HomeMy WebLinkAboutLisa Drive (2) r
The Baseels, 141 Lisa Drive
South Windsor, CT 06074
March 10, 1998
Matthew Galligan
Town Manager
South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Subject: Sinkage/Erosion on Lisa Drive
Dear Mr. Galligan:
This letter is to reinstate our position previously on file with former Town Manager, Jean
Zurbriggen and Town Engineer, Jerry Iazetta.
As homeowners abutting the troublesome town property, we will not be held responsible for any
damage, claims or liability for the continued sinkage that has occurred in the area of 141-148 Lisa
Drive. This sinkage has been ongoing for ten years and has shifted sidewalks, damaged lawns and
caused huge sinkholes in the street.
The most recent sinkage was spotted on March 10, 1998, by a neighborhood boy who by accident
almost fell into the hole.
Attached for your records is our previous correspondence from our files.
Sincerely,
Gerald A. Baseel �►
Jean M. Baseel
(860) 644-3035 MAR 18 1998 q►��
w
SOUTHWWSM
6
November 11, 1991
Ms. Jean E. Zurbrigen
Town Manager
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Ms. Zurbrigen:
My wife, Jean Marie Baseel and I, Gerald A. Baseel, are property
owners of lot 65, subdivision of Mountainview Estates, located
at 141 Lisa Drive, in South Windsor, Connecticut. I am writing
this letter to notify you and to state for the record, the
continuing occurrence of land sinkage and damage resulting to the
sidewalks and street abutting our property.
Town records should disclose that we purchased the newly
constructed residence and land parcel in October of 1987. Since
that time, JMJ Construction Company, builders of our residence
and general contractor for the construction of the sidewalks and
street, have under the watchful eye of the Town's Engineering
Office, made major repairs to both the sidewalks and streets
abutting our land, seven (7) times in the last four (4) years.
The most recent repairs after notifying the Town Engineer occurred
on October 14 and 15, 1991.
The necessary repairs were a result of large "sinkholes", some
as deep as 4-6 feet. In addition, JMJ has on several occasions,
brought in additional "fill" to reoccurring sinkholes appearing
in the apron located between the street and the sidewalk.
Mr. "Bo" Davies of the Town's Engineering office has informed
us that JMJ Construction Company, no longer has maintenance
responsibility for repair. Upon inspection of the area by Mr.
Davies as recently as November 5, 1991, we are alarmed and
concerned that the Town accepted the conveyance of this road
and sidewalk in its defective condition from the builder. A
final inspection would have disclosed major faults that
continue to exist in this isolated area.
Mr. Jean Marc Jacques of JMJ Construction Company told us that
the problems are a result of "blasting" that was necessary to
install the storm and sewer drains. Mr. Davies informed us
verbally that after the blasting was done, JMJ should have
installed "netting" to prevent soil seepage and movement.
According to Mr. Davies, this was never done.
It is evident, by further inspection of the property, that it
is a matter of time before further sinkage will result in more
damage to the sidewalks and street. Even Mr. Jacques admitted
that this problem would probably continue to surface.
Mr. Davies' informed us that the town has assumed responsibility
from the builder and we, as abutting landowners, will be
responsible for the future repair or replacement of the
sidewalks, according to the Town Ordinances under Article IV,
sections 159-18 and 159-19.
Without admitting any liability under those ordinances, nor
their enforceability in general, we find that their enforcement
in this instance would be grossly unfair, unwarranted and _
discriminatory. We will assume no responsibility for repair
or liability claims resulting from the continued "sinkage and
settling" of this area.
As a result of what appears to be construction negligence and a
lack of a proper final inspection, the Town. and/or JMJ should
eliminate its patchwork approach and properly reconstruct the
street and sidewalks with appropriate netting and fill. This
should alleviate the dangers that exist to all families and
owners of property in this area of Lisa Drive.
In the meantime, we want some assurance and acknowledgement
from the Town, that the repairs that have been made to date,
are appropriate and acceptable to the Town and have completely
eliminated the underlying cause of the continued sinkage and
settling to the sidewalk and apron.. From Mr. Davies statements,
concerning the failure to require the appropriate netting to
be installed after the blasting in this area, this problem
could have and should have been avoided or eliminated by the
Town before it accepted the sidewalk. My wife and I cannot
and will not be liable for the results of that failure.
Please acknowledge in writing that the Town accepts all
responsibility and liability for any and all repairs, and/or
replacement necessitated by the sinkage and settling of this
sidewalk today and in the future, as well as the liability
for any and all damages or inquiries resulting from such
defects.
Very truly Yours
Gerald A. Baseel
141 Lisa Drive
South Windsor, CT 06074
t �O.p N SPq
O
-Cm� O-P S,91� ?dt;f
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�►�soe•co� AREA CODE 203/644-2511
JEAN E. ZURBRIGEN
Town Manager February 11, 1992
Mr. & Mrs. Gera 7d A. Basee l
747 Lisa Drive
South Windsor, CT 06074
Dear Mr. & Mrs. Baseel:
We received your letter concerning the sidewalk problem in front of your
house at 747 Lisa Drive. It is understandable that you are concerned about
the reoccurrence of the "sinking" problem, and the repair of it becoming
your responsibility.
Presently, JMJ Cons truct ion Co. is responsible for making any
repa i r/correct ions necessary through October 31, 7992. At tha t t ime,
norma 7 ly, the respons ib i 7 i ty for the maintenance of the s idelva lk wou 7d
revert to the property-owner, as per Town Ordinance # 775.
In response to your letter, on November 21, 1991, Mr. Davies inspected the
area in front of your house and noticed further settlement. JMJ
Construction was contacted; and, on December 2, 7997, an exploratory
excavation was undertaken with representatives of the Town of South Windsor
Engineering Department present. The results were inconclusive in
determining the cause of the settlement.
With the proper backfilling and compaction of this area, it is anticipated
that this settlement problem has been reso 7 ved. However, we w i 7 7 be
monitoring the situation at 747 Lisa Drive; and, if necessary, wi 7 7 have
JMJ Construction make any needed repairs.
We hope that this 011 ease your fears concerning liabilities in this
ma t ter.
Very tru ly yours,
�Townftn'qoelr
JEZ/js v
cc: Michael J. Gantick, Director of Public Works
Jerry C. Iazzetta, Town Engineer
e
September 11, 1992
Mr. Jerry Iazzetta
Town Engineer
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Jerry,
I am the abutting landowner to the property located at 141 Lisa
Drive, lot 65 subdivision of JMJ's Mountainview Estates.
As you are aware, over the past 4 1/2 years, the property in this
area has experienced major patches of repair, resulting from
continued land sinkage. Since May of this year, I have been confronted
with barracades, cones and dirt piles surrounding new faulty areas
still yet to be repaired. The latest location blocks 1/2 of my driveway.
In correspondence between the Town and JMJ, the Town has requested
JMJ to derive an acceptable plan to alleviate the causes of the
sinkage. My understanding is that this report/plan was due on August
30th.
I did not buy a new home to be confronted with patchwork to my
driveway, entrance and yard. For the record, I will accept nothing
less than a complete restoring/repaving of my driveway and entrance
to its original condition at the time of occupancy with the submitted
plans to alleviate the sinkage condition.
Jerry, I appreciate your consideration to this unfortunate situation.
I am confident that the town will work with JMJ to ensure proper
reconstruction of this area.
Sincerely71
Gerald A. Baseel
141 Lisa Drive
cc: K. McCann, Attorney
J. Zurbrigen, Town Manager
March 28, 1992
Mr. Jean Marc Jacques
JMJ` Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr . Jacques:
i C+rrespOr,detice received �' Offl Jean n 7Urbrigen5 oath evil%d sor Trswn
Manager, dated February 11 , 19'92, has indicated that JMI7
ConSt►--uction Company is responsible for making necessary repair-=
and corrections to the sidewa]ks and apron abutting bur property:
located at 141 Lisa Drive.
Inspection of the area as recently as March 285 1992 indicates fUT-thee
settling with several =-I nk holes in the apron.
Over the past four years, temporary repairs have been made by
putting in fill of clay, gravel and stone without proper excavation.
This has resulted in an unsafe, unattractive apron littered with
patches of repair.
A temporary warning barier now stands by a section of sidewalk::
that has sunk and will have to be replaced. This will result
in more patchwork to an area already unsightly.
At this point, without the complete reeucavation of the "entire"
apron, properly tampered, filled with soil and sodded, this
property remains a hazard and a liability.
We expect JMJ Construction Company to reexcavate the entire apron
to its original appearance and condition, including replacing the
sections of sidewalk that have not yet been replaced.
As abutting landowners, we will assume no responsibility for
repair or liability claims that have resulted from this area.
Furthermore, if necessary, we will pursue legal action for
any damages, injury or harm that results from the property being
left in its current condition.
