Loading...
HomeMy WebLinkAboutDrain Layers Permit 155 Abbe Road (2) 1000050 TOWN OF SOUTH WINDSOR, CT PERMIT NUMBER DRAIN LAYER PERMIT 07 DATE: 09/27/10 � y GIS ID: 00600155 � FEE: 60.00 MUNIS APPLICATION# 201001315 _ffm r EXPIRATION DATE: 10/27/10 x, APPLICAN It LOCATION NAME: WASTEWATER SER ,ETC , - -DREW r 5_ABIRIE ROAD ADDRESS: 100 B WINDERME RFA a - y ELLINGTON,CT 06 9 1 �I 1ICHAEL S&AMY C Lq1 abllk ROAD PHONE INDSOR,CT 06074 - I - a woo s WORK DESCRIPTION: NEW SEW. QI THE DRAIN LAYER ASSIGNED TO THIS 1 S A BU y US AND HEREBY AGREES TO ALL THE TERMS AND CONDITIONS SET FORTKIlkff � E SHALL BE IN ACCORDANCE WITH THE TOWN OF SOUTH WINDSOR STANDA A Q � ,�AVWT (ATTACHED CONDITIONS. R S i ISSUED BY DATE INSP CTED INSPECTED BY 9/27/2010 3:48 PM ....-- ----- .....-..... ......... fT � _ �� � i JJ Af 1=04 it jf g wwj N St W y - om 'RK jr j/ 3 z S TOWN OF SOUTH WINDSOR INSPECTION REPORT PERMIT NO.: 10000 0 CONTRACTOR: W dS toua-t0't Ep-to I w LOCATION: l TYPE OF WORK: DATE INSP NEEDED: DATE INSP: 129 /o INSPECTED BY: gD WORK IN PROGRESS: z lO A w,Mt S Pvc S'Ch 40 a u" m S(-It 40 Fro h +o SEPTIC TANK PUMPED, SMASHED, FILLED WITNESSED ❑ YES ❑ NO AS-BUILT: V INPUT: DATE: 15 ` I -10 S/FORMS/TOWN OF SOUTH WINDSOR INSPECTION APPLICATION FOR DRAIN LAYER PERMIT TOWN OF SOUTH WINDSOR PUBLIC WORKS DEPARTMENT TOWN HALL 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT FEE $60.00 Location of w • ass 44 �J proposed irk. Lot # Street No. Street Name Premises owned by: 4m y 1 �1 e Name of Firm: Wes thraf r� �c�✓%"5 Phone: 4 S71,ZC16 Address of Firm: f0 0� -nofl�i�clL Svc �1� JZ�► CT CEO Z9 TYPE OF WORK: Lay House Drain Repair House Drain Lay Main : Lay Lateral for Commerdal/Industrial Building of acres Connection will be made with Existing Water Supply: Public Water Well Proposed Start Date 9 ZK Estimated time for completion ALL WORK TO BE IN ACCORDANCE WITH TOWN OF SOUTH WINDSOR STANDARDS, ALL OSHA REQUIREMENTS AND CONDITIONS ATTACHED TO THE PERMIT Permit is to be issued to the holder of Drain Layer's License No. _:�--T7&54 P- I /Only holders of P-1, P-7 or W-9 licenses will be,issued a permit. PERMIT WILL EXPIRE THIRTY(30) DAYS AFTER DATE OF ISSUANCE. The undersigned Drain Layer hereby agrees to all the terms and conditions set forth in the permit and attached thereto. Applicant has received Town Street Excavation Permit No. and/or ConnDOT.Permit No. CBYD No. z D l y -;`t 01$3 `I Signed: Print Name: �c � censed Drain Layer Date: S Standard FOrms\PermQsWPLICATION FOR DRAIN LAYERS PERMIT.doc TOWN OF SOUTH NINDSOR SANITARY - SEWER LATE RAL FIELD LOCATION DATE OF CONSTRUCTION: Z BUILDING ADDRESS STREET SUBDIVISION: NORTH ARROW OF . ..... ............ ')',tox. r ' w 1 ' Y 1 1� � _ I Z/4 In,✓,t es CONTRACTOR (PRINT) NAME OF CONT S UPE , 0 n(PRINT) /1 O/5 /✓n c�ti t". Al. STREET ADDRESS SIGNATURE OG U z q L .,A42�DATE TOWN STATE ZIP INSPECTED BY TOWN &0 511, Z,6t 6 DATE TELEPHONE NUMBER WHITE - TOWN PINK - CONTRACTOR YELLOW - CONSULTING .ENGINEER / DEVELOPER ............._..... ........._..... yf low MG200 WGL2Q Series Series �L FM 777 xeecorie� u _ MG200 C4"tdf*9W Autianw0c WGL20 C+ W A ntanuktic Gdnder Pip !Choice rt�der PUMPRecessed impeller provides steep nun of standard, high head or high overloading.operating curve. flaw designs, + Oil-filled rrtutOe for maximum heat dissipation Recessed impeller provides steep non overloading and constant bearing lubrication, operating carve. f • Recessed impeller reduces radial bearing,loads, Oil-filled motor for maximum heat dissipation and increases bearing life, cc►nstant bearing lubrication. • High torque capacitor starts single phase motor - Recessed impeller reduces