HomeMy WebLinkAboutPierce Road PW Street File �lc-► �.t i"�rQ �"c-�a MEMORANDUM TO: MICHAEL J. GANTICK, PE FROM: MELVIN C. STEAD, JR. Irv,� SUBJECT: WATER LEVEL IN PODUNK RIVER AT RAYMONDS DATE: FEBRUARY 27, 2004 Attached is a memo to file concerning observations and some history of the water elevations in the Podunk River, Raymond's Pond and Desmond's Pond. There may be additional source material at Town Hall concerning water levels in the Podunk River at each of the culverts at Strong Road and Pierce Road that would give us water surface levels prior to 1990 when the beaver moved in. The culvert was reconstructed on Strong Road and the water elevation may be recorded in the project file. The sewer plans show that the Raymond house surrounding ground surface is at 82 along the north side. This would mean that the top of the foundation would be around 82.5. Allowing 10 feet for foundation wall and footing that would put the bottom of the footing at 72.5. This puts the bottom of her house footing at approximately the same elevation of Pierce Road over the outlet culvert from Desmond's Pond and approximately 4 feet above the current elevation of Raymond's Pond. Some of her lawn area south west of her driveway has been known to get spongy in the past. The ground elevation here is around 71-72. It is not uniformly graded with a slope and has some low spots. The water leaving Desmond's Pond discharges into a channel that flows into the Raymond Pond. Regardless of elevation of Desmond's Pond, the water elevation in Raymond's Pond is dependent on what happens in the Podunk River and not on the elevation of the water in Desmond's Pond. The beaver activity on the Raymond, Collins and Myers properties have the biggest impact. The smaller dam on the Mangino property has a lessor impact and the dam further south may have a slight impact. CC: Jeff Doolittle Jeff Folger Karl Reichle MEMO NOTE TO FILE PIERCE ROAD/STRONG ROAD OBSERVATIONS 2/24/04 • Water level at Strong Road culvert over Podunk River. • The water level here is higher than it was 20 years ago as evidence by the wider spread of water both up stream and down stream of the culvert. • The water level is lower here than it was in 1990 after the beavers moved in. I got an elevation for the roof of the culvert here at 71.00 from some source in 1998. 1 do not recall where so we should have Engineering run from a bench to confirm. • The following are measurements down from roof of culvert taken at this location: 6/4/98 2'-2 '/2 (2.20)68.8 7/14/98 2-2 '/2 (2.20) 68.8 10/30/98 2-0 (2.0) 69.0 2/23/04 2-11 (2.92) 68.08 • Maps of record — 1986 Topo maps Quinn Associates Raymond Pond 66.1 Vertical Datum NGV 1929 Desmond Pond 71.6 1976 Sewer map Purcell Ass. Datum not referenced. No water elevation noted. Contours indicate Raymond Pond +- 64 Desmond Pond dam elevation 69.9 1964 MDC sheet USC&GS datum shows a low swamp area for Raymond's Pond and for Desmond's Pond. A pond shows up further to the east of Desmond's Pond. The contour line around Raymond's swamp is 68. The contour line around Desmond's swamp is 71. • Historical • I recall that in the 1960's there was a defined stream extending eastward from the outlet structure on the East Side of Pierce Road where Desmond's Pond is now. • Sherman Collins recalls that in his childhood days block ice was cut from a pond on this spot. • Conclusions • The water level in Desmond's Pond has varied in the past 70 years from between a high of 72 (assumed) and a low of 69.9. It has always been above the elevation of the Podunk River. • The Podunk River has been up and down since 1990 when the first of several beavers moved in. • The river currently seems to be 2 feet higher than it was 20 years ago. • Causes - The entire Podunk River from the Connecticut River to Strong Road has a series of beaver dams. I have not been north of Strong Road but I suspect there are additional beaver dams up stream. • The dams that I have seen between Strong Road and the wooden bridge at the power line off Pierce Road are leaking and in disrepair. This probably means that the beavers are not currently in residence. But it may also mean they just are not now active. • High water is probably also aggravated by the high water table and to some extent the frost. This probably only contributes a small amount of height. Maybe 1 or 2 inches. • All of the dams