Very Truly Yours,
Gerald A. Haseel Jean M. Haseel
141' Lisa 'Driwe ``
South Windsor
cc: Jean M. Zurbrigen
November 10, 1092
M.S. Marcia Banach
Town Planner
Town of South Windsor
South Windsor, CT. 06074
Dear Marcia,
After six months of barecades, construction vehicles and
limited access to our property, the town and JMJ Construction
Company have completed the "temporary" repair work located at
141 Lisa Drive.
As evidenced by the Town Engineering Office, major voids
and improperly sealed sewer lines were uncovered in the small
section of repair area. Water was flushed into the dug areas
at one time for four hours with no clue as to where it was
going. Further street sinkage around Jessica and Lisa Drives
may only be the beginning of major repair work that will have
to be done.
Again, as abutting landowners, we clearly state for the
record that we will not be held liable or responsible for any
further sinkage resulting from the original construction
negligence.
On the positive side, Bo Davies of the Town Engineer' s
Office was instrumental in overseeing the repair effort. He
kept us the homeowners, fully informed and showed a real caring
concern which helped ease the inconvenience. For his support
and knowledge we are deeply grateful. Mr. Davies is a credit
to the Town Engineers Office and the people of South Windsor.
Sincerely,
Geral Baseel
141 Lisa Drive
c.c: K. McCann, Attorney
Jerry Iazzetta, Town Engineer
Jean Zurbrigen, Town Manager
Bo Davies, Deputy Town Engineer
Sew M 8 fq< 'Y
Tian ayesa� ?1)
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
~osoR-CO AREA CODE 203/644-2511
August 7, 1992
Mr. Jean Marc Jacques, President
JMJ Construction Company, Inc.
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
.RE: Lisa Drive Settlement
As I expressed in our conversation on Tuesday, August 4, 1992, it
is urgent that you have your geological consultant develop a formal
plan of action to resolve the settlement problems on Lisa Drive.
Such a proposal shall be submitted to the Town for review and
approval prior to any further excavation in this area.
I also indicated that all of this work, including restoration,
should be completed by October 15, 1992 . With that in mind, we are
requesting that a proposal be submitted by August 31, 1992 .
The proposal should include the scope of the project; anticipated
limits; restoration of the disturbed area; maintenance and
protection of traffic, utilities, and the abutters; easements (if
required) ; anticipated schedule and any other items that your
consultant feels should be addressed.
If you or your consultant have any questions, please call me at
644-2511, Ext. 240.
Very truly yours,
/J U
A. - Bowen Davies
Deputy Town Engineer
ABD/jsv
cc: Michael J. Gantick, Director of Public Works
Jerry C. Iazzetta, Town Engineer
Melvin C. Stead, Supt. of Street Services
a �6
r qOW N SF4 -
C x f Town o-PSVtd V ?V G �
s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
oR.co 203 CODE 644-2511
r�dse AREA �
April 22, 1994
Mr. Jean Marc Jacques +
JMJ Construction Co. Inc .
658 Ellington Road APR 2 2 1994
South Windsor, CT 06074 90MWWWR
or PUBLIC W°RxF
Dear Mr. Jacques: °EK A-
RE: LISA DRIVE
On April 20, 1994 a meeting was held outside of 141 Lisa Drive
concerning the proposed repairs in Lisa Drive. In attendance
were: Mr. Michael Gantick, Director of Public Works; Mr. Jerry
Iazzetta, Town Engineer; Mr. Melvin Stead, Supt. of Streets; Mr.
Ron Asselin, Service Specialist; Mr. Jean Marc Jacques and Mr.
John Jacques .
It was agreed that the repair would start in the areas marked out ,
with white paint (see attached sketch) -and would include the
sanitary laterals to #140 and #141 Lisa Drive as a minimum. If,
in the course of the pencil vibrator compaction, adjacent areas
start showing areas of settlement, those areas shall be opened up
and compacted until stabilized.
The procedure to be followed is as indicated in Dr. Clarence
Welti's letter of November 5, 1993 . These are as follows:
1 . Excavate to 3 feet below existing grade to expose sandy
fills . Do not excavate more than 1,000 s . f. or the
amount that can be stabilized in one day. The first
day the area should be limited to 500 s. f.
2 . Provide sufficient water (from hydrant) to maintain
light flooding. Penetrate with concrete pencil
vibrator to 7 to 8 feet below grade. Move up and down
for about 10 seconds . Pull up vibrator. Repenetrate
until resistance to further penetration occurs .
3 . Vibratory penetration to be accomplished at 18" centers
over the entire exposed area.
4 . When the above process is completed, the entire area
shall be surficially compacted to 95% of modified -
optimum density.
Mr. Jean- Marc Jacques
April 22, 1994
Re: Lisa Drive
Page 2 .
5 . Place sand layers to underside of processed stone in
12 " layers, compacting to 95+% of modified optimum
density.
6 . Place processed stone to underside of Bituminous
Concrete.
7 . Place Bituminous Concrete.
Dr. Welti is to be on site to give initial instructions to assure
that the work is following proper procedures .
Also, you .will compact the area around the sanitary sewer
laterals for house #140 and #141, regrade lawn area, place
topsoil, seed, mulch.
As per your suggestion, you will also overlay the entire area
from the first patch to the last patch.
If you have any questions, please call me at 644-2511, Ext. 245 .
Very truly ours,
jJ rry C. Iazzetta, P.E.
own Engineer
MJG/jsv
cc: Michael J. Gantick, Director of Public Works
Melvin C. Stead, Supt. of Street
Ron Asselin, Service Specialist
A. Bowen Davies, Deputy Town Engineer
Lester A. Braddock, Engineering Assistant
f -
r
Lai
155
s g \
�lkl/ 3 141 41.
GA ,o w 1.1� � o
e �
N
F Yp M-
2S � 0'pM.N.
0
0
L6GENp
® AREA of
�NCE21y
CATcµ T3A51iJ
O MANNoLE
F'SS&O•^aL MANCNEiTER• CONNECTICUT
Gr'SZou"]> --F'EN ET(2 ATILIG
• FIELD •SkETc1-} o►.1L�( RA•pA•R SuRVE�(
S-M:S CoNs-rRuc�-io,�
L15A -DP- W iN 5o L'1'
tROJ.MO.q�?SI�70ATE:�T�wdlQc�a�r•� r. •�-.- .-•
�l pN SE,.4 To� 01 siga&
<�
U
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
wc,
R•co� AREA CODE 203/644-2511
November 29 , 1993
Mr. Jean Marc Jacques
JMJ Construction Co . Inc .
658 Ellington Road
South Windsor, CT 06074
Re: Lisa Drive
Dear Mr. Jacques :
We have reviewed Ms . Jean Huppe' s November 23, 1993 letter
concerning the repairs to the roadway in the vicinity of 141 Lisa
Drive. As it is late in the year, we feel that the proposed
repairs could be accomplished in early spring of 1994 . However,
you may be asked to make temporary repairs to keep this roadway
usable during the winter, as problems occur.
If you have any questions , please call me at 644-2511, Ext.. 245 .
Very truly yours ,
rry I ta, P. E.
wn ngindeV
JCl/jsv
cc: Michael J. Gantick, Director of Public Works g � �
Melvin Stead, Jr. , Supt. of Street Services
A. Bowen Davies , Deputy Town Engineer
Lester A. Braddock, Sr. Engineering Inspector RECaVED
w NOV 3 0 1993
SOOT MIXOR `
d PUBLIC WORC, y
DEFT. <
a
Tiawn O-P S-10� ?&"�Ot
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
R C /
AREA CODE 203 644-2511
September 20, 1993
Mr. Jean Marc Jacques
JMJ Construction Company, Inc.
658 Ellington Road
South Windsor, CT 06074
Re: Lisa Drive Settlement
Dear Mr. Jacques:
We have reviewed the report prepared by Dr. Clarence Welti dated
September 7, 1993 concerning the settlement in the vicinity of
141 Lisa Drive. Corrective measures indicated in this report
should be undertaken immediately so that permanent pavement can
be placed before the winter.
Your engineer should outline in detail the course of action to be
taken and it should be implemented with representatives of your
engineer and the Town present. Please advise. as to your schedule
for these corrective measures.
If you have any questions, please call me at 644-2511, Ext. 245 .
Ve truly yours,
Je azze t P.E.
TO g' eer
JCl/jsv
cc: ✓ Michael J. Gantick, Director of Public Works '/
Marcia A. Banach, Director of Planning
Melvin C. Stead, Supt. of Street Services q►
A. Bowen Davies, Deputy Town Engineer ®►
Lester A. Braddock, Sr. Engr. Inspector 1'
S E P 2 0 1993
r KnO v
r . r.
y
M
a.
A
DR. CLARENCE WELTI, P.E., P.C.
GEOTECHNICAL ENGINEERING
227 Williams Street• P.O. Box 397 _
Glastonbury, CT 06033 O ti
(203) 633-4623/FAX(203)657-2514
s RECEIVED
8 SFP 1 4 1993 ► 2
Town of south Windsor
September 7, 1993 th EnUieeering ,
P
Mr. Jean Marc Jacques Cn
JMJ Construction Co.
658 Ellington Road
South Windsor, CT 06074
Re: Lisa Drive - Vicinity of Lot 141
Dear Mr. Jacques:
Regarding the above, herewith are results . of borings made
at the above site. The borings were located by
representatives of the town and are believed to generally
cover the areas of concern, as regards the erratic
settlements occurring under and in proximity to the
sanitary. sewer under Lisa Drive.
