Loading...
HomeMy WebLinkAboutFoster Road (2) MEMORANDUM May 4, 1978 To: Allan S. Young Director of Public Works Re: Foster Road Drainage Based on the Engineering Bureau current work load, and after discussion with Lester and Mel, I recommend that we hire a Land Surveyor to obtain the necessary infor- mation on Foster Road. This will be the most efficient and quickest method to obtain the necessary baseline information we need. The Engineering Bureau could then design the drainage system, using the baseline information. J. E. Page Town Engineer/Planner JEIjfnl ` 4 / MEMORANDUM August 18, 1975 Re: Seventh Day Adventist School - Foster Road Truman Hills applied for a Pavement Cut Permit to put a lift . in Foster Road in front of the driveway to the parking lot of the above-mentioned school. Upon inspection and checking of grades and plans, I found the parking lot grades differing from the approved Site Development Plan. Mr. Carlson, Superintendent at the site, informed me that they had changed both the building and parking lot elevations. Had they continued as they .planned, there is good reason to believe that it could have caused a water and ice problem in Foster Road. I refused the Permit, and advised Mr. Carlson to revise the drainage in a manner which would relieve any water problems in the street. I would suggest that this situation be carefully checked and approved by the Town prior to issuing their Certificate of Occupancy. Also, I suggest site approval by the Town on the adjacent properties, in order that any future problems not arise. Lester A. Braddock LAB:prb cca Planning & Zoning Commission Donald McLaughlin ' Emil Lucek MEMORANDUM April 10, 1975 To: Terry V. Sprenkel Re: Foster Road Public Water Supply Norman Petersen has informed me that he has been notified by the MDC Water Bureau that there is a proposal to extend the public water on Foster Road, north, to serve the new Seventh-Day Adventist Church School. This would bring the public water past the intersection of our new Burgess Road and Foster Road. Although we have not anticipated this in our coming budget, I strongly recommend that we communicate with the MDC, and express our agreement with their plans for this public water extension. If this extension becomes a reality, perhaps in the fiscal year 1976 we could then budget funds for construction of a wager service into the Town Garage. I believe such a letter of agreement should come from the chief executive official of the community; however, if you wish, I will draft such a letter for your signature. f Emi W. Lucek EWL:.prb Town Hall, 1540 Sullivan Avenue, South Windsor, Connecticut 06074 Public Works May 28, 1974 Mr. Paul McCarthy Metropolitan District Commission Water Bureau Hartford Plaza Hartford, Connecticut Dear Mr. McCarthy: The Town of South Windsor is anxiously awaiting your permanent paving of Foster Road. May. I hear from you immediately in this regard. Thank you. Very truly yours, TOWN OF SOUTH WIN R Emil W. Lucek Director of Public Works EWL:prb ALTON 247-6761 MELVI E. SMITH - PETERSEN AND HOFFMAN AREA CODE MELVIN C. STEAD AREA CODE 208 EDWIN D. BARBER CIVIL ENGINEERS AND SURVEYORS THEODORE A. PETERSEN, ASSOCIATE SUCCESSORS TO ESTABLISHED 1897 SPENCER &WASHBURN INC. 68 TEMPLE STREET 06108 HARTFORD, CONN.. January 31, 1972 Engineering Department Town of South Windsor Sullivan Avenue, dapping South Windsor, Connecticut 06074 Attention: Mr. Emanuel Lucek Re: Establishing Street Lines Foster Road. Dear Mr. Lucek: Petersen & Hoffman agrees with the Town of South Windsor, to establish street lines for Foster Road from Strong Road, southerly about 3500 feet. The right of way is to be shown on plans drawn to a scale of 1 inch = 40 feet, with an over-all index plan showing the entire right of way on one (1) plan scaled to fit a sheet size of 24" x 36" , inside the border. Our agreed cost does not include merestones to be set as requested by your office. Merestones to be delivered and set are 30.00 each. If merestones are to be provided by your office , the price for setting each will be $ 25.00. Our agreed upon price is $ 1800.00,. Agreed to this S day of ��•^��„� , 197 Town Engineer for the Town of South Windsor Partner Petersen & Hoffman Zjf . p v"� s 7 ! ! AGREEMENT �G !' 