HomeMy WebLinkAboutFoster Street (13) 1
•Y
MEMORANDUM
TO: Matthew Galligan, Town Manager
CC: Michael J. Gantick, P.E., Director of Public Works
FROM: Jeffrey Doolittle, P.E., Town Engineer
DATE: March 16, 2006
RE: Property on Foster St. Ext. for Culvert Replacement
The Town has plans to replace the twin culverts crossing Foster Street
(extension) as part of the Miller Road Drainage improvements. I have contacted
the property owners on both sides of Foster Street extension to secure
easements for the construction and maintenance of the new culverts. The
property on the east side of this road (by the culverts) is 4.3 acres of
undeveloped land owned by Ralph Winn Jr. with an address of R048 Foster
Street. The Town has requested an easement from Mr. Winn of approximately
2100 square feet (0.048 acres) on this property to replace the culverts. This
included paying a fair price for this easement. Mr. Winn's reply was that he is
not interested in an easement but he would like to give the entire property to the
Town in lieu of the back taxes owed on this property. The property is wooded,
flat, has two streams passing through it, and is mostly covered with wetlands
(according to the Town's wetland map). According to the Town Assessor, this
property was appraised at $53,750 in 2002. The total back taxes with interest
(including a sewer assessement) owed are $54,949. No taxes have been paid on
this property for the past 15 years. Attached is a map showing the location of
this property and a second map showing the approximate topography and
location of the stream channels on this property. Please let me know how the
Town will proceed with this property.
\ i /
I
YG � �
7-________________
--•---.
__T`
\ ; -
S
e � '
i
i
1 \
.r
r�
: 1
l '
t,
l
Town of South Windsor R048 Foster Street N ; ``. ! WATERCOURSES
Connecticut
4.3 Acres 0 PARCELS
Date Printed: March 14,2006 ROAD NAMES
0 600 Feet '
Property boundaries are derived from the Town of South Windsor Tax Assessor maps,digitized at a scale of 1 inch=100 feet,and include the same data limitations and disclaimer as the Assessors map
All other data portrayed is representation only and,due to inherent mapping limitations,should be used as a guide only. The intent of this map is to present a graphical representation of property bounder'[
and selected data,and the map is subject to change as more accurate surveys may disclose. Property boundaries mapped as of June 4,2001.
is I a.
MEMORANDUM
TO: Jerry C. Iazzetta, Town Engineer 2�z
FROM: A. Bowen Davies, Deputy Town Engineer ,' /�
RE: Foster Street Extension
DATE: September 30, 1993
In researching the origin of the "Extension"., I couldn't find in
the Town Clerk' s records where there has been a road name change.
The confusion appears to be around the intersection with
Ellington Road, at Fire House No. 2 .
On the 1869 map no names were given to the streets . The layout
had not changed much to the 1949 map, revised to 1963. As noted
on this map, it is showing present Town roads as recommended by
the Board of Selectmen. It was noted that this plan was not
officially adopted.
On the 1958 subdivision plan, it shows the edge of pavement going
around the front of Lot A, the Fire House lot: The Street Map
for that time showed an island at that intersection.
The ConnDOT 1979 and 1987 listing of Town maintained roads does
not help much with a listing for Foster Street No. 1 & 2 . I
don't know where this came from.
Since that time, with the recent work with Fire House No. 2 and
the realignment of Foster Street to meet the intersection with
Devonshire, Windshire Abbe Estates, Section VI, the Foster Street
pavement ends are not opposite each other, as in normal
intersections .
It would appear that the Town intended the street name to be
Foster Street for the entire length. The three street signs at
Ellington Road, Saginaw Street and Miller Road with Foster Street
. Ext. on them are incorrect, and should be replaced.
ABD/jsv
• " _ _ �;I%� —.— _E any A S � _ • • �, - - - � . , Y ,
A _
e
6 ,ll gQse L9
OVADist No,10
,traZ at
J P IiO A4 �sr
`1,�' Ch uv Wa Zcott� Cr`r/t tl \ ' •L�th rp S
—�—
- _ O l+
� - . ^� _-_ p •_.
x. +�'N11!(11 0� '\ `q$, : `��� c. ✓Tii. � - \ .$Abbe.. •R"8.4bbe
O ' ,/l �'('� i C•: • �reLBG CO
' r \
off
• ' - �I jY t 9er ram' ��rssrL
-17
J .flBrzrbpr !
•• • gird• °d t _ `"K Fg Z 'T f 1'aC}l �� 1 C Ir \ +
f J""wan C .afisBarber
.//,�t;'! � .l.w . '! 8�, G--'/\', ��.- gSr+�,.r/:1,7. ,( ' ;/\i I)I tJ ant• t �``% � r -
J i ,• ` \ Asi' �U.
JO l��f[ll�li �a�aGy li1p�,+ .• J��r �'jer r \` a, Jf r ;' Jf� •'�$St.G'Lrii,�L---•---z_- ._J i ...
�,� ,'� �'�;// '`may' � `ZL ► \;�• /--- f �c�h � .7J•L .-
i/�/%;�� v` x, `{'. lcS' J.Duff + \
�i•� \� �` /i � ' \ \\ I `� �•' ��� N l/ �` j rf i ..7frsBrsre O,C � ,y G 1 � � 1`�
,r r•;f,J., rJ. \\: • _yA 1 s♦I%1 !` Pew
_ 7
r%/,//l�'iJ �G •J. `\�,�\�<.'jiP. 1 'S..'kdi>kayt• ��' f1>_1= --7i _ 1`C•' /t
I
I1� J'�✓�' 1 - - �\ + cc`,ti'1\ 7� Jl � rY'r� 1 •L' -� �'
.>• / r. .ct . LS ! _\ I del �+ttLt`,.•
i r -o,,. 'r/•�_.�-f'I �\ • �'13 ar i G'�mr\. � rJ- r�ear,• F.Tolll
/�j J-: �.�� /lam ;" �.a, r�fi�'�C',e\'• rG 1 \ `�- � ,� ap-�'t�-_ + - �'\*
;yAy
�.fl -`_✓� Key",�� `� I �.