The borings vary somewhat, . but there are zones of very
loose Fine Sand and Silt, notably at Holes 3 and 4 . Such
looseness is probably not the result of lack of
compaction, but rather the possible migration of some fine
soils into the rock fractures . The area of such migration
is difficult to clearly define, but sample blow counts
in the range of 2 to 4 per 6" are clearly not possible
within 3 feet of grade without some loss of material below
that level . Low blow counts at depths below 6 feet are
possibly attributable to lack of compaction.
The process of soil migration usually occurs as a result
of ground water movement. Heavy rainfall infiltration on
the grassed areas contiguous to the trench would cause
such migration. Normally the backfill within a rock cut
should be either a coarse gravel or crushed stone ( 1/2" to
3/411 ) , which would preclude migration.
Considering the existing condition, the .probable remedy
would be localized use of water, combined with concrete
pencil vibrators . This process would provide a localized
force to accelerate the movement of fines into the voids
without causing excessive effects on the roadway outside
the trench area. This process would only be carried out
after an initial excavation of about 3 feet to minimize
effects on other utilities .
y _
Page 2
As regards the possibilties of more extensive areas of
similar conditions, the condition would be generally
limited to areas, where the rock was blasted. Furthermore,
if the soils are medium compact to at least 6 feet after 5
years of being in place, it is not probable that future
settlement will occur. This is not to exclude settlements
in areas outside the area studied, but rather to define
the probability of such occurrences .
If you have any questions please call me.
Very truly yours,
Clarence Welti, PhD, P.E.
President, Dr. Clarence Welti, P.E. ,P.C.
CW:nl
Encs .
CLIENT PROJECT NAME
•. CLARENCE WELTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.O. BOX 397
GLASTCNBURY. CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES 1 1.,2., 3..4., (Select one or more) HOLE NO. B-1 Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.75e
2. DRIVEN CASING. Diameter GROUND WATER OBSERVATIONS START
8/31/93
3. DRILLED CASING, Diameter DATE
AT NONE FT.AFTER�HOURS
4. ROCK CORING. Diameter g type FINISH 8/31/93
AT FT.AFTER HOURS DATE
E SAMPLE STRATUM DESCRIPTION REMARKS
T NO. BLOWS/6" DEPTH A + DEPTH
H
1 14-22-23-25 0.5'-2.5' ** 0.6'
2 21-12-22-14 2.5'-4.5' *** 1.0'
3 7-8-.3-3 4.5'-6.5'
5
4 7-5-7-7 6.5'-8.5' BR.FINE-MED.SAND,SOME SILT,
LITTLE FINE-MED.GRAVEL - FILL
8.5'
10
BOTTOM OF BORING 8.5'
**ASPHALT
15 ***TRAPROCK
20
25
30
35
40
LEGEND: Col. A CHR I ST I ANA
1401b Wt. x 30" fall on 2" O.D. Sampler Driller:
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector:
TIP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + Very Dense 15-30 V-Stiff Sheet 1 of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations — not interpretations.
CLIENT PROJECT NAME
CLARENCE WELTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.O. BOX 397 .
GLASTONBURY. CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES 1 1.,2., 3.. 4.,(Select one or more) HOLE NO. g-Z Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.75"
2.DRIVEN CASING. Diameter GROUND WATER OBSERVATIONS START DATE 8/31/93
3.DRILLED CASING. Diameter AT NONE FT.AFTER�0 HOURS
4. ROCK CORING. Diameter &type FINISHAT FT.AFTER HOURS DATE 8/31/93
E. SAMPLE STRATUM DESCRIPTION REMARKS
T NO. BLOWSl6- DEPTH A + DEPTH
H
1 1 14-14-10-8 0.5'-2.5' ** 0.5'
2 7-6-6-7 2.5'-4.5' *** 0.8'
3 7-5-8-14 4.5'-6.5'
5 BR.FINE-MED.SAND,SOME SILT,
4 22-36-60 6.5'-8.0' LITTLE FINE-MED.GRAVEL - FILL
8.0'
10 BOTTOM OF BORING 8.0'
**ASPHALT
***TRAPROCK
15
. 20
25
30
35
40
LEGEND: Col A CHRISTIANA
1401b Wt. x 30"fall on 2" O.D. Sampler Driller:
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector.
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + VeryDense 15-30 V-Stiff Sheet 1 of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations— not interpretations.
CLIENT PROJECT NAME
CLARENCE W£LTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.O. BOX 397
GLASTONBURY, CONN 06033. LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES 1 1.,2.,T. 4.,(Select one or more) HOLE NO. g-3 Surface Elevation
1. HOLLOW STEM AUGER. Diameter 3.7511
2. DRIVEN CASING. Diameter GROUND WATER OBSERVATIONS START
8/31/93 DATE
3. DRILLED CASING, Diameter
AT NONE Fr.AFTER 0 �HOURS
C ROCK CORING, Diameter g type FINISH
AT FT.AFTER HOURS DATE 8/31/93
E SAMPLE STRATUM DESCRIPTION
REMARKS
T NO. BLOWS/6- DEPTH A + DEPTH
H
1 14-16-16-17 0.51-2.51 ** .171
2 5-3-3-2 2.51751 *** 0.51
3 3-2-2-1 4.51-6.51
5 BR.FINE-MED.SAND,SOME SILT,
4 14-14-16-32 6.51-8.51 LITTLE FINE-MED.GRAVEL
8.51
10
BOTTOM OF BORING 8.51
**ASPHALT
15 ***TRAPROCK
20
25
30
35
40
.LEGEND: Col. A
1401b Wt. x 30"fall on 2" O.D. Sampler Driller: CHR I ST I ANA
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector:
TIP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT-Undisturbed Thinwall and 35 to 50% 50 + Very Dense 15-30 V-Stiff Sheet 1 of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations —not interpretations.
' CLARENCE WELTI ASSOC., INC. CLIENT PROJECT NAME
P.O. BOX 397 JMJ CONSTRUCTION CO. LISA DRIVE
GLASTONBURY. CONN 06033. LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES: 1 1.,2., 3.,4., (Select one or more)
HOLE NO. B-4 Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.751,
2. DRIVEN CASING, Diameter GROUND WATER OBSERVATIONS START
3.DRILLED CASING, Diameter DATE 8/31/93
4. ROCK CORING, Diameter AT NONE FT AFTER 0 HOURS
8 type FINISH
8/31/93
AT FT.AFTER HOURS DATE
D SAMPLE
E P STRATUM DESCRIPTION
T NO. BLOWS/6" DEPTH A REMARKS
1 12-12-13-17 0.5'-2.5' ** 0.2'
:-
2 16-8-5-5 2.5'-4.5' *** 0.3'
3 3-5-5-4 4.5'-6.5'
5 BR.FINE-MED.SAND,SOME SILT,
4 2-1-2-2 6.5'-8.5' TR.FINE-MED.GRAVEL
10 8.5'
BOTTOM OF BORING 8.5'
**ASPHALT
15 ***TRAPROCK
20
25
30
35
40
LEGEND: Col. A
1401b Wt. x 30" fall on 2"O.D. Sampler Driller: CHR I ST I ANA
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston tittle 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8.15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + VeryDense 15-30 V-Stiff Sheet 1 of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations— not interpretations.
CLIENT PROJECT NAME
r CLARENCE WELT) ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.O. BOX 397
GLASTONBURY. CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES: a 1..2., 3.,4.,(Select one or more) HOLE NO. B-5 Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.7511
2.DRIVEN CASING; Diameter GROUND WATER OBSERVATIONS START
S/31/93 DATE
3.-DRILLED CASING, Diameter AT NONE FT.AFTER 0 HOURS
4. ROCK CORING. Diameter g type FINISH 8/31/93
AT FT.AFTER HOURS DATE
E SAMPLE STRATUM DESCRIPTION
REMARKS
T NO. BLOWS/6" DEPTH A + DEPTH
H
1 9-11-12-13 0.5'-2.5' ** 0.2'
2 14-22-18-20 2.5'-4.5' *** 0.5'
3 7-6-6-6 4.5'-6.5'
5 BR.FINE-MED.SAND,SOME SILT,
4 7-4-3-3 6.5'-8.5' TR.FINE-MED.GRAVEL
8.5'
10
BOTTOM OF BORING 8.5'
**ASPHALT
15 ***TRAPROCK
20'.
25
30
35
40
LEGEND: Col. A
1401b Wt. x 30" fall on 2" O.D. Sampler
Driller: CHRISTIANA
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stitt Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8.15 Stitt
LIT=Undisturbed Thinwall and 35 to 50% 50 + Verylense 15-30 V-Stiff Sheet 1 of 1
1. Unless otherwise agreed. samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations— not interpretations.
CLARENCE WfLTI ASSOC., INC. CLIENT PROJECT NAME
JMJ CONSTRUCTION CO.