from 100 feet south east of the culvert on Pierce Road to the culvert on Strong Road are on private property. Mrs. Alfreda Raymond 1201 Strong Road William & Karen Myers 1141 Strong Road Francis Collins 1105 Strong Road William & Jean Mangino 272 Pierce Road • South of Pierce Road, beyond the small dam on the Mangino property, the river traverses property owned by the South Windsor Land Conservation Trust, Inc. and the Town of South Windsor. • The wooden bridge elevation at the power lines is not impeding the flow of water but the water elevation is nearly at the bridge deck level. The river down stream is also higher and wider than 20 years ago. I suspect there may be beaver activity between here and Ellington Road (Route 30) also. The MDC map contour line indicates the elevation here on the gravel roadway and bridge to be +- 64.00. It should not have an impact on the water level in the Raymond Pond or Desmond Pond. i e s 1 �<r S i• _ � jam, Iqy� ;00 / YYY Atl YYY a 1 NOW bye rH Al Vt .i , � ia��,P�' .: va��"'�i�r ^a✓ �', v.. ,,,,�,� .._ ,a� err ij'-/ v'6_ : 1 7.7 n ,. 4�� ��. �\"� r" na . \�j�lAr�' _ � �� BPS �•' �,. IS �rJ+ 4,,-t� l� 1 f,`l1�,� \},`'"", _ A.� Mike"' tick Re Duck Pond Pierce Road ge 1 WPa From: Melvin Stead To: Jeff Folger; Mike Gantick Date: 6/27/01 11:43AM Subject: Re: Duck Pond- Pierce Road The 1998 plan for the construction of the access deck shows a pond elevation of 71.7, and a road elevation of approximately 72.5. (from contour lines). The road base here was designed to be 18 inches. I am not sure if it was constructed that way. A sanitary sewer was installed here in the west green area behind the curb. When under construction sheet piling was installed and left below grade. I do not know how low below grade. Ther is also a water line trench and a storm sewer trench in the road at this location. I am concerned that raising the water level further will cause the water to run through the road base at a faster rate and cause damage to the road. I am also concerned that raising the water level will reduce the runoff storage area. This is a unique are in that the road is only 15 iee from the pond and only about 14 Inches above the water level. It seems t beg for an expertise beyond my knowledge. Perhaps we should look at raising the road and controling infiltration into the base. >>> Mike Gantick 06/25/01 10:41AM >>> Sherman Collins called to talk about the water level of the pond. He believes the level should be maintained 8 inches higher than it is presently. What are your thoughts? Regards, Michael J. Gantick, P.E. Director of Public Works Town of South Windsor, Ct. IVfike Gantick-Re Duck Pond Pierce Road Pa e 1 From: Jeff Folger To: Gantick, Mike Date: 6/25/01 11:31 AM Subject: Re: Duck Pond- Pierce Road I don't believe that the outflow structure is built to accomodate that level. Past efforts by Mr Collins to increase the water level were done by the Rube Goldberg method. An 8" increase in watre level will not give us 12"of free board either. t5ll ke&4ck Re Duck Pond Pierce Road u, Page 1 From: Melvin Stead To: Jeff Folger; Mike Gantick Date: 6/27/01 11:43AM Subject: Re: Duck Pond-Pierce Road The 1998 plan for the construction of the access deck shows a pond elevation of 71.7, and a road elevation of approximately 72.5. (from contour lines).The road base here was designed to be 18 inches. I am not sure if it was constructed that way. A sanitary sewer was installed here in the west green area behind the curb.When under construction sheet piling was installed and left below grade. I do not know how low below grade. Ther is also a water line trench and a storm sewer trench in the road at this location. I am concerned that raising the water level further will cause the water to run through the road base at a faster rate and cause damage to the road. I am also concerned that raising the water level will reduce the runoff storage area. This is a unique are in that the road is only 15 feet from the pond and only about 14 Inches above the water level. It seems t beg for an expertise beyond my knowledge. Perhaps we should look at raising the road and controling infiltration into the base. >>> Mike Gantick 06/25/01 10:41AM >>> Sherman Collins called to talk about the water level of the pond. He believes the level should be maintained 8 inches higher than it is presently. What are your