.f•: \ \ 1 s
; �. , • : , � ql � oIf
- " ' _ ^ - _ �.• ''• ' �•Gjvd,o„ 11 .V / `pie y\ 7.0
i C•. J.'. --\ S/rn F k, '�. rsr r, d \,
a9 1�'•yr� / .,✓u• � . 1 "°14r q / ski:°h rr / - ,,_ •✓.GP ,V -�
- q:'% r� •;fti �p��.I/i �0 1, y i f, / [{f ;I , --••:✓: Ch-4 �.'LILrL . •
f Yam' \ a ,� S( �T \�=� _—r"� �tps f �� •i$C,.Sfru R��fo/l % .I;' &Dart
' . �Lr� f'cT ;+�:.�y� /`�P's• Q f \\� 46 t��II �1i•/j �T/�� r, o� •f i/ ���d,� � / _
:./ T./ \\ '4�AtJ• J/. -qT��>\ I i.\ MJe
I;(;atlrs.F' .Sr2rGZli - TU,g, '
`j r �lv� \`�`�i�i /, at '��. It S J�i•,SC1tZ r ;%r I.ILc,'gr7 Ary�C'eeR
; •t/ L,S, �` '' ./°ilk � �`\ � � J'ct.:w.f...,. "c4., r ., !�`rFe�t `�Dur.f �i /
rt � r i:z •�S:y rt
of �1 RflShir>rE�j� / �\ 8 2 r5' 'r Q 9n i�•O.Dart
!`9 ° Cer'� �/! , / of{{��n
a. r' ✓ •dry \ .�' \ ./ C 1 /J /r 1 �iil�,, r �_ _ , i \ \ f/
' ;i� �"i�• .: '^Fr mot\\�� c r. \1 I rat. , Grrrge.��- ` .,1 //• /
(1 r �� /�-. ��`�L-.._ �� / - � I / �� Xr ,Sir�hlon 1 i /' k.'ty�•a�, \ \. ( .�/�G.ltuzli.,'tea'•
II I •l y ](+! �' \\ \ 1 \J ,J'�et�� ctnt
5 Ad44 a�1
0¢ �
stalig
f Xwta�!�" S� r. a" 4
d j ?��, / • • 1 ,/ rSlrru .•<on`� nIIy n -``=��. �At a t t� \... /
4r� (/ 6 •�i. ♦ FS t C+ �^ ° Y,'' CLoumr
4! sEdG
�r is l/ $a 1 \
r'r +v �j' • • {� (0// � � • odrr � t , $rtckSi2rc �= S��• S°'Sq��` � � S, a,�r�J1 �
4i ahs ..S.)rt7BOn _ h -
{yitSJr itt
' \ l• l, G �L \� 7 41/ �g ' ( , (� S Sre\ s�hfcut tl ( • �rtfee
:' `�l �f1c EW.Bornham. • ' A Q/. . iys .%`�-i�� //�•\ I�r.ia7 J-S\a '•�.•Gti.�a/ //j 0R4 �• A?8 - _ _ '_` •Url� /G �tfi • S� T . f
�
C SB -
Y, ip /• \� �' .. _ 31 -- - s�:x ,45 .,_ J. RRo'rkweZLi�'f- +h� �f \� :/ f /at+ /'JOj D • l /''
GtnJacn7rs `ti ' �.3• 64 wjm-Y / I C1�0 d • ck •': 11..2' /:
PSp7 • t� �Bfl •i/ f � ♦ i
� ♦ !a r giA� cV \\Y_ • 1 $
•�� f�r < ` ,Cr yt �o e�.• / i $ I yG>n'�t•�•G sQ�l xor,� •\�j "s, i `.spry lre ``�
/ �.T.EZnteT Xislc_y-
.S . ' W rant• eQ,t 'Ay �" � s.\ °eke, r s - '.D !. �.and: y` ,
` r0. [L' -FR. ��\ c1 f' `�a� •Crfs `:\ ''' .'+�Z, v� as?dD
T I ¢ 10E- UberG:,/ J
�: I Dlst. �?Vo1w. I /•L.DewpY
.'+ ./.•'•�YJlPxtrJ►/ i %•afElmore \ 1 a o I UpaZmer. '+07Frty ?'��\`Jl/�•ii`�.r +:�\
r• c�OttL•'•TBr77grLalTtr°p :\\ 1St�iNO ° �&3.b711o� v `� I Dist.
C �'Tmtes � ^� lfra7V7rap7e. \\ •� rq 1
ltG.'P yt4 r \. \ l�+U ifrsFrntor�•' • 'r 4 i° a I
h 71raB' gluon`:\ ;\ �tGi7lnrcrn--- - t\IS,X • , O.Z,on>rris .� •Gao.Gi"lb¢rt f �,p��� f Q
N t/TJ)/�rr / ff -I / �. "� •Z.Grmct !: •-- , . � � T� ,.
� �a7ur�n;. i+v7tlia» % rTb f / \. •G.Tpsmr �-Jj
Jltoy,�daZrrurrr7cr, $itbd°/fit
�0.7i'°od 7 �4'"lu.�` "�•?A / J — •t'
f,/-lt<hartls.�atf�s- . ('IPest `l()IIjt�jl,S;rahh&mh m \\ /. ♦-Hayes t 1
L ATJ3ura enm`� __.'IfixF.huore..�r7 t` r.1 Y 0.
S T — _—
SOUTH WINDSOR HISTORICAL SOCIETY
South W' s onnecticut c ;
Z4 Y� }���f P '� z`�§� '�{' 4t � `'}r'�:.�*Y�-. cI ��fhi t+- f � 5 �' ♦{
1 r<
�'""Rhy .••�'M� r r aa'+ o�r"�`L+: r wT{_ c �' � `"`'` '
�rrrs� - ��Kt�.�e�Y" kFc Y r �_,, ��,k�' "`.����)t�_< rs'��•ya' 'SS�o-��b r� :'\
��.}s �( r;'4' �t x`,f.� c -` �"�" .��.r j''� rq^:;.�� ��� �.3'..},r�� r,•�4��- � t., '' �:: �s`� �cg,�� �� V
��? �..»x.,a'.:.-k. `�` ` 'r � r'- �''�•x�--��r'`.3 .•tea.� i' ' '''�.