P.O. BOX 397 LISA DRIVE
GLASTONBURY, CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES: .1 1.,2., 3-4., (Select one or more) HOLE NO. B_6 Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.7511
2. DRIVEN CASING, Diameter GROUND WATER OBSERVATIONS START8/31/93
3. DRILLED CASING, Diameter NONE DATE
AT Fr.AFTER 0 HOURS
4. ROCK CORING. � Diameter g type- - FINISH8/31/93
AT FT.AFTER HOURS DATE
SAMPLE
STRATUM DESCRIPTION REMARKS
H
T NO. BLOWS/6- DEPTH A + DEPTH
1 17-22-23-21 0.5'-2.5' ** 0.2'
2 16-17-17-18 2.5'-4.51 *** 0.5'
3 14-7-7-29 4.5'-6.51
5 BR.FINE-MED.SAND,SOME SILT,
4 25-19-19-22 6.5'-8.5' LITTLE FINE-MED.GRAVEL
8.5'
10
BOTTOM OF BORING 8.5'
**ASPHALT
15 ***TRAPROCK
20
25
30
35
40
LEGEND: Col. A
1401b Wt. x 30"fall on 2"O.D. Sampler
Driller: CHRISTIANA
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + Very Dense 15-30 V-Stiff. Sheet 1 of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations— not interpretations.
J
i
CLIENT PROJECT NAME
^ CLARENCE WELTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.D. BOX 397
GLASTONBURY, CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES: 1 . 2.,3., 4.,(Select one or more) HOLE NO. B-7 Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.7511
2. DRIVEN CASING, Diameter GROUND WATER OBSERVATIONS START
8/31/93 DATE
3. DRILLED CASING, Diameter AT NONE FT-AFTER 0 HOURS
4. ROCK CORING. Diameter &type FINISH AT FT.AFTER HOURS DATE 8/31/93
E SAMPLE STRATUM DESCRIPTION REMARKS
T NO BLOWS/6" DEPTH A + DEPTH
H
1 13-14-17-20 0.5'-2.5' ** 0.2'
2 14-17-19-19 2.5'-4.51 *** 0.5'
3 7-6-6-7 4.5'-6.5'
5 BR.FINE-MED.SAND,SOME SILT,
4 14-24-8-5 6.5'-8.5' TR.FINE-MED.GRAVEL
8.51
10
BOTTOM OF BORING 8.5'
**ASPHALT
15 **TRAPROCK
20
25
30
35
40
LEGEND: Col. A CHR I ST I ANA
1401b Wt. x 30"fall on 2"O.D. Sampler Driller:
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose G-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + Very Dense 15-30 V-Stiff Sheet 1 of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations — not interpretations.
i)
CLIENT PROJECT NAME
CLARENCE WELTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.O. BOX 397
GLASTONBURY, CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES- 1 1., 2.,3.,4.. (Select one or more) HOLE NO. R_g Surface Elevation
1.HOLLOW STEM AUGER, Diameter 3.7510
2.DRIVEN CASING. -Diameter GROUND WATER OBSERVATIONS START
8/31/93 DATE
3.DRILLED CASING, Diameter AT NONE FT.AFTER 0 HOURS
4.ROCK CORING, Diameter g type FINISH 8/31/93
AT FT.AFTER HOURS DATE
E SAMPLE STRATUM DESCRIPTION REMARKS
T NO. BLOWS/6" DEPTH A + DEPTH
H
1 11-12-14-14 0:6'-2.5' ** 0.2'
2 7-6-3-4 2.5'-4.5' *** 0.5'
3 3-3-8-4 4.5'-6.5'
5 BR.FINE-MED.SAND,SOME SILT,
4 6-4-3-4 6.5'-8.5' TR.FINE-MED.GRAVEL
8.5'
10
BOTTOM OF BORING 8.5'
**ASPHALT
15 ***TRAPROCK
20
25
30
35
40
LEGEND: Col. A CHRISTIANA
1401b Wt. x 30"fall on 2"O.D. Sampler Driller:
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0.10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + Very Dense 15-30 V-Stiff Sheet 1 of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations— not interpretations.
I)
CLIENT PROJECT NAME
CLARENCE WELTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.O. BOX 397
GLASTONBURY. CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES 1 1.. 2., 3..4.,(Select one or more) HOLE NO. g-9 Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.75"
2. DRIVEN CASING. Diameter GROUND WATER OBSERVATIONS START
8/31/93 DATE
3. DRILLED CASING, Diameter AT NONE FT AFTER 0 HOURS
4- ROCK CORING, Diameter g type FINISH 8/31/93
AT FT.AFTER HOURS DATE
E SAMPLE STRATUM DESCRIPTION REMARKS
M hNO BLOWS/6•• DEPTH A + DEPTH
1 13-17-18-18 0.5'-2.5' ** 0.2'
2 20-34-27-31 2.5'-4.5' *** 0.5'
3 16-8-8-10 4.5'-6.5'
5 BR.FINE-MED.SAND,SOME SILT,
4 10-12-15-12 6.5'-8.5' TR.FINE-MED.GRAVEL
8.5'
10
BOTTOM OF BORING 8.5'
**ASPHALT
15 **TRAPROCK
20.
25
30
35
40
LEGEND: Col. A CHR I ST I ANA
1401b Wt. x 30"fall on 2"O.D. Sampler Griller:
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry, C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + Very Dense 15-30 V-Stiff Sheet 1 of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations - not interpretations.
k
DR. CLARENCE WELTI, P.E., P.C.
GEOTECHNICAL ENGINEERING
227 Williams Street• P.Q. Box 397
Glastonbury, CT 06033 ti
(203) 633-4623 I FAX(203) 657-2514I]6
s RECEIVED 1
9 S F p 1 41993 ► 2
Town of South Windsor
September 7, 1993 th Engineering
kepi.
Mr. Jean Marc Jacques
JMJ Construction Co.
658 Ellington Road
South W' ,
Re Lisa Drive - Vicinity of Lot 141
Dear Mr. ues :
Regarding the above, here re results of borings made
at the above site. The borings were located by
representatives of the town and are believed to generally
cover the areas of concern, as regards the erratic
settlements occurring under and in proximity to the
sanitary sewer under Lisa Drive.
The borings vary somewhat, but there are zones of very
loose Fine Sand and Silt, notably at Holes 3 and 4 . Such
looseness is probably not the result of lack of
compaction, but rather the possible migration of some fine
soils into the rock fractures . The area of such migration
is difficult to clearly define, but sample blow counts
in the range of 2 to 4 per 6" are clearly not possible
within 3 feet of grade without some loss of material below
that level . Low blow counts at depths below 6 feet are
possibly attributable to lack of compaction.
The process of soil migration usually occurs as a result
of ground water movement. Heavy rainfall infiltration on
the grassed areas contiguous to the trench would cause
such migration. Normally the backfill within a rock cut
should be either a coarse gravel or crushed stone ( 1/2" to
3/411 ) , which would preclude migration.
Considering the existing condition, the probable remedy
would be localized use of water, combined with concrete
pencil vibrators . This process would provide a localized
force to accelerate the movement of fines into the voids
without causing excessive effects on the roadway outside
the trench area. This process would only be carried out
after an initial excavation of about 3 feet to minimize
effects on other utilities .
page Z
As regards the possibilties of more extensive areas of
similar conditions, the condition would be generally
limited to areas, where the rock was blasted. Furthermore,
if the soils are medium compact ,,to at least 6 feet after 5
years of being in place, it is not probable that future
settlement will occur. This is not to exclude settlements
in areas outside the area studied, but rather to define
the probability of such occurrences .
If you have any questions please call me.
Very truly yours,
Clarence Welti, PhD, P.E.
President, Dr. Clarence Welti, P.E. ,P.C.
CW:nl
Encs .
CLIENT PROJECT NAME
CLARENCE WELTI ASSOC., INC.
P.O. BOX 397 JMJ CONSTRUCTION CO. LlSA DRIVE
GLASTONBURY. CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES: 1 1..2.,3..4.,(Select one or more) HOLE NO. g-1 Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.75"
2. DRIVEN CASING, Diameter GROUND WATER OBSERVATIONS START
8/31/93
DATE
3. DRILLED CASING, Diameter AT NONE FT.AFTER 0 HOURS
4. ROCK CORING. Diameter g type FINISH 8/31/93
AT FT.AFTER HOURS DATE
E SAMPLE STRATUM DESCRIPTION
REMARKS
T NO. BLOWS/6" DEPTH A + DEPTH
H
1 14-22-23-25 0.5'-2.5' ** 0.6'
2 21-12-22-14 2.5'-4.5' *** 1.0'
3 7-8-3-3 4.5'-6.5'
5
4 7-5-7-7 6.5'-8.5' BR.FINE-MED.SAND,SOME SILT,
LITTLE FINE-MED.GRAVEL - FILL
8.5'
10
BOTTOM OF BORING 8.5'
**ASPHALT
15 ***TRAPROCK
20
25
30
35
40
LEGEND: Col. A
1401b Wt. x 30" fall on 2" O.D. Sampler
Driller: CHR I ST I ANA
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 04 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stitt
UT-Undisturbed Thinwall and 35 to 50% 50 + VeryDense 15-30 V-Stiff Sheet 1 of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations —not interpretations.