1 �CNel N QWN WHEREAS the Town Council of the Town of South Windsoriuna.nimously voted in regular session to authorize its Town Manager to enter into an Qcc epp Agreement with Norman Petersen, ;M of South Windsor; and to a*eett a 4>U i r -Qu-iek Claim Deed from said Norman Peterson to the Town of South Windsor for the necessary land upon which a road will be constructed, running in an,:.'east/west direction connecting land of the Town of South Windsor to Foster Road; and located by an easterly extension of the northerly property line of said land of the Town of South Windsor presently known as the Sanitary Landfill Area; AND WHEREAS said Norman Petersen is the sole owner of said land and is fully and legally entitled and empowered to grant such a k Claim Deed; AND WHEREAS the Town has the financial capability to construct said road. NOW THEREFORE, in consideration of these premises and the mutual promises of the parties hereto, it is agreed as follows : 1. That the Town shall complete construction of said road within three years of the date of this Agreement, L? That the Town shall include in said road construction adequate storm drainage on said road and Foster Road. Agreement Page 2 3. That the Town shall construct said road such that the finished grade shall be no greater than one and one-half feet (1k') higher than the average existing grade of abutting lands . S414 Ov o T 4.That Norman Petersen shall provide to the Town a quick Claim Deed for the land upon which this road will be constructed. S.That this Agreement shall be attached to and made part of said T AQui-ek Claim Deed and shall be permanently filed in the Office of the C .rak wn South Windsor. �1 11 W;fuesr k4eve s-p j we (dwc re+ Our Imu4jr 0a seal S 44"S. ,._ e�a� a�._._....., 19-- TOWN OF SOUTH WINDSOR BY: Ct.$ WITNESS Terry V, Sprenkel, its Town Manager, M BY; `_'S! WITNESS Norman Petersen MELVIN C. STEAD. SR. L.S.EDWIN D. BARBER L.S. PETERSEN & HOFFMAN TEL. 247671$1 . ALTON E. SMITH L.S. SUCCESSORS TO ESTABLISHED 18.97 SPENCER 9 WASHBURN, INC. THEODORE A. PETERSEN P.E.-L.S.ASSOCIATE 69 TEMPLE ST :. p, HARTFORD, CONN 06103 , Alk; }ti T, .;te :jE;.; ow are the cj:3 c (.?' a Survey Tra'.r'ty �.r�.0 .rltsicrar , e I"C o nw p e d av -an d i-iola r1y btr :5 ,._,'n Surrey 1-art - , ir!c'ludinr Ch of 0f.,1 l �i , . . . : i a x ` .•- E31 v ol\C't.h r?€- :. 1-2 7 h.e cc t BCC t ;':j mil L`Lp.., ` zu t .:j �1 v, - 18, 00 0 il 6. .G per >lour fol1 c,: lcuiv tint cclrn:._ t , ;tcc, . an0_ f'0r .D-I—a ght3,::r�,.n ' .0G 1)er our k lF' Co :sulte:ti�?>x - - - - - - 1�,, t. z:rr recur J)1. F u tri iTI^luCie:� tiiltTC ll:ne. t,'n d L-G,1,d 3 iI b i 1; an( one--he.If. C'_ y 4 u 4)1�/ er !N tj,-,-`�.... . C" .i_`.' r E:re n�C-:_ trac1kci ."., p.L`c_l.-nF?_' of y-i lr,! 1 c i on o� , _:L. �! ..: G .tlU,la?.�q} " 0. :� y;e ,��t c: 7,,,';' 1'-! ..• -: ? i;:, l:i:'.`�'':i'Er C;'C� £•. i co 4�t .r 4 p ALTON .247-6761 MELVI E. SMITH PETERSEN AND HOFFMAN TA CODE MELVIN C. STEAD AREA CODE 208 EDWIN D. BARBER CIVIL ENGINEERS AND SURVEYORS THEODORE A. PETERSEN, ASSOCIATE SUCCESSORS TO ESTABLISHED 1897 SPENCER &WASHBURN INC. 68 TEMPLE STREET 06103 HARTFORD, CONN.. January 19, 1972 Engineering Dela rtment Town of South Windsor Sullivan Avenuexi mapping South Windsor, Connecticut 06074 Attention: Mr. Emil Lucek Res Establishing Street Lines Foster Road. Dear Mr, Lucek: We hereby submit our estimate for establishing new street lines or right of wag lines for Foster Road from Strong Road about 3500 feet Southerly. The right of way is to be shown on plans drawn to a scale of 1 inch = 40 feet, with an overall or index plan showing the entire right of way on one (1) plan, scaled to fit a sheet size of 24 11 x 36 11. Our estimated cost does not include merestones to be set as requested by your office. Merestones to be delivered and set are 30.00. Our not to exceed price is 1800.00 less stones. Restectfully submitted Petersen & Hoffman Form letter sent the following 3-5-68: John A.Stelmat, 1286 Ellington Rd. jSouth Windsor Lillian & Anthony Slusarz, 100 Foster Rd. ,, South Windsor Walter A.Kasheta, 1299 Main St. pSouth Windsor Mary K.Lapi,nskas, 1335 Main St., South Windsor Agnes G. Esada, 1304 Ellington Rd. , South Windsor Timothy & Diana M. Burns 1326 Ellington Rd., South Windsor Cl'ynton Buckland, 395- Buckland Rd. , Wapping, Conn, *Dorothee Grenon, 15 Wells Farm Drive, Wethersfield,Cona.06109 Benedict Kupchunosi) 390 Avery St. pwapping, Conn. Walter- .'