The Contractor shall make all arrangements with the Town for the closing of sections of streets within the work area to accomplish his construction operations, and shall not barricade any street or sidewalk without prior approval from the Town. Such temporary closings shall be for as short a period as feasible and the Con- tractor shall notify the Police Department and Fire Department immediately of such closings and openings; and if schools are in session, the Board of Eduction shall also be notified. (b) The Contractor shall provide egress to all adjacent properties at all times. No drive or entrance shall be closed without prior notice to the property owner and tenants and no closing of such ' drives shall be for a period in excess of eight (8) hours without the Owner's consent. (c) The Contractor shall provide, place and maintain such barricades, warning signs and lights as necessary to protect adequately the work and provide for public safety. Traffic policemen .or flagmen shall ' be furnished by the Contractor as required for the proper directing and control of traffic during the construction period. The Contractor shall be responsible for keeping warning lights lit at all appropriate ' times. METHOD OF MEASUREMENT: No separate measurement of work done ' under this item will be made. BASIS OF PAYMENT: Work under this section shall be paid for at the ' Contract lump sum price Bid for "Maintenance and Protection of Traffic". ' Griswold & Fuss, Inc. ' Pierce Road South Windsor, Connecticut ' T P-61 SANITARY SEWERS ' DESCRIPTION: This work shall consist of the construction of plugged laterals where shown on the plans or where directed by the Engineer and ' a concrete encased sanitary sewer under the box culvert at the Podunk River. ' MATERIALS: Laterals shall be six (6) inch polyvinyl chloride (PUC) pipe, Schedule 40, conforming to the requirements of Commercial Standard CS 228, amended to date, with the following additions and/or exceptions: CS 228 - Section 5. 1 . 1 , Deflection Temperature, shall be amended to require an average deflection temperature of not less than 73 degrees C, ' 163 degrees F.) plus or minus 2. per cent. CS 228 - Section 5. 1 .2, Impact Resistance, shall be amended to require an ' average Izod impact strength of not less than 1 .0 (plus 20, minus 10 per cent) foot-pounds per inch of notch. ' CS 228 - Section 5. 1 .31, Tensile Properties, shall be amended to require an average tensile strength of not less than .4,500 p.s.i. plus or minus 5 per cent. ' CS 228 - Section 5.2. 1 , Pipe Diameters, shall be amended to require a minimum wall thickness of 0. 180 (plus .015, minus .010) for 6-inch pipe. ' CS 228 - Section 5.2.2, Pipe Lengths, shall be amended to require that ' all pipe shall not exceed 6.5 feet in length. CS 228 - Section 5.2.3, Fitting Dimensions, shall be amended to require that all joints shall consist of bell and spigot with rubber "O" ring, single ' socket as manufactured by Evanite Plastic Company, or approved equal. Plugs as required and approved by the Engineer shall be provided. CS 228 - Section 5.8 and 7.. 