CL WELTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
BOX P.O.. BOX 397 CLIENT PROJECT NAME
39
GLASTONBURY, CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES: 1 1..2..3..4-(Select one or more) HOLE NO. R-2 Surface Elevation
1. HOLLOW STEM AUGER. Diameter 3.75"
2. DRIVEN CASING. Diameter GROUND WATER OBSERVATIONS START 8/31/93
3.DRILLED CASING, Diameter DATE
AT NONE FT.AFTER,��HOURS
4. ROCK CORING. Diameter 6 type FINISH 8/31/93
AT FT.AFTER_ HOURS DATE
E SAMPLE STRATUM DESCRIPTION
REMARKS
T NO. BLOWS/6" DEPTH A + DEPTH
H
1 14-14-10-8 0.5'-2.5' ** 0.5'
2 7-6-6-7 2.5'-4.5' *** 0.8'
3 7-5-8-14 4.5'-6.5'
5 BR.FINE-MED.SAND,SOME SILT,
4 22-36-60 6.5'-8.0' LITTLE FINE-MED.GRAVEL - FILL
8.0'
10 BOTTOM OF BORING 8.0'
**ASPHALT
***TRAPROCK
15
20
25
30
35
40
LEGEND: Col. A
1401b Wt. x 30"fall on 2"O.D. Sampler
Driller: CHRISTIANA
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stitt Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30.50 Dense 8-15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + Very Dense 15-30 V-Stiff Sheet 1 of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations —not interpretations.
• CLARENCE WELTI ASSOC., INC. CLIENT PROJECT NAME
P.O. BOX 397 JMJ CONSTRUCTION CO. LISA DRIVE
GLASTONBURY, CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES: 1.,2.,3.,4.,(Select one or more) HOLE NO. B-3 Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.7511
2. DRIVEN CASING, Diameter GROUND WATER OBSERVATIONS START
S/31/93
3. DRILLED CASING, Diameter DATE
AT�E FT.AFTER��HOURS
♦. ROCK CORING, Diameter &type FINISH
AT FT.AFTER HOURS DATE 8/31/93
E SAMPLE STRATUM DESCRIPTION
REMARKS
H NO. BLOWS/6" DEPTH A + DEPTH
1 14-16-16-17 0.5'-2.5' ** .17'
2 5-3-3-2 2.5'-4.5' *** 0.5'
3 3-2-2-1 4.51-6.5'
5 BR.FINE-MED.SAND,SOME SILT,
4 14-14-16-32 6.5'-8.5' LITTLE FINE-MED.GRAVEL
8.5'
10
BOTTOM OF BORING 8.5'
**ASPHALT
15 ***TRAPROCK
20
25
30
35
40
LEGEND: Cot. A
1401b Wt. x 30"fall on 2" O.D. Sampler
Driller: CHR I ST IANA
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + Very Dense 15-30 V-Stiff Sheet Of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations—not interpretations.
CLIENT PROJECT NAME
• CLARENCE WELTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.O. BOX 397
GLASTONBURY, CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES: 1 1.,2.,3.,4.,(Select one or more) HOLE NO. B-4 Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.75"
2. DRIVEN CASING, Diameter GROUND WATER OBSERVATIONS START
8/31/93 DATE
3.DRILLED CASING, Diameter AT NONE Fr AFTER 0 HOURS
4. ROCK CORING. Diameter g type FINISH8/31/93
AT FT.AFTER HOURS DATE
E SAMPLE STRATUM DESCRIPTION REMARKS
T NO. BLOWS/6- DEPTH A + DEPTH
H
1 12-12-13-17 0.5'-2.5' ** 0.2'
2 16-8-5-5 2.5'-4.5' *** 0.3'
3 3-5-5-4 4.5'-6.5'
5 BR.FINE-MED.SAND,SOME SILT,
4 2-1-2-2 6.5'-8.5' TR.FINE-MED.GRAVEL
8.5'
10
BOTTOM OF BORING 8.5'
**ASPHALT
15 ***TRAPROCK
20
25
30
35
40
LEGEND: Col. A CHRISTIANA
1401b Wt. x 30" fall on 2" O.D. Sampler Driller:
Type Sample T Proportions Used Cohesionless Density Cohesive Consistency Helper:
P
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0.4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector:
TP-Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + Ve,ryDense 15-30 V-Stiff Sheet 1 _of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations—not interpretations.
CLIENT PROJECT NAME
•CLARENCE WELTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.O. BOX 397
GLASTONBURY, CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES: 1 1.,2.,3..4.,(Select one or more) HOLE NO. g_5 Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.75"
2. DRIVEN CASING. Diameter GROUND WATER OBSERVATIONS START
B/31/93
3. DRILLED CASING, Diameter DATE
AT NONE FT.AFTER O HOURS
4. ROCK CORING. Diameter g type FINISH 8/31/93
AT FT.AFTER HOURS DATE
E SAMPLE STRATUM DESCRIPTION
REMARKS
T NO. BLOWS/6" DEPTH A + DEPTH
H
1 .9-11-12-13 0.5'-2.5' ** 0.2'
2 14-22-18-20 2.51-4.51 *** 0.5'
3 7-6-6-6 4.5'-6.5' k.
5 BR.FINE-MED.SAND,SOME SILT,
4 7-4-3-3 6.5'-8.5' TR.FINE-MED.GRAVEL
8.5'
10
BOTTOM OF BORING 8.5'
**ASPHALT
15 ***TRAPROCK
20
25
30
35
40
LEGEND: Col. A
1401b Wt. x 30"fall on 2" O.D. Sampler
Driller: CHR I ST I ANA
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT-Undisturbed Thinwall and 35 to 50% 50 + Very Dense 15-30 V-Stiff Sheet 1 of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations—not interpretations.
CLIENT PROJECT NAME
• CLARENCE WELTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.O. BOX 397
GLASTONBURY, CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES: 1 1.,2.,3-4.,(Select one or more) HOLE NO. B-6 Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3•73I1
2. DRIVEN CASING. Diameter GROUND WATER OBSERVATIONS START8/31/93
DATE
3. DRILLED CASING, Diameter AT NONE Fr.AFTER 0 HOURS
4. ROCK CORING. Diameter &type FINISH8/31/93
AT FT.AFfER HOURS DATE
E SAMPLE STRATUM DESCRIPTION REMARKS
T NO. BLOWS/6" DEPTH A + DEPTH
H
1 17-22-23-21 0.51-2.51 ** 0.21
2 16-17-17-18 2.51-4.51 *** 0.51
3 14-7-7-29 4.51-6.51
5 BR.FINE-MED.SAND,SOME SILT,
4 25-19-19-22 6.51-8.51 LITTLE FINE-MED.GRAVEL
8.51
10
BOTTOM OF BORING 8.51
**ASPHALT
15 ***TRAPROCK
20
25
30
35
40
LEGEND: Col. A CHRISTIANA
1401b Wt. x 30" fall on 2" O.D. Sampler Driller:
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% IG-30 Med.Dense 4-8 M/Stiff Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + VeryDense 15-30 V-Still Sheet of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations—not interpretations.
CLIENT PROJECT NAME
CLARENCE WELTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.O. BOX 397
GLASTONBURY, CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES: 1 1.,2., 3., 4.,(Select one or more) HOLE NO. % Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.751'
2.DRIVEN CASING. Diameter GROUND WATER OBSERVATIONS START
8/31/93 DATE
3. DRILLED CASING, Diameter AT NONE FT.AFTER 0 HOURS
4. ROCK CORING, Diameter g type FINISH8/31/93
AT FT.AFTER HOURS DATE
E SAMPLE STRATUM DESCRIPTION REMARKS
T NO. BLOWS/6" DEPTH A + DEPTH
H
1 13-14-17-20 0.51-2.51 ** 0.21
2 14-17-19-19 2.51-4.51 *** 0.51
3 7-6-6-7 4.5--6.51 k.
5 BR.FINE-MED.SAND,SOME SILT,
4 14-24-8-5 6.51-8.51 TR.FINE-MED.GRAVEL
8.5'
10
BOTTOM OF BORING 8.51
**ASPHALT
15 **TRAPROCK
20
25
30
35
40
LEGEND: Col. A CHR i ST I ANA
Type
P
1401b Wt. x 30"fall on 2" O.D. Sampler Driller:
Sample T Proportions Used Cohesionless Density Cohesive Consistency Helper:
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stiff Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + Very Dense 15-30 V-Stiff Sheet of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations—not interpretations.
CLIENT PROJECT NAME
CLARENCE WELTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.O. BOX 397
GL.ASTONBURY. CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES 1 1..2.,3..4-(Select one or more) HOLE NO. q_$ Surface Elevation
1. HOLLOW STEM AUGER. Diameter 3.75" GROUND WATER OBSERVATIONS START
2.DRIVEN CASING, Diameter DATE 8/31/93
3.DRILLED CASING. Diameter AT NONE FT.AFTER_0 HOURS
Diameter FINISH
4. ROCK CORING, 8 type AT FT.AFTER HOURS DATE 8/31/93
D SAMPLE STRATUM DESCRIPTION
REMARKS
T NO. BLOWS/6- DEPTH A + DEPTH
H
1 11-12-14-14 0.6'-2.5' ** 0.2'
2 7-6-3-4 2.5'-4.5' *** 0.51
3 3-3-8-4 4.5'-6.5'
5 BR.FINE-MED.SAND,SOME SILT,
4 6-4-3-4 6.5'-8.5' TR.FINE-MED.GRAVEL
8.5'
E15
BOTTOM OF BORING 8.5'
**ASPHALT
***TRAPROCK
20
25
30
35
40
LEGEND: Col. A CHRISTIANA
1401b Wt. x 30"fall on 2" O.D. Sampler Driller:
Sample Type Proportions Used Cohesionless Density Cohesive Consistency Helper:
P Y
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10.30 Med.Dense 4-8 M/Stiff Inspector: -
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8.15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + Very Dense 15-30 V-Stitt Sheet of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations—not interpretations.
