HomeMy WebLinkAboutFoster Road (2) MEMORANDUM May 4, 1978
To: Allan S. Young
Director of Public Works
Re: Foster Road Drainage
Based on the Engineering Bureau current work load, and
after discussion with Lester and Mel, I recommend that
we hire a Land Surveyor to obtain the necessary infor-
mation on Foster Road.
This will be the most efficient and quickest method to
obtain the necessary baseline information we need.
The Engineering Bureau could then design the drainage
system, using the baseline information.
J. E. Page
Town Engineer/Planner
JEIjfnl
` 4 /
MEMORANDUM August 18, 1975
Re: Seventh Day Adventist School - Foster Road
Truman Hills applied for a Pavement Cut Permit to put a lift
. in Foster Road in front of the driveway to the parking lot
of the above-mentioned school. Upon inspection and checking
of grades and plans, I found the parking lot grades differing
from the approved Site Development Plan. Mr. Carlson,
Superintendent at the site, informed me that they had changed
both the building and parking lot elevations.
Had they continued as they .planned, there is good reason
to believe that it could have caused a water and ice problem
in Foster Road.
I refused the Permit, and advised Mr. Carlson to revise the
drainage in a manner which would relieve any water problems
in the street.
I would suggest that this situation be carefully checked and
approved by the Town prior to issuing their Certificate of
Occupancy.
Also, I suggest site approval by the Town on the adjacent
properties, in order that any future problems not arise.
Lester A. Braddock
LAB:prb
cca Planning & Zoning Commission
Donald McLaughlin '
Emil Lucek
MEMORANDUM April 10, 1975
To: Terry V. Sprenkel
Re: Foster Road Public Water Supply
Norman Petersen has informed me that he has been notified by
the MDC Water Bureau that there is a proposal to extend the
public water on Foster Road, north, to serve the new
Seventh-Day Adventist Church School. This would bring the
public water past the intersection of our new Burgess Road
and Foster Road.
Although we have not anticipated this in our coming budget,
I strongly recommend that we communicate with the MDC, and
express our agreement with their plans for this public
water extension.
If this extension becomes a reality, perhaps in the fiscal
year 1976 we could then budget funds for construction of a
wager service into the Town Garage.
I believe such a letter of agreement should come from the
chief executive official of the community; however, if you
wish, I will draft such a letter for your signature.
f
Emi W. Lucek
EWL:.prb
Town Hall, 1540 Sullivan Avenue, South Windsor, Connecticut 06074
Public Works May 28, 1974
Mr. Paul McCarthy
Metropolitan District Commission
Water Bureau
Hartford Plaza
Hartford, Connecticut
Dear Mr. McCarthy:
The Town of South Windsor is anxiously awaiting your permanent
paving of Foster Road. May. I hear from you immediately in
this regard.
Thank you.
Very truly yours,
TOWN OF SOUTH WIN R
Emil W. Lucek
Director of Public Works
EWL:prb
ALTON
247-6761
MELVI E. SMITH - PETERSEN AND HOFFMAN AREA
CODE
MELVIN C. STEAD
AREA CODE 208
EDWIN D. BARBER CIVIL ENGINEERS AND SURVEYORS
THEODORE A. PETERSEN, ASSOCIATE SUCCESSORS TO ESTABLISHED 1897
SPENCER &WASHBURN INC.
68 TEMPLE STREET 06108
HARTFORD, CONN..
January 31, 1972
Engineering Department
Town of South Windsor
Sullivan Avenue, dapping
South Windsor, Connecticut
06074 Attention: Mr. Emanuel Lucek
Re: Establishing Street Lines
Foster Road.
Dear Mr. Lucek:
Petersen & Hoffman agrees with the Town of
South Windsor, to establish street lines for Foster Road
from Strong Road, southerly about 3500 feet.
The right of way is to be shown on plans
drawn to a scale of 1 inch = 40 feet, with an over-all
index plan showing the entire right of way on one (1)
plan scaled to fit a sheet size of 24" x 36" , inside the
border. Our agreed cost does not include merestones to
be set as requested by your office. Merestones to be
delivered and set are 30.00 each. If merestones are to
be provided by your office , the price for setting each
will be $ 25.00.
Our agreed upon price is $ 1800.00,.
Agreed to this S day of ��•^��„� , 197
Town Engineer
for the Town of South Windsor
Partner
Petersen & Hoffman
Zjf .
p
v"� s 7
! ! AGREEMENT �G
!' 1 �CNel
N QWN
WHEREAS the Town Council of the Town of South Windsoriuna.nimously
voted in regular session to authorize its Town Manager to enter into an
Qcc epp
Agreement with Norman Petersen, ;M of South Windsor; and to a*eett a
4>U i r
-Qu-iek Claim Deed from said Norman Peterson to the Town of South Windsor
for the necessary land upon which a road will be constructed, running in
an,:.'east/west direction connecting land of the Town of South Windsor to
Foster Road; and located by an easterly extension of the northerly
property line of said land of the Town of South Windsor presently known
as the Sanitary Landfill Area;
AND WHEREAS said Norman Petersen is the sole owner of said land
and is fully and legally entitled and empowered to grant such a k
Claim Deed;
AND WHEREAS the Town has the financial capability to construct
said road.