11 , Joint Tightness, shall be amended to require that the rubber "O" ring gasket shall be as approved by the Engineer and ' shall be of a composition and texture which is resistant to common ingredi- ents of sewage, industrial wastes including oils and groundwater, and ' which will endure permanently under the conditions likely to be imposed by this use. The tensile strength shall be at least 1 ,300 psi. The elongation at rupture shall be such that 2-inch gauge marks shall stretch to not less than 10 inches. Hardness shall be between 40 and 50, as measured with a Shore Durometer. The compression set (constant deflection) shall not 1 Griswold & Fuss, Inc. Pierce Road South Windsor, Connecticut TP-62 exceed 25 per cent of the original deflection. The tensile strength after ' accelerated aging shall be not less than 80 per cent of the original strength. The joint, when assembled, must be able to withstand an hydraulic pressure internally of at least 10 psi. CS 228 - Section 7.8, Chemical Resistance, shall be amended to include in the list of chemicals and their concentrations, Hydrocarbon (Aviation Gaso- line) Resistance. Test specimens shall be immersed in the Aviation Gaso- line at 73 degrees F. in the manner described for a period of two hours with no change in the physical or chemical properties of the material. Allowable Pipe Deflection: Plastic pipe provided under this specification shall be so installed in the ground that a deflection of no more than 5 per cent can be anticipated. Such deflection shall be computed by dividing the amount of deflection (nominal diameter less minimum diameter when measured) by the nominal diameter of the pipe. ' Pipe Straightness: No single piece of pipe shall be laid on any project covered by these special provisions unless it is found to be generally ' straight. Such pipe shall have a maximum ordinate as measured from the concave side of the pipe not to exceed 1/16-inch per foot of length. If the deviation from straightness exceeds this requirements, then the particular ' piece of pipe shall be rejected for use until it can comply with this provision. Sewer pipe under the box culvert at the Podunk River shall be either cast ' iron pipe, thickness Class 23 (.48 inches) meeting the requirements of AWWA Specification C106-70; or ductile iron pipe, thickness Class 2 (.35 inches) meeting the requirements of AWWA Specification C151-71 . Joints ' shall be push-on type similar or equal to Tyton. Plugs for laterals and sewer pipe shall be of the same material as the pipe. Concrete for encasing sewer pipes shall conform to the requirements of the Section "Miscellaneous Concrete" herein. Pipe bedding shall be screened gravel uniformly graded from the No. 4 ' sieve to 1/2 inch, or 1/2 inch crushed stone. The sand layer over the concrete encasement shall be clean concrete sand. CONSTRUCTION METHODS: Laterals shall be constructed to the line and grade as shown on the plans or as directed by the Engineer. Joints shall ' be in compliance with the manufacturer's printed recommendations. All laterals shall be laid on a compacted six (6) inch thick bed of Pipe Bedding. Trenching and backfilling shall conform to the applicable requirements of 1 the Section "Trench Excavation" herein. Griswold & Fuss, Inc. ' Pierce Road South.Windsor, Connecticut ' T P-63 Sanitary sewer pipe under the box culvert at the Podunk River shall be ' constructed to the line and grade as shown on the plans or as directed by the Engineer. Joints shall be in compliance with the manufacturer's printed recommendations. The concrete for encasement shall be placed on ' a compacted six (6) inch thick bed of Pipe Bedding. Trenching and back- filling shall conform to the applicable requirements of the Section "Trench Excavation" herein. ' Ties, both horizontal and vertical for both ends of all sanitary sewer pipe, shall be provided by the Contractor. METHOD OF MEASUREMENT: Laterals will be measured for payment by the linear foot along the center line of the pipe. ' Sanitary Sewer will be measured for payment by the linear foot along the center line of pipe. 1 Bedding material will be measured by the actual cubic yards placed as ' directed by the Engineer. Trench excavation will be measured as outlined in the Section "Trench Excavation" herein. ' Pipe plugs, concrete for encasement and sand for covering concrete encase- ment 9 ment will not be measured for payment, but will be included in the cost of ' the pipe. BASIS OF PAYMENT: Laterals will be paid for at the Contract unit price per linear foot for "Sanitary Sewer Laterals" including plugs. Sanitary sewer under the box culvert will be paid for at the Contract unit price per linear foot for 1110" Sanitary Sewer" including plugs, concrete encasement and sand cover. Bedding material will be paid for at the Contract unit price per cubic yard for "Bedding Material" . ' Trench excavation will be paid for at the Contract unit price per cubic yard for "Trench Excavation". Payment under this section shall be considered as full payment for furnishing all materials, equipment, tools and labor incidental to the construction. ' Griswold & Fuss, Inc. ' Minimum Rates and � � Federal Aid Proj. No. Classifications for STATE OF CONNECTICUT State Project No. State Ilighwa)• and LABOR DEPARTMENT Location South Windsor, Conn. ' Bridge Construction Reeanstruction- of Pierce. Road CONTRACT Issued Sept, 24, 1974 I CRAFTS Per W.F. P.F. Per , W.F. P.F. .. Hr. ... Hr. .... •.. + Bricklayer, Scone Mason 8.70 .35+15 .25 POWER EQUIPMENT OPERATORS Cat enter - 9.05 .35+15 .30. Erecting and Handling Steel 9. 57 40+20 . 50 p 9•,45 40+20. .50 .Painter - - - Crane, Derrick, and Dragline Painter, Spray - Steel Pile Sheeting 9.45 40+20 .509.45 11.OQ includ ene, 9.45 40+20 ,50 * Painter(structural steel and bridge) � �_ Pile Drivel Electrician Side Boom 9.17 40+20 .50 9.45 40+-20 - .50 Lineman 9,93 .40 Power Shovel • �•• 8.86 40+20 • 50 Groundman 5.34 -40 Compressor Battery Operator Groundman-Inexperienced 4.67 .40 Trenching Machine 9.45 40+20 Sb Groundman-Trucl•driver 7.15 .40 -- Excavator-All Purpose (Gradall) 9.45 40+20 .50 Pile Driverman - • 9.05 - .35+15- .30 Front-End Loader(under 3 yds) 8. 55 40+20 ,50 10..05 - ;5.5 .74 Front-End Loader (3 yds. and over) 8.88 40+20 . 50 Ironworker . * Bridge Spray 14.50 includ. bene. Scraper(Carryall) 8.72 40+20 50 LABORERS + Bulldozer 8.72 40+20- . 