radial bearing loads, for assured starting under heavy load. No increases bearing life; external capacitor needed. e High torque capacitor start/run single phase or • On-winding current and l -mperature three phase motors for assured starting under sensitive overload. heavy load + Shredding ring and grinder Seal leak probe warns impeller are re IN replaceable Wthuut ca cmru�+�s�raaM{p ffi T w uo i� of Seal leak cc�ndltit3n, dismantling pump or motor. -- helps prevent;Gostly IlaLLLL _ - " motor damage.;. • Single phase rotors i have on-Winding current; - and temperature- sensitive overload, Shredding ring and grinder Impeller are replaceable without dismantling pump or - M motor. Y5 {4 3 fl I L1#91 4 ffi lip 45 .. .. f3hi�liGITY GitU1CXi.^PFR:MIIV�{�. .--: Septic Repair For: Mike and Amy Small 155 Abbe Rd South Windsor CT 4 � 6 a 4`�` .AQi��S Q�•i L� �.Fv�e k �f�.a t! (moo r GrN�e N `L HE'S,t• NO PVC. to ABBE �D Designed By: Andrew Coleman �������aste�waterServices Inc 9/15/10 Septic Repair For: Mike and Amy Small 155 Abbe Rd South Windsor CT ab e a r �p Gig >r D t ti ABBE �D Designed By: Andrew Coleman Wastewater Services Inc 9/15/10 520/7-1 Myers ® It H Pentair Pump GroupIIIH i i 2HP Residential Grinder Pump Rail System Package Structural Polypropylene Cover I � I � I I f% Guide Rails GRADE Control Panel and Visual High Water Alarm Structural \ Lifting Chain Plastic Junction Box �o PVC Ball Type Shut Off Valve and Handle I PVC Discharge Pipe f i High Water Alarm - Mercury Level Control Inlet Hub (Field Mounted) i { ON and OFF Mercury o Level Controls �. f" 2 HP Grinder • -- Pump 24"Diameter by 60" Fiberglass Basin Concrete 1 520/7-2 Myers- Pentair Pump(fcup 2HP Reside--"a' Grinder Pump ` Rail Svsterr! :Pack- age Basin Assembly Basin Assembly Top View & Side View 45 I 54 1 1/2 DISCHARGE FLANGE 0 TOP VIEW o ° I I/4 BALL VALVE 51 0 BASIN COVER CORROSION RESISTANT%"THK. STRUCTURAL POLYPROPYLENE ° 1 1/4 SUPPORT FLANGE PUMP GUIDE AND RAIL SUPPORT YOKE LIFTING PLATE JUNCTION BOX MTG. BRACKET SIDE VIEW 12" 1 11/4 BALL VALVE 48"MAX. i 11/4 PVC DISCHARGE PIPE I I"GUIDE RAILS t LIFTING CHAIN rl INLET ELEV. L_-� HIGH WATER ALARM PUMP "ON" M.- 24*DIA. FIBERGLASS BASIN �✓ - PUMP "OFF- BASIN DEPTH ^ '3 520/7-3 M"rs® Pentair Pump Group 2HP Residential Grinder Pump Rail System Package Basin Assembly Technical Specifications Ball Shut Off Valve The manufacturer shall furnish and deliver fully assembled grinder pump stations to the contractor or owner. Simplex units, containing 14 NPT — o one grinder pump and all necessary parts and o 0 equipment, shall be installed in fiberglass rein- o 0 forced polyester tanks for outside installation. o I I PVC TRUE UNION All equipment shall be factory installed, except PVC BALL AGAINST 4 BALL VALVE for externally mounted control panel, gravity TEFLON SEATS CORROSION RESISTANT sewer inlet hubs and pump assembly, which are to be installed in the field. 4. Rail Assembly Each pre-assembled simplex station shall All guides, brackets and hold-downs will be of include the basin, basin cover, grinder pump and non-sparking, corrosion resistant structural motor, quick disconnect rail system, check valve, plastic. junction box, start-stop level controls, motor A lift-out guide rail assembly shall permit easy high temperature shutoff, motor seal leak alarm, removal and installation of the pump and lower high water alarm, all internal wiring terminating check valve without the necessity of personnel into the junction box, shutoff valve and Schedule entering the basin. Structural guide brackets 80 PVC discharge piping. In addition, an external with guide yokes of sufficient bearing strength