Loading...
HomeMy WebLinkAboutMaskel Road (6) WORK PROPOSAL-ESTIMATE CENTRAL PAVING C 0-, I N C. Page One of 520 BURNHAM STREET Date 19 7-s-- SOUTH WINDSOR, CONN. 06074 Phone 289-7088 or 528-3153 Residential - Commercial - Industrial Paving Drainage & Excavating To: .lob: �. SPECIFICATIONS I We hereby propose to furnish Labor and Materials complete with the above specifications,for the sum of: Dollars ($ �y� 1 with payments as follows Authorized Signature ' TERMS AND CONDITIONS 1. All work specified above to be completed in a workmanlike manner. 2. Any changes from above specifications shall be in writing only;stating changes to be made and agreed price for said change. 3. All agreements subject to accidents,strikes and other causes beyond our control. 4. The undersigned is to maintain Fire,Liability and other necessary insurance. 5. The undersigned agrees to pay cost of collection or attorneys fees incurred in case payments are not made as stated above. 6. This proposal may be withdrawn,if not accepted within days. ACCEPTANCE The above specifications, prices and conditions are satisfactory and are hereby accepted. You are authorized to do said work as specified. Date 19 Signature xur �tl Page No. of Pages HILLS PAVING & CONSTR. CO. INC. 1468 Sullivan Avenue South Windsor, Conn. 06074 644-0916 PROPOSAL CMI7D TO ^ /t ` �_ ) PHONE DATE STREET 1) / I v JOB NAME / l J5vd /(i(�•!�/✓,fit /e ��dGt4 //�iJIJ Ifc / Ie �1cS 14//er',ol, CITY. TATE AND IP COPE JOB LOCAT ON AR ITECT DATE OF PLANS JOB PHONE We hereby submit specifications and estimates for: THIS INSTRUMENT IS BASED UPON A HOME SOLICITATION SALE, WHICH SALE IS SUBJECT TO THE PRO- VISIONS OF THE HOME SOLICITATION SALES ACT. THIS INSTRUMENT IS NOT NEGOTIABLE. NOTICE TO BUYER:(1)Do not sign this agreement if any of the spaces intended for the agreed terms to the extent of then available information re left blank.(2)You are entitled to a copy of the original of this agreement at the time you sign it.(3)You may at any time pay off the full unpaid balance due under this agreement, and in so doing you may receive a partial rebate of the finance and insurance charges.(4)The seller has no right to enter unlawfully your premises or commit any breach of the peace to repossess goods purchased under this agreement. (5)You may cancel this agreement if it has not been signed at the main office or a branch office of the seller, provided you notify the seller at his main office or branch office shown in the agreement by certified mail, return receipt requested, which shall be posted not later than midnight of the third calendar day after the day on which the buyer signs the agreement,except if the signing is on Friday,Saturday or Sunday, the cancellation shall be posted not later than midnight of the Wednesday immediately following.The seller shall fill all blank spaces in such agreement intended for the agreed terms,to the extent of then available information, before the agreement is signed by the buyer and shall furnish the buyer with a copy of the original of the signed agreement. Wit frapast hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: Payment to be made as follows: dollars($ In the event the undersigned purchaser fails to make payment as hereinafter set forth, and is in default of said payment for a period of thirty (30) days after said payment date, then the undersigned purchaser agrees to pay all costs of collection, including reasonable attorney's fees, incurred in any action brought to collect said payment. The undersigned purchaser further agrees to pay interest at the rate of l% per month (12% per annum) on the unpaid balance, from the due date. All material is guaranteed to be as specified.All work to be completed in a workmanlike < _ manner according to standard practices.Any alteration or deviation from above specifiea- Authorized tions involving extra costs will be executed only upon written orders,and will become an Signature extra charge over and above the estimate.All agreements contingent upon strikes,accidents or delays beyond our control.Owner to carry