Loading...
HomeMy WebLinkAboutNevers Road PW Street File OARDINAL ENGINEERING ASSOCIATES, INC. 3 COLONY STREET, MERIDEN, CONNECTICUT 06451 (203) 238-1969 JOSEPH A. CERMOLA,P.E., L.S. Fax(203) 630-2056 JOSEPH A. CERMOLA,III,P.E. � 4 � Report of Meeting Public Informational Meeting �E E�Town of South Windsor Nevers Road Reconstruction Project J A N 1 4 2008 SOUTH WINDsoF PUBLIC WORK Date: Wednesday,November 28,2007, 7:00 pm Location: South Windsor Town Hall,Council Chambers In Attendance: Name Company Telephone -"Michael Gantick South Windsor—Director Of Public Works 860-644-2511 Jeffrey Doolittle South Windsor—Town Engineer 860-644-2511 Joseph Perna South Windsor—Project Engineer 860-644-2511 Gary Bazzano South Windsor—Town Council Member David Arzt Cardinal Engineering—Project Manager 203-238-1969 Gene Louison Cardinal Engineering—Engineer 203-238-1969 Peter Aceta Resident,447 Nevers Road 860-648-5859 Maureen Hickey Resident, 144 Hayes Road 860-644-9872 Bob&Cindy Muska Residents, 365 Nevers Road 860-643-7632 Rob Sullivan Resident,411 Nevers Road 860-432-0129 Purpose Of Meeting: To present preliminary design plans for the reconstruction of Nevers Road and to obtain the publics input regarding the project. Transactions and Determinations: 1. Jeffrey Doolittle opened the meeting at 7:10 pm with a description of the project history and purpose.Then introduced members of the Town staff and Cardinal Engineering. 2. David Arzt of Cardinal Engineering presented preliminary design plans for the project with a description of the project limits and what the project entails. This section of Nevers Road has very flat roadway slopes, insufficient roadway cross slopes and subsequently has many areas that do not drain properly impacting several properties along Nevers Road. Improvements proposed under this project consist of the reconstruction and widening of the road to a width of 26 feet from Hazel Street northerly to a point 300 feet past the Miller Road intersection for a total length.of 1550 feet. Storm drainage improvements consisting of catch basin and adequately sized pipes as well as underdrains where required are proposed. Mr.Arzt requested input from property Town of South Windsor Nevers Road Report of Meeting 11-28-07 pg.2 owners regarding any problems they may be experiencing on their properties and opened the meeting for discussion. 3. Owner at house#447 stated that his driveway is flooded after a rain storm and is deteriorating due to poor drainage. 4. Owners at house#365 reported no drainage problems at their property. 5. Owners at house#411 stated that they are still experiencing flooding in their driveway although not as severe, after the Town installed a drywell catch basin. They stated that the water is coming from— Nevers Road itself and not from the rear of their property, however they do experience some flooding in the side yard at their southerly property line. 6. Resident questioned why sidewalks are not proposed for the entire length of the project. Mr. Doolittle explained that the walks shown were proposed and bonded for as part of the Brightman Circle subdivision. Mr. Gantick stated that the Town presently has a committee studying the feasibility of sidewalks and bikeways townwide. Mr. Bazzano stated that the Town will work with property owners wherever sidewalks are wanted by the residents. Resident also questioned whether the width of Nevers Road could be increased to allow for a construction of a bikeway. They stated that they would be in favor of sidewalks and expressed concerns over children having to walk in the road. 7. Mr. Bazzano asked for citizens input regarding the project. 8. Mr. Gantick stated another meeting on the project will scheduled sometime in the spring. 