alarm and pump control panel is to be provided to prevent binding shall bolt to the pump. The for each unit. yokes shall mate over guide rails of a minimum of 1 inch fiberglass pipe running between an 1. Basin lower rail support and the discharge case. A lower discharge nozzle, downstream from the The basin shall be 24" diameter with depth as check valve, shall be guided into a chamfered shown on the plans. The basin shall be molded cavity in the discharge case. A shoulder on the of fiberglass reinforced polyester resin manufac- nozzle shall bottom on the discharge case when tured by the lay-up and spray technique to assure the pump is properly Located and shims shall not that the interior surface is smooth and resin rich. be required to insure alignment for a leak tight The basin shall have a minimum wall thickness seal. Dual "O" rings shall effect a hydraulic seal of/4 inch. A steel anti-flotation plate shall be around the nozzle when it is in its operating molded into the bottom of the basin. position. A brace, easily removable from the top of the basin, shall be provided to lock the parts together, preventing line surges from breaking 2. Basin Cover the seal and allowing leakage. The discharge The cover shall be of 3/a" polypropylene. The case shall have a discharge opening with piping cover shall be bolted to the basin with stainless to a coupling through the basin wall. steel cap screws. Cadmium plated nuts for the The discharge case shall be securely bolted to screws shall be embedded in the fiberglass to the basin floor and arranged in such a way that prevent turning and for corrosion resistance. slight deflection caused by the discharge pipe will not cause the quick-connect pump flange to leak. 3. Shutoff Valve the lifting chain shall be securely fastened to the top of the pump and to the top of the basin A PVC true union ball type shutoff valve with to facilitate removal of the pump. The chain teflon seats shall be furnished and installed in shall be minimum of welded link type, or of the discharge piping, as shown on the plans. If adequate strength, required to effectively sup- the discharge depth is more than 2 feet from the port the weight of the pump assembly while surface, a handle extension shall be supplied. removing and installing. 520/7-4 Pentair Pump Group --- 2HP ReSidentiai - -n e`er Pump =1 T L Rai! System Packa—= Basin Asse Technical Specifications 5. Piping Schedule 80 PVC discharge piping shall connect to the stationary discharge base lift assembly and terminate at a 11/4"discharge Lift Out Assembly flange mounted on the basin at the height shown LFTNO on the drawing. HOLDDOWM BRACKET Cast Iron Check Valve I.NPT RAIL SUPPORT ---GUIDE RAILS DISCHARGE SST SCREWS HOLDDOWN I RUBBER BRACKET U FLAPPER CAST IRON BODY EPDXY COATED C GUIDE PLATE 1 I/4 NPT 4.--- -�-1 1 I/4 NPT L I ( CHECK II11 VALVE S. Check Valve � � � A heavy duty spring loaded all rubber flapper DUICK CONNECT type check valve with cast iron body shall be an EUNOE OPING SEAL integral part of the discharge seal assembly and shall lift out with the pump assembly. The valve 4 ROSITEON / design shall be such to allow for operation when negative heads, of up to 5 feet, are encountered. The valve shall be designed to operate at all pressures in the sewer system created by the grinder pumps. A flat set stainless steel spring, integrally molded into the Buna N rubber flapper, shall be BASIN WALL furnished in order to prevent collection of debris in the check valve. All fasteners shall be stainless 5"HOLE REQ•D steel. SEALING FLANGE t1, inlet Flange (SELF-SEALING) _/ /. A basin inlet flange for 4" SCH 40 plastic pipe shall