fire,tornado and other necessary insurance. Note:Thi p p05a1 may be Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us If accepted within days. .C�rrP�it�IIX� � ; r1111D�'ittl—The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized Signature to do the work as specified.Payment will be made as outlined above. Date of Acceptance: Signature I ._ ._ _._ L. ter A� "_ ' Por t9 rti ��. .. ... RECEIPT FOR CERTIFIED MAIL-3041 (plus postage) SENT TO POSTMARK Mr Jaan Lane OR DATE STREET AND NO. Old. 44 Herwy Street Q0 P.O., STATE AND ZIP CODE Manchester Connecticut 0 0g OPTIONAL SERVICES FOR ADDITIONAL FEES RETURN 1. Shows to whom and date delivered 1 RECEIPT With delivery to addressee only............65 l 2. Shows to whom,date and where delivered.. 354 SERVICES With delivery to addressee only............85d • DELIVER TO ADDRESSEE ONLY ...................................................... Sod SPECIAL DELIVERY (2 pounds or less) .......................................... 450 ►F7� POD Form 3800 NO INSURANCE COVERAGE PROVIDED— (See other side) July 1969 NOT FOR INTERNATIONAL MAIL GPO: 19700-997.459 4 K L a May 22, 1973 O Department of Public Works e. South Windsor, Connecticut Dear Sir: I request that the Town of South Windsor make the proper repairs to the road at the entrance to the driveway located at 108 Maskel Road. A slumping of the road at that location has caused a dangerous condition for vehicles entering or leaving the driveway as the underside of the vehicles strike the road causing both physical damage to the vehicle and chance of acci- dent due to driver distraction. I further request that I have a written reply by May 31, 1973 as to whether the Town intends to make the requested repairs. Sincerely, Robert M. Brandenburger 3 y. t; i 'own Hall,- 1540 Sullivan Avenue, South Windsor, Connecticut 06074 February 15,_ 1973 Mr. Frank Rossi Ma.skel Construction Company 1209 Route YP5 South Winc?sor, Connecticut 06074 Lear Mr. Rossi: in order that the Totten of South Windsor Engineering Department ---ay p e_forst - preliminary analysis of_3mtjr-proposed subdivision off Abbey Road anal M_st_cel mad, the following information is needed from you: 1) A Soil Conservation Service report from the U.S,D.A. Soil Con se.. ton Service in Warehouse Point, Please contact Art Cross or marl j'_ede - re-rfer at telephone numiber 623-0607 2) Three or four strategically located percolation tests. the critical nature of drainage in this area and ero -ln v p_obl`^C On °_1"-Cy a.a :e will need re-imiaa i f ._..-t-i n _ i-- storm drainage system you will propose for the area. The Engineering Departnen_t has recently made an i-.Tastigation of ✓e 4 erosion conditions of the present subdivision on IrLaskei Load. T.-.r e erosion of alnost all lots on the easterp_ side of '-!---skel Road is e :-dent a' --such silt- is "Orr i i n- at the soutC?erl j' of-the road, _ r _. _. `or -h is subdi.v4 si7T yea='�ieO� t0 O ,t OL z Lr r� p_ans _ of the above. In any new subdivision in this area, the Engineering Department is going to recon—unnd that the cover crop should only be i removed from two lots at a time and be replaced with grass seed as s---= I as possible before any other -ots are st._-op Of their Covar. S^cause ybbey Road is defined as a collector street in the Plan, it t;auld be desireable for it to have a 60/foot right-of-,:ay width. This could be partly accomplished by having your subdivision provzde a � I 30/:coot right-of- ,ray from the center line of the presently-trat-I!ad t tray of Abbey Road. . Very truly yours, !_ - cc: l 7,ucek t �a7o q. -j INVENTORY & EVALUATION of -; Proposed Subdivision, Abby Rd. , So. Windsor For: Soo Windsor Planning & Zoning - -- By: Ar%i ar -Cross, f1 s t r iC t i.°onsei atiokist U.S.iD.A,, Soil Conservation Service In Cooperation With: -' IL�..o-c1 O,D .COU"NT'1' . SOIL & MATTR COMS :RVATION DISTRICT G kal et al qnmmms (cont,d) sous -- - 'ia a r'S and-a7 'ia. v0`l2a'. - Soil uuZ°'V ,Q Naeural Map 1-1 Z;� On A Slight - U.04 33 lztrast 3 cnly [C.-33 - Y'1`y.i'� VOJ ^VY 4r c..d 3O'• 1'eA+fh/4/lR�� i zC _ - _ �� _ "�--..