9. Mr. Doolittle explained that preliminary design plans have been developed by Cardinal Engineering and that specific issues such as storm drainage and curbing will have to be addressed in subsequent levels of the design. Meeting adjourned at 7:45. The above record reflects the writer's understanding of discussions and statements made during the subject meeting. If any of the parties believe a discrepancy exists, please notify this office in writing prior to the next project meeting. Prepared by: Gene Louison Submitted by: David P.Arzt,Project Engineer PA\ACTIVE PROJECTS\2097 South Windsor On Call\2097-1 Nevers Road S.Windsor\Meetings\PubliclnfoMtg112807.doc MEMORANDUM ApFuU 29, 1981 To: Mn. R,ichatcd A. Shattuck Ditec to& o j Pubt i.c Glen Re: Mn. Robext Spi k - #94 Nevelus Road I have tecentty been in communication with Mn. Spctka, with xegaxd to the dust pxobtem associated with the roadway to the baU4ietd on Nevetus Road. He a zo comptained about the xumbting noise caused by nock.s on this toad. I met with him and, at though I neat ize some eatc ium chtoA i.de has been appt�i.ed to .the toad, I bet i.eve an addit ionat apptication, extending to the .eim.its o6 his developed ptcopeAty, might be ,in oxdex. I do not .know ij it is possibte to e iimi.nate the pnobtem with the g&avet Woad, but ptease tcev.iew the matter. R.ichand J. Saxto& Town Manager RJS:pnb i �SOwN Sf,,`� j J w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-Co � AREA CODE 203/644-2511 November 12, 1987 Mr. R. G. Kaye Director of Development The Balf Company P.O. Box 11903 Newington, CT 06111 Dear Mr. Kaye: Subject: Nevers Road Trees Savin Woods This letter will service to confirm that the tree work performed along the Nevers Road Sidewalk was completed to the satisfaction of the Town. Very truly yours, r Michael J. antick Director of Public Works MJG/jsv CC: Marcia A. Banach, Director of Planning Subdivision Project File / THE BALF CO. CONTRACTORS C�,1G SINCE 1878 RO,BOX 11903 NEWINGTON, ' CT 06111-0903 203/549-3200 CONTRACTORS SINCE 1979 PLANT LOCATIONS NEWINGTON MANCHESTER GLASTONBURY October 6, 1987 .Mr, Michael J. Gantick Director of Public Works Town of South Windsor 1540 Sullivan Avenue South Windsor, CT. 06074 Re: Nevers Road Trees Dear Mr, Gantick: Please be advised that the tree trimming and removal requested by yourself and Karl Reichle, has been completed by Rouleau Forestry, working under the direction of Mr. Reichle, on September 9, 3.987. I have asked Mr. Rouleau to provide me with a letter from yourself or Mr. Reichle indicating that all work has been completed in a satisfactory manner in accordance with your desires. This letter has not been forthcoming at this writing, and I would appreciate it if you could provide me with same, so that I may close out this matter. Your cooperation is, as always, deeply appreciated. Very truly yours, THE BALF Cc R. G. Kaye Director of Development 10 lI RGK/rk I2 4 cc: BCNR File FC `r ✓ OCTJ 8. N y Town of S�.[;SndsOr Cspt, � AN EQUAL OPPORTUNITY EMPLOYER M E M O R A N D U M TO: Allan S. Young, Director of Public Works FROM: Paul F. Talbot, Town Manager DATE: November 27, 1978 SUBJECT: PORTER COLLINS' PROPERTY ON NEVERS ROAD Attached communication from Town Attorney in regards to leasing Porter Collins' land on the corner of Nevers and Sand Hill Roads. As indicated in the memo, prepare a map defining the area to be leased by the Town. Tom Burgess has indicated to me that our insurance coverage will cover liability suits against the Town. The area across the street is owned by the Town and can be utilized for parking as was done two years ago. Attachment U �a� A0 S44 - I-awn sio-aLls, ?J/&Zdsot 01 ,� wG 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074- ��dsoR.co�� AREA CODE 203/644-2511 Novem'oer 22 , 1978 TO: Mayor Caffyn FROM: Richard M. Rittenband, Town Attorney SUBJECT: Use of Porter Collins ' property on Nevers Road This is in response to your memorandum of Nove,,' er 17, 1978 `concerning Deputy Mayor Myette"s request for me to investigate the poss-ibility of a hold-harmless agreement so that Town residents can use the property during the winter for sliding. I recommend the following: 1. A lease between Mr. Collins and the Town from December 1, 1978 to April I, 1979 and the same period for an additional four years,; at $1. 00 for each four month period for the property. in question and the subject purpose. 