Loading...
HomeMy WebLinkAboutdrain layer permit 00 Sullivan Avenue 1. TOWN OF SOUTH WI N DSOR o DEPARTMENT OF PUBLIC WORKS II1� BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT v. 4710 19 Pursuant to written application, permission is her b grant o the cen ed Dra' Layer 4 named herein to perform the work indicated low a v \ a at premises owned by whose address is and to Lay House Drain, Repair House Drain, Lay Main, Other , for occupancy or use, with Family Units, with acres. Type of Sewage to be connected under this permit: SANITARY SEWAGE ( ), INDUSTRIAL WASTES ( ), OR ( ) Connection will be made with Show sketch of proposed work or furn' t ooft" p3 ""Qf rate drawin s. t 40 SPECIAL CONDITIONS Desired Starting Date , j` r Estimated Time for Completion Permit to be issued to -,0v i rc� `>Tl`J G T'J u', 60 . the holder of Drain Layer's License No Permit will a ire/th" ty (30) days after date of issuance. The undersigne Drain Layer hereby agreesIt 111 he terms and conditions set forth in the permit and the reverse side there A ici�i has received -;Town Permit No. and/or CHD Permit No. Signed ` i� :� 'sayer j The above named Drain Layer has a valid license issued by the Stt t-e"of/Connecticut and has filed a satisfactory bond and insurance policy in the name of Ke Towif of South Windsor: 36 En ineering Depa ent 15ate Connection Charge Paid 12' S Permit Fee: Paid $ /�� A =--'J Check Numbigr- z- ' f Issued by Tax Office INSPECTION Q `� Date work started 1 Date completed Sufficient notification receive -. _ Yes No Special Conditions APPROVED: Inspe for Date