HomeMy WebLinkAboutdrain layer permit 138 Rye Street 1000021 TOWN OF SOUTH WINDSOR, CT
PERMIT NUMBER
a�, naanvvavvvn„�anv„vv„vvvvvvvvavvvvv DRAIN LAY
ER PERMIT
"\\\'
'k'Q�\ \�Agan A\\\\\
DATE: 05/11/10 au�v y\ �a
Vail aa��� �nw „�a��p �u���y� ll
�u��w��ay... `"` �)
n0pa \ „a,p \\\ a\n\\\ann
GIS ID: 78600138 �0'� „�) "���� vv �uv� FEE: 60.00
av� AAA ��P� �\ @n ��
MUNIS APPLICATION# 201000550 �� a�� VV °���wt
V� vv�"o� „�„�\jv���w��� w� A\ v vv\.v EXPIRATION DATE: 06/10/10
\ pan wv� � ��� �\�
� as , �h. gAV\vwangpaNnvavp��\\ y,v Y�VA VA\awvn n vn��� �e�\� �w� , Av
APPLICAN ,vv� ����\��v� \V A� � v LOCATION
,m, ;o n\\\\\\ , „\\\\\\\\�\ �� \\
NAME: FOLSOM CONSTRU a ° \ �v v�v��v\ y Av.
ADDRESS: 138 RYE STREET � �\ \ \� \\ \\\ \)\^ N` u` 1 RY STREET
��
v �� vv PROPERTY MANAGEMENT LLC
SOUTH WINDSOR,(�I 0 4 \ ` \\\a
` o nn � A, T
INDSOR CT 06074
PHONE 860-528
� a��anvamn\v
WORK DESCRIPTION: .INSTALL ,
FOLSOM NSA
�� a AQq�a�wv��\�w�gvA�a\V ��v� v �� a�up�"�a a vva����V THE DRAIN LAYER ASSIGNED TO THIS P�
� �vv� �� ST�By STATE AND HEREBY AGREES TO ALL
THE TERMS AND CONDITIONS SET FORTHCH �\ \ \ \ \
ITI m� WORK SHALL BE IN ACCORDANCE WITH
THE TOWN OF SOUTH WINDSOR STANDARD �w\� � `a" ATTACHED CONDITIONS.
4o�
vv\y\vqq\yavv, �\
\�ggvvnua�vvnv '�avvv�aYav an 0n„vveanaaovnu,,,,,,a,',a
0
ISSUED BY DATE INSPECTED INSPECTED BY
5/11/2010 3:08 PM
TOWN OF SOUTH WINDSOR INSPECTION REPORT
PERMIT NO.: D CONTRACTOR:—
LOCATION:—
TYPE OF WORK:
DATE INSP NEEDED: DATE INSP:-
INSPECTED BY:
WORK IN
PROGRESS: Goork, v, n✓L �S
AS-BUILT:
INPUT: DATE:
W/2007 Town of South Windsor INPSECTION REPORT 07
APPLICATION FOR DRAIN LAYER PERMIT
TOWN OF SOUTH WINDSOR
PUBLIC WORKS DEPARTMENT
TOWN HALL
1540 SULLIVAN AVENUE
SOUTH WINDSOR, CT
FEE $60.00
Location of proposed work: 3 e ST Lot #
Street No. Street Name
06v6�.2t . Premises owned by: o so roae,7w
Name of Firm:- � Irth4 �`� !ram�h Phone: 5�� -P i
Address of Firm: lv?d� w, c.�, f �✓
TYPE OF WORK: /
Lay House Drain ✓ ; Repair House Drain_
Lay Main f/. ; Lay Lateral for Commerdal/Industrial
Building of acres
Connection will be made with
Existing Water Supply: Public Water Well
Proposed Start Date S /v Estimated time for completion t_1_&_ LJ
ALL WORK TO BE IN ACCORDANCE WITH TOWN OF SOUTH WINDSOR STANDARDS,
ALL OSHA REQUIREMENTS AND CONDITIONS ATTACHED TO THE PERMIT
Permit is to be issued to PO the holder of Drain
Layer's License No. Only holders of P-1, P-7 or W-9 licenses
will be issued a permit PERMIT WILL EXPIRE THIRTY(30)DAYS AFTER
DATE OF ISSUANCE. The undersigned Drain Layer hereby agrees to all the terms
and conditions set forth In the permit and attached thereto. Applicant has received
Town Street Excavation Permit No. and/or ConnDOT.Permit No.