3+
'� v ,,_�a � ..� '"a x � •s .z °+ r ��,�,�„'�� �� ads � fx,�
t Ra Paz ' t iF
r 0
ar
\ r � Q�. _ •.a+ ..i�4 9< S)"5i: �.� .. _.✓" �,�y_,-}tG-M1 G:S�y.3.}2�`f Sn 4fk�1
W,1 I
�.
r�L�, rS r:'�k 1•ytt � •S{-ad � 7 y''�� yi,',€`t
•�:_ t - � ,:a,{,iz drl'Ay�.1��` #=�s'<i n _ r T�✓��c�t„r i �,`�r����r! A f,Sj r� s ?' � _
a\ a�t� g Mi4
iS s'F S - t 0r1:, +:{i •- v�. s _ _ a :. a r3
r- ff
fi�o-•
r�,��•�' L :'���Y+� ft.y-„��'ur��L- �.s F ,. +e �' - .r..c ' .....Lo-..• -,o to
' ;� S='`t T.Y• �,A,x z / �-��- � ��� � { €"� 5ti x.K t C�1" "��7f`�"��� � � , `f�`ct" �, C6
�� +
7
+''� 't'
4.
`t #
C Ph� 4 ,may l 'T h ) ZSY3•- .i '� --Af
ANA
f � f as r^- F ti ''�•..�s-., rF s* f �sa'>,c-C r , t �' � a d � r)
- yyy��/•• '` 5 � �a ��T7K— N �t�aS. t# - s 'F _
-�� _` 1 j � � ,. ar •P -'-sk-ys,t ��t r`� �.� �'`•y'�a'��/* ','•t. sryr��$t1 ,yy,�j.-
� *," r FnF��� v� �� 'ui � .,ay •`i3 J> a YaP* 3, x - `r
�`�p§ _� rij,� •���r'��tirY ryt�{ -> - -•°'"Y ti'taa � < ss^s _r-i1� �e�'��"a�' a.-3� +� u ��k ,� y:,
4.rF�,� i 3rr• i � f�'rc 0.r ;' 3��> 1"� ly�l_ (f`-b Y.Se 2-r �� �yY
-', i F §,�� �s+`rs,+":�.�t� ''# � T ri^ 8� �v n-.�` y`"',�}t'��A�M•i�3RC'rt�{ '��
�r y gc; .( z.��T'�� F��•„3}'�{ra�i s ��; rx �� ��{'�: � S .as •.:i
G`vs �7�`£s+�a"��b � �y ' •F Y _ 'r".it�r � 'jFi�'r�"'`"7 M f ; q,-V r3"
`�'�u�r� ";•� �� xi ty'�e<�^` �t a .�� .v • ,?rx1�,x,.`, ���r��r �'`i a'� � .`c' rc. ,+;. 1
e��A �t t :;� � �5"-� �S��.'� � °�- �. S. -'�' � t' }'.�'�' "`` $ zt �� ""^.•r�e Y�.��akh wS�,,.r_� .,`z! K
7y. +F: :� �1 B 3 §�� ,"g..t,3 �`�u�x.•+2$� �:n1� �x s' :`T`t` J
51
S :A t � zrY -•.S+ �t a � ,r.; +t a�sf - �,u§ 3,,,.` a£ 3 3. 3�,r< r1 r _O -
s � 1 a a i''-�"^'�fa:`f-e � a h t �a''K r� '✓',:.J F:� � °�kt <,m. �'� � r r: ,t'��.4(,�- } i r x .�.r a.z 3 S�y�''�+rN�
+�- .,1, t7; a, ti -.>/ jsa ip� y"� '4r c,g: .'X.ai'- zS_ �-�� rt rs �`aio-• J i 5_��, t ��,s ? i F
e+..� �� h}+ 6�f a,.- "+� 2 � K. �+. •^sT.�" .1.. 2. -.;i` �•.. �.. �`'`'�� !., Vic. a:�4• '{ a--31C::+ a A' � s r.:u '�'�-�:.
ryr�,,�� �-'?'-tti �r as-, �' "• •} °�Y �+.54{.. �� �.:S,-e .:s.� aSf-3�_ 4�&�'f N�-�°' r tj' �` 4�: i £
`.5: t '� x 7 :{ Y br:� h -, 1.A r S4� �- 4""�_ iT,lx 'r _ Y; R .;�hy't n g, ;:.� 'W - �' �4•.
1` L '•+ -.jy ".KL ,' �t r 'S .k`'`:°SS �v �JJ•a-j NS F YAllJ'
..i AY �-•a, r s ,ss n � .s�t Wr ;�A-� -r * �a �F..
+ u � ,:� r .F,'t-�,����.y��-m"� �µ: ,ej- �. r s .:�� ...�{� �t�'y#�..er�t`2��z -'� r{> 5��, r'a!y 3.,�+-'��aF �w •. ''°}a'#
,6-,�. ..__ Z*,,rfi.'•. rbL+„X"h;7=arJ'fs ` `� r . �.+f-.� r C ; S t:.t >si'"` u•.': �.r.l.; Rv:.'� _._ArS.C�_ _
P cW Y
8 RLE A, RD.
d o' a
a a Rp.
0� �`vv DART H144
i ti0� DgNr
• �o
v
�v
N
m q N
j
m AVE Y ST. SCHOO
o �4 NppSE 2
4 00 FIRE
Qp, 6
eq 2
Lu
'A P C � v ,
tq RQ \
<(Fr t3 gACN N2 4k
`2?°�`Q O r o v MGRRgr e1 .. i
00 a AQ �P,
SCOTT
tREEZY�ry ARt+.O
ROAD < L WAY °j CH ID STA
'IEL
BLUE RIDGE ONOp
,r �, F(( RQ
DRIVE OD /� '1'ONp r J
o Ro r
OR e BROAD b - OQ �L
LEAF DR
N /
R t0 0 6Q
o°
tK.