50 Laborer 6,90 -45 - -40 Euclid Loader 9-.17 _ 40+20 . 50 Laborer(intermediate) 7.15 .45 .40 Grader 8.88 40+20 . 50 Borir. Machine 8.88 40+20 50 Air Track Operator 740 45 g 9.17 40+20 .50 . , .40 Pavet, Rammer, Curb Setter Post Hole Digger - Fi (hi h pressure) 8.25 40+20 .50 Powderman and Blaster 7,65 .45 .40 reman. g p 8.55 40+20 .5() `Waterproofer Roller 45 40+20 .50 Concrete Paver ' TRUCK DRIVERS Finishing Machine 8.55 . 40+20 .50 6.57 .42 .575 8.55 40+20 . 50 2-Axle Power Pavement Breaker 8.55 4.0+ 00 50 3-Axle 6.67 .42 .575 Power Chipper 8.17 0� , 5n 4-Axle 6.77 .42 .575 Compressor 8.17 0+20 ,n 2-Axle Ready-Mix 6.67 .42 ;575 Pump 3-Axle Ready-Mix 6.72 .42 ,575 Concrete Mixer(under 5 bags) -- 4-Axle Ready-Mix 6.82 .42 ,575 Concrete Mixer(5 bags and over) 8.7t _40+20 .-.50 Power Stone S leader 8.88 40+•20 .50 Heavy Duty Trailers up to 40 Tons 6.77 .42 .575 p 9.00 40+20 , . 50 Heavy Duty Trailers 40 Tons and over 6.87 .42 .575.- Asphalt Spreader Roller (asphalt) 8.55 40+20 .50 Specialized Equipment 6.57 42 .575 . 8.55 40+20 .50 Helper. Asphalt Plant Batch Plant 8,15 40+20_ _50 MISCELLANEOUS ++ Bulk Cement Plant 8.15 40+20 .50 ' 5.63 40+20 .50- Puntpecece .9.17 40+20 .50 Rodman 9,-45 40+20 .50 Chainman 5.63 40+20 .50 Master Mechanic - 7.07 40+20 .50 Maintenance Engineer 8,72 40+20 ,50 . Transitman Chief of Party 8.20 40+20 .50 *Welder Aset. Chief of Party 7.63 40+20 .50 Oiler . 7.66 40+20 .50 OTH E RS NOTE` Welders' and Wa[erproofers'Races of wages shall be the same as that of the trade with which they are working. ' •• Welfare Fund ••'1"tcnsicn Fund 1 Laborers-Welfare .45 Training Fund .05 4+ _Power Eq iprienc Operators. '_ welfare - .40 Supplemental Unemployment Fund -.20 Apprentice rates will he furnished on'y 1`a=: a;;:oca'. of :!lei _'cn:ure of the I.abo: Corr„rissioner. l;y irwe of rite au[horicy vested in nit under provisions of Section 31-5.1 of rhe• 191,9 Supplecaenr to the General Scanucs, I hereby declare the foregoing to be the prevailing rates of pay and employee welfare contributions for the occupations listed in the _Areas as applied to the captioned project as of this date. EXHIBIT "Arr ( ) ac4: A. l•u::eu C.os^i;s,o:r.r 1 t 1 l 1 1 3/713 0 7S4 \3r%-i't-ti-) 3735_Atlgu5. '12,. 1974) Hartford County,- Connecticut .T_ 1T'o[li�OrlSwi'S: ' Stru aural, ornamental, rein orc-- i.np, and precast concrete er.cction 9.30 •55 .74 .04 i 1 i - 1 4I EXHIBIT "B" CO"11''Ct'-C'.i� ., �-....�....�.....COT-,1, t a ' : ford _ ;0 DAT-E;: i?,e . Publication pion ,�Z�; •rc,'�lL a 1'1ec 1-S=Cr 11.0 � A �C� �'r.�► 1C`�.; l» 3!�_•%'�-�•�.:^fJ ;C; ` !O_' 0-11.0?�•- . B;...i -rn ldi Cos L:C � sir S ("y--S='�� r i i _,_I _^_C_Cs 2rd y ( i_ _ c <.rii:n 1 To'� c'T ?T� CYLtS tl� �O ?nd 1noju^'-- t'-a-Cri�S�y ilia y c'';: _z„r a-- COrSoZ"t;CtZ011• '!ZIDl ;Gy t Z�rY 2c NI�I�irAY CO` S 3jC•�1:0_ Lozie Fri ;r Eenci;;s Pay:.:_nes Asbestos workers: I Suffield-':indsor Locks , 8.4-5 .44 .45 t •01 � Rem-illder O-L Col.;.nty j 9.12 + .55 •53 J 9.03 I •60 1' J ` .01 ' 2r]-C1 oy CL_e-1; ?sons, TLarble seta erS y l aStorerS y I Stone- h1asons y Terrazzo :dorI:ers y tie Set t�rS (B't it di r_- Only): { Bristol-Plainville ! 