2. The lease would have the same effect as a hold- harmless agreement as far as Mr. Collins' liability problem, and under a lease ar'rariq_ ent, I am advised that Tom Burgess has informed the Town Manager that the Town's general liability insurance policy would cover the area. This should be obtained in writing from Mr. Burgess. i 3. I have asked Mr.. -.Talb-at-..to-:-have_th€_engineerin - department prepare a map defining the portion of Mr. Collins ' property that ,will be used, and this will then _be--described- in_:a lease- S--will-prepare 4. I would recommend that in-'order to-limit- the potential - __ liabilityof the Town signs b� , g . posted to show the- area _ that may and may not be used by. citizens, and to advise them that it is an unsu ervised recreational, area that they will be using at .heir own risk. This will preclude the Town having to maintain the area or having someone there to supervize it, and should :further persuade citizens not to go on other parts of Mr. Collins ', property. RMR/dds cc: Deputy Mayor M ett i dhWr(r M. Rittenband Paul Talbot South Windsor Town Attorney MEMORANDUM January 30, 1975 To: Terry V. Sprenkel Re: Miller/Nevers Road Drainage Project (Acct. ##4023) I have been asked by Emil to try and complete the above-mentioned project in the present 1974/1975 budgetary period. To this end, I have obtained the following quotes for material from the below-listed suppliers. However, as you will note the expenditure for this material will exceed $2, 000. Leonard Concrete Pipe - 700 linear feet @ $4.43/l. f. _ $3, 101 Delta Wire & Steel - 700 linear feet @ $6.00/l. f. _ $4, 200 Capital Pi e(Class III) - 200 linear feet @ $4.80/l. f. Field Concrete Pipe - 300 linear feet @ $4.80/l. f. Balf (Seconds) - 200 linear feet @ $3. 50/l. f. The State Aid price is $4.92 per linear foot. By using - Balf Seconds - 200, L.F. @ $3.50 = - $ 700 Capital Pipe - 200 L.F. @ $4.80 = 960 $1, 660 Field Concrete Pipe 300 L.F. @ $4.80 = 1,440 TOTAL FOR (2) SUPPLIERS $3, 100 Attached are quotes from four (4) local Contractors for equipment and labor. I will need your "O.K. " on the above before proceeding any further. However, I urgently request your reply soon, as I do not believe this project can be done for the Budget figure if construction is delayed beyond March 1, 1975. Lester A. Braddock LAB:prb ec: E. W. Lucek STATUS OF FUNDS REQUEST Town of South Windsor, Connecticut For commitments in excess of $1,000.00 Forward to Finance Department: Date: Account Account Name Number Amount GENERAL GOVERNMENT BUDGET $ C ooa.o� f GENERAL GOVERNMENT-CAPITAL OUTLAY REVENUE SHARING APPROPRIATION CONTINUED APPROPRIATION ADDITIONAL APPROPRIATION BOND ISSUE FUNDS CAPITAL RESERVE AND NON-RECURRING FUND OTHER (IDENTIFY) I, ZeS 7`v-v-' P30KA> D O c-K request the information to cover potential purchases, services or items with a quotation amount of $ S¢p O To be completed by the Finance Department; I hereby authorize the purchase of goods and services from the accounts listed above in an amount not to.exceed your quotat' DATE CONTROLLER NOTE: _ 1. The requesting agency should put in the account number, name, quotation amount of goods and services and the request date. 2. This form is to allow the purchase or commitment, it is not to be processed after the purchase order or receipt of goods and services. 3- Although not a requirement we would prefer wiitten quotations from vendors of those amounts in excess of $1000. 1/24/75 supercedes green form of 7/15/74 i I, hereby agree to allow the Town of South Windsor to enter upon my property (east of Nevers, and .south of Miller Road) a distance of approximately 700 feet, to stockpile and install a Storm Drainage System. Y-a Signature Date Page No. I of Pages V,L (7 Covend11-( P. O. 13ox 511 South ("ind/sm Cann. 06074 PROPOSAL SUBMITTED TO PHONE DATE Tnuw / r C ) • —4- 75 STREET JOB NAME SoLUvan- Ave.- II 1 JL(. CITY, STATE AND ZIP CODE JOB LOCATION ':1JIjC1AQ!1__ ('01111 - (161114 1evPvL,5 Pd. South ()iii; AOn. ARCHITECT DATE OF PLANS JOB PHONE We hereby submit specifications and estimates for: The on i11eveJL6 ..}td Scat, ()i1TdS dn, _ CUnn ........................ P Frltpoor hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: one 1Lou5and iaun hundned and 46u.ntlf 'ive--------------- dollars($ Payment to be made as follows: All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or deviation from above specifica- Authorized tions involving extra costs will be executed only upon written orders,and will become an Signature extra charge over and above the estimate.All agreements contingent upon strikes,accidents 17 or delays beyond our control.Owner to carry fire,tornado and other necessary insurance. Note:This proposal may be Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us if not accepted within days. LDateof aurt of f roposid—The above prices, specifications s are satisfactory and are hereby accepted. You are authorized Signature k as specified.Payment will be made as outlined above. ptance: Signature FORM 118 COPYRIGHT 1960 - NEW ENGLAND BUSINESS SERVICE,INC.,TOWNSEND,MASS.01469 ' Page No. of Pages k , t... F.._ ..... pp 'LYe!