\ _ W
sue
/
� /o
R w
m �
CqR ao
ti e
� oro Qoo
w I
SO. WI
FE
1000
ENGIN
X
r
/ — M
i - --- - N�L- 50UT WIND
SUft
T0 4U
T.
4 4
MILE5 OF LOCALLY MAINTAINED ROADS AS OF DECEMbER 31 ► 1979
t NUM €1 aTRETAH MP• MILIw INIP. MILE -
GRID UNf
4[1 DART HILL RD M C�3 1 '`�`' -
�. 91 DAVEWELL RD F 07 • 15
q2 DEEPWOOD DR L G5 T
.3b
16 OEER IIfLt EA !
fit 7
y5 pQGWQQR LA 0 a5
46 DORI.A LA K 03 906
'17 DOWER RD Ca 01 923
1� E€�GE"W0Q. t�
�"
193 Iw1 �+IN RI3
E531
{
F O6
+f E .IABET.H 5 012
ELM ST
. 207 FAIRVIEW DR M 03 .37
J 02 049
51 FARMSTEAD DR
52 ARNHAt .IrL1 FI
4 'S S ELF Rp I's7
1sI
t D .tl 2 _�
a 1 4 7 W. F. .R Y L A --- G �G 6..- _ - __ �-- ,'j 7
�Sq FOSTER §D L 0'F •69
� � 55 FOSTER ST NO I
0( L 0 7
a 188 FOSTER ST NO 2
R _T-
72
-. F M IT A I t3 N 77
mm : ai
i 57 GARNFTA L U2
6
58 iE . #E .l1�
� -:
} 0 5 '21" 59 GLENDALE RD M 06
195 GLENWOOD RD .08
--
60 GOL.DM I NE RD N 06
61t1Qp HILL Ii }
t < H . 0 t • '��
)ON p ".39 b5
62 < _..GOVERNORS. Y 909
K 03
I? GS
6.3_ GRACE RD J 04 1 .95
_ - 64 GRAHAM RD
t+2 GRAY i2R� M 05
179 W GREENFIELD DR
- J G2
10£1, N GR ENWO.OD D
i. C► ► 6
H t�1 I . 6
6 GR 1'FF I.4 RD �_ 0 Q5 �;10
- _66 GUt.LEY DR y
67 HARVEST LA G 01 J #
!35
68 _. H A Y E S RD - -
;> 69 HALEL 0R J C2 •:27 :
y 70 HENRY RD
l 1 . 166 HERMAN i J 02
_ 923
196 ~HIGH RIDGE RD M Cb
71 HIGH ST J 03 .36
G 01 . 26
7-3..-._� _ HIGH TOWER RD _.._. . ,_ ._. -_. _
744l HIGH VIEW RD N 06 •2$
_ 7 HIGHLAND pE? N O5 ..3
. 75 --- --H1LlSDAt Ra. OIL..«.-- -
•08
--- •50
76 HILLSIDE DR H 03
.QA
TOWN OF SOUTH WINDSOR
- - MILES OF LOCALLY MAINTAINED ROADS- AS OF DECEMBER___31_,-�1-987-----
NUM DIR STREET NAME GRID UNIMP. MILES IMP. MILES
186 E CLIFFWOOD DR N 03 . 16
33 W CLINTON DR M 06 . 48
216 E CLOVER DR 1 06 . 18
174 N COLLINS LA J 05 . 08
34 W COLONY RD D 06 . 27
35 N COMMUNITY RD J 06 . 08
36 N CONCORD RD M 07 . 05
237 S CONNECTICUT AV E 07 • 14
37 S CRESTWOOD DR M 06 . 16
40 E DART HILL RD M 03 1 . 45
41 N DAVEWELL RD F 07 • 15
227 W DAWN DR F 09 . 23
42 E DEEPWOOD DR L 05 . 36
164 E DEERFIELD LA K 06 • 24
43 E DEMING ST J 06 1 . 64
44 S DIANE DR N 07 . 76
45 S DOGWOOD LA 0 05 • 49
46 S DORIA LA K 03 , 06
47 N DOWER RD G 01 • 23
48 N EDGEWOOD DR E 06 • 42
193 W EDWIN RD E 05 . 31
49 W ELIZABETH ST F 06 . 23
50 S ELM ST N 06 : 12
223 E EVERGREEN LA G 08 . 16
207 E FAIRVIEW DR M 03 •62
51 S FARMSTEAD DR J 02 .49
52 W FARNHAM RD F 01 . 56
53 S FELT RD K 07 1 . 10
147 W FERRY LA D 02 . 74
54 S FOSTER RD G 06 1 . 17
X 55 S FOSTER ST N0 1 L 04 •69
X 188 S FOSTER ST NO 2 L 07 1 . 72
56 N FOX MEADOW LA K 01 . 06
228 E GAIL LA F 09 . 38
57 E GARNET LA L 02 . 08
58 S GERBER RD WEST 0 06 .20
59 W GLENDALE RD E 05 . 21
195 E GLENWOOD RD M 06 . 24
60 E GOLDMINE RD N 06 • 08
61 S GOOD HILL RD M 07 . 17
178 N GORDON DR H 01 . 30
62 E GOVERNORS HWY D 05 1 .84
63 N GRACE RD K 03 •09
64 S GRAHAM RD J 04 1 . 95
202 W GRAY RD M 05 • 42
179 W GREENFIELD DR J 02 • 29
180 N GREENWOOD DR L 06 . 06
65 S GRIFFIN RD H 01 1 .76
66 N GULLEY DR 0 05 . 10
67 N HARVEST LA G 01 . 04
M E M O R A N D U M
TO: Members of the South Windsor Town Council
FROM: Terry V. Sprenkel, Tom IMLalnaaer
_DATE: December 4, 1975
SUBJECT: COMTHETION OF _FOSTER STREET EXTENSION CULVERT INSTALLATION
I had earlier indicated to Council the culvert installation work on the above-
mentioned project would commence December bath
Mr. Delisle signed his easement on December lst. We rescheduled the installation work
with the contractor for Thursday, December 4, 1975• The work was commenced on December
4, 1975 and the culvert installed with the road completely re-opened at 2:00 p.m.