8.70 .351.15 .25+.17 T�,erion 9•L1 .50 .55 i ' Berlin-Kensin',tor_-Tew Bri tai-r-Terri P1a_ni svi lle-Sottt'_i ion ; + I I g.i� ! .50 .,�o J Rem,a.i 11der of County 9.60 I .50 I ' j 13ri ckl.ay e rS y CemCnt ?_.''.scns y Finishers .2' � [I �cilid atOY1P SO=!3 ('_CW;,zv and �z Hi -;a ) 8.TO I ESQ .2j 1 p axDexlte.rs P-nd P1lCC=ri�'vri;C:2 (ea-v- - and 1.1 ;P ;-�y) w C, . I-_'1:"X_t-e-s y Sol t -loon Laye-s y Pi to j /•l ( •'0 �,✓ eiriv erme-1l (Build}ir Only) • !' t B rlii-lgL.OP i8 .9 _ } 8 .,G 0 .50 •30 s i .05 Eris tL,ol_-P la in Fill;-Ca t0 . _erl,li-TriT�St0- _ ;4ir t0 -:;S';l 1 6arlbo_ot,�S,h - 9 0 J (! ( I ,SOt1F�2L 'tC:? t �J •50 •%0 + Qr 7 - .50 c _ .Q3 , Rem-air_der of COi.-�t;T 9.31 •5O ,O I 5 f �� r 0 ICC�riCi�r,g� ! � � • Berlir_-Bristol-= BiGir_y j_le- J I I I - - I i Salzt'r�ii�ton-T;e;ri���on 9.62 •55 'i _ ! � , of i-�� j l;- �� ' 9• ;?' 1 . 0 � � 0 .Jtf�ield .57 �118 Of pS0ng yilia C ! - �rGD/ • ;' 43 � kGo .nrRonainder or ► 9.30 � •75 Li yc?tJr COnSt'�^' C�0S3 7 i ' e,v uor co:'_struc t or-s J hal2:C"^ '39 •2� i 2-_ ^; �C .02 -� ( o.02 .3.9 .zo ) .0z lEVc,t 0Y CC'^_ T.rTiC u t !1-el { } 2 _7+O;�C• � I i rs �iU7.� 1 j + '.a.=tzi;:rs; Outside ' ;:.7 + J I •59 i •47 i Chu �xnal y Url '�a's2t21 reiT1:C'_'C?� !` ) 9.30 .55 7 4 i j •QI} t i �t=•:i_e?"-Suffield'-� 'a.�so_��i�� -.�=r=,_ ' 1 I t:C...-_ I U L.:�._. _. V• �c V::.�).�7•l7't7.\` 'vl Cam_._ ll } . i a.GJ ; .45 ) .2' ' - 3 o Go�� I /•15 .25 �O { L .z�ur.r_:L I •� I .01 .30 I i .01 Contraction: } I >, r ^�z •35 1�7 t3�8 or t ` ( AR- 095 P. 2 2-COI;1.-1-2-3- V 2 of 3 Basic Fri::y_ bet.er;ts Pc rents l H e H i sncio Va'stisr. A:p. i tile setters terrazzo t':o ers l l tt helpers 8.0D I ,35 .151.35 I i•i;111•lri ;nt s b�is tol-Pl?rrlville-Canton 8.12 .35 .20 - ' Eerlin-3ri stol-BurLnUton-E?.rt-land- . New Brit2_i_� �`�eil1_g ton-Plainville- t Souther ro�cn-fensinaton Forestville- ' E-Berlin-i.';lldale-Plant sville-Union- ville: i Brush 7.90 .55 .30 Spray 1I.21 .55 .30 I Painters Bridge: (Entire Cour_ty� Brush 9.525 •35 .525 ! .01 Spray 13.025 •35 i ..525 I .01 ' Pema.inae? of County: I Brush 8.10 .50 .30 t Spray 11.10 .50 .30 ' Pi ledrive=er_ (Building Only): N-axlboro 8.12 .35' .20 ! Plu_ibers I Southi-n ton 1 9.45 •55 •30 h Ber7.in_-3ri stcl-i�a;r Britain--Plainvi lI e- E E. { _ I f C zngto .i 9.n- .55 .5c j,1.08 Remainder oz County t 8.87 •5322. ! •5322 h .20 Composition 8.50 .125 . ' ! 55 .40 ' Slate, Tile, Precast Concrete 9.00 ( •425 ! 55 ( .40 Sheet i: .etal ."Or zers 9.20 •50 •51 1 •05 Sp-_^ir��le-r ='it tars 9.45 _ .50 .70 '05 Ste2�iitters: ( - Soutl1- ion 6.00 .15 .20 Be=1ir_-Bristol-i;e;r Britain-Plain-vi 1le 9.05 .30 .30 �.. I i E .ai.,a_�.c of County � 9.3'0 i •57 � -57 � .13 �'Ta.terproofero 8.50 I25 .55 .40 Welders - -receive rate prescr-!bed for craft perfo=ino operation to which weld z is incidental. 1 1 E E E � f 1 i -t 1 =.-3095 P ' 3 2-COILr.