�+,••s.'1..�,�[� "�t � �.��•q ') -+.�. ^.,'t..T �-+..i�a 1 3 --..:s ...5 v o- � w-". .9 .•---��.r..tvs �u a�' �: c r'4 o t-j t!$s7,:.� A,, y c� c•n"f"P�;� Fb_ q ram",^�. ,t:_ w 4.J:.v w .+tww� ve ter - 33- s ♦.i i;ws�ay..�--�'W. �.w� :S a.¢»�..:J C.'+..+L:S ,n (+i�.ea�.... t^.'�+'�3i v�i r\erJw�3�-- _J d3 J L . „ with ga 3 40M to S ccti crm r�} c$icl�e1 Xm cal. tea,... z-n n-n Iltt o S!rc—cmd e- _'.:mso o at any :0 to :�n .�i/4.s�:s ti�'y°'� `s J�.i '�.•J�.'_'4�� es - . - l : /6 7 3 et al ."... ,� :�" '.. s (cam ci) s 34 "-fit uEreslon znd Sc4lLmmt Cc,,-t=ol_Ra n `=% 2ar at d�:+~ca3 t.s'c.�. .s 8..�zt--a Is t�z- L�Li a►imw-l cn - &.4►1 void Sc Ica - ' l ' ! � - •' .. - .._ .. _ _ -- a-� - __ _ YXMORATIDU1,11 18 June, 1974 To: Terry V. Sprenke - Town Manager From: Me n , Jr. Pollution Control Superintendent Subject: Maskel Roa Complaints; Preliminary Report On Per your direction this Department has conducted various investigations on properties located on the east side of Maskel Road. On the morning of 17 June we tried to contact several of the homeowners, and spoke with three (3) of them at some length. At -0g50 we inspected the property of John E. Loker, known as House # 148. There is no apparent system failure here. The run-off to the catch basin ona the R.O.W. appears to be caused by storm water and roof leaders. At 1005 we spoke with Mrs. Robert D. Crawford of House # 132. They are in the process of re-landscaping after an in-ground pool installation.. The landscaper exposed the end of one (1) leaching trench; however, extra backfill has been placed to correct .this, along with contouring in conjunction with grading around the pool. There is an erosion problem because of the new fill around the pool and this is causing some run- off; however, this should be cleared up after new grass has set. At 1020 we spoke with Mrs. Edward W. Reinhardt of House # 160. There is no apparent field failure here; however, the runoff on her property is septic during rainy periods due to a field failure next door. Our.next stop, at 1035, was at House # 174 where we spoke with Mrs. Philip 0. Stoddard. The septic system on this property has definitely failed. In fact, there almost seems_ to be an underground spring welling up at times in the immediate vicinity_ of the distributions box for this field. Most of the trench ends appear to have blown out, as if from pressure. We advised Mrs. Stoddard that she would be hearing from the Director of Health on this matter. Other than the above mentioned failure, none of the houses checked show signs of system collapse. However, everyone to whom we .talked di& remark that their fields have a strong tendency to overflow during the Spring. All expressed the feeling that rising ground water at this time of the year was the major cause of problems 'in the area. The entire hillside behind these homes is honeycombed with springs and climbs quite steeply to the power company R.O.W. The springs are a constant problem - especially in the case of 174 Maskel. At the time of building there was some work done on the installation of a curtains drains to the rear of all these properties, as shown by the red line on the attached drawing. However, there is some doubt that this work was ever completed. I will advise you--of further developments on this matter. Respectfully submitted, ell n�'dwards, Jr.'- uperinitendent Department of Pollution Control cc: E.W. Lucek ' 23-74 • ' MASKEL ROAD SANITARY SURVEY r5T0DDARD, Nilip 0. 'House 174, Lot 10 i i dward W. louse 1601 Lot 9 i KER, okx E. House 148, Lot 8 RAWF'ORD, Robert D. House 132, Lot 7 MOIR, --- - -- Rickard D. -----fte- 71� Aee� A,- AUX 0,4� - - - ------------ - r*e��;e 44*X. .o4A�� we &a2w,104*0 -7� IOV- Aak7 ,o%�.c %oL 20 ro� - o4eo;Asr e jo�ZAZk4 /4"4-,. m� _ __ _.. _..__ 1 ___ _� _ _ ___ _.. _ _ _ _ . _ _ z. ��`� . � • � .�y. / /4 ,,,� . - � ... / (J -- .