HomeMy WebLinkAboutArnold Way 1 M E M 0 R A N D U M July 13, 1990 TO: Jean E. Zurbrigen, Town Manager SUBJECT: ARNOLD WAY - CUL-DE-SAC TO FOSTER STREET REPAIR ALTERNATIVES I have reviewed the subject driveway condition with Mr. Melvin Stead, Jr. , Superintendent of Streets . The existing pavement surface is severely stressed with numerous cracks, rutting and areas which require frequent patching. Several catch basins have been rebuilt in the few years due to deterioration. The rutting and other pavement distress suggests an insufficient pavement structure for the present traffic conditions (i.e. , buses) . The pavement is over 20 years old and beyond its expected life. Several alternative repair methods were considered: 1 . Cut and patching at existing problem areas . 2 . Shim coat (thin overlay) of existing problem areas. 3 . Reconstruction/renovation of existing driveway in total. Option #3 is the only via long term solution. Total pavement replacement along with some additional drainage work would be required. The option will be developed further for consideration in a future capital project list since the associated costs will be significant. Option #1 and #2 are bandaids at best. Option #1 would cost approximately $15,000, would be labor intensive and would prove some relief through the next year from the continued pothole problem. Option #2 would cost approximately $5,000, would be less labor intensive and would provide similar relief as that of Option #1 . Because of the present condition, we will expect to make the temporary repairs as described under Option #2. It should be noted that the area under question is not an officially recognized street--it actually is the driveway to Timothy Edwards . The Town has, however, done periodic maintenance to this driveway for many years . At your convenience;-__f~--stand-.ready to review this matter with you. Michael J Gantick, P.E. Director of Public Works MJG:bmr cc: M. C. Stead, Jr. , Supt. of Streets MEMORANDUM July 9, 1990 TO: Michael Gantick, Director of Public Works FROM: Mel Stead, Superintendent of Streets RE: Arnold Way - Cul-de-sac to Foster Street I investigated the idea of doing a cut and patch repair to Arnold Way to hold it together for an additional year. The attached sketch and costs indicate that the method would be too costly because the permanent repair would likely still require pulverization of the existing pavement and mixing it into the base. Also there is a limited space to dispose of the spoil . Overlaying the base with 2 1/2" of Class I and 1 - 1 1/2" of Class II Surface will give a 18 - 20 year life. There is also catch basin reconstruction work to be done prior to permanent resurfacing. It now appears that even though the longevity of shim coats is almost nil , a shim approach will provide an adequate surface to hold the road together until a set of contract documents can be prepared and bid for a pulverization project next year. One hundred tons of material should be enough to do this job at $39.00 per ton. We have Roncari coming to shim the streets planned for Chip Seal , I could have this added to that schedule during the week starting July 30. MCS/ds Attachment r Orc fb Q;p 30 V/0, 3 ooc) �o K I /o x L .5-6K 3v I So v 6K3J i2- oo fox L '� 36v 3 o I So p /dX3a = 3oc� 24 .3oxclo I�oJ a Q- 3�' l� ' -- .3o q yy J 13y 70 Y^Q�^o 0-ft- 3,o o o 7b 7- ow Z-C-