Rip-rap work and channel clearing is being completed.
-We were able to install the tu-in culvert appro,—dimtely six to eight inches lower
that the existing concrete culvert. The Lmnnediate results were most satisfactory.
The water level of the channel and the large swamp area to the east of Foster
Street Extension dropped immediately. Within a period of several days we anticipate
dowering the water level of the swamp area by almost a foot in elevation. This will
lessen potential flooding problems mentioned at the November 3, :1975 Council meeting.
In addition to the above project the drainage installation at the intersection of
Foster Street Extension and Ellington Road is proving to function in a satisfactory
manner. The installation of the two basins has eliminated the continual flooding
and long standing puddles at this intersect_on. This project had originally been
scheduled for the spring of 1976 but was accelerated in the schedule to eliminate
the continual hazard and complete the two drainage projects on Foster Street Extension
this fall. This project was completed about six weeks ago.
cc Melvin Stead
:ate
October 16, 1975
Xa. Bother A&347
5 pwltqr Strellt
South for, Canaftiout 06074
Dear Ms. D&UVt
1 ha" "f*rr4d YOW l*ttar Of d - 280 1975 to Tom AttarAV
far raviw aad cement. This vas received at titTamH&U
The TOM ap "r ast 4 is 0 dft� ao�3 ti�m
at inifttAM Rea4 avA Foster,3tr4ot. The Tom CwawU fumW tbkg
ProJeat with the wAsrstandift tho work wM bo caM2&W *aim& tho bye
gimift
Of the Mb 0040AMINUM M&M. I that the To ,, for a lone
Of tom, att to have this Bad the reepanisiblUty for the correct,
iv* work aim a 8tata h1*007 Is Im 3v d *
The TOM C ldn � a f4Wr for b to "law the i
�► isa Cul AdJueent, to tho exisuAg ealvert
OR FD*tsr . The roqwmt wiU the, TOM Cowtoil wad 1 wDWA
h*P* thAt &MthDrizatim will be Vwtood in .
ocatut Fm vpM a dOW- ndmUm t T Ate Of Of Claim
for
V ;Wws
TOW Cr BM WNWM
V. $ 1,
Tom XwAdw
: Mayw Robert faith
Tom, Attu Thaws D"Als
ladl s, Mr. of P%bU* Works
SOW N sFq`
H Town o-P S_O_U�i �
C a
ti
1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074
SOR•CO AREA CODE 203/644-2511
October 10, 1975
Mr. Emil Lucek,
Direcror of Public Works
Town Hall
1540 Sullivan Avenue
South Windsor, CT. 06074
Dear Emil:
The recent week of heavy rains resulted in flooding conditions that were not
apparent problems in past years. Specifically, I am referring to the flooding
condition that resulted on Foster Street Extension where the Podunk River passes
through a culvert under the road. The property on the easterly side of Foster
Street Extension is the land that was filled several years ago by Mitchell Brothers
and was the center of a controversy between the owners and the Conservation Commiss-
ion.
The fill material appeared to restrict the flow of the water to some degree
though I realize the culvert was running to capacity. However, I am concerned that
the culvert may not be of adequate capacity or at the proper elevation and causing
further complications to the flooding condition.
I would appreciate your investigating the situation surrounding the flooding
problem and informing me of the ramifications the fill material might have caused
in the problem as well as the pipe size of the existing culvert. You should also
indicate any recommendations that might be implemented to eliminate or reduce this
potemmtial flooding location. I would appreciate your report and comments by Friday,
October 17, 1975.
Very truly yours,
TOWN OF SOUTH WI OR
L2;
Terry Vfnpre el,
Town Manager
�O'NN
?dUU144'0t
ti
w� 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
jl�soR•co^ AREA CODE 203/644-2511 -
November 4, 1975
Mr. G. Ted Ellis, Controller
Town of South Windsor
1540. Sullivan Avenue
South Windsor, Conn. 06074
Dear Mr. Ellis:
Please be advised that the South Windsor Town Council, at the
regular Council meeting of November 3, 1975, voted to approve
the following resolution:
BE IT RESOLVED that the South Windsor Town Council hereby
authorizes the transfer of $3,000. from Contingency
Account #11001 to Public Works Contractual. Services,
Account #4023, for culvert installation on Foster Street
Extension,
Very truly yours,
TOWN OF SOUTH WINDSOR
Winifred H. Wilson
Clerk of the Council
cc: Emil Lucek, Director of Public Works
J. Russak, Finance Department
Terry V. Sprenkel, Town Manager
Lawrence Decker, Town Treasurer
r'
&7IJ
MEMORANDUM
TO: Melvin Stead
FROM: Terry V. Sprenkel, Town Manager
DATE: October 23, 1975
SUBJECT: FOSTER STREET CULVERT INSTALLATION REQUEST
Council has received the report and recommendation pertaining to the installation
of a thirty-six inch culvert on Foster Street for a cost of approximately $3,000.
This item is to be reviewed at a Council work session on Wednesday, October 29th
at 7:45 P.m. I want you to attend this portion of the Work Session to cover the
following aspects of the proposal.
1. Cause and effect of the recent and potential flooding in the area of the
existing thirty-six inch culvert.
2. Calculations of increased velocity of runoff within the watershed area
due to recent construction of "residential units in such areas as Timber Ridge
and other areas.
3. Effect of upstream swamp areas being saturated as the result of rains
during the week of September 22, 197 6.
4. Anticipated future flooding problems within this area and quantity of
estimated rainfall that can be handled before a flooding condition occurs.