__ __ r-�"' _ _ _ _ _ _ . __ __ ___ i HERMAN MASKEL VITO COVENSKY FRANCIS ROSSI PRESIDENT & TREASURERS VICE PRESIDENT. CONSTRUCTION CHIEF ENGINEER - VICE PRESIDENT SECRETARY MASKEL CONSTRUCTION COMPANY, INC. P.O. BOX 53 TELEPHONE 1209 JOHN FITCH BLVD. 289-9329 SOUTH WINDSOR, CONN. 06074 5-15-75 Mr. Emil Lucek Town Of So. Windsor So. Windsor, Conn. Dear Mr. Lucek, In response to your letter of May 13 , 1975 regarding paving on Maskel Road, We question whether you have the authority to take such drastic action. We definitely will not honor any bill that was incurred by The Town of So. Windsor. V� y truly yours, t"fierman Maskel ROAD BUILDERS—,STORM i SANITARY SEWERS—WATER MAIN INSTALLATIONS—SITE DEVELOPMENTS EXCAVATORS—EARTH MOVERS--EQUIPMENT RENTALS 4ovi o � .7 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 CO AREA CODE 203/644-2511 SOR• Public Works May 13, 1975 Maskel Construction Company John Fitch Boulevard South Windsor, Connecticut Attention: Mr. Hymie Maskel Dear Mr. Maskel: Re: Maskel Road - Cul-de-sac Paving As stated in my letter of May 1, 1975, the deadline date for the paving of the above-mentioned cul-de-sac is May 15, 1975. Since I have heard nothing from you regarding this matter, I have requested (and received) Proposals from two private paving firms with quotes in the vicinity of $4,000. By virtue of this letter, I am extending, this deadline date to Thursday, May 22, 1975. If you have not completed this work by then, I will engage one of these firms to do the paving, and then bill Maskel Construction Company for the total cost. May I hear from you this week. Very truly y0iar,-�i TOWN TH JIN SOR Em 1 W. Lucek Dir for of Public Works EWL:prb cc: Mr. T. V. Sprenkel C " a T-01 O-P Sou ?V 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �fNeS1R-CO��'� AREA CODE 203/644-2511 Public Works May 1, 1975 Mr. Frank Rossi Maskel Construction Company John Fitch Boulevard South Windsor, Connecticut Dear. Frank: Re: Maskel Road - Cul-de-sac Paving The Town Council is again pressing for a definite date for the completion of the above project; and since I have heard nothing further from you regarding a firm schedule for this work, I have established, and given to Council, the date of May 15, 1975. I am sure that Maskel Construction Co. will meet this deadline date, Frank. If you have. any questions regarding this, please give me a call. Very truly yours, TOWN OF SOUTH WINDSOR Eriil W. Lucek t-77 tor of Public Works EWL:prb Cc: Terry V. Sprenkel MEMORANDUM May 1, 1975 To: Terry V. Sprenkel Re: Various Items 1. Avery Brook Spillway Design Progress I spoke with Griswold and Fuss yesterday and was assured that the design, plans, and specifications would be completed and in my hands by Monday, May 5, in accordance with our deadline. 2. Maskel Road Resurfacing I spoke to Frank Rossi after the Council work session on this item, and again on April 17, and informed him of the Council' s order that the cul-de-sac paving be completed as soon as the plants opened. i Frank advised me that he would speak with Hymie Maskel and call back with a definite date and schedule. To date, I have not heard anything in this regard. I anticipate that Maskel will tend to procrastinate on this project. For that reason, I recommend that rather than request a schedule from Maskel, that I, at this time, establish a deadline date for the completion of the paving. I suggest, and submit to you as a completion date, the date of May 15, 1975. I will so inform Maskel Construction Company by letter. 3. Spring Pond Repairs On Wednesday, April 30, Jim Snow, Karen Fellows, Lou Jeski, Bill Shuteran, and I inspected Spring Pond for spring repairs. I have prepared an itemized list of work to be done, and Jim is preparing a cover letter to you including this list. The only added point I mention here is that, in my opinion, the old Pavilion should be raised and replaced with a simple concrete block structure, to house the bathrooms, and lifeguard and storage area. The repair and maintenance costs due to Memorandum Page 2 May 1, 1975 vandalism have reached a point where the expenditure of these funds towards amortizing the capital costs of a new vandal-proof structure is reasonable and logical. 