-1-2-3-V 3 of 3 ' +0j _YS: (!,!here Avnlicable) - t;•r _a 's Day; B-:• smorial Davy; C-Indeper_ddnce Day; D-Labor Day; E-harjksoivir Day; -Christ=ws Day. a. 36 per man per week. ' ' b. Employer cortibutes llo of basic hourly rate for 5 years or more o' service or Lf of basic hourly rate.for 6 months to 5 years of service as vaca tior Pa; Credit. ' CO Holidays: A through F. d. Holidays: A through F, Washih,CtonI s Birthday and Good Friday, and Christmas Eve, ' provided the employee has wox'ked at least 45 full days .diz_inE tTQ 120 calendar days prior to the holiday and the regular scheduled work days preoealLn- following the holiday. ' f e. Hine (,9) Paid Holidays: A through F, Washirgton's Birthday a_nd Good Friday plus I one (1) floating holiday per year vrovided the employee has beer e=ntoyed for a period of ten (10) working days prior to the holiday and. won=s the S'C aduled work days i.—ediately preceding and following the holiday. f• Paid Holidays: B through F. .go Paid 11olid2ys s A through F and Good Priday. -- h. Paid Holiday: D i• Paid Holidays: C and D. 3, Paid Holidays: D and the Friday after Thanksgivrnj is a paid half-holiday; and the 2kth, of December, provided .it falls on a vorting day is a half-holiday 4rith pay. k. 30� per.week per employee. paid aliday. The last 4 regular working hours prior to Christmas shall be a `:i;� •_: li i{::AS,Y ANDr.vim:`' ;' i•^=ic cea,e i:•rnaicts Pe f,.rrts Orers: Building): �.. wrack- laborers • s..•_�r.., cargo:tors. Ce:.dc_s, _r 6.910 .50 .40 .0.5 Iop. , masons •tenders, f :5rtar r;.xer, pipe la•.e_s, plasterer Ii ene—ars G E►ov er buggy 1.15. .50 .40 + ..05 ! 4r track operators, vagon drill ops. ! aZ sc dblasters t+i �.40 •50 .40 .05 ! -- A?r. Caisson.j, 'C y1i- dricat .•pork i f and Bering Crew: Ibottom ran � 7.40 .50 .40 � .05 Top man 6.90 .50 ,40 } .05 t*t.Q e=s (Heavy and :iighw-,ty)s - bo r ers 6.90 .50 .40 } .05 -Optalt reke•-a., adzener±, bracers, it srs, .coacrete and power buggy i )ere tc-s. •on. c.rete saw op., c.1R r. aw op. , fence and guard rail erec- ars, fo=m setters, corcar mixers, Opel Byers, ri.praD and. drywall vilders, stony O�preaters, masons gt:dc=_s, vresrzatic dr_1_1 operators, boo! ope.ators, ;:agora drill oa. , =e tri-I^ors, tree tappers, mulch- rs, c:.ippers, s tuimpers & all op- eratiens connected there wt th 1• 7.4L5 .50 .40 t+ack ope .stevs,__blo..k ;pavers, e''`,_.csrb setters ��LO ..Q :'4�0 ; .05 t3w..erTers t. 150 :1+0 :. _ f P P0:MR t QUIP-ENT OPERATORS P1* Fri'n^ye $oni;ms rev-rsnit BUILDING CO',STRUCTIbN Hourly - Rot*s H G C1 Prnsions i Vetolion App. Tr. C'•` e• ji s t i nStructural Steel, Setting Stone errick, Pile Driver, Hoisting Engineer drumts and over $6.97 .30 .50+a b .:cr Crane, Dragline, Grada!1, Kohering Scooper Loader anal;or lice, Hoisting (all types of equipment .:here Ingincer drvm and .cable are used to hoist, gull., nr-drag material regardless. of Motive power or operation)., wont End � oader_ - 7 cy. or over, Master :1echanic,r Shovel, Fork Lift .- over 4 f-t. _lift 8.86 .30 .5O+a b ntenance Engineer 8.76 .30 .50+a b !'. bratory, Ham r, Front End Loader -' 3 up;'to 7-cy., Culet^an Loa-der a-vd reeving Plant or similar equipment, :.'l+'*1der Joy Drill - l nIt i.ted to joy avy .1eight Cham6ion or equivilent, cking... Machine, Punp:rrete Machine, Rock Boring Machine, Pti)st Hole D.i„ger, It Dagger, Conveyors - regarr!l'ess cf ' +A%-e .nower, Higi: -Tess tre Portable ;.P.c►31ez � Central '.