NOW THEREFORE, in consideration of these premises and the mutual
promises of the parties hereto, it is agreed as follows :
1. That the Town shall complete construction of said road within
three years of the date of this Agreement,
L? That the Town shall include in said road construction adequate
storm drainage on said road and Foster Road.
Agreement
Page 2
3. That the Town shall construct said road such that the finished
grade shall be no greater than one and one-half feet (1k') higher than
the average existing grade of abutting lands .
S414 Ov o T
4.That Norman Petersen shall provide to the Town a quick Claim Deed
for the land upon which this road will be constructed.
S.That this Agreement shall be attached to and made part of said
T
AQui-ek Claim Deed and shall be permanently filed in the Office of the
C .rak
wn South Windsor.
�1 11 W;fuesr k4eve s-p j we (dwc re+ Our Imu4jr 0a
seal S 44"S. ,._ e�a� a�._._....., 19-- TOWN OF SOUTH WINDSOR
BY: Ct.$
WITNESS Terry V, Sprenkel, its Town
Manager,
M
BY; `_'S!
WITNESS Norman Petersen
MELVIN C. STEAD. SR. L.S.EDWIN D. BARBER L.S. PETERSEN & HOFFMAN TEL. 247671$1 .
ALTON E. SMITH L.S. SUCCESSORS TO ESTABLISHED 18.97
SPENCER 9 WASHBURN, INC.
THEODORE A. PETERSEN P.E.-L.S.ASSOCIATE 69 TEMPLE ST
:.
p, HARTFORD, CONN 06103 ,
Alk;
}ti
T, .;te :jE;.; ow are the cj:3 c (.?' a Survey Tra'.r'ty
�.r�.0 .rltsicrar , e I"C o nw p e d av -an d i-iola r1y btr
:5 ,._,'n Surrey 1-art - , ir!c'ludinr Ch of 0f.,1 l �i , . . . : i a x
`
.•-
E31 v ol\C't.h r?€- :. 1-2 7
h.e cc t BCC t ;':j mil L`Lp.., ` zu
t .:j �1 v, -
18, 00
0 il 6. .G per >lour
fol1
c,: lcuiv tint
cclrn:._ t , ;tcc, . an0_ f'0r .D-I—a ght3,::r�,.n ' .0G 1)er our
k lF'
Co :sulte:ti�?>x - - - - - - 1�,, t. z:rr recur
J)1. F u tri iTI^luCie:� tiiltTC ll:ne.
t,'n d L-G,1,d 3 iI b i 1; an( one--he.If.
C'_ y 4 u 4)1�/
er !N tj,-,-`�.... . C" .i_`.' r E:re n�C-:_ trac1kci ."., p.L`c_l.-nF?_' of
y-i lr,! 1 c i
on o� , _:L. �! ..: G .tlU,la?.�q} " 0. :� y;e
,��t c: 7,,,';' 1'-! ..• -: ? i;:, l:i:'.`�'':i'Er C;'C� £•. i co 4�t
.r
4 p
ALTON
.247-6761
MELVI E. SMITH PETERSEN AND HOFFMAN TA CODE
MELVIN C. STEAD AREA CODE 208
EDWIN D. BARBER CIVIL ENGINEERS AND SURVEYORS
THEODORE A. PETERSEN, ASSOCIATE SUCCESSORS TO ESTABLISHED 1897
SPENCER &WASHBURN INC.
68 TEMPLE STREET 06103
HARTFORD, CONN..
January 19, 1972
Engineering Dela rtment
Town of South Windsor
Sullivan Avenuexi mapping
South Windsor, Connecticut
06074 Attention: Mr. Emil Lucek
Res Establishing Street Lines
Foster Road.
Dear Mr, Lucek:
We hereby submit our estimate for establishing new
street lines or right of wag lines for Foster Road from Strong
Road about 3500 feet Southerly.
The right of way is to be shown on plans drawn to a
scale of 1 inch = 40 feet, with an overall or index plan showing
the entire right of way on one (1) plan, scaled to fit a sheet
size of 24 11 x 36 11. Our estimated cost does not include merestones
to be set as requested by your office. Merestones to be delivered
and set are 30.00.
Our not to exceed price is 1800.00 less stones.