~ CLIENT PROJECT NAME
CLARENCE WELTI ASSOC., INC. JMJ CONSTRUCTION CO. LISA DRIVE
P.O. BOX 397
GLASTONBURY, CONN 06033 LOCATION
SOUTH WINDSOR, CT
DRILLING PROCEDURES 1 1..2.,3..4.,(Select one or more) HOLE NO. R-9 Surface Elevation
1. HOLLOW STEM AUGER, Diameter 3.7511
2. DRIVEN CASING, Diameter GROUND WATER OBSERVATIONS START
DATE 8/31/93
3. DRILLED CASING. Diameter AT NONE FT.AFTER 0 HOURS
4. ROCK CORING. Diameter g type FINISH8/31/93
AT Fi.AFTER HOURS DATE
E SAMPLE STRATUM DESCRIPTION
REMARKS
T NO. BLOWS/6- DEPTH A + DEPTH
H
1 13-17-18-18 0.5'-2.5' ** 0.2'
2 20-34-27-31 2.5'-4.5' *** 0.51
3 16-8-8-10 4.5'-6.5'
5 BR.FINE-MED.SAND,SOME SILT,
4 10-12-15-12 6.5--8.5' TR.FINE-MED.GRAVEL
8.5'
10
BOTTOM OF BORING 8.5'
**ASPHALT
15 **TRAPROCK
20
25
30
35
40
LEGEND: Col. A
1401b Wt. x 30"fall on 2" O.D. Sampler
Driller: CHRISTIANA
Proportions Used Cohesionless Density Cohesive Consistent Helper:
Sample Type P Y Y
D=Dry C=Cored W=Washed trace 0 to 10% 0-10 Loose 0-4 Soft
UP=Undisturbed Piston little 10 to 20% 10-30 Med.Dense 4-8 M/Stitt Inspector:
TP=Test Pit A=Auger V=Vane Test some 20 to 35% 30-50 Dense 8-15 Stiff
UT=Undisturbed Thinwall and 35 to 50% 50 + Very Dense 15-30 V-Stiff Sheet 1 of 1
1. Unless otherwise agreed, samples will be held by Welti Associates a maximum of 60 days after boring completion.
2. Water readings represent driller observations — not interpretations.
/ C
�A�owN Sf 4t R v ' /�
ISO V
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
ox•co�'�w AREA CODE 203/644-2511
Mr. William Connerty
c/o New England Bank & Trust
Windsor, CT 06096
Re: C43Lisa Driveh Windso
Dear Mr. Connerty:
In reference to our telephone conversation of July 23 , 1993, it
is my understanding from South Windsor Town Records that the
New England Bank & Trust owns the above referenced property.
There is a fence running along the eastern side of ' the property
which is falling down. Since this fence surrounds the swimming
pool, which is filled with water, this creates a potentionally
dangerous situation.
We would like this situation to be rectified,and this office to
be notified that corrective action has been taken,no later than
July 30 , 1993 .
Should you find that the New England Bank & Trust no longer owns
this property, please notify this office as to the present owner.
Our telephone number is 644-2511 ext. 230 and our FAX Number is
644-3781 .
Very truly yours,
J-8hn F. Hogan
Assistant Building Official
ATTACHMENT (1)
146 Hartford Road,Manchester,CT 06040-5921
TEL 203 646-2469 FAX 203 643-6313
1200 Converse Street,Longmeadow,MA 01106-1721
TEL 413 567-9886 FAX 413 567-8936
Fuss&O'Neill Inc. Consulting Engineers Solid Waste Management Environmental Engineering
Industrial/Hazardous Waste Management Wastewater Management
Stream Impact Analysis Site Planning/Engineering
Water Resources Engineering Hydrogeology
Transportation Engineering Park Design
Environmental Field Services Surveying
July 9, 1993
Mr. Michael Jacques
6 ,
J.M.J. Construction
658 Ellington Road
South Windsor, CT 06074
Re: Ground-Penetrating Radar Survey
Lisa Drive /
South Windsor, CT
Dear Mr. Jacques:
A ground-penetrating radar (GPR) survey was performed by Fuss & O'Neill, Inc.
(F&O) at the above-referenced site to attempt to detect any further voids that may
be developing beneath the existing asphalt. The depth of interest was between the
surface of the roadway to 4 feet.
The GPR survey was conducted on June 22; 1993 using the Geophysical Survey
Systems, Inc. (GSSI) Subsurface Interface Radar System (SIR-3� consisting of a
Model PR-8304 Profiling Recorder utilizing a Model 3102-500 mHz transceiver.
The 500 mHz transceiver was used as it has an ideal depth capability window of six
inches to ten feet.
The ground penetrating radar (GPR) instrument emits electromagnetic (EM) waves
in the 80 mHz to 1000 mHz frequency range. These waves are emitted in high-
repetition pulses generated at a transmitting antenna. This pulse of electromagnetic
energy, upon entering the subsurface, travels until it encounters a change in the
electrical properties of the subsurface, i.e., dielectric properties. A dielectric change
will produce the following results: 1) some of the energy is reflected back to the
antenna; and 2) some of the energy continues downward to be further reflected at
additional interfaces. A change in electrical properties is a function of many
conditions, the two most important of which are moisture content and soil
composition or type. The reflected waves are received by an antenna on the ground
surface. The signal received is converted to an audio frequency range signal and is
sent to a graphic recorder.The graphic recorder produces a continuous, permanent
gray-scale record on electro-sensitive paper.
93251 V\1\PA G0702A.WP
Corres.
recycled
paper
Fuss&O'Neill Inc. Consulting Engineers
Mr. Michael Jacques
July 9, 1992
Page 2
The field results constitute a representative sampling of data which may include
multiple reflections. Such multiple reflections indicate many changes in dielectric
properties. A lack of reflections indicate no changes in dielectric properties. The
intensity of the record- is indicative of the strength of the reflection. Using
representative two-way travel times for various earth materials, approximate depths
to observed features can be calculated. Travel velocities for the GPR signal vary in
different materials. Consequently, the accuracy of the depth determination can be
affected if varied materials are encountered as is the case at this location.
The area of study was the roadway and the grassy area to the north and west of the
road. The study area (see attached field sketch) began 39.5 feet east of the lightpole
and catch basin located at the approximate west property line of Lot 105 on Lisa
Drive. The study area was in an easterly direction from this location around the
corner to the approximate south property line of Lot 155 on Lisa Drive. The total
length of this area on the roadway was 425 feet.
Horizontal scaling was accomplished using known points measured by a calibrated
wheel and marked on the roadway every 25 feet along the subject area. Each time
the antenna passes a point, a 'mark' is electronically placed on the paper record
(vertical dashed line). The location of any features of interest can be determined by
calculating the distance from the feature to the nearest 'mark'.
The effectiveness of GPR depends on the physical characteristic's of the materials to
be penetrated. In general, GPR is most effective in materials with low conductivity
(high resistivity) such as sand and concrete. The GPR signal is attenuated by highly
conductive materials such as clay and metals. The effective depth was determined
to be approximately 4 to 5 feet on this survey. This was based on running a transect
over a drain pipe of a known depth near a catch basin. From this the approximate
travel-time and subsequently the depths can be determined.
The GPR transect printouts for this survey were produced as analog records. There
has been no further processing, enhancing, or manipulation of the GPR data. The
original GPR transect records are available for review at Fuss & O'Neill.
9325M11PAG0702AMP
Corns.
recycled
paper
'��RQ Fuss&z O'Neill Inc. Consulting Engineers
J �:V
Mr. Michael Jacques
July 9, 1992
Page 3
There were 12 transects run parallel to each other 2 feet apart along the roadway in
the subject area. An additional transect was run parallel to the roadway transects 4
feet from the curb.
A field sketch was produced by F&O (see attached) showing the areas of concern
based on the field interpretation of the GPR records. The GPR records represent the
conditions that are present on the day the survey took place. The field
interpretations provided by F&O are based on the data acquired and are performed
with our best professional efforts. F&O cannot accept liability or responsibility for
the resulting interpretations should any loss, damage, or expense be incurred from
work performed. The areas of concern were marked in paint on the road surface in
the study area. The areas of concern are those that are field interpreted to be
inconsistent with the data of the surrounding area along a transect. The identified
areas of concern appear to indicate a change in the subsurface conditions that may
represent voids.
Thank you for the opportunity to conduct this work. If you have any questions
regarding this letter, please feel free to contact the undersigned.