thoughts? Regards, Michael J. Gantick, P.E. Director of Public Works Town of South Windsor, Ct. ik Gantick Re:buck Pond- Pierce From: Jeff Folger To: Gantick, Mike Date: 6/25/01 11:31 AM Subject: Re: Duck Pond- Pierce Road I don't believe that the outflow structure is built to accomodate that level. Past efforts by Mr Collins to increase the water level were done by the Rube Goldberg method. An 8"increase in watre level will not give us 12"of free board either. t 6eV-Ct ad s� �� � � MINUTES of Meeting held April 24, 1978. at 9:00 a.m. PRESENT: Messrs. Morway and McKnight (Addison--Construction Co.) ; Messrs. Gates, McKeon, and Baldino (James P. Purcell Assocs.) ; and Messrs. Young, Page, and Stead (Town of South Windsor) . The purpose of the meeting was to discuss a solution to the problem of dewatering in the vicinity of Pierce and Strong Roads right-of-way, and other items regarding the Central Area sewers. On April 18, 1978, representatives of Addison Construction Company appeared before the Sewer Commission to discuss the engineering solutions for the above-mentioned water problem; and the method of payment. The Sewer Commission suggested a meeting between the Contractor,- Purcell Associates, and Town staff to discuss the engineering solutions. It is understood that the payment question is the prerogative of. the Sewer Commission. The meeting began with a discussion of the problem of sewer line installation. it is apparent that the Contractor and the Consultant do not agree, at this point, as to an acceptable installation design. The design proposed by Purcell included steel sheeting driven to specific elevations, use of well-points for dewatering, and then removal of the steel sheeting. The Contractor, on the other hand, contends that removing the sheeting will create voids in the clay and produce !subsequent failure of the pipe system. The Contractor wished to go on record that he was not going to assume responsibility for the project as proposed by Purcell; and that his opinion be recorded in the Minutes of this meeting. Background The problem was first identified approximately Spring of 1977. The Contractor evidently notified Purcell, in writing, of the problem and asked for specific procedures to be followed for t installing the sewer line. As a result of that request, Purcell recommended that sheeting- be driven to control underground water flow. This solution did not work. Purcell then recommended that the Contractor either dril.7e the sheeting further or put in well-points. It was apparent at the time that the well-points were the more practical solution.. inutes--Meeting 4/24/78 Re: Central Area Page 2 Purcell stressed the fact that these were, in thbir opinion, only recommendations and that the Contractor must have final responsibility. Present Condition The Contractor has installed sheeting. The water under the trench, according to the Contractor, has moved the sheeting substantially. The Contractor stated that he felt all along the sheeting should not be driven, and that well-points were required from the start. He was, however, instructed not to use well-points, but to utilize the sheeting procedure. It was then agreed that this meeting was to determine an acceptable procedure for installation of the pipe, and not to determine ultimate responsibility. After much discussion, the conversation again returned to acceptable procedures. The Town then, asked the Consultant for an engineering opinion and recommendations as to what should be done. Some items considered were: 1. Driving piling to bedrock and supporting the pipe with cross-members. 2. Utilizing a concrete cradle for the protection of the pipe, 3. Well-points, with sheeting pulled. 4. Well-points with sheeting left in place. 