Restectfully submitted
Petersen & Hoffman
Form letter sent the following 3-5-68:
John A.Stelmat, 1286 Ellington Rd. jSouth Windsor
Lillian & Anthony Slusarz, 100 Foster Rd. ,, South Windsor
Walter A.Kasheta, 1299 Main St. pSouth Windsor
Mary K.Lapi,nskas, 1335 Main St., South Windsor
Agnes G. Esada, 1304 Ellington Rd. , South Windsor
Timothy & Diana M. Burns
1326 Ellington Rd., South Windsor
Cl'ynton Buckland, 395- Buckland Rd. , Wapping, Conn,
*Dorothee Grenon, 15 Wells Farm Drive, Wethersfield,Cona.06109
Benedict Kupchunosi) 390 Avery St. pwapping, Conn.
Walter- .'..Kupchunos, 323 Graham Rd. pWappingo Conn.
Paul Kupchunos. ..2019 Ellington Rd. ,Wapping, Conn.
4Viola Marenholtz,
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074
DEPARTMENT OF Engineering March 4sl968
The Town of South Windsor is planning to
do the field surveys and engineering necessary to
realign Foster Road.
In order to accomplish these surveys we
need the right to enter and work on private proper-
ties, also the permission from these property owners
to clear brush or small trees for sight lines and to
put survey points in.
Enclosed are three copies of an agreement
to enter and complete work on these surveys. one
copy to be kept by the property owner and two copies
to be signed and returned to the Engineering Depart-
ment, Town Hall, 824 Main at.,South Windsor,Conn.
Any further questions may be answered by
calling the South Windsor Engineering Department,
telephone number 289-6435.
Very truly yours,
TOWN OF SOUTH WINDSOR
e ra oc ,
LWB/a senior Engineer
encl:
Eng?�r eer ng. March .*190
The fistwt3 ��` $�4't Wi nds�►r: in. planning to
do the field Hers and engineexvjng necessary to
reillign Poster Road.
3i Ord r ; atr s ►liah0126, surveys we
used t right to enter AYA 'e+ork On private proper-
i8910i €;trou thane pro rtry` Mare
.e c a3 � Us
t2 clear brash Or 60011 trees for :sight lines and to
put; P points in
Enclosed are three copies 6f aw agreetaent
V> enter and e"pletet-wor on'Us ae surveyaw.. . One
e opy to be kept by iiie prolperty *waer ond two copies
to bit.signed.-a re trued to the Emir er i ' Depart.
1 tEIt TIC Bali, 824 Ifain St . South Wi dsarC'2mM. .
kfty� f urthti questions my bs ansvered by
C&A.tug the SiNuth,, Windsor Eegizleeting Department�
telephone number 289-6435
Very truly yours,
TOWN OF SQL WINDSOR
Lester se ,
L /a Senior Engineer
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074
DEPARTMENT OF ENGINEERING
j
1
AGREEMENT
I agree and allow the Town of South Windsor or itts
representatives, the right to enter onto my property
or properties to establish a right-of-way as part of
the overall engineering study .needed to prepare a
map for use in land acquisition. In the act of
producing this survey and obtaining other necessary
engineering field data I agree that if trees or brush become
obstacles then they can be removed to complete the
survey.
Signed
Dated
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074
i
DEPARTMENT OF ENGINEERING
i
AGREEMENT
I agree and allow the Town of South Windsor or it' s
representatives, . the right to enter onto my property
or properties to establish a right-of-way as part of
the overall engineering study .needed to prepare a
map for use in land acquisition. In the act of
producing this survey and obtaining other necessary
j engineering field data I agree that if trees or brush become .-
obstacles then they can be removed to complete the
survey.
Signed
i
I
Dated'
TOWN OF SOUTH WINDSOR
TOWN HALL.
SOUTH WINDSOR, CONNECTICUT 06074
DEPARTMENT OF ENGINEERING
i
i
AGREEMENT `
i
i
I agree and allow the Town of South Windsor or it' s
representatives, the right to enter onto my property
or properties to establish a right-of-way as part of
I the overall engineering study .needed to prepare a
map for use in land acquisition. In the act of
producing this survey and obtaining other necessary
engineering field data I agree that if trees or brush become
obstacles then they can be removed to complete the
survey.
Signed lw/ai4 ;Arer,�4�
,
,
Dated
i -
1
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074.
DEPARTMENT OF ENGINEERING
i
i
1
I
AGREEMENT `
I agree and allow the Town of South Windsor or it' s
representatives, the right to enter onto my property
or properties to establish a right-of-way as part of
the overall engineering study .needed to prepare a
i
map for use in land acquisition. In the act of
producing this survey and obtaining other necessary
engineering field data I agree that if trees or brush become
obstacles then they can be removed to complete the
survey.