4. Main Street Sewer Grant The Public Hearing for the Main Street Sewer Grant will be held on Thursday, June 5, 1975, at 10:00 a.m. , at 340 Capitol Avenue. I strongly urge that Town officials attend and speak on behalf of our continued eligibility. In my meeting this morning at DEP, I requested a Letter of Eligibility be sent immediately, rather than wait until after the Public Hearing. The representative I spoke with stated that he would check this with Mr. Hupfer and comply with my request, if possible. i Emil W. Lucek Director of Public Works EWL:p rb MEMORANDUM February 18, 1975 To: Terry V. Sprenkel Re: Status - Maskel Road Completion With regard to the petition received by the Town Council on February 3, 1975 from Maskel Road residents, and with further . regard to your request for a complete report on the background, status, and proposed improvements to Maskel Road, I submit the following. The development of Maskel Road was accomplished in two phases-- the first, a subdivision approved in 1957, including Garnet Lane and the majority of Maskel Road, which was completed, approved, and accepted by the Town on October 19, 1962. The deed representing the acceptance of these streets is on file in the Office of the Town Clerk. The second phase of development involved a 200 '± extension of Maskel Road to the south, as part of a subdivision by Land Development Corporation, approved July 27, 1971. This extension has not, at this time, received final approval or acceptance by the Town. In order to receive final approval, the Developer must apply a final surface course pavement and curbing to this southerly extension. This paving will probably be applied this Spring of 1975--provided that contemplated plans for subdivision development north of Maskel Road does not materialize. The vacant land north of Maskel Road has been submitted preliminarily to Town Departments and agencies for consideration as a subdivision; and specifically is discussed in the attached correspondence, dated February 15, 1973, to Mr. Frank Rossi of Maskel Construction, from Mr. J. E. Page, Planning-Coordinator. The development of this land would require the installation of a substantial drainage system the full length of Maskel Road, southerly, with eventual drainage into the Podunk River. If this' subdivision proposal is pursued, it would be desirable to postpone the final paving of the southerly extension of Maskel Road until the completion of this additional construction work. Memorandum Page 2 Re; Maskel Road February 18, 1975 z Recent discussions with Frank Rossi appear to indicate that plans for this additional development are no longer active; and if this is the case, Land Development Corporation will be directed to apply this pavement surface this coming Spring. In response to your question regarding the bonding for this subdivision, an investigation of pertinent correspondence, and Planning and Zoning Minutes, indicate that a Bond was not required prior to, or after, subdivision approval (see attached Letter of Approval, dated 7/30/71) . Apparently, the reason a Bond was not felt to be required was because the road construction and improvements involved in the subdivision had already been built at the Developer's expense. Subdivision approval required the addition of a temporary cul-de-sac which was not bonded. It is pertinent to note that on October 17, 1972, 89 acres of presently vacant land surrounding the Maskel Road area was approved for a Zone Change- to A-30 zoning, subsequent to the - submission of a preliminary subdivision proposal for this land. Further, several preliminary requests have been made to the Sewer Commission for extension of sanitary sewers into this area. For these reasons, it is likely that some development will take place in this neighborhood in the future. Based upon these facts, and with the understanding that there may be additional construction work on Maskel Road in the future, it is recommended that the Developer be directed to complete the paving and curbing work as requested in the subject petition; and that the Town officially accept this portion of roadway. It is further