•Iix Op. , Combinacion C and Loader over 1/4 ya,. 8.60 .30 .50+a i b . 'retr or Battery Operator 8,44 .30 .50ta f b ku t raader ,• 8.44 .30 .SO+a b 1`dac r, C=ader�'OpoY�ittbr �cr-t rcr a:t R = sate Carr -A11 C gyrators 6 39 - - _ Y ^.30 .50+a t _b`' P mbina f o Hoe''and Loader machine nexe>t:a XiYnr (Cp. -• 5 b?gs or ler, ar En3 1.�rader under 3 cy. , Po. ers_oi:_ 'Spreader Ols. 8.33 .30 .50+a t b ! t a nd Steam Valve Operator 6.31 .30 , .5C a � b "` C nerator, Op,q. Ccmpi:t'ssor Oo. , Pump, and 011. Point U�, 8.21 .30 .50+p. i Stcessit-Danny 0p. , Earl: Lilt Op, not cer it. 8.23 .30 510�!a b :for ss,nical. ticnrc r.. Oper tor. 8.12 .30 .50;-a b - ,PG..s J, , Fcin ^ iersfits PaYsrrts R E �UInSNT OPERAf.-?S ]SY DIIILDItiG CO:�STct::CTIOt: (Contsd); uP.otH !. q P*nsions { Vacation App. Tr. fky machi-ne Operator, Power Pavement50 a b3 +20ea�.er Operator � $S.0 j es;an '(High Pressures) 7:91 .30 .50+a b , jOiler 7..54 .30 .50Fa b Cue Edith boom, excluding Jib., over 150 • - feet - .25 extra- f ne with boo: , excluding Jib, over 200 et .50 extra YA fl 1FD1.$U.Al'S (where applicable): A Yi�at B•:Sexori in t Dey, - C e.pendence Day; D=Labor Day; f:• dP 'ha:zksgiving Aay; F-Christmas Day VM_.�OTE 5 - a Employer contributes $.15 per hour t Supple-, , Une ploy ent.. Funs'. w. :. seven .(7) paid holidays:. A through and Goo FA.id,.p. - 4 t .� ----- - - - - - - - - - - -- - AR..�2q�S P` 7 _ i Basic Hourly Ftir. Paym,oftfi. '0; E:l E^UIp, =;TT O? R.tTORS Rotes _ H t Pensions. oc :in� -AND 1IGi . tipp. Tr. 01horsrp,,TrUCT Pass 1 . 9. 57 40 .i0/a b .d5 2 9.1P5 .40 50la b .05 �s 3 9.17 .40 5plp b .05 S 4 - 9.00 lass.5 .40 • 5-1a b .05 s 6 .8 .40 .i 88 01a 05 s 7 8•7? .40 . 51/a b .CS .40 .50.1a b .05 f 1$s 8 8.17 40 ..50r�a b .05 9 0 s 10 8.2.5 .1;0 .50'a b -.05 .,, 8.57 . .4.0 . ;vr3 b .05 lass 11 8.86 .40 501a b 05 s 12$ 7.86 .40 . 501a b .,0 5 13 8.15 .40. .501a b .05 th 1.0 i`t: b0om-additional 251 Fer hour* g i:it4 200 ft. boar-.additional 50r. per hour. - YOLIDKYS (where applicable): "'ew Year's P�,�; B Me^or;al Day C-?rdY::e . "dance Day; D-Labor Day; E-Thanksgiving NLy; -L^.r's�^as Jay. !l`OTE: 8. �r!nployhr. ccntributAs 20; per boor to S;;pplemental Une.- Fund. b. Seven U) paid holidays: A thru F and Good Friday. X'ICAT10:'S: Class l--Erecting and handling structural steel, 1, L�. ron„ e::,-4 _eager (7 cubic yds. or over) Class 2--Filedriver, power shovel and crane, drF:z?_. e, gradail, trenching ' machine, lighter aerr ck, paver (concrote), derrick .(stiff. lea a^ guy), steel. pile sheet?.., koher_ng loader- ( koo;er), master. . mechanic. } Class -Drill Jo at - Cif$ 3- (Joy heavy weight ihc�.mpion or eou,v-le-+ ;, S2dS 'tjnQrl J . lOaCn (Euclid'), ..uckir.g ,ac :`r�J pLr rock and earth boring II'3C. post and well digger, :S .er (vi'arator;r), cart ry_ �; x operFttor, cor.;binatior. hoe & loader (over yd.) . Jt Class 4`-Asp?:alt spreader. Class 5--Front and 1 : _er (3 yds. or o-r_.r', grader, power stons spreader, combination hoe and loa-der. Class 6--Asphalt roller bullciozc, , carr;-a11, maintenance engineer, conere �^ixer (5 bags and over welder Clash oa: r i:e 7---Front end ? J (under 3 yds. ) roller p--;� chi r� r� �t• finishin7 