CBYD No. 0/ D
Signed: Print Name:_4 r c 4,4
Licensed D in yer
Date:
Standard F0nW\Pem1tsWPUCA'n0N FOR DRAIN LAYERS PERMrr doc
SOWN Sf4
O
w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
f�OsoR•c° TELEPHONE (8$0) 644 2511
April 14,2010
Lloyd Folsom
138 Rye Street
South Windsor,CT 06074
Re: Folsom Property Management, 138 Rye Street—WPCA Approval
Dear Mr.Folsom:
The South Windsor Water Pollution Control Authority, at its regular meeting of April 6, 2010, gave
approval to the application for connection to the Town's sewerage system for commercial building
located at 138 Rom: Street, South Windsor, CT; as more specifically shown on plans entitled "Folsom
Property Management, LLC., 138 Rye Street, South Windsor, Connecticut; Prepared by Zuvic
Associates, Inc., Rocky Hill, CT; File No. 1463, Sheet 1, Dated March 24,.2010".This motion is subject
to the following conditions:
1. The slope of the main sewer line in George Street shall be 0.5%; and the slope of the building
sewer dull be 2%;
2. A draft of a private easement between the property owners for the installation and maintenance of
the sewer must be obtained,reviewed,and approved by the Town Attorney;
3. Technical approval of the Town of South Windsor Engineering Department;
4. Payment of a connection charge in the amount of$3,449.00 at time of connection for one (1)
acre; and
5. Final Authority approval and acceptance of the sanitary sewerage connection will be conditional
upon the sewer line having been installed and inspected by the Town staff, and upon the written
verification of the Town staff that said sanitary sewer line was installed in substantial
conformance with the design plans approved by the Authority, and meeting all Town regulations
and appropriate technical specifications relating to sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
Joseph J. Carino, Chairman
Water Pollution Control Authority
JC:ead
cc: Michael J. Gantick,Director of Public Works
%/Jeff Doolittle,Town Engineer
Marcia Banach,Director of Planning
Chris Dougan, Chief Building Inspector
CALL BEFORE YOU DIG RECORD FORM
Folsom Construction
138 Rye Street
South Windsor, CT 06074 1-800-922-4455
Contractor Number 3563
Job Location: Folsom
Town South Windsor
Address 138 Rye
Nearest Intersecting George St
Type of Worts Install Sewer
Location Details From Rye to our building
Start Date 5/14/2010
CRUD No. 20102000950
Notes
Utilities Notified
SEWER LINE EASEMENT
PERMANENT AND TEMPORARY CONSTRUCTION EASEMENT
KNOW ALL MEN BY THESE PRESENTS, that SHEPARD-POLA, INC., a
corporation with offices on Sullivan Avenue, South Windsor, Connecticut (hereinafter.
"GRANTOR"), for the consideration of ONE DOLLAR ($1.00) AND OTHER VALUABLE
CONSIDERATION, received to its full satisfaction of FOLSOM PROPERTY
MANAGEMENT, LLC, a limited liability company with offices at 138 Rye Street, South
Windsor, Connecticut (hereinafter "GRANTEE"), do give, grant, bargain, sell and confirm unto
the said GRANTEE, its successors and assigns the right, privilege and authority to construct and
to perpetually maintain a sewer line, including the right to lay, install, maintain, inspect, operate,
construct, use alter, repair, replace and remove a sewer line thereto, in, through, upon and over
certain piece(s)of land as described in Exhibit A.
Together with the right, privilege, and authority to trespass, for the purpose of
constructing, maintaining and repairing of said sewers, an additional ten(10)feet outside of, and
on either side of, the permanent Easement described in Exhibit A, which right to trespass shall
terminate upon formal acceptance of the sanitary sewers by the GRANTEE; and be reasserted
only on the occasion and for the duration of subsequent maintenance or repair by GRANTEE.
Within said parcel described in Exhibit A, the GRANTEE, its successors and assigns,
shall have the right to cut trees and bushes as may be convenient or necessary and to remove
structures thereon, and to pass and repass with men and equipment, to operate equipment and
install materials incidental to the construction, maintenance or repair of said sewer line, and to
excavate and fill.