recommended that the Town install the street lights, as requested. Acceptance of the roadway will not prejudice our position in the future, since the additional development will still require the installation of the improved drainage system on Maskel Road by the Developer. In response to your request for a cost estimate to make immediate repairs through the expenditure of Town funds, to the entire length of Maskel Road, it is estimated that the installation of an underdrainage system would require an expenditure of approximately $7, 500. An improved pavement overlay would be provided through our Town Aid paving program, after this installation. This 1 Memorandum Page 3 Re: Maskel Road February 18, 1975 underdrainage system would provide for direct connection of the numerous cellar drain pipes now noted to be exposed in the front yards of homes on this street. However, please note that this underdrainage system need not be installed if a new Maskel - Road drainage system is installed by future developers in this area. In response to your request for information with regard to septic system failures, please refer to the attached report of June 18, 1974, by Mel Edwards; which involved the investiga- tion of four homes, and noted one apparent septic system failure. This failure was referred to the Director of Health for resolution, and I direct you to that office for further - information in this regard. ('111 W. Lucek EWL:prb cc: J. E. Page Wm. Grace Donald McLaughlin Attmts. Town Hall, 1540 Sullivan Avenue, South Windsor, Connecticut 06074 Public Works Department May 10, 1973 Atty. William Grace, Chairman Town Planning and Zoning- Commission 1734 Ellington Road - South Windsor, Connecticut 06074 Dear Bill: _ Re: Abby Road-Ma.skel Road Subdivision I-have taken certain actions with regard to eliminating. the problems attendant to this subdivision. However, there are _ certain additional actions which I would request be taken by - the Planning and Zoning Commission. The actions which have .taken have been to direct Jaan Laine, the builder of the 'homes, to accomplish the following immediately: 1. To pipe all footing drains either into permanent dry-wells or storm sewers. - 2 . To repair broken curbing. 3.- To stabilize yard erosion. 4. To remove from the street all erosion debris. - I gave Mr. Laine a deadline of May 1 for this work. He has not met this deadline, but has pleaded weather conditions as the reason I have, therefore, given him a grace period to start to substantially complete this work during the week of May 14, with the stern warning that if this is not done, the Town will immediately move in its own contractor$ do the work, and turn the bill over to our Town Attorney for collection from Mr. Laine, In its letter of July 30, 1971 to Mr. Herman Maskel, giving approval to this subdivision, the Commission made no mention of storm sewer or underdrain installations. In my opinion at this time, this was an oversight and an error on both the part of the Engineering Department and the Planning and Zoning Commission. Hopefully, this oversight has been noticed in time, and I feel that the Commission has full � Atty, Wm, Grace Page -2 May 10, 1973 authority to direct the subdivider, Herman Maskee, to provide additional storm sewer systems on Maskel Road--the need for which has developed as a result of the development of his abutting property. I would ask that the Commissions therefore, direct Mr. Maskel to install the following storm sewer facilities : 1. An additional underdrain, extending from- the northern most catch basin on Maskel Road, 300 feet (more' or less) northerly, to the vicinity of the existing cul-de-sac. 2, That a storm sewer system be installed along -the northern curb line of the road stub constructed between Lots #7 and #8, ending in a catch basin in the vicinity of the_ rear _ property lines of said lots . _ 3, A storm sewer system be -constructed, commencing at the intersection of Garnet Lane and Maskel Road, and proceeding south in Maskel Road to the cul-de-sac, constructed as part of this subdivision, and emptying into the Podunk River. 