r._r-hi pw _ �r r; `fo.._ 1'�t, • re, as_. .aIt plant, power p ave:zent breaker, dinky machine. - Class 8--Co^cressor, :P mp crerato^. Class 9-- Firer an,. high pressure. Class 1.0`1'.ell po'np s.s` _.. . Class 11--Coy -ressor s__t te._.y o.,- arato,,. ' Class 12--Oilcr. Class 13--Batch plant,, u?k cement plant. - f AR-3095 P.8 LJI"TG,, FEAVY °i FfTrl.". aY CC`TGI'R.:TIC; Basic Fri s• .env its Pa rwMs - Hourly t Rotes • N 1.M Pension* Veeetied ?.pp. Ta C1t.org cr Drivers: ass 1 b. 7 a b c ass 2 6.67 a b ass 3 6.77 a b c ass 4 6.72 a b c 3 Class 5 6.82 a b c ass 6 6.87 a b 6 F HolidIt s (where gpolicable): A-'New _Year's Da• • B-�•'.ernoria? a� • s .r', Day; C-Declaration Day; ! D-Labor Day; E-T ank-sgiviog Dad-; -Christmas Day. a. ` $1tt t0 peek for is plcrye a.*=pl o;,•ed over. 6 hou.�s a:^.3 k2� per hour 1 f " + s its.'eiaPl sd leas 0an. 16 hours during the •as k. ` a ba #Q3,.00 per week for vmployees sn�loyed over 16 h0�� S .BTIt' 571'Y- per hour for t 1Y abtg6yees erl dyed less than 16 hours during :the week. J o. ..even holidays: A thro::jh ? and.Good Friday he E r , provide.. the employee has mil aalertar days aer"rice and is available for wort. the day- preceding and t to2lvwing the holiday. da+.tocti�: . Class 1---:P d axle trucks, Irelpers. Class a"Vires azle trucks, 71.4o arle ready mix. t Class 3--- eau• axle truces, Htai7,r duty trailer-up to 40 tons. Class 4--Three axle read-----.ix. h Class 5--Four axle read;,--::ix Specialized earth �:.ouirg eouipsnt other than :convertiicnai ype' on-the-road trk..'.�s n^d sera=trailers _ L �ircludina IEUC, ;. Class 6 Fleati�,� d4t;• tra3.ler-4 tons and over. t` t,65A-25 BRIDGE SITE/SO .WiNDSOR CI.ARENCE WELTI ASSOC, INC ��BORING LOG" tOO SYC^AO"E STREET GR I SWOLD 8 FUSS pLASTpNWRY,CONN.06033 CLIENT BORING NO. 1 BORING NO. LINE rl. STA. 3 2 + 9 0 LINE & STA. OFFSET 10' �-T• OFFSET GR. ELEV. GR. ELEV. BLOWS BLOWS � 9 A STRATUM DESCRIPTION PER 6" B A STRATUM DESCRIPTION PER B SPHALT&TRAPROCK ED F-M SAND 6 SILT TRACE FINE- 4 . 0 RS .dRAVEL BLK .FINE SAND 2-1- LITTLE SILT 8 . 0 4-5-7 R/RED VARVED SILT S CLAY 4-4-5 2-2-3 2-2-2 • ii . 5 1-2-4 00.4 ' POTTOM OF BORING 31 . 5 , DATE : 9/12/74 r)RILLFP : BRnMLEY 1. COL. A STRATA DEPTH 2. COL. b AND - 40 to 50% 3. HAMMER = 140/• FALL 30" 4. SAMPLER= 2" O.D. SPLIT SPOON SOME - 10 to 40% ' 5. GWT= GROUND WATER TRACE - 0 to 10% pCHIBIT "C" i CLARENCE WELTI, ASSOC, INC. 665A-25 BRIDGE SITE_/SO.',dN S0R ' 100 SYCAMORE STREET "BORING LOG" GR I51h'OLD 9 FUSS CAASTONSUNV.CONN.06033 CLIENT BORING NO 2 BORING NO. ' LINE & STA. �3 2 + 50 LINE & STA. OFFSET 4! �• OFFSET ' GR. ELEV. GR. ELEV. cLEV BLOW, BLOWS .7 A STRATUM DESCRIPTION PER 6 B A STRATUM DESCRIPTION PER B RED FINE SAND 2-24-31 TRACE LK .FINE SAND OME SILT 1-2-3 51 .5 9-38-42 /Az 10-11-10 %;RED FINE-MED SANP & SILT ' RED VARVED SOME FINE-CRS GR VEL SILT &CLAY 2-3-3 BOTTOM OF BORING 51 . 5 WATER 0 HRS- 5 .0 ' DATE: 9/12/74 ' 2-2-2 . i 1-1-2 ' RED CLAY & SILT LAYERED .4-1 . 0 ' I 2-2-2 2-1-2 1. COL. A STRATA QrmpTH ' 2. COL. B 3. HAMMER= 14OI; FALL 30" AND - 40 to 50% 4. SAMPLER= 2�� O.D. SPLIT SPOON SOME - 10 to 40% ' S.- GWT= GROUND WATER TRACE - 0 to 10% EXHIBIT "C" 2