5. The possibility of changing the grade via pump station. It was the consensus of the group, and the final recommendation by the Consultant, that the use of well-points, with sheeting left in place, was the best way to proceed. The Contractor indicated that he would proceed, based on the Consultant 's recommendation, and projected a starting date of may 3, 1978. /" Re: Central Area Page 3 The second item discussed at the meeting concerned the Change Order for sheeting. The Change Order approved by the Consultant was for approximately $15, 000. Further discussions revealed that, to date, the Contractor has only incurred expenses of approximately $4,000 for the sheeting, and boring costs of approximately $1, 000. It was decided, at that point, that the Change Order (as submitted to the Sewer Commission by the Contractor and as approved by the Consultant) should be for approximately $5,000 and not the original . $15, 000. The third item discussed at the meeting concerned the inspection. The Town made the point that inspection of this very critical installation area must be extensive. At this point in the meeting, Purcell Associates stated that if the sheeting is left in place it shall be, in their opinion, a "pay item. " The Town indicated this will have to be decided by the Sewer Commission, based upon information submitted by the Contractor, in writing, justifying such expenses. The last item of discussion was with regard to the restoration of street sewer trenches. The Town directed the Contractor to sweep from the street all excess materials utilized. for trench winter maintenance; and to restore the patch to an acceptable condition. Also, since a storm sewer is proposed for installa- tion on Foster Road, the Contractor was directed notlto pave. The Contractor indicated his bid prices expire May 30, and that any extension of paving beyond that date would require increased paving costs; and he feels that an extra is warranted. The Town requested this information, in writing, so that we may discuss it with the Sewer Commission as far as funding, etc. The Town also stated that the landfill close-out project is scheduled for early Summer. Any damage to the road because of this operation will be maintained by the Town prior to overlay. The Contractor raised the question of reduction of retainer due to the extension of the time for overlay. This :ill be requested in the letter outlining the increased cost referred to above. (THE ABOVE IS A SYNOPSIS OF Tr= APRIL 24 MEETING. ANYONE WISHING TO READ A MORE EXTENSIVE .RECG:" OF' THE MINUTES, MAY DO SO IN THE OFFICES OF THE DIRECTOR OF PUS=,IC 11ORKS. ) • tOW N Sf� t ro 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SOR•CON� n� AREA CODE 203/644-2511 RICHARD J. SARTOR Town Manager f=� f r April 10 , 1985 Mrs . Shirley Stewart 46 Pierce Road South Windsor , Connecticut Dear Mrs . Stewart : Thank you for your letter of April 3 , 1985 , in which you brought to my attention a long-standing commitment that apparently has not been fulfilled by the Town . In order that this matter be corrected expeditiously , and you receive the survey showing the new property lines , I am requesting that the Director of Public Works , Mr . Robert Arsenault , contact you, immediately , and schedule the necessary survey work . If this problem is not corrected to your satisfaction in the near future , please contact me directly . Very truly yours , own Man er RJS : prb cc : ✓Director of Public Works 46 Pierce Road South Windsor, CT 06074 April 3, 1985 Mr. Richard Sartor Town Manager Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Mr. Sartor: During 1975 in connection with the widening of Pierce Road, my husband and I signed an agreement with the Town of South Windsor for compensation for the taking of approximately 2,200 square feet of our property at 46 Pierce Road for the project. The agreement provided for payment of $600, the planting of hemlock shrubs and a survey of the new property lines. Although we did receive the payment and the shrubs were planted as agreed, we have never received the survey. Several times after the agreement was signed, I visited or called the Town Nall and wrote to request the survey, but was told it would not be released until the project was completed. The construction itself took quite some time and was followed by the Installation of sewers on Pierce Road. When all the work was completed, I noticed that the merestone marking they corner of our property was missing. At that time I again wrote to the Engineering Department to request the survey and the replacement of the merestone. The response was that it would be done "in the spring". Nothing further has been done since that time. I was reminded of these items recently while going over property records in connection with the revaluation and I am writing to you in the hope that even after this length of time, it is not too late to take care of these items. We would appreciate your help in resolving this matter. Very