Apx.il 3, 1987
Mt. Axthut Mullen
29 Batt Hill Road
South Windzot, CT 06074
Dean M. Mullen:
In xezponse to your lettex, please be adv.ized that at this time
thete ate no immediate plans Got the installation o4 z idewatkz
along Batt Hill Road. Putzuant to the 1984 Sidewalk. Plan, pt;iot,ity
l.i4tz jot z idewatk .inztallation were developed bated on vat.iouz
ex,itet.ia such as pxo ximity to z cho olz , patkz , zho pp,ing axea4 , ass
well ass the continuation of the ex.izting z idewalh netwotk.
A Fiazt Pt,iot.ity L,izt of z.idewatkz ways developed which conta.inz
some 30, 000 beet of zidewalk imptovementz totalling neatly
$400, 000 . A Second Px,io,%ity L,izt of z idewatkz containing ovex
40, 000 feet o6 z idewatk impxovementz at a eort o6 over $500, 000
ways also developed. Ptezently, only $50, 000 .iz budgeted to begin
the,se .imptovementz . The xate at which the p,%iot.ity z idewatkz ate
.installed .ins obv.iouzly dependent on the availability o4 4und.ing ,
which cannot be pted.icxed at th.iz time.
Please 6.ind enclosed, jot youx ,injoxmat.ion, a copy o j the 1984
S.idewatk Plan. Should you have any additional queztionz , please
heel Jxee to contact, Michael Gant,ick, a,ixectot of Public Uiotckz,
at 644-2511 .
Vety txuly youu ,
.� e...�0
own Manag
4V��
RJS : bmn
cc: Michael J. Gantick.. D,iteexot o$ Public Wotkz
Enclodute
��p11M 5•44( l!'
O�'C-I'�!, l
C ]
U
w� 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
��NpsoIt.co � AREA CODE 203/644-2511
October 7, 1985
Attorney R.ichand R,ittenband
Town Attorney
1734 Ettington Road
South Windsor, Ct. 06074
Dean Dick:
Enctosed .is a copy of the penm.it. bon newer .instattation- on Dana Hitt
Road and the Pot ice Case Log . Corbett Construct ion .Company: was
woxking Jon T 9 M Bu.i.2dens . The contact- pennon was. Dave -Maher.=
Ray Braun, Shop Supenv.ison was. the Stn:e_et Division penson. .on cctt. and
nes ponded to the Pot ice catt Jon bann.icaden. on August 1 1 ,: 19S.5
A Buick automob.ite going east on giant Hitt was nose d'o.wn .in a: .wa. .hed
out Iarea aj the road. South Winds.on Garage was caned. to nemo:ve. _the
veh.icke with Mass . Ptates - 445-92.4.-
Heavy na.in had caused heavy enos.ion .in the newly d:intunbed. .eanth and
it washed out a section of the road. St.onm dna.in6,_` 'sa.n.itany` newens
and water tines had been .inntatted. 6oh T5M I n Vevetopment.
Bngineen.ing records indicate that Con.b.ett Construction .instatted the
storm drains and the san.ixany s ewers . Both o f these enoss. the. road.
I think this should be Jonwanded to Conb.ett Construction and T 9 M
Bu,it dens .
S.incenety,
Metv.in C. Stead, Jn.
Supen.intendent of Stn_eet Services
MCS/ds
OWN Sfq`
O
s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
��dsoR•CO AREA CODE 203/644-2511
M E M 0 R A N D U M April 18 , 1985
TO: Richard J. Sartor, Town Manager
RE: ROBERT S. LEAVITT, 170 DART HILL ROAD
REQUEST FOR SANITARY SEWERS
Attached is a report from Fred Shaw relative to Mr. Leavitt' s
request. Fred has been in contact with Mr. Leavitt, and has
explained the options available to him.
Also, the storm drainage work for Mr. Leavitt has been completed,
as agreed, by T & M Construction.
Robe t enault
Director of Public Works
RA:bmr
Attachment
M E M O R A N D U M April 10 , 1985
TO: Robert Arsenault, Director of Public Works
RE: 170 DART HILL ROAD
At 'the request of the Town Manager, I contacted Mr. Robert S. Leavitt
at the above address to answer specific questions relative to a sewer
service connection.
In the telephone conversation with Mr. Leavitt, he indicated that his
septic system was failing, and wished to know how sewer service could
be provided.
I outlined three options he could pursue in resolving his problem.
1. Connection to the existing sewer on Paper Chase Road.
2. Repair the subsurface system and continue to use this system
until the day when future development in that area extends
the sewer near enough for his use.
3. Petition the W.P.C.A. for sewers.
I advised Mr. Leavitt that Option No. 1 would be expensive, for there
was ledge in the area and sewer construction costs would be about
$70 per foot; I recommended to him to compare the costs of options
1 and 2 .
C. F. Shaw, Superintendent
Bureau of Pollution Control
CFS:bmr
MEMORANDUM October 31, 1978
To Allan S. Young
Re: Dart Hill Road Area Complaint
To my knowledge, there have been only three (3) house connections
installed on Dart Hill Road in the past month. I personally
inspected each one of these and did not find evidence that work
was performed after normal working hours. In fact, the contractor,
on at least one occasion, came back on a Saturday to finish grade.
Furthermore, the same contractor performed the work on all three
installations, and to date, he has always displayed, to me, a high
degree of workmanship.
Regarding the second point, if, in my opinion, a line is closer
than 75 feet to a well, then that line is tested by the contractor.
(My opinion is based on information provided to me by the contrac-
tor and/or homeowner, if not detailed on the As-Built Sewer Con-
struction Plans. ) Also, in quoting a memo to Frank Messenger from
DEP, PVC pipe manufactured to Specifications D-3033 or D-3034 is
acceptable, when within 75 feet of a well. For your information,
every contractor working in Town uses this pipe regardless of the
proximity to the well.
It appears that if work was being performed at 8 :30 p.m. , that a
"bootleg" hookup was being installed. I do not think it is my
responsibility to police the Town after normal working hours,
unless a blatant attempt at making a bootleg connection is
brought to my attention. If you wish me to investigate the matter
further, please provide me with the complaintant' s name and I will
personally contact him.
Gregory TG6
Public Works Inspector