Sincerely,
G ,
Peter A. Gregson William D. O'Neill, P.E., L.S.
Project Hydrogeologist President
\PAG
attachment
9325M1\PA00702A.WP
Corres.
recycled
paper
'y
�O\
155
bR/ -SIq w
�o
/ 4J
c13-
M'a.
o
IV26,�TYA) OMB O
So 5�
LGGEND
L�GHZ' �o�E
® AREA of
Co 1N cE iLN
CATcVk 13A51t l
p MANNoL.E FUSS&O'NE"
O MANCHESTER, CONNECTICUT
GRouND --PENETRATING
-RAt>AR SvRVE`(
FIEL37 SIcETCI-F �►a�-`(
S.M:S CoI��sT�ucT1oN
LISA "DR'vF—
w�N so eT
pROd.NO.9325I AlDATE:TUL:,{Iq93SCAlE
TOWN OF SOUTH W I NDSOR
PUBLIC WORKS DEPARTMENT
STREET SERVICE DIVISION
MEMORANDUM April 26, 1993
TO: Leo Davies, Deputy Engineer
FROM: Ron Assel i n, Road Super•vi sor e
SUBJECT: 141 Lisa Drive
On the afternoon of April 23, in front of 141 Lisa Drive, one of
our Street Department personnel reported a contractor doing
restoration work originating from past undermining. The
contractor was using a payloader and was in the area of the
pavement near the mailbox when the failure occurred. I was
called and relayed the message to you.
Your inspection indicated a hole the size of a "wheel barrow" in
::the shoulder of the pavement in front of the rnai ).bo . The hole
necessitated immediate attention. A crew was dispatched to make
a temporary repair with bituminous concrete.
On April 27, I made a re—evaluation of the area to check: the
integrity of the repair. Settlement was evident in the patch,
and new failure in the pavement of the shoulder 10 feet to the
east , in front of 141. Lisa.
A crew was sent to make this second temporary repair.
The Street Department at this point is concerned about road base
deficiencies since. Could you advise the contractor of this
situation. Pavement undermining is susceptible to heavy traffic ,
(i . e. , mechanical sweepers, school buses, refuse trucks, mail
trucks and snow removal equipment) , and all use the shoulder of
the road. Unexpected pavement failure is a hazard to motorists
and residents and an inconvenience to Street Department services.
RA/ds
cc:
A r-or yRaWzeo
Mel Stead
Russ Cable
Street File
�4o�N at,t�
U
6 O-P saa�
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
AREA CODE 203/644-2511
YpsoR•C0N
August 7, 1992
Mr. Jean Marc Jacques, President
JMJ Construction Company, Inc .
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques :
RE: Settlement
As I expressed in our conversation on Tuesday, August 4, 1992, it
ultant is urgent that you have vu the set
tlement geological cons
problems one Llsa Drivel
plan of action to resol
e
shall be submitted to the Town for
Such a proposal review and
approval prior to any further excavation in this area.
I also indicated that all of this work, including restoration,
should be completed by October 15, 1992 . . With that in mind, we are
requesting that a proposal be submitted by August 31, 1992 .
The proposal should include the scope of the project; anticipated
limits; restoration of the disturbed area; maintenance and
protection of traffic, utilities,
and any and the anther ritemss thatsyour
required) ; anticipated schedule
consultant feels should be addressed.
If you or your consultant have any questions, please call me at
644-2511, Ext. 240 • Very truly yours,
A. Bowen Davies
Deputy Town Engineer
ABD/jsv
cc: Michael J.
Gantick, Director of Public Works
Jerry C. Iazzetta, Town Engineer
Melvin C. Stead, Supt. of Street Services
1,-voo a
10�1
A I
June 23, 19g2
Dear JMJ,
This is to inform you that further sinkage has
occurred at the entrance of our driveway, abutting
our property located at 141 Lisa Drive.
This sinkage provides a hazard for all residents
who walk or ride bikes in this location. A "complete"
regradding/repaving of the driveway entrance should be
done to correct this problem.
Very truly yours,
tl `
Gerald A. Baseel
cc: J. Zurbrigen
B. Davies
t
��pwN at4`
'A U Tawn O-P S-Oam vt��
�Ci 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
�IOSOR,co AREA CODE 203/644-2511
JEAN E.ZURBRIGEN
Town Manager February 11, 1992
Mr. & Mrs. Gerald A. Basee7
747 Lisa Drive
South Windsor, CT 06074
Dear Mr. & Mrs. Basee 7:
We received your letter concerning the sidewalk problem in front of your
house at 747 Lisa Drive. It is understandable that you are concerned about
the reoccurrence of the "sinking" problem, and the repair of it becoming
your responsibility.
Presently, JMJ Construction Co. is responsible for making any
repair/corrections necessary through October 31, 7992. At that time,
normally, the respons ib i 7 i ty for the maintenance of the s idewa 7k wou 7d
revert to the property:owner, as per Town Ordinance# 7 75.
In response to your Letter, on November 21, 1991, Mr. Davies inspected the
area in front of your house and noticed further settlement. JMJ
Construction was contacted; and, on December 2, 7997, an exploratory
excavation was undertaken with representatives of the Town of South Windsor
Engineering Department present. The results were inconclusive in
determining the cause of the settlement.
With the proper backfilling and compaction of this area, it is anticipated
that this settlement problem has been resolved. However, we will be
monitoring the situation at 747 Lisa Drive; and, if necessary, will have
JMJ Construction make any needed repairs.
We hope that this will ease your fears concerning liabilities in this
matter.
Very truly yours,
Town Man r
JEZ/js v
cc: Michael J. Gantick, Director of Public Works
Jerry C. Iazzetta, Town Engineer
tow M ae�
t�
O p. 0 S'I�
9 • 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
�l�Soe•CO AREA CODE 203/644-2511
JEAN E. ZURBRIGEN
Town Manager
November 19, 1991
Mr. and Mrs. Gerald A. Baseel
141 Lisa Drive
South Windsor, Connecticut
Dear Mr. and Mrs. Baseel:
I received your letter of November 14 expressing your
concerns with what you observe to be land sinkage (and the
resultant damage to sidewalks and street) in the area
abutting your property at 141 Liza Drive.
I am having relevant staff members research your complaint;
and, following their compilation of pertinent information, I
expect to be able to make an informed response to your
concerns.
r
Very truly yours,
Z' Manag
Z:prb
i
f
ti 3 g
ti
RACE vE0 `�
9, 199�
�� �
Ikto.
F. .n
TOWN HALL't on File 1540 SULLIVAN AVENUE Permit No.
SOUTH WINDSOR, CT 06074
Date of Expiration Permit Expires
APPLICATI� FOR PER IT
FEE .2
Name and address of applicants ff i 6'Pi - 111i & Phone No Q D R
Location of proposed work t ,
Describe fully n ture of permit requested ' '• �,
IV.
Insurance on file w'th Town es no Date policy expires
G Name of Insurer
o Approximate time for completion Desired starting date
Call before you dig ticket Pdo.
a. Show sketch of proposed work or furnish 2 copies of separ ravings
CL
0 r
w
11101
7.0
0 o
Lk
In
U t f��
° T' iE
Iv.Lo'
Q Applicant is responsible for contacting the Police Department and CALL BEFORE YOU DIG.
Q
I agree to furnish to the Town of South Windsor the amount of bond or deposit required and to
reimburse the Town of South Windsor for any expenses incurred by the Town for maintenance or repair
work in connection with this permit and that I am familiar with and will abide by the rules and
regulations for permits as outlined in the Town of South Windsor's (Pavement Cut Regulations.)
Signed
APPROVED. DATE APPROVED: %✓ -jG DATE �>
Supt. of Highways To n Enginee
FOR INSPECTOR: Date work started Date completed
Sufficient notification received: yes no Type of repair: Perm. Temp.
Unusual conditions encountered
Material slips attached: yes no Dated for Permanent repair
Signed
9 Inspector
!/.4
D R A F T
November 22, 1991
Mr. & Mrs . Gerald A. Baseel
141 Lisa Drive
South Windsor, CT 06074
Dear Mr. & Mrs. Baseel:
We have received your letter of November 11, 1991 concerning the
sidewalk problem in front of your house at 141 Lisa Drive. It is
understandable that you are concerned about the reoccurrence of the
"sinking" problem and the repair of it becoming your responsibility.
Presently JMJ Construction Co. is responsible to make any
repair/corrections necessary through October 31, 1992 . At that time,
normally, the responsibility for the maintenance of the sidewalk
would revert to the property owner, as per Town Ordinance #115 .
As you have indicated, this has been a recurring problem which has
been repaired each time by JMJ Construction Co. The cause of this
sinking is unknown at this time, and any conclusion as to why it
happens would be speculation. If Mr. Davies conclusion as to why
this happens is correct, his suggestion may work , for a short time,
however the material would still migrate through the filter fabric
but would do so at a slower rate.
If this "sinkage" does occur before October 31, 1991, the Town's
Engineering Department will have JMJ Construction at this location to
repair the problem. We will, with JMJ, do some exploratory
investigation to discover the actual cause. A method of repair will
then be decided upon and implemented. Because of the frequency of
occurrence of this problem, we can assume that if it does not reoccur
by October 31, 1992 the problem than been corrected.