The GRANTOR herein, for itself, its successors and assigns, shall not erect or allow to be
erected any immobile structures on said easements or rights-of-way which may endanger or
interfere with the said sewer line.
The GRANTOR herein for itself, its successors and assigns, reserves the right to itself, its
successors and assigns, to continue to use the land within which the aforesaid easements or
rights-of-way have been granted for any uses and purposes which shall not in any way interfere
with the use thereof by the GRANTEE, its successors and assigns, in fulfilling the purpose for
which this/these easements or rights-of-way are granted.
As partial consideration for this easement, the GRANTEE herein, for itself, its successors
and assigns, agrees to restore and maintain said premises in their original condition as nearly as
possible commensurate with the above use upon the completion of any maintenance, operation,
construction, replacement or repair work in said easement or right-of-way areas, and
GRANTEE agrees to hold the GRANTOR, its successors and assigns, harmless from and
against any and all damage to property or person caused by the construction and/or maintenance
and repair of said sewer line.
IN WITNESS WHEREOF, the GRANTOR has hereunto set its hand and seal this
day of May, 2010.
Signed, Sealed and Delivered GRANTOR:
in the p •senr- �& µ SHEPARD POLA, INC.
By. C`
Charles.S''kepard ,
� ,� Its `
A-S.
STATE OF CONNECTICUT)
) SS: South Windsor, May�, 2010
COUNTY OF HARTFORD )
CHARLES B. SHEPARD, personally appeared who signed the foregoing instrument and
acknowledged his signature to be his free act and deed and the duly authorized fact and deed of
the corporation.
IN WITNESS WHEREOF, I hereunto set my hand.
Notary Public
My Commission Expires
EXHIBIT A
Description of Sanitary Sewer Easement
in favor of the Town of South Windsor and 138 Rye Street
Being that certain easement of land on the right-of-way of George Road containing
3,501.66 square feet (0.08 acres); in the Town of South Windsor, County of Hartford, and State
of Connecticut, as shown upon a map or plan entitled: "PROPOSED SANITARY SEWER
CONNECTION FOLSOM PROPERTY MANAGEMENT LLC 138 RYE STREET SOUTH
WINDSOR, CONNECTICUT PREPARED FOR: FOLSOM PROPERTY MANAGEMENT LLC 138
RYE ST. SOUTH WINDSOR PREPARED BY: ZUVIC ASSOCIATES INC. 1090 ELM STREET,
SUITE 102, ROCKY HILL, CT OFFICE (860) 436-4901 FAX (860) 436-4953 SCALE 1" = 20'
DATE APRIL 12, 2010 FILE 1463 SHEET I", being more particularly bounded and described as
follows:
Commencing at a point on the southerly right-of-way line of Rye Street, and 11.30 feet
from the northwesterly property corner of now or formerly Jean T. Hill.
Thence south 15' 58' 22" west through the right-of-way of George Road 147.99 feet to a
point.
Thence south 74° 08' 58" east through the right-of-way of George Road, 12.97 feet to a
point on the northwest corner of now or formerly Folsom Property Management LLC.
Thence south 15' 50' 42" west along the right-of-way of George Road, and now or
formerly Folsom Property Management LLC, 15 feet to a point.
Thence north 74' 08' 58" west through the right-of-way of George Road, 33.14 feet to a
point.
Thence north 15' 58' 22" east through the right-of-way of George Road, 162.99 feet to a
point on the southerly right-of-way line of Rye Street.
Thence south 74' 09' 18" east along the right-of-way of Rye Street, 20 feet to a point and
place of beginning.
TOWN OF SOUTH ANDSOR
SANITARY - SEWER LATER-A'L--- '..FIELDI- .L,OCATION
DATE OF CONSTRUCTION: l
BUILDING ADDRESS 3�
STREETy '
SUBDIVISION:
NORTH ARROW
y
lion 9
s a 1
Mz
1
471
Ls �2 / -ro
CONTRACTOR (PRINT) NAME OF CONTRACTO S SUPERVISOR (PRINT)
13
STREW[ ADDRESS - SIGNA RE
��, �� � SY✓ DATE
TOWN STATE ZIP INSPECTED BY TOWN
GI Z DATE
TELEPHONE NUMBER
WHITE - TOWN PINK - CONTRACTOR YELLOW - CONSULTING .ENGINEER / DEVELOPER,