HomeMy WebLinkAboutdrain layer permit 9 Fox Meadow Lane t?I I
Z nlv/v
To help locate your^ sewer connection on the main line, please shove
wh��re you would like the connection by drawing a line From the house or ,
the septic tank to the main line in the street. Also, install stake in yard
to indicate line as shown on sketch. IF.you have any doubt please -contact
the Town Engineering Department,
Please draw important in Formation such as driveways, large trees
and other obstructions.
PLEASE MAIL THIS FORM IMMEDIATELY TO:
JAMES S. MINGES & ASSOC. , INC.
The Exchange
Farmington Avenue
Farmington, Connecticut 06002
;mot If 4
A.
r n ,