..Kupchunos, 323 Graham Rd. pWappingo Conn. Paul Kupchunos. ..2019 Ellington Rd. ,Wapping, Conn. 4Viola Marenholtz, TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074 DEPARTMENT OF Engineering March 4sl968 The Town of South Windsor is planning to do the field surveys and engineering necessary to realign Foster Road. In order to accomplish these surveys we need the right to enter and work on private proper- ties, also the permission from these property owners to clear brush or small trees for sight lines and to put survey points in. Enclosed are three copies of an agreement to enter and complete work on these surveys. one copy to be kept by the property owner and two copies to be signed and returned to the Engineering Depart- ment, Town Hall, 824 Main at.,South Windsor,Conn. Any further questions may be answered by calling the South Windsor Engineering Department, telephone number 289-6435. Very truly yours, TOWN OF SOUTH WINDSOR e ra oc , LWB/a senior Engineer encl: Eng?�r eer ng. March .*190 The fistwt3 ��` $�4't Wi nds�►r: in. planning to do the field Hers and engineexvjng necessary to reillign Poster Road. 3i Ord r ; atr s ►liah0126, surveys we used t right to enter AYA 'e+ork On private proper- i8910i €;trou thane pro rtry` Mare .e c a3 � Us t2 clear brash Or 60011 trees for :sight lines and to put; P points in Enclosed are three copies 6f aw agreetaent V> enter and e"pletet-wor on'Us ae surveyaw.. . One e opy to be kept by iiie prolperty *waer ond two copies to bit.signed.-a re trued to the Emir er i ' Depart. 1 tEIt TIC Bali, 824 Ifain St . South Wi dsarC'2mM. . kfty� f urthti questions my bs ansvered by C&A.tug the SiNuth,, Windsor Eegizleeting Department� telephone number 289-6435 Very truly yours, TOWN OF SQL WINDSOR Lester se , L /a Senior Engineer TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074 DEPARTMENT OF ENGINEERING j 1 AGREEMENT I agree and allow the Town of South Windsor or itts representatives, the right to enter onto my property or properties to establish a right-of-way as part of the overall engineering study .needed to prepare a map for use in land acquisition. In the act of producing this survey and obtaining other necessary engineering field data I agree that if trees or brush become obstacles then they can be removed to complete the survey. Signed Dated TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074 i DEPARTMENT OF ENGINEERING i AGREEMENT I agree and allow the Town of South Windsor or it' s representatives, . the right to enter onto my property or properties to establish a right-of-way as part of the overall engineering study .needed to prepare a map for use in land acquisition. In the act of producing this survey and obtaining other necessary j engineering field data I agree that if trees or brush become .- obstacles then they can be removed to complete the survey. Signed i I Dated' TOWN OF SOUTH WINDSOR TOWN HALL. SOUTH WINDSOR, CONNECTICUT 06074 DEPARTMENT OF ENGINEERING i i AGREEMENT ` i i I agree and allow the Town of South Windsor or it' s representatives, the right to enter onto my property or properties to establish a right-of-way as part of I the overall engineering study .needed to prepare a map for use in land acquisition. In the act of producing this survey and obtaining other necessary engineering field data I agree that if trees or brush become obstacles then they can be removed to complete the survey. Signed lw/ai4 ;Arer,�4� , , Dated i - 1 TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074. DEPARTMENT OF ENGINEERING i i 1 I AGREEMENT ` I agree and allow the Town of South Windsor or it' s representatives, the right to enter onto my property or properties to establish a right-of-way as part of the overall engineering study .needed to prepare a i map for use in land acquisition. In the act of producing this survey and obtaining other necessary engineering field data I agree that if trees or brush become obstacles then they can be removed to complete the survey. Signed I i j Dated i i TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074 ' DEPARTMENT OF ENGINEERING AGREEMENT I agree and allow the Town of South Windsor or it's representatives, . the right to enter onto my property or properties to establish a right-of-way as part of the overall engineering study .needed to prepare a map for use in land acquisition. In the act of producing this survey and obtaining other neeessary � v tit(�E2 6 ! engineering field data I agree that if trees or brush become . j obstacles then they can be removed to complete the survey. Signed Dated j TOWN OF SOUTH WEIMSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074 OEPARTMENT OF ENGINEERING i i AGREEMENT I agree and allow the Town of South Windsor or it' s representatives, the right to enter onto my property or properties to establish A right-of-way ds part of the overall engineering study .needed to prepare a map for use in land acquisition. In the act of producing this survey and obtaining other necessary v n►dce. 6 engineering field data I agree that if trees �or brush