5. Anticipated downstream erosion and flooding problems that could result
from the doubling of the culvert capacity under Foster Street.
6. Recommendations to eliminate any potential downstream erosion or flooding
conditions referred to in 5 above.
7. Any other comments or ramifications that are pertinent to this flooding:
problem or recommended improvement.
Please submit your comments to me by noon on Tuesday, October 28, 1975. Thank
you for your cooperation.
MEMORANDUM October 28, 1975
To: Terry V. Sprenkel
Re: Foster Street Culvert
The following is in answer to the seven questions put. forth in
your Memorandum of October 23, 1975.
1. Cause - The pipe is undersize for the area. Even during
a 10-year storm, the flow is such that the 36" is marginal.
2. Increased Run-Off - From U & R development according to
their figures is 33 cfs (cubic feet per second) , for a
25-year storm.
My calculations indicate that they could be contributing
as much as 55 'cfs during a 25-year storm. Compared to
the total flow of 401 cfs, during a 25-year storm, they
have increased the flow by 13.7/.
The Dzen tree farm has not caused increased flows.
3. Effect of upstream swamp areas being saturated - The result
of being saturated prior to the downpour is that most of
the rain that fell, ran off immediately.
4. Anticipated Future flooding - Future flooding can be expected
here due to the marginal pipe size. Most common occurrence
will be in the Fall, when the water table is high;and in the
Spring when the ground is frozen. These conditions allow
for almost complete run-off without any percolation into
the soil.
5. Downstream erosion - This is not a serious problem at the
present time. The landowner has, over the years, established
a fairly stable channel. However, any dredging, shaping,
or lowering of the streambed will not only increase the
possibility of erosion, but will more than likely result in
substantial amounts of erosion.
Flooding - Doubling the culvert will not, in itself, add
to the flooding on the downstream or west side of Foster
Street. The channel there almost disappears as you go
westerly from the street. At about 150-175 feet out, it
Memorandum
Re: Foster St. Culvert
Page 2
October 28, 1975
5. (Continued)
turns into a swampy marsh area, where the water flow
decreases to about three feet per second. The channel
here is about 18" to 2 ' wide and is partially choked
with heavy vegetation. The slope here is less than .5.
In the next 200 feet, the slope increases to about 1/;
however, due to the dense growth of grasses, the velocity
does not increase. Due to these conditions, I would expect
to see continued flooding in this area. By flooding, I do
not mean the flooding of homes, but the flooding of land
only. Basements in this area will continue to have problems
of seepage due to the high water table.
6. Recommendations - Erosion is presently under control but
should we install an additional pipe, rip-rap should be
installed to check erosion.
There are two things that should be done to eliminate
potential downstream flooding. First, a definite channel
should be established through the swamp area at the rear ,
of #995 Foster Street and across the powerline property
to Maskel' s Pond. ,
Secondly, the outlet pipe in the dam at Maskel's; Pond
should be cleaned to allow the water level to recede back_
to the level of 1971. At the present time,, the water level
is about two feet (2 ' ) above the 1971 level, and is flowing
over the dam, instead of through the spillway.
7. Comments - This drainage area is at the headwater of the
Podunk River. It should be understood that any increase in
flow generated here will flow through every other drainage
structure along the river channel--all the way to the
Connecticut River. Drainage structures .such as on Miller
Road, as well as others, should be watched carefully for
their potential, and eventual, obsolescence.
Many contributing factors led to the flow over Foster Street.
I cannot point a finger at anyone factor and say "this
caused the flooding." These factors may never duplicate
themselves again--or, they could occur again at anytime.
r
Memorandum
Re: Foster St. Culvert
Page 3
October 28, 1975
7 . (Continued)
To conclude, I would like to say that this condition exists
at a time when only 70± acres of the total 450-600 acres
have been developed. The potential for development in
this area, and in others throughout the Town, is why we
are very concerned about long-range affects of our existing
drainage facilities. Our concern has led to. the Town-wide
drainage study becing conducted by a consulting engineering
firm. It might be wise to review his findings before we
commit ourselves to anything other than doubling the
existing culvert.
Again, I would like to emphasize that, regardless of our
efforts, 980 Foster Street will continue to have basement
flooding. This condition is due to the fact that this
walkout basement doorway is only .about one and one-half
feet above the flow line- of our existing pipe. The home-
owner himself should undertake some type of flood proofing,
such as installing a hatch-way type entrance into his
basement. This would not prevent seepage, but water then
would not be permitted to flow in through the doorway.
Melvin C. Stead, Jr.
MCS:prb
M E M O R A N D U M
TO: Melvin Stead
FROM: Terry V. Sprenkel, Town Manager
DATE: October 23, 1975
SUBJECT: FOSTER STREET CULVERT INSTALLATION REQUEST
Council has received the report and recommendation pertaining .to the installation
of a thirty-six inch culvert on Foster Street for a cost of approximately $3,000.
This item is to be reviewed at a Council work session on Wednesday, October 29th
at 7:45 p.m. I want you to attend this portion of the Work Session to cover the
following aspects of the proposal.
1. Cause and effect of the recent and potential flooding in the area of the
existing thirty-six inch culvert.
2. Calculations of increased velocity of runoff within the watershed area
due to recent construction_ of residential units in such areas as Timber Ridge
and other areas.
3. Effect of upstream swamp areas being saturated as the result of rains
during the week of September 22, 1976.
4. Anticipated future flooding problems within this area and quantity of
estimated rainfall that can be handled before a flooding condition occurs.
5. Anticipated downstream erosion and flooding problems that could result
from the doubling of the culvert capacity under Foster Street.
6. Recommendations to eliminate any potential downstream erosion or flooding
conditions referred to in 5 above.
7. Any other comments or ramifications that are pertinent to this flooding -
problem or recommended improvement.
Please submit your comments to me by noon on Tuesday, October 28, 1975. Thank
you for your cooperation.
DAILY REPORT
528-4431 528-4432 DATE
TRUCKING, INC.
