Loading...
HomeMy WebLinkAboutStreet Cut Permit 151 Sand Hill Road 900162 TOWN OF SOUTH WINDSOR, CT PERMIT NUMBER STREET CUT PERMIT &1 REM DATE: 12/04/09 _� = ` G GIS ID:79800151 �-goy , �� MUNIS APPLICATION# 200901478 9� �� � FEE: .00 , IRATION DATE: 12/04/10 APPLICANT ? LOCATION NAME: EVERGREEN CONSTyUg7lo1 ADDRESS: 39 SULLIVAN ST SAl HILL ROAD ' � INDSOR TOWN OF 56 SPRINGFIELD,MA 0 � IL RD - PHONE J- �STVINDSOR,CT 06074 1 OF WORK DESCRIPTION: REM(1UD ��� &-*ALK AND REPLACE WITH SEW r- IR TE T TS _ APPLICANT AGREES TO FURNISH THE T� F KITH= " Q Mr-W-ND REQUIRED AND TO REIMBURSE THE TOWN OF SOUTH WINDSOR FOR AN� CU `AINTENANCE OR REPAIR WORK IN CONNECTION WITH THIS PERMIT AND THE Ai?�PO` 1R FOR PERMITS AS OUTLINED IN THE TOWN OF ICI L ABIDE BY THE RULES AND REGULATIONS STJ1?SIZ' STI � U 1PIIIT MANUAL. 1p- / - ISSUED BY DATE INS CTED INSPECTED BY 12/4/20092:38PM *** PERMIT TO BE KEPT ON JOB SITE AT ALL TIMES*** -------------------- Mg - �.5 F- i t �j�� ' , l _ y K His-{ Al y y yy TOWN OF SOUTH WINDSOR INSPECTION REPORT PERMIT NO.: q 00 (O a-- CONTRACTOR: LOCATION:__ 15 <15a.Vn cQ l TYPE OF WORK: (�V►�y-P qi-/lplar�-II�Q��,� Slri�P DATE INSP NEEDED: DATE INSP: INSPECTED BY: . P�1 WORK IN PROGRESS: DO kLk N/A SEPTIC TANK PUMPED, SMASHED, FILLED WITNESSED ❑ YES ❑ NO AS-BUILT: INPUT: GVI� DATE: /0 W/2007 Town of South Windsor INPSECTION REPORT 07 12/02/2009 WED 14:00 FAX 210 349 2464 ERCC OFFICE 1j002/006 APPLICATION FOR STREET EXCAVATION PERMIT Appl•No. TOWN OF SOUTH WINDSOR Permit No. PUBLIC WORKS DEPARTMENT TOWN HALL 1540 SULLIVAN AVENUE SOUTH WINDSOR,CT 06074 FEE ,$25.00 / Name of Firm �2� Ns���u�l!4� Phone No. IJ� 73 '(�/Q Address of Firm C /dGrt Zip Cod 011 Location of proposed work N� .Describe fully,nature of permit requested 6,0& / Starting date `7 Approx.ti a for completion Call Before You Dig No. /V PLEASE NOTE: THE DEPOSIT FOR THE PERMANENT PAVEMENT PATCH AND CURB REPLACEMENT IS A PRELIMINARY ESTIMATE. THE APPLICANT IS RESPONSIBLE FOR THE FULL FINAL COST OF THE PERMANENT PATCH AND CURB REPLACEMENT,INCLUDING ANY INCREASES IN PATCH AREA,CURB LENGTH,TRAFFIC CONTROL AND THE TOWN'S CONTRACT COSTS. THE PERMANENT PATCH IS TYPICALLY COMPLETED WITHIN A YEAR OF THE TEMPORARY PATCH BUT IT COULD BE LATER THAN A YEAR. Show sketch of proposed work or furnish two copies of separate dRra�wi�n This section to be filled out by Qg Indicate North Town of South Windsor No.cuts 0 . Est.Patch Size(s) sf Est.Pvt.Thickness in. Est.Patch Unit Price$ /sf Est Patch Cost$ Est Curb Replacement ft Est.Curb Unit Price Est.Curb Cost$ Est.Traffic Unit Cost$ /hr Est.Traffic Control$ AAP Amt.of Deposit$ fGwfti Pro,Ject Total Due$ 0 _ { }Cash ( }Check# Applicant is responsible for contacting Paid By the Police pea and C.B.Y.D. I AGREE TO FURNISH TO THE TOWN OF SOUTH WINDSOR THE AMOUNT OF BOND REQUIRED AND TO REIMBURSE THE TOWN OF SOUTH WIND FOR XPENSES INCURRED BY THE TOWN FOR MAINTENANCE OR REPAIR WORK IN CONK ITH S PE IT T T I AM FAMILIAR WITH AND WILL ABIDE BY THE RULES AND REGULATIONS FOR PE ITS AS O IN TH TO WfNDSOR'S STREET CUT PERMIT MANcU�AL. Sig. t Date Title: Driver's License#• PERMIT SHALL BE KEPT ON JOBSITE AT ALL TIMES Street Excavation:Permit 08 tali �a10 t m 1.0 5 Detailed Scope of Work INNIQ Issued To: Evergreen Construction Corp. 71 Garland Street Chicopee,MA 01020 Tel:(413)737-6100 Fax:(413)737-6111 Re: Job Number: 009271.00 Job Title: South Windsor 2 Concrete Sidewalk Repair at Police Station Contract No: NE-09-EZIQC Purchase Order No: Facility: Police Station 151 Sand Hill Road South Windsor,CT 06074 CRCOG Member Information: Clay major Town of East Granby Detailed Scope of Work: Contractor shall remove and replace section of the concrete sidewalk in front of South Windsor Police Station Break-up and remove damaged concrete pavement within outlined boundary in front of the main entrance(approx. 380 SF) • Install new reinforced 4000 psi concrete to match color of existing pavement • Install expansion joints where new pavement meets existing • Install control joints where necessary • Provide trowel finish • Replace two damaged flags and curb in front of the handicap parking(approx.6'x 10')with reinforced 4000 psi concrete with trowel finish Remove from site all debris and removed concrete Provide pedestrian access to building at all times Please reference the Request for Proposal for additional information regarding this Detailed Scope of Work. July 22,2009 Page 1 of 1