HomeMy WebLinkAboutLong Hill Road (6) 3I�A-1 J O?��
JOHN F.SCULLY COONEY, SCULLY AND DOWLING DAVID A.HAUGHT
PATRICK J.FLAHERTY JOSEPH A.LA BELLA
VINCENT J.DOWLING- ATTORNEYS AT LAW JAMES T.SCULLY
LOUIS B.BLUMENFELD WILLIAM J.SCULLY
JOHN W.SITARZ HARTFORD SQUARE NORTH LORINDA S.COON3
EUGENE A.COONEY ELIZABETH FAIRBANKS FLYNN
JOHN T.SCULLY TEN COLUMBUS BOULEVARD ROBERT G.CLEMENTE
R ICHARD A.FERRIS RODD J.MANTELL
KAREN JANSEN CASEY HARTFORD, CONNECTICUT 06106-1944 ARTHUR J.HUDON
JEFFREY C.PINGPANK MATTHEW J.SCOTT
PAUL T.NOWOSADKO 1860) 527-1141 RICHARD L.ALLEYNE
HERBERT J.SHEPARDSON
'ALSO ADMITTED IN MASSACHUSETTS
FACSIMILE(860)247-5215 2ALSO ADMITTED IN FLORIDA
JOSEPH P.COONEY(1929-1984) 3ALSO ADMITTED IN NEW YORK
HENRY F.COONEY(1951-1991)
March 4, 1997
Town of South Windsor
Department of Public Works
1540 Sullivan Avenue
South Windsor, Connecticut 06074
Attention: Custodian of Records
Re: September 29, 1995 Oil Spill
220 Long Hill Road, South Windsor, Ct.
Dear Custodian of Records:
Would you please forward this office copies of all records and reports contained in your files
regarding a September 29, 1995 oil spill which occurred on property owned by Tadeusz and Barbara
Korzep at 220 Long Hill Road, South Windsor, Connecticut. Please be assured that this office will
guaranty payment of your department's charges for copying your records.
If you have any questions concerning this request, please do not hesitate to contact me. Thank
you for your anticipated cooperation.
Sincerely yours,
John Thomas Scully
JTS:mis
� a �
- b MAR 6 1997 0
� PUBI� N'v
DEPT.
` �SO.NN 9F,4
.�
C w F 7-au / V O-P So�
?d&U&Ot
w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
'Insoe,co AREA CODE 203/644-2511
JEAN E. ZURBRIGEN
Town Manager November 2, 1989
Mr. Stanley Greenberg
116 Edgewood Drive_
South Windsor, Connecticut
Dear Mr. Greenberg:
Thank you for your letter regarding what you perceive to be
a dangerous curb installation at the intersection of
Route 30 and Long Hill Road. I am referring these concerns
to Police Chief Gary Tyler (whose defined responsibility is
for traffic planning and safety) , as well as to Public Works
Director Michael Gantick.
By copy of this letter I am requesting that Chief Tyler
and/or Mr. Gantick contact you regarding this matter; and,
unless I hear from you to the contrary, will assume your
concerns are being addressed.
Very truly yours,
12
wn Manager
c: Police Chief Gary Tyler
Dr. of Public Works Michael Gantick
116 Edgewood Drive
\' TC:1' 8� "��
� South Windsor, CT 06074
' October 18, 1989
To: South Windsor Town'Manager-;"� ` '/
Dear Ms Zurbrigen,
I am writing to call your attention to a dangerous curb that was
recently installed at the intersection of Route 30 (Ellington
Road) and Long Hill Road. The placement of this curb is likely
to cause some automobile accidents, as I will explain. Please
refer to the enclosed diagram.
The top half (labeled "Before") shows the intersection before the
recent road construction. There was no curb, and Long Hill Road
faired smoothly into Route 30.
The bottom half (labeled "Now") shows the intersection as it is
now. The problem is not that curbs have been installed; it is
with the PLACEMENT of the left-hand curb, shown in red. Imagine
that car B starts to make a left turn just before car A reaches
its stopping point. Car B will normally follow the path I've
shown, and that path takes it through the position occupied by
car A as it approaches the stop sign.