become obstacles then they can be removed to complete the survey. Signed ® Datedi�Qc TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074 DEPARTMENT OF ENGINEERING r i I i AGREEMENT ` I agree and allow the Town of South Windsor or it' s representatives, the right to enter onto my property or properties -to establish a right-of-way as part of i i the overall engineering study .needed to prepare a i map for use in land acquisition. In the act of producing this survey and obtaining other necessary engineering field data I agree that if trees or brush become obstacles then they can be removed to complete the i 4 survey. Signed I Dated TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074 DEPARTMENT OF ENGINEERING AGREEMENT ` I agree and allow the Town of. South Windsor or it' s representatives, the right to enter onto my property or properties to establish a right-of-way as part of the overall engineering study .needed to prepare a map for use in land acquisition. In the act of producing this survey and obtaining other necessary a engineering field data I agree that if trees or brush become obstacles then they can be removed to complete the i survey. Signed i i Dated i TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074 DEPARTMENT OF ENGINEERING AGREEMENT ` I agree and allow the Town of South Windsor or it' s representatives, the right to enter onto my property or properties to establish a right-of-way as part of the overall engineering study needed to prepare a map for use in land acquisition. In the act of producing this survey and obtaining other necessary engineering field data I agree that if trees or brush become obstacles then they can be removed to complete the survey. Signed Dated 6 `�' �� TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074 DEPARTMENT OF ENGINEERING I j AGREEMENT I agree and allow the Town of South Windsor or it' s representatives, the right to enter onto my property or properties to establish a right-of-way as part of the overall engineering study .needed to prepare a map for use in land acquisition. In the act of producing this survey and obtaining other necessary engineering field data I agree that if trees or brush become obstacles then they can be removed to complete the survey. Signed Datedc� TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074 DEPARTMENT OF ENGINEERING AGREEMENT I agree and allow the Town of South Windsor or itts representatives, the right to enter onto my property .or properties to establish a right-of-way as part of the overall engineering study needed to prepare. a map for use in land acquisition. In the act of producing this survey and obtaining other necessary engineering field data I agree that if trees or brush become obstacles then they can be removed to complete the survey. Signed Dated �5��� TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074 DEPARTMENT OF ENGINEERING AGREEMENT ` I agree and allow the Town of South Windsor or it's representatives, the right to enter onto my property or properties to establish a right-of-way as part of the overall engineering study needed to prepare a map for use in land acquisition. In the act of producing this surrey and obtaining other necessary engineering field data I agree that if trees or brush become obstacles then they can be removed to complete the survey. Signed z 44 46=L&=g1� Dated 3 17X��� TowN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONNECTICUT 06074 DEPARTMENT OF ENGINEERING AGREEMENT ` I agree and allow the Town of South Windsor or it's representatives, the right to enter onto my property or properties to establish a right-of-way as part of the overall engineering study .needed to prepare a map for use in land acquisition. In the act of producing this survey and obtaining other necessary engineering field data I agree that if trees or brush become obstacles then they can be removed to complete the survey. S igned /' e, Z, lam,, 1 Dated //� l r t TowN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR. CONNECTICUT 06074 DEPARTMENT OF ENGINEERING i i AGREEMENT I agree and allow the Town of South Windsor or it' s representatives, the right to enter onto my property or properties to establish a right-of-way as part of the overall engineering study needed to prepare a i map for use in land acquisition. In the act of producing this survey and obtaining other necessary engineering field data I agree that if trees or brush become obstacles then they can be removed to complete the survey. , Signed Dated: l r Ai fj 0 00 o\ " t • Ioo '] QZ 95�Z F ' I op •VJ I 517_2 p`N G JZc A-D too -