be included, but not mounted on the basin. The flange to be mounted in the field at inlet height required by the installation, or as shown 4" INLET PIPE on the drawing. -(!CH.40) Inlet Sealing Flange 4 520/7-5 M"YS® pentgr pump Group 2HP Residential Grinder Pump Rail System Package Basin Assern ly Technical Specifications 8. Anti-Siphon Valve The basin assembly shall be arranged for quick and easy acceptance of an anti-siphon valve in the field when required. Anti-Siphon valve A riser pipe shall extend from the pump discharge between the check valve and the gate valve to within two feet of the surface of the basin. The riser shall be capped. to An anti-siphon valve kit shall be supplied easily assemble to the riser pipe. The valve assembly shall include all materials required to 1 complete the assembly. The anti-siphon valve shall mount horizontally, shall be made of PVC and will not interfere with pump removal or installation. 5 520/7-7 Pentair Pum Group P �j 2HP Residential Grinder Pump Rail System Package rihder Pump Technical Specifications 10 Operating Conditions The motor shall have two bearings to support Each grinder pump shall be of the centrifugal the rotor; an upper ball bearing to accommodate thrust loads and a lower ball bearing to take design and be capable of delivering a minimum radial loads. Ball bearings shall be designed for of 25 GPM at 84 feet head. The shutoff head a LB-10 life (50,000 hours). shall be no less than 105 feet. A heat sensor thermostat and overload shall be attached to the top end of the motor windings 2. ���� and shall stop the motor if the motor winding The pump shall submersible integrally otor. The toe built in shutoff will causerature reaches 0the pump toOF.The gcease tempera- The pump and subm type should a control failure cause the pump shall be suspended in the basin by two (2) operation, wet well. The thermostat 1 guide rails and quick disconnect lift out pump to run in a dry mounting assembly. Solids shall be fed in an up- shall reset automatically when the motor cools flow direction to the grinder mechanism with no to a safe operating temperature. obstructions below the grinder inlet. The grinder unit shall be capable of cutting 4. Power Cord solid material found in normal domestic sewage, The motor power cord shall be 14-5 SOW/SOW-A including reasonable amounts of foreign objects, and shall be fastened by means of a cord grip in such as plastic, rubber, sanitary napkins and the top of the pump.The top of the pump shall disposable diapers into a fine slurry that will contain a waterproof junction box which will pass freely through the pump, service line and provide space to connect the power cord to the force main. motor leads. The motor leads shall seal between a Motorah rubber compress one motor housin dfitt ng�around each on box by wire of The pump motor shall be of the submersible 5a Seal ��1��1�er type rated for 2 horsepower at 3450 RPM. Motor The motor shall be protected by two (2) rotary shall be single phase,230 volt, 60 Hertz. Single phase motors shall be of the capacitor start- shaft seals mounted in tandem with an oil filled capacitor run type for high starting torque. With chamber separating the seals.The seals shall The stator winding shall be the open typehave carbon and ceramic seal faces diamond Class B insulation rated for 130°C. maximum lapped to a tolerance of one light band. Metal operating temperature.The winding housing parts and springs for seals shall be stainless will be filled with clean dielectric oil that will steel. An electrical sensing probe shall be lubricate bearings, seals and transfer heat from mounted in the seal chamber to detect any the windings to the outer shell.The motor stator water leakage past the lower seal. is to be pressed into the motor housing for optimum concentricity and alignment, and maximum heat transfer.The motor shall be capable of operating over full range of perform- ance curve without overloading motor and causing any objectional noise or vibration. 