In most cases, car B will see car A and will swerve to the right
to clear car A, and then sharply to the left to pass between car
A and the right-hand curb. But in some cases (especially at
night, in inclement weather, and when there is oncoming traffic) ,
the car B driver will NOT make this maneuver because he will not
see that the situation requires it. Meanwhile, the car A driver
normally looks to his left to check the oncoming traffic (car C)
and determine when he can proceed out onto Route 30. So he will
often fail to notice car B, who may be cutting through the spot
he (car A) will occupy as he bends to his left and stops at the
stop sign.
Clearly, the "red" curb should have been placed along the dashed
line that shows where the edge of the road was BEFORE. I'm
astonished that anyone would show such poor judgment as to
position it where they did.
Please take whatever actions are necessary to move or remove this
curb before accidents begin to happen.
Sincerely yours,
Stanley Greenber
Ar
jv
zilk
O
B
Af
30 _f �
,Berrore �p�
Now
c�
co 00 OncovnM
.,1
A � r�+
Tra'��r i G
8
30
R ��
�7�
116 Edgewood Drive
South Windsor, CT 06074
October 18, 1989
To: South Windsor Town 'Mapa'tler--
Dear Ms Zurbrigen,
I am writing to call your attention to a dangerous curb that was
recently installed at the intersection of Route 30 (Ellington
Road) and Long Hill Road. The placement of this curb is likely
to cause . some automobile accidents, as I will explain. Please
refer to the enclosed diagram.
The top half (labeled "Before") shows the intersection before the
recent road construction. There was no curb, and Long Hill Road
faired smoothly into Route 30.
The bottom half (labeled "Now") shows the intersection as it is
now. The problem is not that curbs have been installed; it is
with the PLACEMENT of the left-hand curb, shown in red. Imagine
that car B starts to make a left turn just before car A reaches
its stopping point. Car B will normally follow the path I've
shown, and that path takes it through the position occupied by
car A as it approaches the stop sign.
In most cases, car B will see car A and will swerve to the right
to clear car A, and then sharply to the left to pass between car
A and the right-hand curb. But in some cases (especially at
night, in inclement weather, and when there is oncoming traffic) ,
the car B driver will NOT make this maneuver because he will not
see that the situation requires it. - Meanwhile, the car A driver
normally looks to his left to check the oncoming traffic (car C)
and determine when he can proceed out onto Route 30. So he will
often fail to notice car B, who may be cutting through the spot
he (car A) will occupy as he bends to his left and stops at the
stop sign.
Clearly, the "red" curb should have been placed along the dashed
line that shows where the edge of the road was BEFORE. I'm
astonished that anyone would show such poor judgment as to
position it where they did.
Please take whatever actions are necessary to move or remove this
curb before accidents begin to happen.
Sincerely yours,
Stanley Greenberg
/nIAO
3 n —�
ilk
�oUT�
NSWBe-�oye
.
c��� A On co vnihay
J�
8
Ro JT� 30 �
� ,/ 4 4
FUSS&aNEILL
consulting engineers
March 2, 1988
Mr. Michael Gantick
Director of Public Works
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074 .
RE: Sanitary Sewer 7 Long Hill Road f
Dear Mr. Gantick:
You recently requested a proposal to design a sanitary sewer in
Long Hill Road just north of Chapel Road. This work would be
included in the plans for the Chapel Road Reconstruction as a
non-participating item.
The work would consist of designing 600+ feet of sewer connected
into the existing sanitary line on Chapel Road west of Long Hill
Road. The line would contain three manholes and be placed
vertically so as to permit a gravity outlet from existing
development. The work would also include the design of services
to the street lines. No additional survey work or contact with
property owners is required.
We estimate our costs to design the facility, prepare details
specifications and required estimates to be $2,000. We suggest
a lump sum method of payment.
Please inform me of your conclusions. We are prepared to
incorporate this work in the contract upon your direction to
proceed.
Very truly yours,
William D. O'Neill, P.E. r
President �
/pj g
�o MA R 4 1988
83-38 ,,*
0302AHWY.4 +�
210 MAIN STREET / MANCHESTER, CONN. 06040 / TELEPHONE (203)646-2469
SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING
HIGHWAYS and BRIDGES 9 SURVEYING 9 LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC•PUBLIC WORKS MANAGEMENT•HYDROGEOLOGY