� 1 fil TO PROPOSAL SUBMITTED TO PHONE DATE STREET _ JOB -NAME CITY, STATE AND ZIP CODE o JOB LOCATION -) - ARCHITECT - - _ - DATE OF PLANS - - -- JOB PHONE - - - We hereby submit specifications and estimates for... 11raposP hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: dollars;($ Payment to be made as follows i All material is guaranteedto be:as specified. All work to be completed in a workmanlike manner according to standard practices.Any alteration or deviation from above specifica Authorized tions involving.extra costs will be executed only upon written orders,and will become an-- -Signature. _ Extra charge over and above the estimate.All agreements-contingent upon strikes,accidents ordelays beyond our control.Owner to carry fire,tornado and other necessary,insurance. Note:This proposal may be r e fully covered by Workmen's Compensation Insurances withdrawn by us if not accepted within days._aurr joti rapasal—The above prices;specifications ns are satisfactory and are hereby accepted._ You are authorized Signature k as specified.Payment will be made as.outlined above. ptance: Signature .. FORM 118- COPYRIGHT 1960 —NEW ENGLAND BUSINESS SERVICE,INC.,TOWNSEND.MASS.01469 _ ANDRE CHARBONNEAU & SONS • CONCRETE FLOORS 311 FELT ROAD • SOUTH WINDSOR, CONNECTICUT 06074 . STEPS - PATIOS BUSINESS PHONE 528-7551 RESIDENCE PHONE 644-9188 . SIDEWALKS • PAVING • LOAM Jan. 27, 1975 % ,. Town of South Windsor Engineering Dept. South Windsor, Conn. Gentlemen: We are pleased to submit this proposal to do the follow- ing work: All labor to install 700 lineal ft. of 18 inch concrete pipe. The total cost of the .above ,job will be one thousand, nine hundred dollars ( $l',9®4,..'60) :� Al materiI to be supplied by the Town of South Windsor. We wish to thank you-for giving us this opportunity for submitting the above; proposal. Sincerely, And ' Charbo au & Sons Charbonneau AC : emc Page No. 1 of 1 Pages MITCHELL TRUCKING, INC. 90 BROOKIIELD ST. SOUTH (VINtDSOR, CONN. 06074 Phone 529-4431 PROPOSAL SUBMITTED TO PHONE DATE Town v' South LVindsox Jan 27, 1975 STREET JOB NAME Town. HaU Suttiv an Ave. CITY, STATE AND ZIP CODE JOB LOCATI South Windson Conn. 06074 n . .South ( ind'Isox, Colin. ARCHITECT DATE OF PLANS JOB PHONE We hereby submit specifications and estimates for: The in,6.tct,Uation o_ 700 F f_. PZu,6 vx ll�,i17.cI'S o i, 1 °" /stivh r7_ 1el�en vli ,teven/s &d. : out". ,;•';LadAoh.. P Fropou hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: n rt One Thotoan Five [IttadiLecl anti------------------------- dollars($ 1500. 00 � Payment to be made as follows: 1 0 0 AA All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices.Any alteration or deviation from above specifiea- Authorized tions involving extra costs will be executed only upon written orders,and will become an Signature extra charge over and above the estimate.All agreements contingent upon strikes,accidents or delays beyond our control.Owner to carry fire,tornado and other necessary insurance. Note:This proposal may be Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us if not accepted within days. L r"Ptaurr Dt f roposal—The above prices, specifications conditions are satisfactory and are hereby accepted. You are authorized Signature o the work as specified.Payment will be made as outlined above. of Acceptance: Signature FORM 118 COPYRIGHT 1960 - NEW ENGLAND BUSINESS SERVICE,INC.,TOWNSEND,MASS.01469 Page No. of Pages J & H SLATER CONST. CO., INC. Sewer Construction- Excavating 2" Stv So. Windsor, Conn. 06074 421 Abby Rd Phone 528-0909 PROPOSAL SUBMITTED TO PHONE DATE Town of South Windsor I January 29, 1975 STREET JOB NAME Sullivan Ave. Storm drain. CITY, STATE AND ZIP CODE JOB LOCATION South Windsor, Conn. Nevers & Miller Roads ARCHITECT DATE OF PLANS JOB PHONE We hereby submit specifications and estimates for: ......... . .............. ............. Installation of 18" R Q. P. storm...drain on ..NevrsnMi. .].e _.......... in accordance with the following specifications: ............. ........... Install approximately 700 feet .18" R. C. P. ......................2. Install 3 catch. _basin sumps ......... -_ ......... ........ ... .......... 3. Town to supply all materials and engineering. ......... ......... ! . Removal of rock. ledge., concrete or.. other_ obstacles ..to ......__...._.... be billed as an extra to the town. ........ .... _ ......_ ...... .......... _ _ _ __ ..................... ... ....... . ................................ ........ .............. .............. ....... . .. ......... ........ ........ ........ ...... ........... - ..... ........ .............. ...... ........ .............. ......... lie froposP hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: One Thousand Rour Hundred ..five and 0011 00w..wsbs dollars($ 1 .485.00 ) Payment to be made as follows: Net 30 d All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or deviation from above specifica- Authorized tions involving extra costs will be executed only upon written orders,and will become an Signature extra charge over and above the estimate.All agreements contingent upon strikes,accidents or delays beyond our control.Owner to carry fire,tornado and other necessary insurance. Note:This proposal may be Thirty Our workers are fully covered by Workmen's Compensation Insurance. withdra n by us if not accepted within days. Arr�ep#aurr of rapajoid—The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized Signature to do the work as specified.Payment will be made as outlined above. Date of Acceptance: Signature FORM 118 -COPYRIGHT 1960 - NEW ENGLAND BUSINESS SERVICE,INC.,TOWNSEND,MASS.01469 Proposal oposal No. Sheet No. Date Proposal Submitted To ark To Be Performed At Nome t t/ Sa v e G<' StreetAja4 Street cl City State City _jU Date of Plans/(1 � State cv �l �' Architect Telephone Number We hereby propose to furnish all the. isriwis and erfarm all he labor necessary for the completion of r 4 R � All material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of Dollars ($ /�6fs,Qe ). with payments to be made as follows: Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance upon above work. Workmen's Compensation and Public Liability Insurance on above work to be taken out by r Respectfully submitted Per Note—This proposal may be withdrawn by us if not accepted within days ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made.as outlined above. Accepted Signature Date Signature TOPS FORM 3450 LITHO IN U. S. A. Neue4. Road South wznd ao�, Co.zn. lam" becembe-t 4 1972 N.t. £mit Xacek, gown £n inee't South Wind&o t 96on, daU Su tiva t�Ue vze South. Wind ao-t, Connecticut De" si- Ny name Z& Ceovt-e Cha4l ton and .9 tive at 2S8 Neue ter. road. .9 am w�tZt i nq you about a water eonditton that ha,- become an untoLe4abte 4 tuation in the, pant few yea 4 and asp. wo&deninq each month.. 5hi4 i4 ►xy tita w4itten compta nt at,though we have compLaaned ue&baU-y .wetat -timed.. aunt ptop" i4. bounded by a betook that c�to44" Neuey koad and &un4 aouthe,d y -th&.oujh. ,the /441A School paopetty. 9oa ,the f ii 1-5 yea44 4,6 e 1952 out caUa t way alwaya dry but ay homey and toada, mute bui U noath of ua and chain .into Chid. b-took the, cu&ett undet Neve�t4 road ha& become much -too 4"U. .9 am au to your department -ii awate of thi. ai tuati on. 9 would .think .that moneya mind t haue been app-top4 i ated f opt downa.t team dtai.nar-e •i,nrp.touewenta. We haoe pati entCy been wad f o t .this 4 tuati on ,to be co4tected, but no happens. gh,i a b�took f toody ouet Neve&4 koad about foul .t.imea, a seat and Z j my wife of 9 dad not uabtock thiA culueitt atu 4to4w it woutd stood oueit many mote tiaea. Jhi& ado causes f.toodinq� of oust Lawn and out c Uta�t. &vei nj .the wet aeaaon and gte�t gain we aun as many as five pumper and often fiimes can wt. p44went 4-5 anc/h.ey of wa ." in oust ce -apt. We have stun pumper �ot " Lonq� as 6 weeks. Girth the building now in ptocyte" off Abby koad &vtena.ion we wall noon have a 4ituation ,that we watt not be able to cope with. Jhi d. cu neat has a 2,1" pipe dtaininf a baook and 350 act" of Land. .9 would ,think ,that tAid, ahoatd ",quite at Leaa t a 72" pipe. W a td it be w.tond .to .think ,that a t new eon t4ac t ion up,&ueam of -this eu v ea t be, stopped until -this p tobLem Z& co&Aec ted? 9 would app",c iate a to Jaom you as ,to what yo" depafi tmen t i4 doi*4 of can do about ,this uet y a.e t i oua paobLem and when we can expect a coaAec t i on of 4.awe. �ancehel�1 you, Geode /d. CAA 4&on