Signed
I
i
j
Dated
i
i
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074
' DEPARTMENT OF ENGINEERING
AGREEMENT
I agree and allow the Town of South Windsor or it's
representatives, . the right to enter onto my property
or properties to establish a right-of-way as part of
the overall engineering study .needed to prepare a
map for use in land acquisition. In the act of
producing this survey and obtaining other neeessary �
v tit(�E2 6
! engineering field data I agree that if trees or brush become .
j
obstacles then they can be removed to complete the
survey.
Signed
Dated
j
TOWN OF SOUTH WEIMSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074
OEPARTMENT OF ENGINEERING
i
i
AGREEMENT
I agree and allow the Town of South Windsor or it' s
representatives, the right to enter onto my property
or properties to establish A right-of-way ds part of
the overall engineering study .needed to prepare a
map for use in land acquisition. In the act of
producing this survey and obtaining other necessary
v n►dce. 6
engineering field data I agree that if trees �or brush become
obstacles then they can be removed to complete the
survey.
Signed ®
Datedi�Qc
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074
DEPARTMENT OF ENGINEERING
r
i
I
i
AGREEMENT `
I agree and allow the Town of South Windsor or it' s
representatives, the right to enter onto my property
or properties -to establish a right-of-way as part of
i
i the overall engineering study .needed to prepare a
i
map for use in land acquisition. In the act of
producing this survey and obtaining other necessary
engineering field data I agree that if trees or brush become
obstacles then they can be removed to complete the
i
4 survey.
Signed
I
Dated
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074
DEPARTMENT OF ENGINEERING
AGREEMENT `
I agree and allow the Town of. South Windsor or it' s
representatives, the right to enter onto my property
or properties to establish a right-of-way as part of
the overall engineering study .needed to prepare a
map for use in land acquisition. In the act of
producing this survey and obtaining other necessary
a
engineering field data I agree that if trees or brush become
obstacles then they can be removed to complete the
i survey.
Signed
i
i
Dated
i
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074
DEPARTMENT OF ENGINEERING
AGREEMENT `
I agree and allow the Town of South Windsor or it' s
representatives, the right to enter onto my property
or properties to establish a right-of-way as part of
the overall engineering study needed to prepare a
map for use in land acquisition. In the act of
producing this survey and obtaining other necessary
engineering field data I agree that if trees or brush become
obstacles then they can be removed to complete the
survey.
Signed
Dated 6 `�'
��
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074
DEPARTMENT OF ENGINEERING
I
j
AGREEMENT
I agree and allow the Town of South Windsor or it' s
representatives, the right to enter onto my property
or properties to establish a right-of-way as part of
the overall engineering study .needed to prepare a
map for use in land acquisition. In the act of
producing this survey and obtaining other necessary
engineering field data I agree that if trees or brush become
obstacles then they can be removed to complete the
survey.
Signed
Datedc�
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074
DEPARTMENT OF ENGINEERING
AGREEMENT
I agree and allow the Town of South Windsor or itts
representatives, the right to enter onto my property
.or properties to establish a right-of-way as part of
the overall engineering study needed to prepare. a
map for use in land acquisition. In the act of
producing this survey and obtaining other necessary
engineering field data I agree that if trees or brush become
obstacles then they can be removed to complete the
survey.
Signed
Dated �5���
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074
DEPARTMENT OF ENGINEERING
AGREEMENT `
I agree and allow the Town of South Windsor or it's
representatives, the right to enter onto my property
or properties to establish a right-of-way as part of
the overall engineering study needed to prepare a
map for use in land acquisition. In the act of
producing this surrey and obtaining other necessary
engineering field data I agree that if trees or brush become
obstacles then they can be removed to complete the
survey.
Signed
z 44 46=L&=g1�
Dated 3 17X���
TowN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONNECTICUT 06074
DEPARTMENT OF ENGINEERING
AGREEMENT `
I agree and allow the Town of South Windsor or it's
representatives, the right to enter onto my property
or properties to establish a right-of-way as part of
the overall engineering study .needed to prepare a
map for use in land acquisition. In the act of
producing this survey and obtaining other necessary
engineering field data I agree that if trees or brush become
obstacles then they can be removed to complete the
survey.
S igned /' e, Z,
lam,, 1
Dated //� l
r
t
TowN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR. CONNECTICUT 06074
DEPARTMENT OF ENGINEERING
i
i
AGREEMENT
I agree and allow the Town of South Windsor or it' s
representatives, the right to enter onto my property
or properties to establish a right-of-way as part of
the overall engineering study needed to prepare a
i
map for use in land acquisition. In the act of
producing this survey and obtaining other necessary
engineering field data I agree that if trees or brush become
obstacles then they can be removed to complete the
survey. ,
Signed
Dated: l
r
Ai
fj
0
00 o\ "
t
• Ioo '] QZ 95�Z
F '
I op
•VJ
I
517_2 p`N G JZc A-D
too
-