4. A one-inch (1") surface course still must be applied. T_ Please feel free to contact me if you have any questions concerning this matter. Very truly yours. TOWN OF SOUTH WINDSOR ErA it W. L ek Di actor of Public Works EWL:prb z ;,,;,`, ;` ate'.: -- •*"_•5 ,. ._�. r-rd. .i's.� .F.,.Yzro^-r-9% i-+K .,- .'4,�.. - - _: .a _r `.''- a ..etc ' 4444 WA- e o - o Town Hall, I540 Sullivan Avenue, South Windsor, Connecticut 06074 . Public Works April 24, 1973 REGISTERED LETTER - Mr. Jaan Lame 44 Henry Street Manchester, Connecticut - Dear Mr, Lalae : , a I-am in receipt of a letter from the law firm of Marte, Shea & Keith, dated April- 16, 1973, with regard to your construction on Maskel--Road. In this letter, your attorney advises me that you accept responsibility for only Item 4 the installa- tion of footing drain pipes to underground storm sewers, and that you suggest that the remaining work be taken care of by others, As I stated in my previous letter to you, the Town will hold you fully- liable for all the items needing repair, The damages are the result of the construction by you and by no one else, and the permits for such construction are issued to you alone. I must therefore repeat my earlier request that you accomplish the necessary work prior to May 1, 1973, or the Town shall be forced to seek- repairs by other means. Very truly yours, TOWN OF SOUTH WI SOR 1 � i1 W. Lucek Director of Public Works 1 • - EWL:prb cc : ^ T. V, Sprenkel Atty. Dennis William Grace MARTE, SHEA & KEITH ATTORNEYS AT LAW PAUL R.MARTE 575 MAIN STREET JOHN F. SHEA,JR. MANCHESTER,CONNECTICUT 06040 W.DAVID KEITH TELEPHONE 649-2865 SCOTT B.CLENDANIEL AREA CODE 203 April 16, 1973 Town of South Windsor Town Hall 1540 Sullivan Avenue South Windsor, Connecticut 06074 Attn: Emil W. Lucek Director of Public Works Re: Maskel Road Gentlemen: I am in receipt of your letter of April 6, 1973 to Jaan Laine with the five items which you have indicated that you wanted taken care of by May 1, 1973. Mr. Laine has informed me that as to the items involved, the only one which he feels he will be required to assume any responsibility for would be item 4, as it pertains to the installation of pipes to connect existing exposed footing drains to underground storm sewer facilities. The balance of the items are evidently being taken care of by either Mr. Morton `Schimelman or Maskel Construction. My understanding also is that you have taken steps to contact these individuals for the repair on the other items. Very truly yours, MARTE, SHEA & KEITH Paul R. Marte PRM:jw I Town Hall, 1540 Sullivan Avenue, South Windsor, Connecticut 06074 Public Works Department April 6, 1973 REGISTERED MAIL Mr, Jaan Lane 44 ,Henry Street Manchester, Connecticut Dear Mr. Lane : Please be_ advised that the Town of South Windsor intends to , hold you and your company fully liable for the damages and the necessary repair of damages on Maskel Road. I am directing you to take steps immediately to repair the following items: :, 1. Repair of curbing along the east side of Maskel Road, where erosion has caused wash-out and shifting of said curbing. 2. The removal of debris, rocks, and dirt which has accumulated on Maskel Road as a result of erosion. 3. The repair of the pavement gutters on Maskel Road, which 2 have been damaged as a result of this same erosion. X 4. The installation of pipes to connect existing exposed ,.�' footing drains to underground storm sewer facilities . 5. The regrading of properties or the installation of under- ground piping to alleviate the severe ground water conditions which exist on properties affected by your construction. It is the intent of the Town to pursue the repair of these conditions diligently. If positive action is not taken on your part by May 1, 1973, the Town shall undertake these repairs and seek financial reimbursement from you through legal means. Thank you for your anticipated prompt and coo a ative attention to this matter. Very u Y Y s, cc: T. V. Sprenkel Atty. Dennis F it W. Lucek William Grace Director of Public Works