7 20/7 s Pentair Pump Group y 2HP Residential Grinder Pump Rail System Package Grinder Pump Technical Specifications 6. Pump Impeller holes so that screws can be used to push the The pump impeller shall be of the recessed shredding ring from the housing. Both the radial type to provide an open unobstructed passage cutter and shredding ring shall be removable through the volute for the ground solids. The from the outside without dismantling pump. impeller shall be constructed of cast iron and Grinder assembly shall be of such construction shall have pump out vanes on the back side of that no clearance adjustments are required when the impeller to keep solids from lower seal and assembling. All grinding of solids shall be from reduce pressure at the seal faces. Impeller shall the action of the radial cutter against the be threaded onto the stainless steel shaft. shredding ring. The radial cutter and shredding ring shall be of#440 stainless steel hardened to 7. Grinder Assembly & Construction 58-60 Rockwell C. The grinder assembly shall consist of a 8. Pump & Motor Castings rotating radial cutter and a stationary shredding All iron casting shall be of high tensile cast ring, and shall be mounted directly below the iron and shall be properly cleaned, pre-treated volute passage. The rotating cutter shall be with chromic rinse, and painted with a high threaded onto the stainless steel shaft and quality enamel paint. All pump components shall be locked with a screw and washer. The that are not cast iron or stainless steel shall be stationary shredding ring shall be pressed onto galvanized or painted with baked-on epoxy. an iron holding flange for easy removal. The All fasteners shall be#302 stainless steel. flange shall be provided with tapped back-off 8 Molloy, Catherine From: CallCenter@CBYD2.com Posted At: Tuesday, September 21, 2010 4:26 PM Conversation: Locate Request-20103901834 Posted To: CBYD Subject: Locate Request-20103901834 (CALL BEFORE YOU DIG - CT) 09/21/2010 16:25:46 -5G -C1 -CW -GV -OT 17-SW SWINDS -T5 -------------------------------------------------------------------------- ***** ROUTINE ***** TIME. .16:25 DATE. .09/21/2010 REQUEST NO. . .20103901834 LATITUDE. .41.8569794 LONGITUDE. .-72.5407759 TOWN. . . . . .SOUTH WINDSOR ADDRESS.. . 155 STREET. . . .ABBE RD NEAREST CROSS STREET. .WOOD POND RD -------------------------------------------------------------------------- TYPE OF WORK. . . . .EXC TO INSTALL SEWER GRINDER PUMP SYSTEM AREA IS MARKED. . .YES REMARKS: WORKING IN FRONT LEFT OF PROP -------------------------------------------------------------------------- START DATE. . . . . .09/24/2010 START TIME. .07:00 CALLER. . . . . . . . . .ANDREW COLEMAN CALL BACK. . . . . . . PHONE #. . . . . . . . .860-871-2616 FAX #. . . . . . . . . . .860-871-1587 ALT. PHONE #. . . . EMAIL ADDRESS.. . CONTRACTOR. . . . . .WASTE WATER SERVICES ADDRESS. . . . . . . . .100 WINDERMERE AVE CITY. . . . . . . . . . . .ELLINGTON STATE. . . . . . . . . . .CT ZIP... . . . . . . . . . . .06029 -------------------------------------------------------------------------- EXCAVATOR DOING WORK. .SAME ISSUED TO: DATE: TIME: BY: DATE/TIME ARRIVED: TIME LEFT: COMPLETED BY: CALL BACK: 1) DATE: TIME: BY: 2) DATE: TIME: BY: PERSON CONTACTED: PERSON CONTACTED: 1