TRUCK No. "��
SOUTH WINDSOR,CONNECTICUT 06014
DRIVER
CONTRACTORS NAME DELIVERED TO HOURS TOTAL PIT
CHARGE TO WORKED No. LOADS MATERIAL YARDS NO.
Al
HOUSING DEVELOPMENT WORK Serving The Greater Hartford Area RESIDENTIAL COMMERCIAL
No CENTRAL PAVING, INC. �-)11 tig-
520 Burnham Street • South Windsor, Connecticut 06074
Trucking& Excavating Roadways - Driveways
Telephone (203) 289-7088 & (203) 528-3153
October 27, 1975
Town of South Windsor
Atti Les Braddock
Town. Hall
Sullivan Avenue
South Windsor, Connecticut
Gentlemen:
We are pleased to quote on installation of squash
Pipe at Podunk River on Foster Street, South Windsor,
Connecticut. Town of South Windsor will furnish all
material and. Central Paving will furnish one backhoe,
one truck, one foreman and one laborer for the sum
of $1,850.00 for installation of approximately 50' of
squash pipe, including restoration.
Yours truly,
CENTRAL PAVING CO., INC.
A. J. TERL IZZI
President
AJT/mg
Page No. of Pages
J & H SLATER CONST. CO., INC.
Sewer Construction- Excavating
�i�Mla�t�. So. Windsor, Conn. 06074
421 Abby Road phone 528.0909
PROPOSAL SUBMITTED TO PHONE DATE
Town of South Windsor
STREET JOB NAME
Sullivan Avenue
CITY, STATE AND ZIP CODE JOB LOCATION
South Windsor Conn.
ARCHITECT DATE OF PLANS JOB PHONE
We hereby submit specifications and estimates for:
- - ......... ....... .............
..........................................................._..:...:_._........._.........:..._.................................._....... - .............. .................................
................................. .......................... ............ .......... .......... .............
The installation of a culvert under Foster Street.
..................
__...:._..........._ ._ _ ._...:._..._......... .......... _....._: . ._ _.
....... . ... Al.l znater.i.a1....an.d _engineering to be _supplied..by,..the
Town of South Windsor.
............................... ......... - ......... ........
......... _ __.... ...... ........ ._.__ _ ....................... ... .........
.._................... ......_............._. ............................................._ ......_ ......_....._ .......... ............................................... ........... .............. ....................... _... ..................
............................................... ........................ . _.... ......._......... . .._. ._ _ _. ................... ...._........ . _ _ . ................. ...........
.................. ._.......__ __...._ ... ..................... _ ... .... .. ....... ............................ ........... .. _ _ ................................ .. ...... ..... .._ .....................
....................................... _... ._.._.._._ ...._.................._._..... .....................................___.... ..... ... ._ ............................................................. _.................. ......._ ..........................
.......... _... .........._.. ..............
.................... _ ................. ..._ ....._ ..................... ..._:. ...._ ._ _ .............................. .... ............_._ .............. ................ .. . . .. ..... ..............................
............ ............. ......................................... ......... . _ ... ........................
........__....................................... ....._...................._.......... _............. ...._.. ................................._.............. ...__.............. .......................... __. _... ...................................................
............. ............................. _. ................................. ..__....._..._ .. .. .:... .............. ....................
F f xopoof hereby to furnish material and labor — complete in accordance with above specifications, for the sum of:
Fifteen Hundred and 00/1007777777777-77-7-7- dollars (s 1 ,500.00 ).
Payment to be made as follows:
In full upon completion of work.
All material is guaranteed to be as specified. All work to be completed in a workmanlike
manner according to standard practices.Any alteration or deviation from above specifica- Authorized
tions involving extra costs will be executed only upon written orders,and will become an Signature
extra charge over and above the estimate.All agreements contingent upon strikes,accidents
or delays beyond our control.Owner to carry fire,tornado and other necessary insurance. Note:This proposal may be thirty
Our workers are fully covered by Workmen's Compensation Insurance. withdraw by us if not accepted within days.
AurptMritr at f roposal—The above prices, specifications
and conditions are satisfactory and are hereby accepted. You are authorized Signature
to do the work as specified.Payment will be made as outlined above.
Date of Acceptance:
Signature
FORM 118 COPYRIGHT 1960 - NEW ENGLAND BUSINESS SERVICE,INC.,TOWNSEND,MASS.01469
Page No. of Pages
MITCHELL TRUCKING, INC.
90 Brookfield St.
SOUTH WINDSOR, CONNECTICUT 06074
Phone 5284431
PRO SA BMITTED TO N PHONE / DATE / `
STREET i JOB NAM n �r
CITY, ATE AND Z CODE JOB LOCATION L/ _
sL/iC.GKa
ARCHITECT DATIJ OF PLANS JOB PHONE
We hereby submit specifications and estimates for:
.._...... . .......
--.. .......... .. ...._ � w._ .J.� ......... ...... _. _. .. __.. _ - ��!!�
_... ......._.:..........._..........- -----.... ._..._...... .................... ......_......._. ............. _._.._ _.._.._.._. ........... ......_. -------- ........_.- ................. ............ ......._.... .................. .. ..................
...__ ...._- _.------- --..___........ ........_ ..__...... ..__.__ _...._. __._____ . .............. .--- ---_.._._ ._._......... ........... _.__._.-- -------- -......-- --.....-- -..._._..._...
--_.... ....:...... -----._ ._.._............ ....._.. ......_..-- -------- --._.._.. - .. .._..... _._. __...... ............_._. __...._... ------ -----.. .------- -- -----.__....
.___. ......... ----....._ _.............. ............. .__....._.._.. ------- __.. ...........
........... -------...._..... ._....... .-------.. _.._..---- ..._.._........ . ........_..... - ---.:_.._...... _.......... -------. ---....... .. ................ .._...... .. .._._._ ..................._...
........ ...................... ......... ..... - H... ....... VY......I......... -- ......... ...... -... -- ---. ... ... ........
.... -. ----.-.- ..... ...... ...... ..........