110171rWe hope that this will ease your fearsJ concerning your liabilities in
this matter and that this will be resolved soon.
Very truly yours,
Jean E. Zurbrigen
Town Manager
JEZ/jsv
cc: Michael J. Gantick, Director of Public Works
,
^
'
MEMORANDUM November 25, 1991
TO: Jerry Iazzetta, Town Engineer
FROM: Ron Asselin, Street Super-visorM�'
,
RE: 141 Lisa Drive
The Street Department responded to a complaint at 141 Lisa Drive on
November, 23, 1991 involving roAd and sidewalk underminings. My
findings revealed four sections of sidewlak and a hole the size of a
baseball are clear evidence of the reported undermining. This isn 't
the first incident we've had to respond to. April 1990 a contracted
street sweeper broke through the pavement in the same area. After
inspecting the baseball sized hole that has developed in the roadway
surface, a cavity of 2 1/2 to 3 feet deep lay beneath the road. The
severely fractured subbase displayed evidence that serious pavement
failure was eminent. The sections of sidewalk in question are
experiencing the same type of fatigue. The two sections of walk to
the west of the driveway at 141 Lisa are the most dangerous to
pedestrians. The cavity that lay beneath the sections displayed no
base present after, the recent rain storms. It is conceivable one
more heavy rain storm more than 1 inch could collapse the two
sections leaving the walk unpassable and hazardous to area residents.
I spoke with the residents from 111 and 141 Lisa during my
inspection. Both residents are concerned that the repairs made many
times in front of ther properties are still showing signs of failure.
Because pavement failure exists our department has temporarily
barricaeded the areas in question. '
Please investigate JMJ ,s status in making these repairs. If repairs
aren 't made swiftly pavement failure could jeapardize travel of
vehicles using the shoulder of the road daily, (i . e. , snow removal
~ equipment , school buses, refuse trucks, etc. )
RA/ds
cc:
Bo Davies
Mel Stead
November 11, 1991
41
Ms. Jean E. Zurbrigen 0�', �,�
Town Manager ` 'j Q RUINED
Town of South Windsor ,r
1540 Sullivan Avenue v�'y�'e vg`°/s ,• o NOZ Vaj 199V
South Windsor, CT 06074 ,� �� bwdsowi
flft
A Powiewoft �
Dear Ms. Zurbrigen: 09
My wife, Jean Marie Baseel and I, Gerald A. Baseel, are property
owners of lot 65, subdivision of Mountainview Estates, located
at 141 Lisa Drive, in South Windsor, Connecticut. I am writing
this letter to notify you and to state for the record, the
continuing occurrence of land sinkage and damage resulting to the
sidewalks and street abutting our property.
Town records should disclose that we purchased the newly
constructed residence and land parcel in October of 1987. Since
that time, JMJ Construction Company, builders of our residence
and general contractor for the construction of the sidewalks and
street, have under the watchful eye of the Town's Engineering
Office, made major repairs to both the sidewalks and streets
abutting our land, seven (7) times in the last four (4) years.
The most recent repairs after notifying the Town Engineer occurred
on October 14 and 15, 1991.
The necessary repairs were a result of large "sinkholes", some
as deep as 4-6 feet. In addition, JMJ has on several occasions,
brought in additional "fill" to reoccurring sinkholes appearing
in the apron located between the street and the sidewalk.
Mr. "Bo" Davies of the Town's Engineering office has informed
us that JMJ Construction Company, no longer has maintenance
responsibility for repair. Upon inspection of the area by Mr.
Davies as recently as November 5, 1991, we are alarmed and
concerned that the Town accepted the conveyance of this road
and sidewalk in its defective condition from the builder. A
final inspection would have disclosed major faults that
continue to exist in this isolated area.
Mr. Jean Marc Jacques of JMJ Construction Company told us that
the problems area result of "blasting" that was necessary to
install the storm and sewer drains. Mr. Davies informed us
verbally that after the blasting was done; JMJ should have
installed "netting" to prevent soil seepage and movement.
According to Mr. Davies, this was never done.
It is evident, by further inspection of the property, that it
is a matter of time before further sinkage will result in more
damage to the sidewalks and street. Even Mr. Jacques admitted
that this problem would probably continue to surface.
Mr. Davies informed' us that the town has assumed responsibility
from the builder and we, as abutting landowners, will be
responsible for the future repair or replacement of the
sidewalks, according to the Town Ordinances under Article IV,
sections 159-18 and 159-19.
Without admitting any liability under those ordinances, nor
their enforceability in general, we find that their enforcement
in this instance would be grossly unfair, unwarranted and
discriminatory. We will assume no responsibility for repair
or liability claims resulting from the continued "sinkage and
settling" of this area.
As a result of what appears to be construction negligence and a
lack of a proper final inspection, the Town. and/or JMJ should
eliminate its patchwork approach and properly reconstruct the
street and sidewalks with appropriate netting and fill. This
should alleviate the dangers that exist to all families and
owners of property in this area -of Lisa Drive.
In the meantime, we want some assurance and acknowledgement
from the Town, that the repairs that have been made to date,
are appropriate and acceptable to the Town and have completely
eliminated the underlying cause of the continued sinkage and
settling to the sidewalk and apron. From Mr. Davies statements,
concerning the failure to require the appropriate netting to
be installed after the blasting in this area, this problem
could have and should have been avoided or eliminated by the
Town before it accepted the sidewalk. My wife and I cannot
and will not be liable for the results of that failure.
Please acknowledge in writing that the Town accepts all
responsibility and liability for any and all repairs, and/or
replacement necessitated by the. sinkage and settling of this
sidewalk today and in the future, as well as the liability
for any and all damages or inquiries resulting from such
defects.
Very truly Yours
Gerald A. Baseel
141 Lisa Drive
South Windsor, CT 06074
February 1 , 1992
Ms. Jean E. Zurbrigen
Town Manager
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
REFERENCE: Your memo dated November 19, 1991
Dear Ms. Zurbrigen:
Regarding your correspondence referenced above and our letter
to you dated November 14, 1991s we are still awaiting your
informed response concerning the continued land sinkage and
resulting damage to the street, sidewalks and apron abuting
our property at 141 Lisa Drive.
We hope to hear from shortly with an informed action plan that
will provide answers to our concerns and safety to everyone
in the neighborhood.
Very Truly Yours
Gerald A. Baseel Jean M. Baseel
141 Lisa Drive
FFR
l•
}
Z�tOwN at,` /
C, �
9 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
e•Co�' AREA CODE 203/644-2511
JEAN E.ZURBRIGEN
Town Manager
November 19, 1991
Mr. and Mrs. Gerald A. Baseel
141 Lisa Drive
South Windsor, Connecticut
Dear Mr. and Mrs. Baseel
I received your letter of November 14 expressing your
concerns with what you observe to be land sinkage (and the
resultant damage to sidewalks and street) in the area
abutting your property at 141 Liza Drive.
I am having relevant staff members: research your complaint;
and, following their compilation of pertinent information, I
expect to be able to make an informed response to your
concerns.
Very truly yours,
tA
T Manage
o L)
Z:prb
November 19, 1991
M E M O R A N D U M
TO: Michael J. Gantick, Director of Public Works
FROM: Jerry C. Iazzetta, Town Engineer
RE: Mr. & Mrs . Baseel - 141 Lisa Dri e
I have reviewed Mr. & Mrs . Baseel's November ll, . 1991 letter to Ms .
Jean Zurbrigen concerning the sidewalk situation in front of their
house at 141 Lisa Drive. As indicated in this letter, there has been
a problem of "seepage" for a few years . Each time this problem
occurred we have requested that JMJ Construction Co. repair the
broken sidewalk or fill the holes and he has complied.
There are some theories as to why this sidewalk area has had so much
"seeping" . One is that the fine material used to backfill this area
gradually migrate into the large voids in the rock caused by blasting
for the road and utilities . Another is that the backfill was never
compacted and gradually settles . It would appear, based upon the
size of the holes encountered, that the first theory has some merit.
I have talked with both Mr. Davies and Mr. Jean Marc Jacques about
this situation today (11/19/91) . Mr. Jacques indicated that some of
the problem was caused by a broken pipe and that some may be the
result of further compaction. He does not remember telling Mr. or
Mrs . Baseel that he feels this problem will continue to surface.
Mr. Davies indicated that the Baseel's asked him pointed questions as
to what could be done. Mr. Davies indicated to them that a solution
might be to place a filter fabric over the rock to ,mitigate
infiltration of the finer backfill material into the larger voids in
the rock. He also indicated that this method was not part of the
original specifications for this project and that the contractor was
not obligated to utilize this method.
The maintenance bond for Lisa Drive has expired and we therefore
requested that JMJ Construction take out an excavation permit for
the latest repair work on this sidewalk. On October 30, 1991 this
permit was issued. Our regulations state that the 'permittee is
responsible to maintain any work performed under this permit for a
period of one year. Based upon this, JMJ is obligated until October
31, 1992 to make any repairs if this sidewalk does sink or break
prior to that date.