truly yours, Enclosure �Jc' 'L We, Shirley R. and Ronald C. Stewart, hereby accept the sum of $600.00 (six hundred dollars) from the Town of South Windsor in full satisfaction of all claims for damages resulting from the taking of approximately 2 ,200 square feet of our property at 46 Pierce Road in said Town of South Windsor. The Town of South Windsor hereby agrees to plant hemlock shrubs, two to three feet in height, approximately three feet apart, along the new front property line. The Town further agrees to provide Mr. & Mrs. Stewart with a survey of their property showing the new property line. Dated at South Windsor, Connecticut , this 7,Vf, day of April, 1975. Town =ofuthZin or By TEW RONALD C. STEWART V. Town Manager /SOwN 3F7 ° Y GO Own- a/2 sati l 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f I�soR.cor AREA CODE 203/644-2511 May 16 , 1985 William M. & Jeanne M. Mangino 272 Pierce Road South Windsor, CT 06074 Dear Mr. & Mrs. Mangino: On April 29 , 1985 , I sent you a letter concerning blacktop that was dumped along Pierce Road. I have enclosed a copy for your reference. Since that time , the pile has been added to. It is important that this material not be buried but removed from the site. Very truly yours , i7 2-5 j T /s tJc 7— A. Bowen Davies '�_�Lj �,_s5'ro Deputy Town Engineer ABD:bmr = �v�' - i?/fy'-,�. c. << -7-� j T� %y /L'C' "�_ /`,mac' ?� f j e' cc: R. Arsenault, Director of Public Works R. Martel, Town Engineer �_- Inland Wetlands Agency Central Paving Company Enclosure Certified Mail : #P382 ' 454 153 272 Pierce Road South-- Windsor, Ct .. M ay 28, 1985 Hartford Paving Company 230 Hartford Tpke Vernon, Ct. 06066 Attention: Owner of Hartford Paving During the week of April 22nd, a paving company dumped debris from a job on our property at 272 Pierce Road in Sou.th. Windsor. There was a-sign stating "Clean fill only at the time. This was. rot clean fill that was. dumped, and we were notified by the town of South Windsor to get it removed. On May 16, 1 personally, saw your truck dump another huge load of blacktop, in large chunks, and the sign for cleann fill only had already: been removed by us. I tried to catch the driver but he left before I could get to the end of the road. We have called your office severaL..times, leaving messages with an answering service. Onewoman did call back, but rc�; wife was not at home, but did return the call twice after that, and you have not responded, The woman who talked to my daughter-was: made aware of what we wanted We have been-in touch with the town and they were to bet in touch with you also. We want your company to remove this blacktop fro:.n. our property at once, and if it is not, we will.take steps to have our laTWyer handle the situation. Very truly yours,, WA i.am and Jeanne ?� i�ro CC: A. Bo:.,-en Davies, Deputy Town Engineer (3) taw" SF+ F 7-0� o-P Soa& V&U&O't C wC) 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 r'1oSOR-CO AREA CODE 203/644-2511 May 21 , 1985 Hartford Paving, Inc. 230 Hartford Turnpike Vernon, CT 06066 Gentlemen: Enclosed are copies of letters sent to the Mangino's on Pierce Road concerning dumping of blacktop. They were inadvertently sent to Central Paving based on the information presented. Since then, we have additional information on good authority that your trucks dumped this material, and we would like you to clean it up. To avoid complications, your prompt attention to this matter would be appreciated. Very truly yours, A. Bowen Davies Deputy Town Engineer ABD:bmr Enclosures cc: ✓R. Arsenault, Director of Public Works R. Martel, Town Engineer Central Paving Company CERTIFIED MAIL: #P 042 890 544 'Qy1N Sf4 -Town 07/e Satz M ?d wC, 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR•Co AREA CODE 203/644-2511 May 16 , 1985 William M. & Jeanne M. Mangino 272 Pierce Road South Windsor, CT 06074 l I/t Dear Mr. & Mrs. Mangino: \ On April 29 , 1985 , I sent you a letter concerning blacktop that was dumped along Pierce Road. I have enclosed a copy for your reference. Since that time, the pile has been added to. It is important that this material not be buried but removed from the site. Very truly yours , A. Bowen Davies Deputy Town Engineer ABD:bmr cc: /R. Arsenault, Director of Public Works R. Martel, Town Engineer Inland Wetlands Agency Central Paving Company Enclosure Certified Mail : #P382 454 153