►nterest-at-the-rate of one (1)--percen er month will be charged on all balances from the date payment is due if the balance Is not -
paid when due, and the matter is referred to an attorney for collection, reasonable attorney's fees shall be payable in addition to the
balance,due plus interest. ...........
Customer waives any rights under Public Act 431 to a notice of hearing prior to a pre-judgement remedy.
frIIpou hereby to fur 'sh material and labor — co lete in a ordance with above specifications, for the sum of:
�- 9 l
dollars($
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be completed in a workmanlike
manner according to standard practices.Any alteration or deviation from above specifica- Authorize
tions involving extra costs will be executed only upon written orders,and will become an Signature
extra charge over and above the estimate.All agreements contingent upon strikes,accidents
ordelays beyond our control.Owner to carry fire,tornado and other necessary insurance. fusif
proposal may be
Our workers are fully covered by Workmen's Compensation Insurance. withdraw accepted within days.
Arreptunrr of 11rnpojottl—The above prices, specifications
and conditions are satisfactory and are hereby accepted. You are authorized Signature
to do the work as specified.Payment will be made as outlined above.
Date of Acceptance: Signature
FORM 118-3 COPYRIGHT 1960-Available from n s Inc.,Townsend,Mass.01469
Page No. of Pages
COVEN CONSTRUCTION CO.
P. 0. Box 511
SOUTH WINDSOR, CONNECTICUT 06074
Phone 289.7851
PROPOSAL SUBMITTED TO
PHONE DATE
Town 04 South Wind6on STREET Oct 28 75
JOB NA E
T mun H aeZ, SuZeivan Ave,CITY, STATE AND ZIP CODE Podunk Raven Bhook Cho6,6 inq,
South W inddon , Conn. 06074 JOB LOCATION
P o�te,c St, is xt. South Gv�.ndb an ARCHITECT DATE OF PLANS
JOB PHONE
We hereby submit specifications and estimates for:
The excavation and indtaZZation o4 50 ' o 6 ACCMP Squash Pipe.
L. and- equipment by _cont4acton. .
0775000
(Seventeen hund&ed .6eventy 6.cve and 00 eent6
.....- _..._ ... _ ._ .
Att...matex'a:2z. to _ be ..4u.)ntb.hed ._bra.. lawn ag. ..So.. ...Gltindsat,
..........
...............
................. ..
interest at the rate of one 1) percent per month will be charged on all balances from the date payment Is due if the balance is not
�
paid wheli due, and fhe matteC is referred to an attorney for collection, reasonable atf;orney's fees shah be payable in addition to the
balance due plus Interest
Customer waves any rights under Public Act 431 to a notice of hearing
prior to a prejudgement remedy.
r 11rapau hereby to furnish jop(�K and labor — complete in accordance with above specifications, for the sum of:
S v nteen hundxed S eventu ,i.ve dollars($ 177 S, n n
Payment to be made as (lows:
Net h,iA.tu dac z a teh comptetion
All material is guaranteed to be as specified.All work to be completed in a workmanlike
Imanner according to standard practices.Any alteration or deviation from above specifiea- Authorized
tions involving extra costs will be executed only upon written orders,and will become an Signature
extra charge over and above the estimate.All agreements contingent upon strikes,accidents
or delays beyond our control.Owner to carry fire,tornado and other necessary insurance. Note:This proposal may be ��Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us if not accepted within
days.
Ar t;1tatta of 11xnpDjoal—The above prices, specifications
and conditions are satisfactory and are hereby accepted. You are authorized Signature
to do the work as specified.Payment will be made as outlined above.
Date of Acceptance: Signature
FORM 118-3 COPYRIGHT 1960-Available from Inc.,Townsend,Mass.01469
MEMORANDUM October 17, 1975
To: Terry V. Sprenkel -
Re Flooding on Foster Street
As previously reported to you, during the recent storm (Eloise)
there was significant flooding in the nothern sections of
Foster Street. Immediately following the storm, I had Mel
Stead investigate the causes of the flooding.
To begin with, -it has been known for some time that to the east
of the flooded area is a very flat swampy area, which is
unpredictable in terms of its eventual direction of flow.
Depending upon numerous natural and man-made conditions, the
flow sometimes goes easterly into the headwaters of Avery
Brook; and on other occasions, flows westerly into the
Podunk River headwaters. Something as small as a fallen
tree could effect this change in flow.
Since the Town has no control over what happens on this private
land,, it is my opinion that any culvert revisions should be
designed for the most extreme situation. It is immediately
apparent from the hydraulic analysis that, the existing 36-inch
culvert is inadequate. The design flow requires .the installation
of an additional 36-inch culvert.
I am requesting at this time that the Council appropriate funds .
in the amount of $3,000 for the installation .of this additional
culvert. I feel this should be an emergency appropriation, and
the culvert should be constructed immediately.
I would hope you would include this on the next Town Council
agenda.
You have requested that I comment on the fill material placed
last year by private developers in this immediate area. It is
my opinion that the addition of the fill has 3�)negligible
affect upon the flooding and flow at this cuYvort.
l W. Luce
k
EWL:prb
MEMORANDUM October 6, 1975
To: Emil W. Lucek
Re: 36-Inch Culvert at 980 Foster Street
The following is a brief history, as I know it, of the problem
at the above-mentioned site.
Prior to 1967, but sometime after 1960, the 36-inch pipe was
installed. Before 1960, it was common to see water crossing
the street at this point. This 36-inch pipe has functioned
well until this time.
In March of 1972, the residents cited problems with some local
Spring flooding that left stagnant ppols in the area, and they
requested a larger pipe. In 1973, two major storms caused
flooding of the basement at 980 Foster Street. However, the
water did not flood over the road.
The storm that occurred in September of 1975 also filled the
basement of 980 Foster Street, but also caused flows too great
for the 36-inch pipe. to handle. Rain gauge information for
the storm has indicated that it was of 100-year storm magnitude;
and based on that data,. a larger or an additional pipe should
be provided, to lessen the possibility of this happening again.
Melvin C. Stead, Jr.
MC S:p.rb